SMITHS FALLS RISE AT THE FALLS

TOWN OF SMITHS FALLS WATER POLLUTION CONTROL PLANT

MONTREAL DISTRICT OF SAN FRANCISCO

2023 PERFORMANCE REPORT Revision #1 Environmental Compliance Approval Number 5671-AE7HFT


April 30<sup>th</sup>, 2024

Ministry of the Environment Conservation & Parks Ottawa District Office, Eastern Region 2430 Don Reid Drive Ottawa, Ontario K1H 1E1

Attention Mrs. Shannon Hamilton-Browne

Dear Mrs. Hamilton-Browne,

Please find enclosed the Annual Performance Report and other supporting documents for the Smiths Falls Water Pollution Control Plant (WPCP), Works No.120000890 as per the Amended Environmental Compliance Approval Municipal and private Sewage Works Number 5671-AE7HFT January 11, 2017, prescribed by Condition 11 Subsection (4).

The Town of Smiths Falls is the owner and operator of the WPCP. The facility operated under the responsibility of Jason Barlow, Manager of Water & Wastewater ORO whose office is located at 43 Abbott Street North, Smiths Falls, and can be contacted at 613-283-4124 ext. 5501 or jbarlow@smithsfalls.ca. As of April 26<sup>th</sup>, 2024 the ORO for the facility is Tyler George, Chief Operator.

Regards,

Sarah E. Cooke

Water and Wastewater Compliance Coordinator

Tel: 613-283-4124 ext. 5502

Email: <u>scooke@smithsfalls.ca</u>

cc. Brenda Beaudoin, Water Inspector


Executive Summary

The enclosed Annual Performance Report is prepared in accordance with Amended Environmental Compliance Approval (ECA) number 5671-AE7HFT, Condition 11 Reporting Subsection (4) for the Town of Smiths Falls Water Pollution Control Plant (WPCP) for submission to the Ministry of Environment Conservation and Parks (MECP). The secondary purpose of this 2023 Performance Report is to keep the Owner (Council) informed regarding the general operation, maintenance and, facility compliance regarding solids and liquid handling and disposal as per the ECA. Each year it is a requirement that the owner prepares and submits an annual Performance Report for the previous calendar year and must contain the following information:

a) A summary and interpretation of all monitoring data and a comparison to the effluent limits in condition 7 in the Environmental Compliance Approvals (ECA), including an overview of the success and adequacy of the Works;

b) A description of any operating problems encountered and corrective actions taken;

c) A summary of all maintenance carried out on any major structure, equipment, apparatus, mechanism or thing forming part of the Works;

d) A summary of any effluent quality assurance or control measures undertaken in the reporting period;

e) A summary of the calibration and maintenance carried out on all effluent monitoring equipment;

f) A description of efforts made and results achieved in meeting effluent objectives of Condition 6.

g) A tabulation of quantity of sludge generated in the reporting period, an outline of anticipated quantities to be generated in the next reporting period and a summary of the locations to where the sludge was disposed;

h) A summary of any complaints received during the reporting period and any steps taken to address the complaints;

i) A summary of all by-pass, spill or abnormal discharge events;

j) A copy of all Notice of Modifications submitted to the Water Supervisor as a result of Schedule B, Section 1, with a status report on the implementation of each modification;

k) A report summarizing all modifications completed as a result of Schedule B, Section 1; and

l) Any other information the Water Supervisor requires from time to time.


In addition, this Annual Performance Report must be forwarded to the Ministry no later than March 31, 2024. The WPCP must comply with all the requirements, criteria contained in the ECA, along with all Acts, Regulations, and F-Series Procedures made concerning operation of facilities, licensing of facilities, licensing of operators and Legislation that pertains to the Sustaining of Water and Sewerage Facilities.


Table of Contents

Executive Summary.............................................................................................................. 3 1.0 Introduction............................................................................................................... 7 2.0 Facility and Process Overview........................................................................................ 7 2.1 Inlet Sewers............................................................................................................... 7 2.2 Head Works Building and Preliminary Treatment ............................................................ 7 2.3 Primary Treatment ..................................................................................................... 8 2.4 Biological and Secondary Treatment ............................................................................. 8 2.5 Tertiary Treatment ..................................................................................................... 8 2.6 Disinfection & Outfall .................................................................................................. 8 2.7 Solids Handling.......................................................................................................... 9 2.8 Combined Sewer Overflow Tank..................................................................................10 3.0 Environmental Compliance Approval & Licensing ...........................................................10 4.0 Monitoring Data ........................................................................................................11 4.1 Performance of Effluent Quality Assurance or Control Measures.......................................11 4.2 Meeting Final Effluent Limits & Objectives.....................................................................11 5.0 Performance of Secondary Treatment By-pass Events....................................................12 6.0 Operational Problems & Corrective Actions ...................................................................13 7.0 On Call.....................................................................................................................13 8.0 Performance of all Maintenance...................................................................................14 8.1 Centre St Pumping Station .........................................................................................14 9.0 Performance of Verification and or Maintenance on Effluent Monitoring Equipment.............14 10.0 Sludge Generation.....................................................................................................15 11.0 Summary Complaints.................................................................................................15 12.0 Ministry of Environment Conservation & Parks Communal Sewage Inspection Report.........15 13.0 Waste Received from Outside Smiths Falls....................................................................16 14.0 Municipal Utility Monitoring Program (MUMPs) Report ....................................................16 15.0 Operator Licenses......................................................................................................16 16.0 Notice of Modifications (Limited Operational Flexibility)..................................................16 17.0 Service Sustainability Review Performance Measures.....................................................16


APPENDICES

Appendix A – Environmental Compliance Approval (ECA) #5671-AE7HFT (page 1 to 32)

Appendix B – Monitoring Data and Comparison to Effluent Limits (page 1 to 5)

Appendix C – Secondary Treatment Bypass Data (page 1 of 2)

Appendix D – Maintenance Records (page 1 of 10)

Appendix E – Solids Handling (page 1 of 3)

Appendix F – MUMPs Reports (page 1 to 25)

Appendix G – Operator Licenses (page 1 of 2)

Appendix H – Notice of Modification Forms (1 of 25)

Revision #1

S Page 12 effluent objective limits section revised due to incorrect information provided.


1.0 Introduction

1.0 Introduction

This Annual Performance Report is for the period from January 1<sup>st</sup> to December 31<sup>st</sup> 2023 which is a legislative requirement under Condition 11 (4) of C of A number 5671-AE7HFT. This Annual Performance Report must be forwarded to the Ministry of Environment Conservation and Parks (MECP) no later than March 31<sup>st</sup>, 2024.

$$ 1^{\mathsf{st}} $$

2.0 Facility and Process Overview

2.0 Facility and Process Overview

The Smiths Falls Water Pollution Control Plant (WPCP) is responsible for providing wastewater collection and treatment from industrial, commercial, and residential users within the limits of the Town of Smiths Falls, as well as Atironto subdivision in Montague Township. The wastewater is collected in sanitary and combined sewer pipes that is conveyed by gravity and or pumped to the WPCP. A total of 2,736,344 cubic meters (m<sup>3</sup>) of wastewater was treated in 2023.

The WPCP is a Class IV nitrifying tertiary treatment activated sludge plant with a rated capacity of 14,700 cubic meters per day (m<sup>3</sup>/d). As such, the facility consists of a raw sewage lift station (head works building) including screening and grit removal/classification, primary treatment, secondary treatment including nitrification which removes nitrogen by a nitrification/denitrification process. The plant also has chemically assisted phosphorus removal, tertiary filtration and effluent disinfection by ultraviolet light irradiation (UV). Primary and thickened waste activated sludge is dewatered, dried and pelletized. The final product is sold for off-site reuse.

2.1 Inlet Sewers

2.1 Inlet Sewers

The inlet sewers consist of one 600 mm diameter gravity sewer from the river crossing downstream at Old Slys Locks and one 900 mm diameter gravity sewer from the Highway 43 trunk sewer to the inlet sewer described above. Both of these collectors combine into a 1,200 mm diameter gravity sewer which discharges into the wet well in head works.

2.2 Head Works Building and Preliminary Treatment

The head works building contains a 60-foot deep wet well where raw sewage is pumped (lifted) by three (3) sewage lift pumps up to the bar screens. There are two (2) additional sewage lift pumps onsite as backup pumps should one or more primary sewage lift pumps fail. Screening units consists of two (2) parallel bar screen channels which screen large suspended or floating solids and materials from the raw sewage to prevent plugging and damage to equipment.

Grit removal is accomplished by using teacups which use a vortex action that will cause the heavier particles of grit and sand to separate out of the wastewater which then flows to the primary tanks. The grit is then pumped to a bin for off-site disposal.

2.3 Primary Treatment

2.3 Primary Treatment

The wastewater flows by gravity from the head works building to the primary clarifiers which consists of two (2) parallel rectangular clarifiers or tanks. The clarifiers consist of a chain and flight system which moves solids that have settled to the bottom of the clarifiers. These solids are later removed by processing into pellets. Floatable materials are skimmed from the surface and later landfilled.

2.4 Biological and Secondary Treatment

2.4 Biological and Secondary Treatment

The Biological and Secondary treatment occurs when primary treated wastewater is discharged into two (2) aeration basins, activated sludge (return activated sludge RAS) is mixed with the wastewater. Micro-organisms in the sludge provide biological treatment by consuming the colloidal and dissolved solids. A coagulant is added to the wastewater prior to wastewater entering the secondary clarifiers. This coagulant is added to help in the removal of phosphorus.

2.5 Tertiary Treatment

2.5 Tertiary Treatment

Tertiary treatment is an advanced wastewater treatment process which further removes nutrients like phosphorus and a higher percentage of suspended solids by sand filtration from the effluent.

2.6 Disinfection & Outfall

2.6 Disinfection & Outfall

Disinfection of the final effluent is provided by two (2) in series banks of ultraviolet (UV) light irradiation. The use of UV lights is used to irradiate the pathogenic micro-organisms in the effluent prior to discharging to the outfall. The final effluent is discharged through a 1,050 mm diameter outfall sewer pipe to the receiving water body which is the Rideau River.


2.7 Solids Handling

2.7 Solids Handling

Sludge from the primary and secondary treatment processes are pumped into one of two (2) 75 m<sup>3</sup> underground sludge storage tanks, the two tanks equalize through a common connection. The sludge is conveyed from the storage tanks to a belt filter press. The press produces a sludge cake with a minimum solids’ concentration of 15 - 22%.

$$ 75\ m^{3} $$

The dewatered sludge is fed to a single train sludge dryer and pelletizer process to produce a granulated dried sludge at a solids’ concentration of 94%.

The sludge pellets are registered under The Canadian Food Inspection Agency’s (CFIA) program 13: organic derived fertilizer program and are sampled once a year by CFIA. This sampling is to confirm the pellets meet the requirements of the Fertilizer Act and guidelines.
The WPCP also does sampling of the pellets on every 11<sup>th</sup> bag processed.

On February 23<sup>rd</sup>, a CFIA inspector attended the WPCP to collect samples of pellets to confirm they meet the parameters. On March 7<sup>th</sup>, CFIA’s results detected Salmonella and this bag was issued a Notice of Detention which meant this bag of pellets could not be sold or moved until it was found free of salmonella. On March 21<sup>st</sup> the inspector re-sampled and those sample results were found to be compliant and free from salmonella. A Notice of Release From Detention was issued on March 29<sup>th</sup> allowing the pellet bag to be moved or sold.

$$ 23^{\mathsf{rd}}, $$

These pellets are sold to GFL Environmental Inc. and, as such the marketed fertilizer pellets are used for agricultural (excluding crops for human consumption) or horticulture. Monthly solids totals appear in <u><strong>Appendix E Solids Handling.</strong></u>

Production for 2023:

• 14,153 m<sup>3</sup> of sludge was processed

$$ 14,153\ m^3 $$

• 381 super sacks filled (approximately 631 kg/sack)

• 233,596 kg of pellets produced

• 2,223 pellet production hours

Production for 2022:

• 16,917 m<sup>3</sup> of sludge was processed

$$ 16,917\ m^3 $$

• 565 super sacks filled (approximately 631 kg/sack)


• 363,026 kg of pellets produced

• 2,538 pellet production hours

2.8 Combined Sewer Overflow Tank

2.8 Combined Sewer Overflow Tank

Excessive storm water/snow melt flows are handled by temporary storage in the Combined Sewer Overflow Tank (CSO). The capacity of the tank is approximately 4,000 m<sup>3</sup> or 4 million liters. As storm water/snowmelt flows subside, the captured wastewater is fed back into the main process flows for treatment. Flows exceeding the capacity of the CSO tanks will bypass secondary treatment (Aeration and Tertiary) via the bypass pipe and then blended with process flow which has received aeration, secondary clarification and filtration. This blended flow of bypass and process wastewater passes through UV treatment before discharge to the receiving water (Rideau River).

$$ 4,000\ m^{3} $$

3.0 Environmental Compliance Approval & Licensing

For the year 2023, the Smiths Falls WPCP operated under amended Environmental Compliance Approval (ECA) Number 5671-AE7HFT which was issued on January 11<sup>th</sup>, 2017. The facility has been designated as a Class IV facility under the Licensing of Sewage Works Operators Regulation, O. Reg. 129/04 made under the Ontario Water Resources Act.

