| Sanitary Sewer Lining - rail crossing | 322,000 | Sanitary | N | 322,000 | | | |
| Pelletizer; Solid Handling Eng. Study | 163,950 | Study | Y | 163,950 | | | |
| WPCP Financial Plan | 17,000 | Regulatory | N | 17,000 | | | |
| M105; Sewage Lift Pump #5 | 30,000 | Equipment | N | 30,000 | | | |
| Grit system #1 | 28,150 | Equipment | N | 28,150 | | | |
| Grit system #2 | 28,150 | Equipment | N | 28,150 | | | |
| Tank Collectors | 30,000 | Equipment | N | 30,000 | | | |
| Primary/Secondary Tank Gates | 465,368 | Equipment | N | 465,368 | | | |
| Blowers (upgarde 1 blower) | 350,000 | Equipment | N | 284,000 | | | 66,000 |
| EV Chargers | 15,000 | Equipment | N | 15,000 | | | |
| SCADA Upgrade | 50,000 | Equipment | N | 50,000 | | | |
| | | | | | | | |
| TOTAL WPCP CAPITAL BUDGET: | | 1,499,618 | | | 1,433,618 | | 0 | 0 |
| | | | | | | | |
| TAX-SUPPORTED | | | | | | | | |
| POLICE | | | | | | | | |
| Annual Vehicle Replacement | 80,000 | Vehicles | N | 80,000 | | | |
| NG 911 System | 25,000 | Equipment | N | 25,000 | | | |
| | | | | | | | |
| AIRPORT | | | | | | | | |
| | | | | | | | |
| FIRE | | | | | | | | |
| CAD Upgrade | 60,000 | Equipment | N | 60,000 | | | |
| MSA Gas Detector (Amonia) | 14,000 | Equipment | N | 14,000 | | | |
| Positive Pressure Electric Fans | 23,000 | Equipment | N | 23,000 | | | |
| | | | | | | | |
| PARKS | | | | | | | | |
| Accessible access-Lower Sidewalk to Vic Park | 45,000 | Misc. | Y | 45,000 | | | |
| Lower Reach Redesign (incorpor parking lot from 2023) | 100,000 | Study | N | 100,000 | | | |
| Lee Avenue Parkette Sidewalk | 45,000 | Misc. | N | 0 | 45,000 | | |
| Lee Avenue Parkette Play structure | 80,000 | Building | Y | 0 | 80,000 | | |
| Accessible Swing Set Lower Reach | 25,000 | Equipment | Y | 25,000 | | | |
| Accessible Play Structures- Corbett (flooring, spinner) | 40,000 | Building | Y | 40,000 | | | |
| Walking Trail/Connection Upgrades - New Trailhead | 45,000 | Parks | Y | 45,000 | | | |
| Expand Urban Forest | 20,000 | Parks | Y | 20,000 | | | |
| Community Centre Playground Design | 20,000 | Parks | Y | 20,000 | | | |
| Bellamy Farms Playground and Trail- Design | 45,000 | Playgrounds | Y | 45,000 | | | |
| Geese Deterrent (dog) | 30,000 | Misc. | N | 30,000 | | | |
| Picnic Tables (Accessible and affixed) | 12,000 | Parks | Y | 12,000 | | | |
| Abbott and Lombard Welcome Parkette | 25,000 | Parks | Y | 25,000 | | | |
| Ballfield dragger | 10,000 | Equipment | N | 10,000 | | | |
| Trailhead and wayfinding design | 25,000 | Study | Y | 25,000 | | | |
| Pedestrian Bridge Footing Repair (to island) | 20,000 | Bridge | Y | 20,000 | | | |
| Healing Circle | 20,000 | Parks | N | 20,000 | | | |
| Swimming barricades | 11,000 | Parks | Y | 11,000 | | | |
| | | | | 0 | | | |
| FACILITIES | | | | | 0 | | | |
| Feasibility Study- Youth Arena | 80,000 | Study | Y | 80,000 | | | |
| Header- Youth Arena | 105,000 | Arena | N | 105,000 | | | |
| New tables and chairs - Halls | 15,000 | Equipment | N | 15,000 | | | |
| Baffles- Memorial Community Centre | 20,000 | Buildings | N | 20,000 | | | |
| Dehumidifier Motor Replacement -MCM | 10,000 | Buildings | N | 10,000 | | | |
| Boiler Replacement MCM | 45,000 | Buildings | N | 45,000 | | | |
| Town Hall Signage and Flag poles | 20,000 | Buildings | N | 20,000 | | | |
| Town Hall- Chamber Doors | 35,000 | Buildings | N | 35,000 | | | |
| Public Works Operations Centre Design Study | 75,000 | Study | N | 37,500 | 37,500 | | |
| Fire Hall Drywall/Ceiling Repair | 15,000 | Buildings | N | 15,000 | | | |
| Dept | Fire Hall Bay Floor Epoxy | 15,000 | Buildings | N | 15,000 | | | |
| Fire Hall Garage Door Repair/Replacement | 15,000 | Buildings | N | 15,000 | | | |
| Town Hall Window Coverings- all phases | 15,000 | Buildings | N | 15,000 | | | |
| Air Care Drive CO Sensors | 10,000 | Buildings | N | 10,000 | | | |
| Hillcrest Records -digitizing | 10,000 | Admin | N | 10,000 | | | |
| HHM Roof Repair | 25,000 | Buildings | N | 25,000 | | | |
| HHM Washroom - Accessibility Upgrade | 50,000 | Buildings | Y | 50,000 | | | |
| HHM Weeping Tile/drainage | 25,000 | Buildings | N | 25,000 | | | |
| HHM Boardwalk Replacement | 20,000 | Buildings | Y | 20,000 | | | |
| Melt Pit Repairs | 40,000 | Buildings | N | 40,000 | | | |
| | | | | | | | |
| PUBLIC WORKS | | | | | | | | |
| Asphalt, Concrete, Milling and Paving | 750,000 | | Y | 750,000 | | | |
| Snow Dump/Compost Site Approval | 60,000 | | Y | 30,000 | | | |
| Traffic Controller Equipment | 100,000 | | N | 100,000 | | | |
| Pre-emption | 50,000 | | Y | 50,000 | | | |
| Trailer mounted Speed Radar Signs x 2 | 18,000 | | N | 18,000 | | | |
| Intersection Data Collector | 9,500 | | N | 9,500 | | | |
| Old Slys Fixed Bridge - Underwater Assessment | 20,000 | | N | 20,000 | | | |
| George Street Phase 1 (Strathcona to William St) | 2,500,450 | | N | 783,693 | | 581,000 | |
| Trailer for Public Works for Excavation materials and equipment | 15,000 | | N | 15,000 | | | |
| Beckwith Street New Lock and Pedestrian Structure Rehabilitation | 650,000 | | Y | 65,000 | | | |
| Public EV charger | 64,040 | | N | 34,040 | | | |
| LIBRARY | | | | | | | | |
| Library Renovations (original budget 1.287M) | 175,000 | | N | 148,750 | 26,250 | | |
| Front door replacement | 16,000 | | | 16,000 | | | |
| | | | | | | | |
| EC DEV | | | | | | | | |
| Movie Trailer | 50,000 | | N | 50,000 | | | |
| PLANNING | | | | | | | | |
| Official Plan | 45,000 | | N | 45,000 | | | |
| | | | | | | | |
| TOTAL TAX-SUPPORTED CAPITAL BUDGET: | | 5,987,990 | | | 3,437,483 | 188,750 | 581,000 | 0 |
| Total | | 13,349,263 | | | 5,232,756 | 1,013,750 | 581,000 | 3,631,000 |