2024 capital projects summary

Public source material preserved in the Field Guide. Consult the original for authoritative wording and current status.

Source text
DeptProjectNew Budget RequestCategoryAMP or Strat Plan Priority (Y/N)Capital ReservesDC'sFGTLoansFinance/ Approved Grants
WTP/Dist.
Water Tower2,320,000StructuresY348,000928,0001,044,000
Trunk Main for Water Tower - Phase 13,180,000Water MainsY477,0002,703,000
WTP Financial Plan17,000RegulatoryN17,000
Overland Backfeed system for construction projects100,000EquipmentN100,000
Water Meter Replacement60,000DistributionN60,000
Analyzer Replacement (AIT-185)11,260EquipmentN11,260
Filter GAC Top up30,000EquipmentN30,000
Equipment/Analyzer Replacement16,395EquipmentN16,395
SLP 162 (sludge pump) Refurbishment9,000EquipmentN9,000
Chlorine equipment replacement (scales, chlorinators)28,000EquipmentN28,000
SCADA Upgrade50,000EquipmentN50,000
Fence Gates - controller25,000EquipmentN25,000
EV Chargers15,000EquipmentN15,000
TOTAL WTP/DISTRIBUTION CAPITAL BUDGET:5,861,655361,655825,00003,631,0001,044,000
WPCP
Sanitary Sewer Lining - rail crossing322,000SanitaryN322,000
Pelletizer; Solid Handling Eng. Study163,950StudyY163,950
WPCP Financial Plan17,000RegulatoryN17,000
M105; Sewage Lift Pump #530,000EquipmentN30,000
Grit system #128,150EquipmentN28,150
Grit system #228,150EquipmentN28,150
Tank Collectors30,000EquipmentN30,000
Primary/Secondary Tank Gates465,368EquipmentN465,368
Blowers (upgarde 1 blower)350,000EquipmentN284,00066,000
EV Chargers15,000EquipmentN15,000
SCADA Upgrade50,000EquipmentN50,000
TOTAL WPCP CAPITAL BUDGET:1,499,6181,433,61800
TAX-SUPPORTED
POLICE
Annual Vehicle Replacement80,000VehiclesN80,000
NG 911 System25,000EquipmentN25,000
AIRPORT
FIRE
CAD Upgrade60,000EquipmentN60,000
MSA Gas Detector (Amonia)14,000EquipmentN14,000
Positive Pressure Electric Fans23,000EquipmentN23,000
PARKS
Accessible access-Lower Sidewalk to Vic Park45,000Misc.Y45,000
Lower Reach Redesign (incorpor parking lot from 2023)100,000StudyN100,000
Lee Avenue Parkette Sidewalk45,000Misc.N045,000
Lee Avenue Parkette Play structure80,000BuildingY080,000
Accessible Swing Set Lower Reach25,000EquipmentY25,000
Accessible Play Structures- Corbett (flooring, spinner)40,000BuildingY40,000
Walking Trail/Connection Upgrades - New Trailhead45,000ParksY45,000
Expand Urban Forest20,000ParksY20,000
Community Centre Playground Design20,000ParksY20,000
Bellamy Farms Playground and Trail- Design45,000PlaygroundsY45,000
Geese Deterrent (dog)30,000Misc.N30,000
Picnic Tables (Accessible and affixed)12,000ParksY12,000
Abbott and Lombard Welcome Parkette25,000ParksY25,000
Ballfield dragger10,000EquipmentN10,000
Trailhead and wayfinding design25,000StudyY25,000
Pedestrian Bridge Footing Repair (to island)20,000BridgeY20,000
Healing Circle20,000ParksN20,000
Swimming barricades11,000ParksY11,000
0
FACILITIES0
Feasibility Study- Youth Arena80,000StudyY80,000
Header- Youth Arena105,000ArenaN105,000
New tables and chairs - Halls15,000EquipmentN15,000
Baffles- Memorial Community Centre20,000BuildingsN20,000
Dehumidifier Motor Replacement -MCM10,000BuildingsN10,000
Boiler Replacement MCM45,000BuildingsN45,000
Town Hall Signage and Flag poles20,000BuildingsN20,000
Town Hall- Chamber Doors35,000BuildingsN35,000
Public Works Operations Centre Design Study75,000StudyN37,50037,500
Fire Hall Drywall/Ceiling Repair15,000BuildingsN15,000
DeptFire Hall Bay Floor Epoxy15,000BuildingsN15,000
Fire Hall Garage Door Repair/Replacement15,000BuildingsN15,000
Town Hall Window Coverings- all phases15,000BuildingsN15,000
Air Care Drive CO Sensors10,000BuildingsN10,000
Hillcrest Records -digitizing10,000AdminN10,000
HHM Roof Repair25,000BuildingsN25,000
HHM Washroom - Accessibility Upgrade50,000BuildingsY50,000
HHM Weeping Tile/drainage25,000BuildingsN25,000
HHM Boardwalk Replacement20,000BuildingsY20,000
Melt Pit Repairs40,000BuildingsN40,000
PUBLIC WORKS
Asphalt, Concrete, Milling and Paving750,000Y750,000
Snow Dump/Compost Site Approval60,000Y30,000
Traffic Controller Equipment100,000N100,000
Pre-emption50,000Y50,000
Trailer mounted Speed Radar Signs x 218,000N18,000
Intersection Data Collector9,500N9,500
Old Slys Fixed Bridge - Underwater Assessment20,000N20,000
George Street Phase 1 (Strathcona to William St)2,500,450N783,693581,000
Trailer for Public Works for Excavation materials and equipment15,000N15,000
Beckwith Street New Lock and Pedestrian Structure Rehabilitation650,000Y65,000
Public EV charger64,040N34,040
LIBRARY
Library Renovations (original budget 1.287M)175,000N148,75026,250
Front door replacement16,00016,000
EC DEV
Movie Trailer50,000N50,000
PLANNING
Official Plan45,000N45,000
TOTAL TAX-SUPPORTED CAPITAL BUDGET:5,987,9903,437,483188,750581,0000
Total13,349,2635,232,7561,013,750581,0003,631,000
Breakdown of Revenue Sources
Capital Reserves39%
FGT4%
DC Funding8%
Government Grants22%
Loans27%