The ECA establishes terms and conditions which the WPCP must operate under at all times.
These terms and conditions establish effluent objectives, effluent limits, operation and maintenance, monitoring and recording along with reporting requirements of the WPCP. Should these requirements not be met the facility is not complying with the ECA.

The ECA also establishes the Rated Capacity for the facility which is 14,700 m<sup>3</sup>/d. For 2023, the average daily flow was 7,591.1 m<sup>3</sup>. For the reporting period of 2023, the WPCP operated at an average of 51.64% of the rated capacity. Typically, the average flows are between 60% and 70%.

$$ 14,700\ m^3/d $$

$$ 7,591.1\ m^3 $$

The Licensing of Sewage Works Operators Regulation, O. Reg. 129/04 requires the owner to ensure that everyone would works in the facility holds a license applicable to the type of facility. This regulation also requires the designation of an overall responsible operator (ORO) for the facility and that the ORO holds a license applicable to and of the same class as or higher than the class of the facility or one level below for no longer than six months out of a year. Both of these requirements are being met.


A copy of Environmental Compliance Approval number 5671-AE7HFT which the facility operated under in 2023 can be found in <u><strong><em>Appendix A.</em></strong></u>

4.0 Monitoring Data

4.0 Monitoring Data

The ECA lists effluent limits for Carbonaceous Biochemical Oxygen Demand (CBOD5), Total Suspended Solids (TSS), Total Phosphorus (TP), Total Ammonia Nitrogen (NH3), pH and E. coli. The limits are used to determine monthly compliance with the ECA and to determine if the process is functioning as per the ECA requirements.

4.1 Performance of Effluent Quality Assurance or Control Measures

The WPCP maintains a weekly sampling schedule of Raw Influent and Final Effluent as per the requirements listed in the monitoring and recording Condition of the ECA. Analyses are performed in-house or sent to an accredited laboratory as part of a quality assurance program, and as such, the results are utilized to identify any process changes required. All such analysis is included as part of the monitoring data in this report. Plant performance data is stored both in-house as well as on an online repository known as WaterTrax®.

Monitoring data and a comparison to effluent limits can be found in <u><strong>Appendix B.</strong></u>

4.2 Meeting Final Effluent Limits & Objectives

During this reporting period the treatment train produced an effluent that overall met all limits as indicated in the ECA.

Compliance was achieved with the Final <u><em>“Effluent Limits”</em></u> during eleven (11) months out of the reporting period for monthly average concentrations and monthly average waste loadings for Carbonaceous Biochemical Oxygen Demand (CBOD5), Total Ammonia Nitrogen (NH3), pH and the monthly Geomean for E. coli.

Compliance was not met during the month of April for the below Final <u><em>“Effluent Limits”</em></u>

S Total Suspended Solids (TSS): 20.95 mg/L, Effluent Limit TSS: 15 mg/L

S TSS Loading: 288.33 kg/d, Effluent Limit TSS Loadings: 220.5 kg/d

S Total Phosphorus (TP): 0.39 mg/L, Effluent Limit TP: 0.30 mg/L


S TP Loading: 5.37 kg/d, Effluent Limit TP Loadings: 4.40 kg/d

This non-compliance was reported verbally to the Ministry on June 29<sup>th</sup> with written notification submitted on June 30<sup>th</sup> as per the ECA condition 11. This non-compliance was the result of two (2) secondary treatment bypass events. The first event (portal incident #230405-000012) started on April 5<sup>th</sup> and ended on April 9<sup>th</sup>, 2023. The second event (portal incident #230430-000012) started on April 30<sup>th</sup> and ended on May5<sup>th</sup>, 2023.

$$ 29^{th} $$

$$ 30^{th} $$

Compliance was also achieved with the Final <u><em>“Objective Limits”</em></u> during ten (10) months out of the reporting period for monthly average concentrations for Carbonaceous Biochemical Oxygen Demand (CBOD5), Total Ammonia Nitrogen (NH3), pH and the monthly Geomean for E. coli.

The final objective limit was not achieved for TSS during the month of January and TP during April due to a secondary treatment bypass events.

S Total Suspended Solids (TSS): 9.49 mg/L, Effluent Objective Limit TSS: 5 mg/L

S Total Phosphorus (TP): 0.39 mg/L, Effluent Objective Limit: 0.25 mg/L

ECA Objectives are non-enforceable effluent quality results which wastewater plants are obligated to use best efforts to achieve on an on-going basis.

A summary and interpretation of all monitoring data and a comparison to the effluent limits in Condition 7 in the Environmental Compliance Approvals (ECA), including an overview of the success and adequacy of the Works can be found in <u><strong>Appendix B.</strong></u>

5.0 Performance of Secondary Treatment By-pass Events

In 2023, there were a total of three (3) secondary treatment by-passes, which lasted for a total duration of 205.98 hours and a total volume of 115,348.4 m<sup>3</sup> treated.

All secondary treatment by-pass events are reported verbally to the Ministry’s Spills Action Centre (SAC) or use of the Ministry’s online Bypass reporting portal. Agencies are notified via email or fax includes SAC, and the Leeds Grenville and Lanark District Health Unit. Samples of the by-pass events are collected and sent to our accredited laboratory when possible. Every effort is made to have each by-pass event sampled in accordance with the ECA, this could include driving samples to the laboratory or couriering them.


The Ministry now as an online reporting portal that secondary treatment bypass events can be reported too. The Town has also migrated the bypass forms into MESH.

There can be no raw sewage by-passes to the environment at the WPCP. All wastewater entering the facility receives at a minimum preliminary treatment, grit removal and primary treatment along with UV irradiation and blending with the secondary and tertiary effluent wastewater stream before discharge to the Rideau River.

The bypass summary was submitted to the Ministry on the following dates February 10<sup>th</sup>, May 16<sup>th</sup>, August 14<sup>th,</sup> and November 10<sup>th</sup>.

$$ 10^{th}, $$

$$ 10^{th} $$

The below table is a summary of the secondary treatment bypasses from 2019 to 2023

YEARNumber of Secondary Treatment BypassesTotal Duration (Hr)Total Volume (m3)
20196121.927,114.0
20205105.942,639.7
202100.00.0
2022369.711,964.0
20233205.98115,348.43

Secondary treatment bypasses can be found in <u><strong>Appendix C.</strong></u>

$$ \underline{\mathbf{c}} $$

6.0 Operational Problems & Corrective Actions

The was only one operational problem during the reporting period which did not cause any treatment plant issue with the ECA. The plant experienced an increase in rag build up (nonflushable wipes) that did cause some operational issues with buildup on process equipment such as mixers, pelletizer cyclone and screens.

7.0 On Call

The operators are provided with their own Town issued mobile phone. These lines of communication allow the operator to connect to the SCADA (Supervisory Control and Data Acquisition) system and immediately take measures to monitor or correct abnormal operational issues. Should an alarm fail to be answered or acknowledged, it will go through the programmed WIN-911 list which the Manager is a part of and can take the required action if needed.

8.0 Performance of all Maintenance

8.0 Performance of all Maintenance

During the reporting period, reactive maintenance, preventative maintenance, and predictive maintenance was performed as required and, on a routine basis or, as recommended by the equipment manufacturer manuals.

An electronic work order management system (MESH) is also being used to track preventative and corrective maintenance activities.

Below are some of the major maintenance highlights:

S PLC upgrade project completed including pump stations & Old Mill CSO systems.

S Both Aeration tanks drained/cleaned and entire new diffuser heads installed.

S Bar screen replacement project started December 2023 ongoing.

S Installed new socks in pelletizer cyclone.

S Installed new muffin monster cutting components to eliminate rag issues.

S Actuator for Valve (209): Actuator replacement.

S South Primary Tank: replaced all cross-collector flights due to damage. Replaced parts as necessary and inspected all other parts on chains, drives etc.

A summary of 2023 Maintenance Records can be found in <u><strong>Appendix D.</strong></u>

8.1 Centre St Pumping Station

8.1 Centre St Pumping Station

Although the Centre St pumping station is listed in the WPCP ECA #5671-AE7HFT, the Ministry approved on August 17<sup>th</sup>, 2022 the first Consolidated Linear Infrastructure (CLI) ECA for the Town’s sewage collection system. As such all pumping stations are now included in this new ECA.

9.0 Performance of Verification and or Maintenance on Effluent Monitoring Equipment

There are two Parshall Flumes in service at the WPCP. One measures Secondary Clarifier (SC) flow, and the other measures Final Effluent (FE) flow. Verifications were performed on the Final Effluent, Secondary Effluent Flow meter and the Secondary Bypass Flow meter in


December 2023. There were also nine (9) flow meters that were verified in December 2023 as well.

10.0 Sludge Generation

10.0 Sludge Generation

Approximately, 14,153.4 m<sup>3</sup> of sludge was processed in 2023. Sludge generation is not anticipated to increase significantly during the next reporting period. The sludge generated is processed into pellets which are in turn sold to GFL Environmental Inc to facilitate sales for farmers to spread on their fields as fertilizer. These pellets are regulated by the Canadian Food Inspection Agency (CFIA) under the Fertilizer Act. Exact locations of the farmers’ disposal sites (fields) are decided by the farmer.

$$ 14,153.4\ m^{3} $$

Contingency

In the event that primary sludge must be hauled offsite, arrangements have been made with the Robert O. Picard Environmental Center (ROPEC) in Ottawa. Also, primary sludge and processed cake can be shipped to waste sites operated by GFL Environmental Inc. Only Ministry approved and licensed haulers are used to transport sludge or cake. Little to no change in sludge generation is anticipated over the next reporting period.

With the increase of rag build up (non-flushable wipes) that caused build up on process equipment including the pelletizer cyclone and screens, cake from the belt press was shipped via bins to GFL Environmental Inc sites for 20 days.

A summary of 2023 Sludge Solids Handling can be found in <u><strong>Appendix E.</strong></u>

11.0 Summary Complaints

11.0 Summary Complaints

There was one (1) complaint received during the reporting period in 2023 regarding the WPCP. A resident that lives close to the WPCP complaint of unpleasant sewage smells. The reason for the unpleasant odour was the result of primary tank maintenance to repair a broken cross collector as well as to perform an inspection and maintenance on this tank. Should a complaint be received immediate steps are taken to rectify the issue.

12.0 Ministry of Environment Conservation & Parks Communal Sewage Inspection Report

There was no Ministry inspection conducted during the inspection period.


13.0 Waste Received from Outside Smiths Falls

No septage was received at the Smiths Falls WPCP during the reporting period.

14.0 Municipal Utility Monitoring Program (MUMPs) Report

MUMPs compliance reports are completed and submitted electronically to the Ministry. This report contains the following information: monthly flows, secondary treatment by-pass flows (if an event occurred) and, Raw & Final effluent parameters. This report is to ensure the WPCP remains in compliance with the ECA. MUMPs reports from 2023 can be found in <u><strong>Appendix F.</strong></u>

15.0 Operator Licenses

15.0 Operator Licenses

Section 14 (1) of O. Reg. 129/04 requires that the owner of the facility ensures that every operator employed or performing operational duties in the facility holds a valid license. A list of operator licenses can be found in <u><strong>Appendix G.</strong></u>

16.0 Notice of Modifications (Limited Operational Flexibility)

There was one (1) notice of modifications (limited operational flexibility) completed for the reporting period. The LOF completed is to replace the two (2) existing bar screens and dewatering press along with associated upgrades to the screening disposal and hazardous gas detection system. This project began in December and is currently on-going. The Notice of Modification to Sewage Works and supporting information (minus the report appendices) can be found in <u><strong>Appendix H.</strong></u>

17.0 Service Sustainability Review Performance Measures

Operational Cost per Cubic Meter Wastewater Treated

2023-$0.632 (unaudited) 2022 - $0.569 2021 - $0.580 2020 - $0.476 2019 - $0.483

(2,736,344 m3) ($1,728,240*) (2,773,433 m3) ($1,576,907*) (2,882,833 m3) ($1,670,796*) (3,676,930 m3) ($1,751,398*) (3,768,236 m3) ($1,819,107*)

  • Operational Only - Not inclusive of Transfer to reserve, capital, loan or interest payments

WPCP Secondary Treatment Bypass Events

# Of BypassesDuration (hours)Total Volume (m3)
2023 -3205.98115,348.43
2022 -369.711,964.0
2021 -00.00.0
2020 -5105.942,639.7
2019 -6121.927,114.0

Sludge/Pellets Processed

Sludge (m3)Pellets (Tonnes)
2023 -14,153234
2022 -16,491358
2021 -16,964342
2020 -17,261358
2019 -15,496458

Chemical Costs (coagulant)

2023 - $136,864 (188,530 kg) 2022 - $78,127 (157,130 kg) 2021 - $68,674 2020 - $80,692 2019 - $102,826

Hydro Costs

2023 - $324,020 (2,192,350 kWh) 2022 - $298,731 (2,292,148 kWh) 2021 - $331,000 2020 - $379,009 2019 - $375,138

Natural Gas

2023 - $113,001 2022 - $103,043 2021 - $81,479 2020 - $90,232 2019 - $74,472

Complaints per 1000 persons served (8780 pop (2016))

2023 - 0.11 Complaints/1,000 (1 total complaints) 2022 – 0.11 Complaints/1,000 (1 total complaints) 2022 – 0 Complaints/1,000 (0 total complaints) 2021 – 0 Complaints/1,000 (0 total complaints) 2020 – 0 Complaints/1,000 (0 total complaints) 2019 – 0 Complaints/1,000 (0 total complaints)


APPENDIX A

Certificate of Approval Number 5671-AE7HFT Certificate of Approval Number 8-4041-93-006


Ontario

Ministry of the Environment and Climate Change Ministère de l’Environnement et de l’Action en matière de changement climatique

AMENDED ENVIRONMENTAL COMPLIANCE APPROVAL

NUMBER 5671-AE7HFT

Issue Date: January 11, 2017

The Corporation of the Separated Town of Smiths Falls

77 Beckwith St N

Post Office Box, No. 695

Smiths Falls, Ontario

K7A 4T6

Site Location: Smiths Falls Water Pollution Control Plant (WPCP) 180 Queen St Smiths Falls, County of Lanark

You have applied under section 20.2 of Part II.1 of the <u><em>Environmental Protection Act,</em></u> R.S.O. 1990, c. E. 19 (Environmental Protection Act) for approval of:

municipal sewage works for the transmission and treatment of sanitary sewage from the Separated Town of Smiths Falls and disposal of effluent to Rideau River via a Sewage Treatment Plant (Smiths Falls WPCP) having a Rated Capacity of 14,700 m /d, consisting of the following:<sup>3</sup>

Previous Works

Centre Street Sewage Pumping Station

one (1) 4.21 m x 1.5 m x 4.25 m SWD wetwell/drywell style sewage pumping station located at 57 Center Street, equipped with two (2) sewage pumps (one standby), each rated at 17.7 L/s at 9.86 m TDH and controlled by variable frequency drives;

flow meter and station bypass pumping chamber;

a 16 kW diesel generator set;

a 150 mm diameter forcemain along Centre Street, discharging to manhole #368 at Centre Street and Elmsley Street and therefrom to the main truck sewer discharging at the Smiths Falls WPCP;


Smiths Falls Water Pollution Control Plant

a conventional activated sludge process plant located at 180 Queen Street, having a Rated Capacity of 14,700 m /d, discharging effluent to Rideau River.<sup>3</sup>

Inlet Sewers

one (1) 900 mm and 1200 mm diameter gravity inlet sewer from the south side trunk sewer Rideau River underpass outlet to the raw sewage pumping station inlet chamber;

one (1) 900 mm diameter gravity sewer from the Highway 43 trunk sewer to the inlet sewer described above;

Raw Sewage Pumping Station

a raw sewage pumping station with an inlet chamber and two wet wells, equipped with three (3) (one standby) submersible pumps, each rated at 352 L/s at 15.3 m TDH, discharging into a channel leading to the Preliminary Treatment;

Wet Weather Flow Storage Tank

one (1) 4000 m tank to temporarily store wet weather flows that exceed the capacity of the<sup>3</sup> secondary treatment system;

two (2) tank discharge pumps (one standby) to return stored sewage back to the primary tank or aeration tank for treatment after the wet weather event, each pump rated at 44 L/s at 7.5 m TDH;

Preliminary Treatment

Screening

two (2) parallel screen channels, each with a Peak Flow Rate of 25,230 m /d and<sup>3</sup> equipped with an automatic self-cleaning screen with 25 mm (vertical) x 6 mm (horizontal) mesh, including a screw conveyor screenings de-watering press and screenings disposal bin;

Girt Removal

two (2) girt removal units, each with a Peak Flow Rate of 25,350 m /d with two (2) grit<sup>3</sup> pumps, each rated at 15.8 to 20.5 L/s at 11.4 to 15.5 m TDH including a grit de-watering unit and grit disposal bin;


Primary Sedimentation

two (2) 38.1 m x 10.06 m x 3.72 m SWD twin-pass primary clarifiers, each with a Peak Flow Rate of 25,230 m /d and equipped with sludge and scum removal mechanisms;<sup>3</sup>

two (2) primary sludge and scum pumps, each rated at 22.7 L/s at 34.75 m TDH;

Secondary Treatment

Biological Treatment

two (2) 39.6 m x 12.5 m x 4.6 m SWD complete mix aeration tanks, equipped with fine bubble aeration systems;

3 three (3) air blowers (two standby), rated at 64.3 m /min at 51.7 kPa;

Secondary Sedimentation

two (2) 46.2 m x 12.2 m x 3.6 m SWD twin-pass secondary clarifiers, equipped with sludge and scum mechanisms;

three (3) variable speed return activated sludge pumps (one standby), each rated at 37.8 to 86.5 L/s at 2.7 to 8.2 m TDH;

two (2) variable speed waste activated sludge pumps, each rated at 6.3 L/s at 7.5 m TDH;

Tertiary Treatment

two (2) 18.9 m x 5.0 m x 2.4 m single media gravity type tertiary filters, each with a Peak Flow Rate of 25,230 m /h, with automatic continuous backwash;<sup>3</sup>

Supplementary Treatment

Phosphorus Removal

two (2) 18.9 m<sup>3</sup> chemical storage tanks, equipped with four (4) metering pumps each rated at 19.5 to 215 L/h, with dosing points at the influent and the effluent channels of the secondary clarifier and in the flash mix tank;

one (1) flash mix tank being a 2.7 m long section of the flocculation tank inlet channel, equipped with a 2.2 kW mixer;

two (2) 6.45 m x 6.45 m x 5.1 m SWD flocculation tanks with overflow gates to the tertiary filter influent channel, each equipped with a 1.1 kW flocculator;

Disinfection

a 11 m x 1.75 m x 1.4 m deep UV disinfection system, equipped with an automatic liquid level controller on the outlet to the plant effluent channel, and a low pressure mercury vapour ultraviolet irradiation lamp system with 65% of the radiation output at the wave length of


253.7 nm and a nominal average intensity of radiation of 6150 µW/cm at 65% transmission,<sup>2</sup> consisting of three (3) in-series independently operated banks of removable lamp modules;

$$ 6150\ \mu W/cm^2 $$

Effluent Outfall

a 1,050 mm diameter outfall sewer extending approx. 145 m south from the end of the plant effluent channel to mid-stream Rideau River past the navigational channel (the river portion buried in the river bed), including a multi-port outfall structure on the outlet, and a valved emergency connection to the old outfall sewer;

Sludge Management

two (2) 75 m mixed sludge (primary and thickened waste activated) holding tanks, each<sup>3</sup> equipped with an mixer;

one (1) filter press sludge feed pump rated at a 2.7 L/s at 296 kPa, equipped with variable speed drive, together with a 3 hp motor sludge mercerator on the pump's suction line;

one (1) belt filter press rated at a sludge loading of 7.0 m /h at a solids concentration of 4%,<sup>3</sup> together with a polymer solution preparation and metering unit, an in-line mixer, and a 0.55 L/s capacity variable speed drive sludge cake transfer pump;

a sludge drying facility (the pelletizer) rated at a sludge loading rate of 1.71 m/h at a solids concentration of 25%, consisting of a twin shaft dryer feed mixer, a rotary drier, a cyclone type solids separator, a vibrating screen type sludge pellet classifier, two (2) final product cooling, and storage silos with a bagging facility;

Standby Power

one (1) 600 kW standby power diesel engine generator set with one (1) 900 litre capacity fuel tank located in the pelletizer building;

all other controls, electrical equipment, instrumentation, piping, pumps, valves and appurtenances essential for the proper operation of the aforementioned Sewage Works;

all in accordance with the submitted supporting documents listed in Schedule A.

For the purpose of this environmental compliance approval, the following definitions apply:

"Approval" means this entire document and any schedules attached to it;

"Annual Average Daily Flow" means the cumulative total sewage flow to the sewage works during a calendar year divided by the number of days during which sewage was flowing to the sewage works that year;

"BOD5" (also known as TBOD5) means five day biochemical oxygen demand measured in an unfiltered sample and includes carbonaceous and nitrogenous oxygen demand;

"Bypass" means diversion of sewage around one or more unit processes within the Sewage Treatment Plant with the diverted sewage flows being returned to the Sewage Treatment Plant treatment train upstream of the Final Effluent sampling location, and discharging to the environment through the Sewage Treatment Plant outfall;

"CBOD5" means five day carbonaceous (nitrification inhibited) biochemical oxygen demand measured in an unfiltered sample;

"Daily Concentration" means the concentration of a contaminant in the effluent discharged over any single day, as measured by a composite or grab sample, whichever is required;

"Director" means a person appointed by the Minister pursuant to section 5 of the EPA for the purposes of Part II.1 of the EPA;

"E. coli " refers to the thermally tolerant forms of Escherichia that can survive at 44.5 degrees Celsius;

"Emergency Situation" means a structural, mechanical or electrical failure that causes a temporary reduction in the capacity of the Sewage Treatment Plant or an unforeseen flow condition that may result in:

a. danger to the health or safety of any person; or,

b. injury or damage to any property, or serious risk of injury or damage to any property; or

c. treatment process biomass washout.

"EPA" means the <u><em>Environmental Protection Act,</em></u> R.S.O. 1990, c.E.19, as amended;

"Equivalent Equipment" means a substituted equipment or like-for-like equipment that meets the required quality and performance standards of a named equipment;

"Event" means an action or occurrence, at a given location within the Sewage Treatment Plant that causes a Bypass or Overflow. An Event ends when there is no recurrence of a Bypass or Overflow in the 12-hour period following the last Bypass or Overflow. Two Events are separated by at least 12 hours during which there has been no recurrence of a Bypass or Overflow. An Overflow and a Bypass are two separate reportable Events even when occurring concurrently;

"Final Effluent" means effluent discharged through the Final Effluent sampling location and via the Sewage Treatment Plant outfall to the environment;

"Geometric Mean Density" is the nth root of the product of multiplication of the results of n number of samples over the period specified;

"Limited Operational Flexibility” (LOF) means any modifications that the Owner is permitted to make to the Works under this Approval;

"Ministry" means the ministry of the government of Ontario responsible for the EPA and OWRA and includes all officials, employees or other persons acting on its behalf;

"Monthly Average Concentration" means the arithmetic mean of all Daily Concentrations of a contaminant in the effluent sampled or measured, or both, during a calendar month;

"Monthly Average Daily Flow" means the cumulative total sewage flow to the sewage works during a calendar month divided by the number of days during which sewage was flowing to the sewage works that month;

"Monthly Average Loading" means the value obtained by multiplying the Monthly Average Concentration of a contaminant by the Monthly Average Daily Flow over the same calendar month;

"Owner" means The Corporation of the Separated Town of Smiths Falls and its successors and assignees;

"OWRA" means the <u><em>Ontario Water Resources Act,</em></u> R.S.O. 1990, c. O.40, as amended;

"Peak Flow Rate" means the maximum rate of sewage flow for which the plant or process unit was designed;

"Overflow" means a discharge to the environment from the Works at a location other than the Sewage Treatment Plant effluent outfall or into the effluent outfall downstream of the Final Effluent sampling location;

"Previous Works" means those portions of the sewage works previously constructed and approved under an approval;

"Rated Capacity" means the Annual Average Daily Flow for which the Sewage Treatment Plant is approved to handle;

"Sewage Treatment Plant" means the entire sewage treatment and effluent discharge facility;

"Water Supervisor" means the Water Compliance Supervisor for the Safe Drinking Water Branch (SDWB) for the Kingston, Ottawa, and Cornwall office of the Ministry; and

"Works" means the sewage works described in the Owner's application, and this Approval, and includes Previous Works, and modifications made under Limited Operational Flexibility.

You are hereby notified that this environmental compliance approval is issued to you subject to the terms and conditions outlined below:

TERMS AND CONDITIONS

1. GENERAL PROVISIONS

(1) The Owner shall ensure that any person authorized to carry out work on or operate any aspect of the Works is notified of this Approval and the conditions herein and shall take all reasonable measures to ensure any such person complies with the same.

(2) Except as otherwise provided by these conditions, the Owner shall design, build, install, operate and maintain the Works in accordance with the description given in this Approval, and the application for approval of the Works.

(3) Where there is a conflict between a provision of any document in the schedule referred to in this Approval and the conditions of this Approval, the Conditions in this Approval shall take precedence, and where there is a conflict between the documents in the schedule, the document bearing the most recent date shall prevail.

(4) Where there is a conflict between the documents listed in the Schedule A, and the application, the application shall take precedence unless it is clear that the purpose of the document was to amend the application.

(5) The Conditions of this Approval are severable. If any Condition of this Approval, or the application of any requirement of this Approval to any circumstance, is held invalid or unenforceable, the application of such condition to other circumstances and the remainder of this Approval shall not be affected thereby.

2. CHANGE OF OWNER

(1) The Owner shall notify the Water Supervisor and the Director, in writing, of any of the following changes within thirty (30) days of the change occurring:

a. change of Owner;

b. change of address of the Owner;

c. change of partners where the Owner is or at any time becomes a partnership, and a copy of the most recent declaration filed under the <u><em>Business Names Act,</em></u> R.S.O. 1990, c.B17 shall be included in the notification to the Water Supervisor;

d. change of name of the corporation where the Owner is or at any time becomes a corporation, and a copy of the most current information filed under the <u><em>Corporations Information Act,</em></u> R.S.O. 1990, c. C39 shall be included in the notification to the Water Supervisor;

(2) In the event of any change in ownership of the Works, other than a change to a successor municipality, the Owner shall notify in writing the succeeding owner of the existence of this Approval, and a copy of such notice shall be forwarded to the Water Supervisor and the Director.

3. RECORD DRAWINGS

(1) A set of as-built drawings showing the Works "as constructed" shall be prepared or updated. These drawings shall be kept up to date through revisions undertaken from time to time and a copy shall be retained at the Works for the operational life of the Works.


4. BYPASSES

(1) Any Bypass is prohibited, except:

a. in an emergency situation when a structural, mechanical or electrical failure that causes a temporary reduction in the capacity of the Sewage Treatment Plant or in unexpected and/or unavoidable circumstance(s) that are likely to result in personal injury, loss of life, health hazard, basement flooding, severe property damage, equipment damage or treatment process upset;

b. where the Bypass is a direct and unavoidable result of a planned maintenance procedure or other circumstance(s), the Owner having notified the Water Supervisor at least fifteen (15) days prior to the occurrence of Bypass, including an assessment of the potential adverse effects on the environment and the anticipated duration of the Bypass and the mitigation measures, and the Water Supervisor has given written consent of the Bypass;

(2) For any Bypass Event, the Owner shall forthwith notify the Spills Action Centre (SAC), and the local Medical Officer of Health. This notice shall include, at a minimum, the following information for each Event:

a. the date(s), time(s) of the Bypass(es);

b. the treatment process(es) Bypassed and the status of the disinfection;

c. the reason(s) for the Bypass(es).

(3) After any Bypass Event, the Owner shall collect and record the following information:

a. the duration of the Bypass Event;

b. the measured or the estimated volume of Bypass(es) for each Event.

(4) The Owner shall use best efforts to collect a representative sample consisting of a minimum of two (2) grab samples of the Bypass and have it analysed for parameters outlined in Condition 7 using the protocol specified in Condition 9, one at the beginning of the Event and the second approximately near the end of the Event, to best reflect the effluent quality of such Bypass. For a specific situation when the facility is unmanned during the Event, a composite sample of the Final Effluent is accepted.

(5) The Owner shall submit a summary report of the Bypass Event(s) to the Water Supervisor on a quarterly basis, no later than each of the following dates for each calendar year: February 15, May 15, August 15, and November 15. The summary reports shall be in an electronic format, which shall contain, at a minimum, the types of information set out in Subsections (2), (3) and (4) for Bypass(es). The Water Supervisor may modify the reporting frequency at any time in writing.


5. OVERFLOWS

(1) Any Overflow is prohibited, except:

a. in an emergency situation when a structural, mechanical or electrical failure that causes a temporary reduction in the capacity of the Sewage Treatment Plant or in unexpected and/or unavoidable circumstance(s) that are likely to result in personal injury, loss of life, health hazard, basement flooding, severe property damage, equipment damage or treatment process upset;

b. where the Overflow is a direct and unavoidable result of a planned maintenance procedure or other circumstance(s), the Owner having notified the Water Supervisor at least fifteen (15) days prior to the occurrence of the Overflow, including an assessment of the potential adverse effects on the environment and the anticipated duration of the Overflow and any mitigation measures, and the Water Supervisor has given written consent of the Overflow.

(2) For any Overflow Event, the Owner shall forthwith notify the Spills Action Centre (SAC) and the local Medical Officer of Health. This notice shall include, at a minimum, the following information for each Event:

a. the date(s), time(s) of the Overflow(s);

b. the location(s) of the Overflow(s) and the receiver;

c. the reason(s) for the Overflow(s); and

a. the level of treatment the Overflow(s) has received and disinfection status of same.

(3) After any Overflow Event, the Owner shall collect and record the following information:

a. the duration of the Overflow Event;

b. the monitored or estimated volume of the Overflow(s); and

c. the impact of Overflow(s) on the receiver.

(4) For each Overflow Event, the Owner shall collect samples, representative of the Event, consisting of a minimum of two (2) grab samples of the Overflow, one at the beginning of the Event and one approximately near the end of the Event, and every 4 hours for the duration of the Event, and have them analyzed for effluent parameters outlined in Effluent Limits condition. For raw sewage and primary treatment system Overflow, BOD5 shall be monitored instead of CBOD5 and monitoring of E. coli is not required.

(5) The Owner shall submit a summary report of the Overflow Event(s) to the Water Supervisor on a quarterly basis, no later than each of the following dates for each calendar year: February 15, May 15, August 15, and November 15. The summary report shall be in an electronic format, which shall contain, at a minimum; the types of information set out in Subsections (2), (3) and (4) for Overflow(s). The Water Supervisor may modify the reporting frequency at any time in writing.

6. EFFLUENT OBJECTIVES

(1) The Owner shall use best efforts to design, construct and operate the Works with the objective that the concentrations of the materials named below as effluent parameters are not exceeded in the effluent from the Sewage Treatment Plant.

Table 1 - Effluent Objectives
Effluent ParameterConcentration Objective (milligrams per litre unless otherwise indicated)
CBOD510
Total Suspended Solids5
Total Phosphorus0.25
Total Ammonia Nitrogen2.0 (Jun 1 to Aug 31) 12.0 (Sept 1 to May 31)

(2) The Owner shall use best efforts to:

a. maintain the pH of the effluent from the Works within the range of 6.5 - 8.5, inclusive, at all times;

b. operate the works within the Rated Capacity of the Works;

c. ensure that the effluent from the Works is essentially free of floating and settleable solids and does not contain oil or any other substance in amounts sufficient to create a visible film or sheen or foam or discolouration on the receiving waters.

d. ensure that the effluent is continuously disinfected during the disinfection period so that the monthly Geometric Mean Density of E. coli does not exceed 150 organisms per 100 millilitres of effluent discharged from the Sewage Treatment Plant.


7. EFFLUENT LIMITS

(1) The Owner shall operate and maintain the Works such that the concentrations of the materials named below as effluent parameters are not exceeded in the effluent from the Sewage Treatment Plant.

Table 2 - Final Effluent Limits
Effluent ParameterAverage Concentration (milligrams per litre unless otherwise indicated)Average Waste Loading (kilograms per day unless otherwise indicated)
Column 1Column 2Column 3
CBOD515220.5
Total Suspended Solids15220.5
Total Phosphorus0.34.4
Total Ammonia Nitrogen2.6 (Jun 1 to Aug 31)14.0 (Sept 1 to May 31)38.0 (Jun 1 to Aug 31)206.0 (Sept 1 to May 31)

(2) For the purposes of determining compliance with and enforcing subsection (1):

a. The Monthly Average Concentration of a parameter named in Column 1 of subsection (1) shall not exceed the corresponding maximum concentration set out in Column 2 of subsection (1).

b. The Monthly Average Loading of a parameter named in Column 1 of subsection (1) shall not exceed the corresponding maximum waste loading set out in Column 3 of subsection (1).

(3) The Owner shall operate and maintain the Works such that the pH of the effluent from the Sewage Treatment Plant is maintained within the range of 6.0 - 9.5, inclusive, at all times.

(4) Notwithstanding subsection (1), the Owner shall operate and maintain the Works such that the effluent is continuously disinfected so that the monthly Geometric Mean Density of E. Coli does not exceed 200 organisms per 100 millilitres of effluent discharged from the Works.

8. OPERATION AND MAINTENANCE

(1) The Owner shall exercise due diligence in ensuring that, at all times, the Works and the related equipment and appurtenances used to achieve compliance with this Approval are properly operated and maintained. Proper operation and maintenance shall include effective performance, adequate funding, adequate operator staffing and training, including training in all procedures and other requirements of this Approval and the Act and regulations, adequate laboratory facilities, process controls and alarms and the use of process chemicals and other substances used in the Works.

(2) The Owner shall prepare an operations manual, that includes, but not necessarily limited to, the following information:


a. operating procedures for routine operation of the Works;

b. inspection programs, including frequency of inspection, for the Works and the methods or tests employed to detect when maintenance is necessary;

c. repair and maintenance programs, including the frequency of repair and maintenance for the Works;

d. procedures for the inspection and calibration of monitoring equipment;

e. a spill prevention control and countermeasures plan, consisting of contingency plans and procedures for dealing with equipment breakdowns, potential spills and any other abnormal situations, including notification of the Water Supervisor; and

f. procedures for receiving, responding and recording public complaints, including recording any followup actions taken.

(3) The Owner shall maintain the operations manual current and retain a copy at the location of the Works for the operational life of the Works.Upon request, the Owner shall make the manual available to Ministry staff.

(4) The Owner shall provide for the overall operation of the Works with an operator who holds a licence that is applicable to that type of facility and that is of the same class as or higher than the class of the facility in accordance with Ontario Regulation 129/04.

9. MONITORING AND RECORDING

The Owner shall, upon commencement of operation of the Works, carry out the following monitoring program:

(1) All samples and measurements taken for the purposes of this Approval are to be taken at a time and in a location characteristic of the quality and quantity of the effluent stream over the time period being monitored.

(2) For the purposes of this condition, the following definitions apply:

a. Weekly means once each week;


(3) Samples shall be collected at the following sampling points, at the frequency specified, by means of the specified sample type and analyzed for each parameter listed and all results recorded:

Table 3 - Influent Monitoring
ParametersSample TypeFrequency
BOD5CompositeWeekly
Total Suspended SolidsCompositeWeekly
Total PhosphorusCompositeWeekly
Total Kjeldahl NitrogenCompositeWeekly
Table 4 - Final Effluent Monitoring
ParametersSample TypeFrequency
CBOD5CompositeWeekly
Total Suspended SolidsCompositeWeekly
Total PhosphorusCompositeWeekly
Total Ammonia NitrogenCompositeWeekly
E. coliGrabWeekly
pHGrabWeekly
TemperatureGrabWeekly
Unionized AmmoniaCalculatedWeekly

(4) The methods and protocols for sampling, analysis and recording shall conform, in order of precedence, to the methods and protocols specified in the following:

a. the Ministry's Procedure F-10-1, “Procedures for Sampling and Analysis Requirements for Municipal and Private Sewage Treatment Works (Liquid Waste Streams Only), as amended from time to time by more recently published editions;

b. the Ministry's publication "Protocol for the Sampling and Analysis of Industrial/Municipal Wastewater" (January 1999), ISBN 0-7778-1880-9, as amended from time to time by more recently published editions;

c. the publication "Standard Methods for the Examination of Water and Wastewater" (21st edition), as amended from time to time by more recently published editions;

(5) The temperature and pH of the effluent from the Works shall be determined in the field at the time of sampling for Total Ammonia Nitrogen. The concentration of un-ionized ammonia shall be calculated using the total ammonia concentration, pH and temperature using the methodology stipulated in "Ontario's Provincial Water Quality Objectives" dated July 1994, as amended, for ammonia (un-ionized).

(6) The Owner shall install and maintain (a) continuous flow measuring device(s), to measure the flowrate of the influent to the Sewage Treatment Plant with an accuracy to within plus or minus 15 per cent (+/- 15%) of the actual flowrate for the entire design range of the flow measuring device, and record the flowrate at a daily frequency.

(7) The Owner shall retain for a minimum of five (5) years from the date of their creation, all records and information related to or resulting from the monitoring activities required by this Approval.

10. LIMITED OPERATIONAL FLEXIBILITY(MODIFICATIONS TO THE WORKS)

(1) The Owner may make modifications to the Works in accordance with the Terms and Conditions of this Approval and subject to the Ministry’s “Limited Operational Flexibility Criteria for Modifications to Sewage Works ”, included under Schedule B of this Approval, as amended.

(2) Sewage works proposed under Limited Operational Flexibility shall adhere to the design guidelines contained within the Ministry’s publication “Design Guidelines for Sewage Works 2008”, as amended.

(3) The Owner shall ensure at all times, that the Works, related equipment and appurtenances which are installed or used to achieve compliance are operated in accordance with all Terms and Conditions of this Approval.

(4) For greater certainty, the following are not permitted as part of Limited Operational Flexibility:

a. Modifications to the Works that result in an increase of the approved Rated Capacity of the Works;

b. Modifications to the Works that may adversely affect the approved effluent quality criteria or the location of the discharge/outfall;

c. Modifications to the treatment process technology of the Works, or modifications that involve construction of new reactors (tanks) or alter the treatment train process design;

d. Modifications to the Works approved under s.9 of the EPA, and

e. Modifications to the Works pursuant to an order issued by the Ministry.

(5) Implementation of Limited Operational Flexibility is not intended to be used for piecemeal measures that result in major alterations or expansions.

(6) If the implementation of Limited Operational Flexibility requires changes to be made to the Emergency Response, Spill Reporting and Contingency Plan, the Owner shall, as deemed necessary in consultation with the Water Supervisor, provide a revised copy of this plan to the local fire services authority prior to implementing Limited Operational Flexibility.

(7) For greater certainty, any modification made under the Limited Operational Flexibility may only be carried out after other legal obligations have been complied with, including those arising from the Environmental Protection Act, Niagara Escarpment Planning and Development Act, Oak Ridges Moraine Conservation Act, Lake Simcoe Protection Act and Greenbelt Act.

(8) Prior to implementing Limited Operational Flexibility, the Owner shall complete a Notice of Modifications describing any proposed modifications to the Works and submit it to the Water Supervisor.

11. REPORTING

(1) The Owner shall report to the Water Supervisor orally as soon as possible any non-compliance with the effluent criteria, and in writing within seven (7) days of non-compliance.

(2) In addition to the obligations under Part X of the Environmental Protection Act, the Owner shall, within ten (10) working days of the occurrence of any reportable spill as defined in Ontario Regulation 675/98, bypass or loss of any product, by-product, intermediate product, oil, solvent, waste material or any other polluting substance into the environment, submit a full written report of the occurrence to the Water Supervisor describing the cause and discovery of the spill or loss, clean-up and recovery measures taken, preventative measures to be taken and schedule of implementation.

(3) The Owner shall, upon request, make all manuals, plans, records, data, procedures and supporting documentation available to Ministry staff.

(4) The Owner shall prepare and submit a performance report to the Water Supervisor on an annual basis, by March 31 of the year following the end of the period being reported upon. The first such report shall cover the first annual period following the commencement of operation of the Works and subsequent reports shall be submitted to cover successive annual periods following thereafter. The reports shall contain, but shall not be limited to, the following information:

a. a summary and interpretation of all monitoring data and a comparison to the effluent limits outlined in Condition 7, including an overview of the success and adequacy of the Works;

b. a description of any operating problems encountered and corrective actions taken;

c. a summary of all maintenance carried out on any major structure, equipment, apparatus, mechanism or thing forming part of the Works;

d. a summary of any effluent quality assurance or control measures undertaken in the reporting period;

e. a summary of the calibration and maintenance carried out on all effluent monitoring equipment; and

f. a description of efforts made and results achieved in meeting the Effluent Objectives of


Condition 6.

g. a tabulation of the volume of sludge generated in the reporting period, an outline of anticipated volumes to be generated in the next reporting period and a summary of the locations to where the sludge was disposed;

h. a summary of any complaints received during the reporting period and any steps taken to address the complaints;

i. a summary of all By-pass, spill or abnormal discharge events;

j. a copy of all Notice of Modifications submitted to the Water Supervisor as a result of Schedule B, Section 1, with a status report on the implementation of each modification;

k. a report summarizing all modifications completed as a result of Schedule B, Section 3; and

l. any other information the Water Supervisor requires from time to time.

(5) The Owner shall, within thirty (30) calendar days of issuance of this Approval, submit a Municipal and Local Services Board Wastewater System Profile Information Form, and shall resubmit the updated document every time a notification is provided to the Water Supervisor in compliance with requirements of change of ownership under this Approval.

The reasons for the imposition of these terms and conditions are as follows:

  1. Condition 1 is imposed to ensure that the Works are built and operated in the manner in which they were described for review and upon which approval was granted. This condition is also included to emphasize the precedence of Conditions in the Approval and the practice that the Approval is based on the most current document, if several conflicting documents are submitted for review. The condition also advises the Owners their responsibility to notify any person they authorized to carry out work pursuant to this Approval the existence of this Approval.

  2. Condition 2 is included to ensure that the Ministry records are kept accurate and current with respect to the approved works and to ensure that subsequent owners of the Works are made aware of the Approval and continue to operate the Works in compliance with it.

  3. Condition 3 is included to ensure that record drawings of the Works “as constructed” are maintained for future references.

  4. Condition 4 is included to indicate that By-pass of untreated or partially treated sewage to the receiving watercourse is prohibited, save in certain limited circumstances where the failure to By-pass could result in greater injury to the public interest than the Bypass itself where a By-pass will not violate the approved effluent requirements, or where the By-pass can be limited or otherwise mitigated by handling it in accordance with an approved contingency plan. The notification and documentation requirements allow the Ministry to take action in an informed manner and will ensure the Owner is aware of the extent and frequency of By-pass events.

  5. Condition 5 is included to indicate that Overflows of untreated or partially treated sewage to the receiving watercourse is prohibited, save in certain limited circumstances where the failure to Overflow could result in greater injury to the public interest than the Overflow itself or where the Overflow can be limited or otherwise mitigated by handling it in accordance with an approved contingency plan. The notification and documentation requirements allow the Ministry to take action in an informed manner and will ensure the Owner is aware of the extent and frequency of Overflow events.

  6. Condition 6 is imposed to establish non-enforceable effluent quality objectives which the Owner is obligated to use best efforts to strive towards on an ongoing basis. These objectives are to be used as a mechanism to trigger corrective action proactively and voluntarily before environmental impairment occurs and before the compliance limits of Condition 7 are exceeded.

  7. Condition 7 is imposed to ensure that the effluent discharged from the Works to the environment meets the Ministry's effluent quality requirements thus minimizing environmental impact on the receiver and to protect water quality, fish and other aquatic life in the receiving water body.

  8. Condition 8 is included to require that the Works be properly operated, maintained, funded, staffed and equipped such that the environment is protected and deterioration, loss, injury or damage to any person or property is prevented. As well, the inclusion of a comprehensive operations manual governing all significant areas of operation, maintenance and repair is prepared, implemented and kept up-to-date by the Owner and made available to the Ministry. Such a manual is an integral part of the operation of the Works. Its compilation and use should assist the Owner in staff training, in proper plant operation and in identifying and planning for contingencies during possible abnormal conditions. The manual will also act as a benchmark for Ministry staff when reviewing the Owner's operation of the Works.

  9. Condition 9 is included to enable the Owner to evaluate and demonstrate the performance of the Works, on a continual basis, so that the Works are properly operated and maintained at a level which is consistent with the design objectives and effluent limits specified in the Approval and that the Works does not cause any impairment to the environment.

  10. Condition 10 is included to provide a performance record for future references, to ensure that the Ministry is made aware of problems as they arise, and to provide a compliance record for all the terms and conditions outlined in this Approval, so that the Ministry can work with the Owner in resolving any problems in a timely manner.

  11. Condition 11 is included to ensure that the Works are operated in accordance with the application and supporting documentation submitted by the Owner, and not in a manner which the Director has not been asked to consider. These Conditions are also included to ensure that a Professional Engineer has reviewed the proposed modifications and attests that the modifications are in line with that of Limited Operational Flexibility, and provide assurance that the proposed modifications comply with the Ministry's requirements stipulated in the Terms and Conditions of this Approval, MOE policies, guidelines, and industry engineering standards and best management practices.


Schedule A

  1. All previous application and supporting documentation including the environmental study report, pre-design report, and plans and specifications prepared by Gore & Storrie Limited, and Thornburn Penny Limited;

  2. <u>Application for Approval of Municipal and Private Sewage Works</u> submitted by Tony Guerrera of The Greer Galloway Group Inc received May 28, 2010, including Town of Smiths Falls Pollution Prevention and Control Class Environmental Assessment Project File Report prepared by AECOM, Centre Street Sewage Pumping Station Design Report and final engineering plans for the CSO Tank and Centre Pumping Station Upgrade prepared by Greer Galloway Group.

  3. <u>Application for Approval of Municipal and Private Sewage Works</u>, submitted by M.G. Christie of XIE (environmental) received on August 4, 2016, including an application and accompanying transmittal form for the Request for Limited Operational Flexibility;


<u><strong>hedule B</strong></u>

Limited Operational Flexibility Criteria for Modifications to Municipal Sewage Works

  1. The modifications to sewage works approved under an Environmental Compliance Approval (Approval) that are permitted under the Limited Operational Flexibility (LOF), are outlined below and are subject to the LOF conditions in the Approval, and require the submission of the Notice of Modifications. If there is a conflict between the sewage works listed below and the Terms and Conditions in the Approval, the Terms and Conditions in the Approval shall take precedence.

1.1 Sewage Pumping Stations

a. Alter pumping capacity by adding or replacing equipment where new equipment is located within an existing sewage treatment plant site or an existing sewage pumping station site, provided that the modifications do not result in an increase of the sewage treatment plant Rated Capacity and the existing flow process and/or treatment train are maintained, as applicable.

b. Forcemain relining and replacement with similar pipe size where the nominal diameter is not greater than 1,200 mm.

1.2 Sewage Treatment Process

a. Installing additional chemical dosage equipment including replacing with alternative chemicals for pH adjustment or coagulants (non-toxic polymers) provided that there are no modifications of treatment processes or other modifications that may alter the intent of operations and may have negative impacts on the effluent quantity and quality.

b. Expanding the buffer zone between a sanitary sewage lagoon facility or land treatment area and adjacent uses provided that the buffer zone is entirely on the proponent’s land.

c. Optimizing existing sanitary sewage lagoons with the purpose to increase efficiency of treatment operations provided that existing sewage treatment plant rated capacity is not exceeded and where no land acquisition is required.

d. Optimizing existing sewage treatment plant equipment with the purpose to increase the efficiency of the existing treatment operations, provided that there are no modifications to the works that result in an increase of the approved Rated Capacity, and may have adverse effects to the effluent quality or location of the discharge.

e. Replacement, refurbishment of previously approved equipment in whole or in part with Equivalent Equipment, like-for-like of different make and model, provided that the firm c apacity, reliability, performance standard, level of quality and redundancy of the group of equipment is kept the same or exceeded. For clarity purposes, the following equipment can be considered under this provision: pumps, screens, grit separators, blowers, aeration equipment, sludge thickeners, dewatering equipment, UV systems, chlorine contact equipment, bio-disks, and sludge digester systems.

1.3 Sewage Treatment Plant Outfall

a. Replacement of discharge pipe with similar pipe size or diffusers provided that the outfall location is not changed.

1.4 Sanitary Sewers

a. Pipe relining and replacement with similar pipe size within the Sewage Treatment Plant site, where the nominal diameter is not greater than 1,200 mm.

1.5 Pilot Systems

a. Installation of pilot systems for new or existing technologies provided that:

i. any effluent from the pilot system is discharged to the inlet of the sewage treatment plant or hauled off-site for proper disposal,

ii. any effluent from the pilot system discharged to the inlet of the sewage treatment plant or sewage conveyance system does not significantly alter the composition/concentration of the influent sewage to be treated in the downstream process; and that it does not add any inhibiting substances to the downstream process, and

iii. the pilot system’s duration does not exceed a maximum of two years; and a report with results is submitted to the Director and Water Supervisor three months after completion of the pilot project.

  1. Sewage works that are exempt from section 53 of the OWRA by O. Reg. 525/98 continue to be exempt and are not required to follow the notification process under this Limited Operational Flexibility.

  2. Normal or emergency operational modifications, such as repairs, reconstructions, or other improvements that are part of maintenance activities, including cleaning, renovations to existing approved sewage works equipment, provided that the modification is made with Equivalent Equipment, are considered pre-approved.

  3. The modifications noted in section (3) above are not required to follow the notification protocols under Limited Operational Flexibility, provided that the number of pieces and description of the equipment as described in the Approval does not change.


RETAIN COPY OF COMPLETED FORM AS PART OF THE ECA AND SEND A COPY TO THE WATER SUPERVISOR (FOR MUNICIPAL) OR DISTRICT MANAGER (FOR NON-MUNICIPAL SYSTEMS)

Part 1 – Environmental Compliance Approval (ECA) with Limited Operational Flexibility (Insert the ECA's owner, number and issuance date and notice number, which should start with "01" and consecutive numbers thereafter)
ECA NumberIssuance Date (mm/dd/yy)Notice number (if applicable)
ECA OwnerMunicipality

Description shall include:

  1. A detail description of the modifications and/or operations to the sewage works (e.g. sewage work component, location, size, equipment type/model, material, process name, etc.)

  2. Confirmation that the anticipated environmental effects are negligible.

  3. List of updated versions of, or amendments to, all relevant technical documents that are affected by the modifications as applicable, i.e. submission of documentation is not required, but the listing of updated documents is (design brief, drawings, emergency plan, etc.)

Part 3 – Declaration by Professional Engineer
I hereby declare that I have verified the scope and technical aspects of this modification and confirm that the design: 1. Has been prepared or reviewed by a Professional Engineer who is licensed to practice in the Province of Ontario; 2. Has been designed in accordance with the Limited Operational Flexibility as described in the EGA; 3. Has been designed consistent with Ministry's Design Guidelines, adhering to engineering standards, industry's best management practices, and demonstrating ongoing compliance with s.53 of the Ontario Water Resources Act; and other appropriate regulations. I hereby declare that to the best of my knowledge, information and belief the information contained in this form is complete and accurate
Name (Print)PEO License Number
SignatureDate (mm/dd/yy)
Name of Employer
Part 4 – Declaration by Owner
I hereby declare that:1. I am authorized by the Owner to complete this Declaration;2. The Owner consents to the modification; and3. This modifications to the sewage works are proposed in accordance with the Limited Operational Flexibility as described in the ECA.4. The Owner has fulfilled all applicable requirements of the Environmental Assessment Act.I hereby declare that to the best of my knowledge, information and belief the information contained in this form is complete and accurate
Name of Owner Representative (Print)Owner representative's title (Print)
Owner Representative's SignatureDate (mm/dd/yy)

Upon issuance of the environmental compliance approval, I hereby revoke Approval No(s). 5076-86NKAG issued on July 12, 2010.

In accordance with Section 139 of the Environmental Protection Act, you may by written Notice served upon me and the Environmental Review Tribunal within 15 days after receipt of this Notice, require a hearing by the Tribunal. Section 142 of the Environmental Protection Act provides that the Notice requiring the hearing shall state:

  1. The portions of the environmental compliance approval or each term or condition in the environmental compliance approval in respect of which the hearing is required, and;

  2. The grounds on which you intend to rely at the hearing in relation to each portion appealed.

Pursuant to subsection 139(3) of the Environmental Protection Act, a hearing may not be required with respect to any terms and conditions in this environmental compliance approval, if the terms and conditions are substantially the same as those contained in an approval that is amended or revoked by this environmental compliance approval.

The Notice should also include:

  1. The name of the appellant;

  2. The address of the appellant;

  3. The environmental compliance approval number;

  4. The date of the environmental compliance approval;

  5. The name of the Director, and;

  6. The municipality or municipalities within which the project is to be engaged in.

And the Notice should be signed and dated by the appellant.

This Notice must be served upon:

The Director appointed for the purposes of Part II.1 of

The Secretary* Environmental Review Tribunal 655 Bay Street, Suite 1500 Toronto, Ontario M5G 1E5AND

135 St. Clair Avenue West, 1st Floor

*** Further information on the Environmental Review Tribunal’s requirements for an appeal can be obtained directly from the**
Tribunal at: Tel: (416) 212-6349, Fax: (416) 326-5370 or www.ert.gov.on.ca


The above noted activity is approved under s.20.3 of Part II.1 of the Environmental Protection Act.

DATED AT TORONTO this 11th day of January, 2017

RY/

c: DWMD Supervisor, MOECC Ottawa

Ted Joynt, Town of Smith Falls

Fariha Pannu, P.Eng.

Director

appointed for the purposes of Part II.1 of the

Environmental Protection Act


CERTIFICATE OF APPROVAL

Ministère de l'Environnement et de l'Energie

AIR

NUMBER 8-4041-93-006 Page 1 of 6

To the Applicant:

Town of Smiths Falls 191 Beckwith Street, Box 695 Smiths Falls, Ontario K7A 4T6

Racid DIOL SEP 23 1993

Located at:

Smiths Falls Waste Water Treatment Facility Highway 43 and Hershey Road Smiths Falls, Ontario.

The Applicant has applied in accordance with Section 9 of the Environmental Protection Act for approval of:

a waste water treatment facility with the following associated exhaust systems:

  • one (1) exhaust system serving the screen channels, corcens, screening conveyors and screening bins, equipped with one (1) carbon adsorption unit, having 143 kilograms of activated carbon, exhausting into the atmosphere at a volumetric flowrate of 140 litres per second, through a louvre having a cross sectional area of 0.16 square metre, located at 7.5 metres above grade,

  • one (1) standby diesel generator, having a continuous rating of 600 kilowatts, fuelled by No.2 diesel oil at a maximum rate of 145 litres per hour. The combustion products are discharged into the atmosphere through a staok having an exit diameter of 0.2 metre, extending 1.0 metre above the roof and 13.0 metres above grade. The diesel generator is equipped with noise control measures as specified in the "Environmental Noise Impact Study", dated November 27, 1992 and prepared by Barman Swallow Associates.

  • one (1) sludge pelletizer unit, equipped with:

  • one (1) natural gas fired burner having a maximum heat input of 3,838,045 kilojoules per hour;

  • one (1) baghouse dust collector serving the drying circuit, having a filtering velocity of 2.0 centimetres per second, equipped with Ryton/Rastex-PTFE filter bags and air pulse cleaning devices;

  • one (1) baghouse dust collector serving the cooling circuit, having a filtering velocity of 2.0 centimetres per second, equipped with Dralon T filter bags and air pulse cleaning devices;

The exhaust gases are discharged into the atmosphere at a volumetric flowrate of 1.6 normal cubic metres per second, through a stack having an exit diameter of 0.3 metre, extending 13.0 metres above grade; and,


Ministry of Environment and Energy

Ontario

CERTIFICATE OF APPROVAL

Ministère de l'Environnement et de l'Energie

NUMBER 8-4041-93-006

  • twenty six (26) exhaust fans to provide general ventilation. They are as follows:
LOCATIONVENT NUMBERABOVE ROOF (metre)HEIGHT ABOVE GRADE (metre)VOLUME FLOW RATE (normal cubic metre per second)
Raw Sludge Pump StationEF10.41.50.34
Raw Sludge Pump StationEF20.41.51.30
Screen and Degrit Building Screen RoomEF30.46.90.67
Pump RoomEF40.46.92.80
Pump RoomEF50.46.92.80
BasementEF60.46.90.64
Grit Pump RoomEF70.41.50.30
Blower Building Blower RoomEF80.41.71.15
Blower Building Blower RoomEF90.41.78.00
MCC RoomEF100.44.62.33
MCC RoomEF11-3.00.09
Filter RoomEF120.44.61.57
Filter RoomEF130.44.61.57
Administration Building Mens Locker RoomEF140.45.90.35
Administration Building Mens Locker RoomEF150.45.90.35
Administration Building Mens Locker RoomEF160.45.90.35
Main ExhaustEF170.45.90.35
Main ExhaustEF180.45.90.35
Ladies Locker RoomEF190.45.90.35
Ladies Locker RoomEF200.45.90.35
Janitorial RoomEF210.45.90.35
LaboratoryEF220.45.90.35
Pelletizer Building Maintenance RoomEF23-4.00.22
WashroomEF240.410.90.022
PelletizerEF25-8.05.18
PelletizerEF26-8.02.59

all in accordance with the application for a Certificate of Approval (Air) dated April 8,1993,signed by C. Kowalewski and other supporting information prepared and submitted by Thornburn Penny.


Ontario

The Applicant is hereby notified that this approval is issued subject to the following terms and conditions outlined below:

TERMS AND CONDITIONS

DEFINITIONS

  1. For the purpose of this Certificate of Approval:

a. "Act" means the Environmental Protection Act;

b. "Certificate" means this Certificate of Approval, issued in accordance with Section 9 of the Environmental Protection Act;

c. "Company" means Town of Smiths Falls;

d.. "Burner" means the natural gas fired burner serving the sludge drying and pelletizing unit described in this Certificate;

e. "Diesel Generator" means the diesel generator set described in this Certificate;

f. "Director" means any Ministry employee appointed by the Minister pursuant to Section 5 of the Act;

  1. "District Officer" means the District Officer, Ottawa District Office, Southeastern Region of the Ministry;

h. "Equipment" means the carbon adsoption unit, the baghouse dust collectors and the burner described in the Company's application, this Certificate and in the supporting documentation referred to hercin, to the extent approved by this Certificate;

  1. "Ministry" means the Ontario Ministry of Environment and Energy;

j. "Point of Impingement" means any point in the natural environment. The point of impingement for the purposes of verifying compliance with the Act shall be chosen as the point at which the highest concentration is expected to occur, when that concentration is calculated in accordance with the Appendix to Regulation 346 written under the Act, or any other method accepted by the Director;

k. "Pre-test Information" means the information outlined in Section 1.1. of the Source Testing Code;

  1. "Source Testing Code" means the Source Testing Code, Version 2, Report No. ARB-66-80, dated November 1980, prepared by the Ministry, as amended;

m. "Source Testing" means sampling and testing to measure emissions resulting from operating the equipment under conditions which yield the worst case emissions within the approved operating range of the equipment.

(محمد، 2016)


Ministère de l'Environnement et de l'Energie

n. "Supervisor" means the Supervisor, Source Assessment and Technology Unit, or any other person who represents and carries out the duties of the Supervicor, Source Assessment and Technology Unit, as those duties relate to the conditions of this Certificate;

  1. "Test Contaminants" means total hydrocarbon, total reduced sulphur and total suspended particulate.

MAINTENANCE

  1. The Company, shall ensure that the Equipment is properly operated and maintained at all times. The Company shall, as a minimum:

a. prepare not later than three (3) months after the commencement of operation of the Equipment and update, as necessary, a manual outlining the operating procedures and a maintenance program for the Equipment;

b. implement the recommendations of the operating and maintenance manual; and

c. retain, for a minimum of two (2) years from the date of their creation, all records on the maintenance, repair and inspection of the Equipment.

SOURCE TESTING

  1. The Company shall monitor the emissions and operation of the Burner as follows:

a. The Company shall perform Source Testing, to determine the rate of emission of the Test Contaminants from the Burner.

b. The Company shall submit, not later than three (3) months after the commencement of operation of the Equipment, to the Supervisor a test protocol, including the Pre-Test Information for the Source Testing required by the Source Teating Code. The Company shall finalize the test protocol in consultation with the Supervisor.

c. The Company shall not commence the Source Testing until the Supervisor has accepted the test protocol.

d. The Company shall complete the Source Testing not later than three (3) months after the Supervisor has accepted the test proctocol.

e. The Company shall notify the District Officer and the Supervisor in writing of the location, date and time of any impending Source Testing required by this Certificate, at least fifteen (15) days prior to the Source Testing.


f. The Company shall submit a report on the Source Testing to the District Officer and the Supervisor not later than two (2) months after completing the Source Testing. The report shall be in the format described in the Source Testing Code, and shall also include, but not be limited to:

i. an executive summary;

ii. records of operating conditions,

iii. the results of dispersion calculations in accordance with Regulation 346 indicating the maximum concentration of the Test contaminants at the Point of impingement.

g. The Director may not accept the results of the Source Testing if:

i. the Source Testing Code or the requirements of the Supervisor were not followed; or

  1. the -Company did not notify the District Officer and the Supervisor of the Source Testing; or

iii. the Company failed to provide a complete report on the Source Testing.

h. If the Director does not accept the results of the Source Testing, the Director may require re-testing.

  1. The Company shall ensure that the noise emissions from the Diesel Generator comply with the limits determined in accordance with Publication NPC-105 of the Model Municipal Noise Control By-Law, Final Report, August 1978, as amended.

  2. The Company shall restrict the periodic testing of the Diesel Generator to the daytime period of 7 a.m. to 5 p.m.

The reasons for the imposition of these terms and conditions are as follows:

  1. Condition No. 1 is included to define the special terms that are used throughout the Certificate.

  2. Condition No. 2 is included on the Certificate to emphasize that the Equipment must be maintained and operated according to a procedure that will result in compliance with the Environmental Protection Act, the regulations and this Certificate.

In addition, the Company is required to keep records to assist the Director, Section 9 of the Environmental Protection Act, in determining whether or not the Equipment is being inspected and maintained as required by the Environmental Protection Act, the Regulations and this Certificate.

0070 (00/00)


Ministry of Environment and Energy

Ministère de l'Environnement et de l'Energie

NUMBER 8-4041-93-006 Page 6 of 6

  1. Condition No. 3 is included to require the Company to gather accurate information so that the environmental impact and subsequent compliances with the Act, the regulations and this Certificate can be verified.

  2. Condition No. 4 is included to provide the minimum performance requirement considered necessary to prevent an adverse effect resulting from the operation of the Diesel Generator.

  3. Condition No. 5 is included to ensure that the proposed operation of the Diesel Generator is not extended beyond day-time hours. Operation outside these hours, when ambient sound levels are significantly lower, may result in non-compliance with the established sound level limits.

The Applicant may by written notice served upon me and the Environmental Appeal Board within 15 days after receipt of this Notice, require a hearing by the Board. Section 142 of the Environmental Protection Act R.S.O.1990, Chapter E.19, provides that the Notice requiring the hearing shall state:

  1. The portions of the approval or each term or condition in the approval in respect of which the hearing is required, and;

  2. The grounds on which the Applicant has made the request.

  3. The grounds on which the Applicant intends to rely at the hearing in relation to each portion appealed.

The Notice should also include:

  1. The name of the appellant;

  2. The address of the appellant;

  3. The Certificate of Approval number;

  4. The date of the Certificate of Approval;

  5. The name of the Director;

  6. The municipality within which the works are located;

And the Notice should be signed and dated by the appellant.

This Notice must be served upon:

The Secretary, Environmental Appeal Board, 112 St. Clair Avenue West, Suite 502, Toronto, Ontario. M4V 1N3ANDThe Director, Section 9, Environmental Protection Act, Ministry of Environment and Energy, 250 Davisville Avenue, 3rd Floor, Toronto, Ontario. M4S 1H2

The above noted works are approved under Section 9 of the Environmental Protection Act.

DATED AT TORONTO this 7th day of September,1993.

QN/an

P. DeAngelis, P. Eng., Director, Section 9, Environmental Protection Act.

cc:-Mr. R. Dunn, MOEE, Ottawa District Officer

9079 (0480)


NOTICE MINISTRY OF ENVIRONMENT & ENERGY

Town of Smiths Falls 77 Beckwith Street North, Box 695 Smiths Falls, Ontario K7A 4T6

OCT 10 1995

OTTAWA

You are hereby notified that the approval issued under Certificate of Approval No. 8-4041-93-006, dated September 7, 1993, is amended as follows:

Condition No. 3.f. is amended to read:

f. The Company shall submit a report on the Source Testing to the District Officer and the Supervisor not later than four (4) months after completing the Source Testing. The report shall be in the format described in the Source Testing Code, and shall also include, but not be limited to:

i. an executive summary;

ii. records of operating conditions;

iii. the results of dispersion calculations in accordance with Regulation 346 indicating the maximum concentration of the Test Contaminants at the Point of Impingement.

All in accordance with the Application for Approval (Air) and supporting information submitted by the Town of Smiths Falls, dated August 28,1995 signed by B. Symondson.

All other Terms and Conditions remain unchanged.

This Notice shall constitute part of the approval issued under Certificate of Approval No. 8-4041-93-006, dated September 7, 1993.

In accordance with Section 139 of the Environmental Protection Act, R.S.O.1990, Chapter E-19, as amended, you may by written notice served upon me and the Environmental Appeal Board within 15 days after receipt of this Notice, require a hearing by the Board. Section 142 of the Environmental Protection Act provides that the Notice requiring the hearing shall state:

  1. The portions of the approval or each term or condition in the approval in respect of which the hearing is required, and;

  2. The grounds on which you intend to rely at the hearing in relation to each portion appealed.


The Notice should also include:

  1. The name of the appellant;

  2. The address of the appellant;

  3. The Certificate of Approval number;

  4. The date of the Certificate of Approval;

  5. The name of the Director;

  6. The municipality within which the works are located;

And the Notice should be signed and dated by the appellant.

This Notice must be served upon:

The Secretary, Environmental Appeal Board, 112 St. Clair Avenue West, Suite 502, Toronto, Ontario. M4V 1N3ANDThe Director, Section 9, Environmental Protection Act, Ministry of Environment and Energy, 250 Davisville Avenue, 3rd Floor, Toronto, Ontario. M4S 1H2

The above noted works are approved under Section 9 of the Environmental Protection Act.

DATED AT TORONTO this 18th day of September, 1995
THIS IS A TRUE COPY OF THE ORIGINAL NOTICE OF AMENDMENT SIGNED BY P. DEANGELIS, P. ENG. MAILED ON BY

SJ/fn

cc: District Manager, MOEE Ottawa District Office


APPENDIX B

Monitoring Data and Comparison to Effluent Limits


Town of Smiths Falls 2023 Performance Assessment Report - WPCP Works # 120000890 Conventional Tertiary Treatment UV Disinfection / Pelletization

MONTHPLANT FLOWS Minimum Day (m3)PLANT FLOWS Maximum Day (m3)PLANT FLOWS Average (m3)PLANT FLOWS Total (m3)RAW INFLUENT Alkalinity (mg/L)RAW INFLUENT BOD5 (mg/L)RAW INFLUENT BOD5 Loadings (kg/d)RAW INFLUENT CBOD5 (mg/L)RAW INFLUENT CBOD5 Loadings (kg/d)RAW INFLUENT TSS (mg/L)RAW INFLUENT TSS Loadings (kg/d)RAW INFLUENT TP (mg/L)RAW INFLUENT TKN (mg/L)RAW INFLUENT Ammonia (N) - Total (mg/L)RAW INFLUENT Ammonia (N) - Unionized (mg/L)RAW INFLUENT pHRAW INFLUENT Temperature (°C)RAW INFLUENT Nitrate (mg/L)RAW INFLUENT Nitrite (mg/L)
January5,67829,18110,758333,511250.00122.001,312.5249.00527.16190.002,044.101.8317.704.690.0687.718.603.7700.241
February5,58717,1019,811271,594232.00201.001,971.9168.00667.11255.002,501.683.4621.006.020.0357.528.002.1600.311
March6,40217,44610,310300,773234.00139.001,433.0343.00443.31154.001,587.682.5617.507.650.0617.528.602.5800.245
April6,24851,41913,761403,592234.0096.001,321.0832.00440.36118.001,623.831.7118.207.840.1307.539.402.59326.132
May4,93945,14010,708331,939237.00113.001,209.9872.00770.96187.002,002.363.3017.607.510.0337.449.101.6600.120
June3,3227,7544,687140,598224.00191.00895.1683.00389.00236.001,106.062.4426.1015.200.0627.499.700.9070.151
July4,00814,3725,672175,821228.00151.00856.4374.00419.71312.001,769.574.9128.9012.800.0707.4411.501.2390.310
August4,3739,3965,906183,091229.00141.00832.7582.00484.29310.001,830.865.6027.709.880.0817.5511.401.2400.140
September2,3346,5334,466133,983222.00237.001,058.4797.00433.21606.002,706.465.7034.3015.400.0807.539.001.4900.136
October3,5196,0134,181129,604216.00234.00978.3179.00330.28395.001,651.426.2036.9018.100.0987.538.802.0000.182
November3,5755,8184,029120,866231.00217.00874.2782.00330.37287.001,156.295.3734.0018.500.0997.548.902.9660.260
December4,20115,0776,806210,972234.00149.001,014.0260.00408.33200.001,361.104.4825.2012.020.0707.587.901.2100.132
TOTAL54,184225,24991,0932,736,3442,771.001,991.0013,757.93821.005,644.103,250.0021,341.4047.56305.10135.610.8990.38110.9023.8228.36
AVERAGE4,51518,7717,591228,029230.92165.921,146.4968.42470.34270.831,778.453.9625.4311.300.077.539.241.982.36
Max6,40251,41913,761403,592250.00237.001,971.9197.00770.96606.002,706.466.2036.9018.500.1307.7111.503.77026.132
Min2,3345,8184,029120,866216.0096.00832.7532.00330.28118.001,106.061.7117.504.690.0337.447.900.9070.120

Annual average flow (m 3 /d): 7,591.11

WPCP rate capacity (m3/d): 14,700

Peak flow (m 3 /d): 51,419

Percentage of rated capacity (%): 51.64

MONTHFINAL EFFLUENT Alkalinity (mg/L)FINAL EFFLUENT Ammonia (N) - Total (mg/L)FINAL EFFLUENT NH3 Loads (kg/d)FINAL EFFLUENT Ammonia (N) - Unionized (mg/L)FINAL EFFLUENT BOD5 (mg/L)FINAL EFFLUENT BOD5 Loadings (kg/d)FINAL EFFLUENT CBOD5 (mg/L)FINAL EFFLUENT CBOD5 Loadings (kg/d)FINAL EFFLUENT TSS (mg/L)FINAL EFFLUENT TSS Loadings (kg/d)FINAL EFFLUENT TP (mg/L)FINAL EFFLUENT TP Loadings (kg/d)FINAL EFFLUENT TKN (mg/L)FINAL EFFLUENT TKN Loadings (kg/d)FINAL EFFLUENT pH MinFINAL EFFLUENT pH AvgFINAL EFFLUENT pH MaxFINAL EFFLUENT Temperature (°C)FINAL EFFLUENT Nitrate (mg/L)FINAL EFFLUENT Nitrite (mg/L)FINAL EFFLUENT E. Coli Geomean
January171.000.1101.180.0075.0053.794.0043.039.49102.080.192.040.808.617.167.347.568.209.220.07713.36
February149.000.0700.690.1103.0029.433.0029.430.777.570.090.880.807.856.867.227.427.3012.580.2071.00
March167.000.0200.210.0103.0030.933.0030.930.656.730.080.820.707.227.097.277.468.309.790.3761.00
April161.000.2753.780.01013.00178.908.00110.0920.95288.330.395.370.506.886.987.327.909.408.850.02720.60
May157.000.2282.440.0103.0032.123.0032.122.8730.720.090.960.909.647.127.367.559.808.900.0244.81
June119.000.0270.130.0103.0014.063.0014.060.783.670.050.230.703.286.847.217.4411.109.113.1441.00
July127.000.0330.190.0103.0017.023.0017.022.0911.850.060.340.804.547.007.227.4514.6813.900.0321.00
August140.000.0430.250.0103.0017.723.0017.721.005.910.050.300.704.137.097.397.3915.0011.740.0261.15
September131.000.2200.980.0033.0013.403.0013.400.703.130.070.311.104.917.087.337.6311.5013.200.2051.00
October96.000.0320.130.0103.0012.543.0012.541.205.020.050.210.702.936.967.307.4811.8017.600.0601.00
November98.000.0380.150.0103.0012.093.0012.090.903.630.160.640.903.636.987.267.528.303.240.0501.00
December127.100.0310.210.0103.0020.423.0020.421.369.230.040.270.906.127.127.477.736.7013.700.0501.00
TOTAL1,643.101.12710.350.21048.00432.4142.00352.8442.76477.861.3212.399.5069.7384.2887.6990.53122.08131.834.2847.92
AVERAGE136.9250.0940.8630.0184.00036.0343.50029.4043.56439.8210.1101.0330.7925.8117.0237.3087.54410.17310.9860.3573.993
Max171.000.2753.780.11013.00178.908.00110.0920.95288.330.395.371.109.647.167.477.9015.0017.603.1420.60
Min96.000.020.130.003.0012.093.0012.090.653.130.040.210.502.936.847.217.396.703.240.021.00
LIMITS2.6/14.038.0/206.015.00220.5015.00220.500.304.406.0 to 9.5200
OBJECTIVES2.0/12.010.005.000.256.5 to 8.5150

NOTE: if cell is highlighted in yellow with red text this is a non-compliance monthly average. Ministry must be notified (verbal & written) as per ECA condtion 10(3) NOTE: if cell is highlighted in orange with bold text this value is above the objectives noted in ECA

Comments: January: TSS over objective due to secondary treatment bypass April: Effluent objectives not met for TSS and TP. Effluent limits not met for TSS, TSS loadings, TP & TP loading due to secondary treatment bypass. Ministry verbally notified of effluent limit exceedances June 29 and written notification provided June 30, 2023


2023 Final Effluent GeoMean

Town of Smiths Falls

2023 Performance Assessment Report - WPCP Works # 120000890

Conventional Tertiary Treatment UV Disinfection / Pelletization

JANUARY 3-Jan-23Location Final Bypass EffluentLocation 100Location CFU/100mL
4-Jan-23Final Effluent*1CFU/100mL
5-Jan-23Final Bypass Effluent3,800CFU/100mL
6-Jan-23Final Bypass Effluent100CFU/100mL
11-Jan-23Final Effluent2CFU/100mL
18-Jan-23Final Effluent*1CFU/100mL
25-Jan-23Final Effluent*1CFU/100mL
GEO MEAN13.36CFU/100mL
Min1CFU/100mL
Max3,800CFU/100mL
FEBRUARY 1-Feb-23Location Final Effluent*Location 1Location CFU/100mL
8-Feb-23Final Effluent*1CFU/100mL
15-Feb-23Final Effluent*1CFU/100mL
22-Feb-23Final Effluent*1CFU/100mL
CFU/100mL
CFU/100mL
GEO MEAN1.00CFU/100mL
Min1CFU/100mL
Max1CFU/100mL
MARCH Location
1-Mar-23Final Effluent1CFU/100mL
8-Mar-23Final Effluent*1CFU/100mL
15-Mar-23Final Effluent*1CFU/100mL
22-Mar-23Final Effluent*1CFU/100mL
CFU/100mL
CFU/100mL
CFU/100mL
GEO MEAN1.00CFU/100mL
Min1CFU/100mL
Max1CFU/100mL
APRILLocation
5-Apr-23Final Bypass Effluent210,000CFU/100mL
5-May-23Final Effluent*1CFU/100mL
9-Apr-23Final Effluent*1CFU/100mL
12-Apr-23Final Effluent*1CFU/100mL
19-Apr-23Final Effluent*1CFU/100mL
26-Apr-23Final Effluent*1CFU/100mL
30-Apr-23Final Bypass Effluent7,500CFU/100mL
GEO MEAN20.60CFU/100mL
Min1CFU/100mL
Max210,000CFU/100mL
MAY Location
3-May-23Final Effluent440CFU/100mL
5-May-23Final Bypass Effluent28CFU/100mL
10-May-23Final Effluent*1CFU/100mL
17-May-23Final Effluent*1CFU/100mL
24-May-23Final Effluent*1CFU/100mL
31-May-23Final Effluent*1CFU/100mL
GEO MEAN4.81CFU/100mL
Min1CFU/100mL
Max440CFU/100mL
JUNE Location
7-Jun-23Final Effluent*1CFU/100mL
14-Jun-23Final Effluent*1CFU/100mL
21-Jun-23Final Effluent*1CFU/100mL
28-Jun-23Final Effluent*1CFU/100mL
GEO MEAN1.00CFU/100mL
Min1CFU/100mL
Max1CFU/100mL
JULY Location
5-Jul-23Final Effluent1CFU/100mL
12-Jul-23Final Effluent1CFU/100mL
19-Jul-23Final Effluent1CFU/100mL
26-Jul-23Final Effluent1CFU/100mL
GEO MEAN1.00CFU/100mL
Min1CFU/100mL
Max1CFU/100mL
AUGUST Location
2-Aug-23Final Effluent2CFU/100mL
9-Aug-23Final Effluent1CFU/100mL
16-Aug-23Final Effluent1CFU/100mL
23-Aug-23Final Effluent1CFU/100mL
30-Aug-23Final Effluent1CFU/100mL
CFU/100mL
CFU/100mL
CFU/100mL
GEO MEAN1.15CFU/100mL
Min1CFU/100mL
Max2CFU/100mL
SEPTEMBER Location
6-Sep-23Final Effluent1CFU/100mL
13-Sep-23Final Effluent1CFU/100mL
20-Sep-23Final Effluent1CFU/100mL
27-Sep-23Final Effluent1CFU/100mL
GEO MEAN1CFU/100mL
Min1CFU/100mL
Max1CFU/100mL
OCTOBER 4-Oct-23Location Final Effluent*Location 1Location CFU/100mL
11-Oct-23Final Effluent*1CFU/100mL
18-Oct-23Final Effluent*1CFU/100mL
25-Oct-23Final Effluent*1CFU/100mL
GEO MEAN1.00CFU/100mL
Min1CFU/100mL
Max1CFU/100mL
NOVEMBER 8-Nov-23Location Final Effluent*Location 1Location CFU/100mL
15-Nov-23Final Effluent*1CFU/100mL
22-Nov-23Final Effluent*1CFU/100mL
29-Nov-23Final Effluent*1CFU/100mL
GEO MEAN1.00CFU/100mL
Min1CFU/100mL
Max1CFU/100mL
DECEMBER 6-Dec-23Location Final Effluent*Location 1Location CFU/100mL
13-Dec-23Final Effluent*1CFU/100mL
20-Dec-23Final Effluent*1CFU/100mL
27-Dec-23Final Effluent*1CFU/100mL
CFU/100mL
CFU/100mL
CFU/100mL
GEO MEAN1.00CFU/100mL
Min1CFU/100mL
Max1CFU/100mL
  • indicates sample result was 0 cfu/100mL, round up to 1 for geomean calculation

Smiths Falls WPCP Final Effluent Flow (m3) 2019 to 2023

CategoryWPCP Maximum Flow (m3)WPCP Average Flow (m3)WPCP Rated Capacity (m3/day)
Jan-19200001000014800
Feb-1915300950014800
Mar-19408001480014800
Apr-19318001800014800
May-19153001150014800
Jun-1913200900014800
Jul-1910200700014800
Aug-1910200630014800
Sep-1912000680014800
Oct-1920000970014800
Nov-19225001070014800
Dec-19160001080014800
Jan-20340001400014800
Feb-20118001000014800
Mar-20270001600014800
Apr-20158001180014800
May-2017500970014800
Jun-209000700014800
Jul-209200650014800
Aug-20255001100014800
Sep-2013700750014800
Oct-2014800820014800
Nov-2014200750014800
Dec-20320001120014800
Jan-219400720014800
Feb-218000600014800
Mar-21215001180014800
Apr-2116800870014800
May-2115800900014800
Jun-219200620014800
Jul-219000600014800
Aug-219000580014800
Sep-2111500650014800
Oct-2118700800014800
Nov-2110600770014800
Dec-2117200930014800
Jan-226700580014800
Feb-2220000750014800
Mar-22230001400014800
Apr-22212001180014800
May-2213700850014800
Jun-2210400730014800
Jul-2212200670014800
Aug-228200530014800
Sep-228400560014800
Oct-227500500014800
Nov-2211500520014800
Dec-2225800770014800
Jan-23292001080014800
Feb-2317000980014800
Mar-23175001040014800
Apr-23513001370014800
May-23450001080014800
Jun-237700450014800
Jul-2314500550014800
Aug-239500580014800
Sep-236500430014800
Oct-236000400014800
Nov-235800380014800
Dec-2314800680014800

Smiths Falls WPCP Yearly Overview 2019 to 2023

YearWPCP Average Flow (m3)WPCP Maximum Flow (m3)WPCP Rated Capacity (m3/day, rhs)Percent of Rated Capacity (%, rhs)
2019103004080019.571.5
2020100003400019.569
202177002150019.552
202275002570019.551
202375005130019.557

APPENDIX C

A summary of all by-pass, spill or abnormal discharge events


Town of Smiths Falls 2023 Performance Assessment Report - WPCP Works # 120000890 Conventional Tertiary Treatment UV Disinfection / Pelletization

IncidentIncident Event #NotificationOperator Reporting Bypass StartDate Bypass Started (DD/MM/YY)Time Bypass StartedOperator Reporting Bypass EndedDate Bypass Ended (DD/MM/YY)Time Bypass EndedTypeDuration (hrs)Volume (m3)Disinfected TypeMax Flow (L/s)REASON CODESamples
11-2FXFRSACS. LaPlante5-Jan-2300:28:00S. LaPlante6-Jan-2300:35:00Secondary Treatment Bypass24.103,370.2UV Disinfection681, 2Yes
2230405-000012PortalS. LaPlante5-Apr-2314:48:00S. LaPlante9-May-2310:59:00Secondary Treatment Bypass82.8857,939.0UV Disinfection4101,2Yes
3230430-000012PortalS. LaPlante30-Apr-2322:13:00T. George5-May-2308:13:00Secondary Treatment Bypass99.0054,039.2UV Disinfection4061Yes
IncidentIncident Event #Start or EndChain of Custody # or In house #Report #Sample Date (DD-MM-YYYY)RAW WW E. Coli (cfu/100mL)RAW WW BOD5 (mg/L)RAW WW CBOD5 (mg/L)RAW WW TSS (mg/L)RAW WW TP (mg/L)RAW WW NH3 - TOTAL (mg/L)RAW WW NH3 -UNIONIZED (mg/L)RAW WW pHRAW WW Temp. °C
11-2FXFCRStartWW23-05B23-002985-Jan-2354,00080.029501.470.83<0.017.679.90
11-2FXFCREndWW23.06B23-003846-Jan-23410,00059.056471.242.600.037.7110.40
2230405-000012StartWW2309523-006539R05-Apr-2370,00057.06820.820.81<0.017.127.10
2230405-000012EndWW2309923-006631R09-Apr-2372,00076.07651.531.10<0.017.589.90
3230430-000012StartWW2312023-008844R030-Apr-23139,00051.020860.970.76<0.017.2212.40
3230430-000012EndWW2312523-009580R05-May-23140,00091.0221002.284.31<0.017.45
IncidentMOECP Incident #Start or EndChain of Custody # or In house #Report #Sample Date (DD-MM-YYYY)Primary Eff. E. Coli (cfu/100mL)Primary Eff. BOD5 (mg/L)Primary Eff. CBOD5 (mg/L)Primary Eff. TSS (mg/L)Primary Eff. TP (mg/L)Primary Eff. NH3-TOTAL (mg/L)Primary Eff. Primary Eff. NH3-UNIONIZED (mg/L)Primary Eff. pHPrimary Eff. Temp. °C% Removal BOD5% Removal TSS
11-2FXFCRStartWW23-05B23-002985-Jan-2366,00073.018641.500.91<0.017.547.908.75-28.00
21-2FXFCREndWW23.06B23-003846-Jan-23164,00052.026521.152.140.037.5111.0011.86-10.64
2230405-000012StartWW2309523-006539RO5-Apr-23120,000166.0423606.461.61<0.017.149.70-191.23-339.02
2230405-000012EndWW2309923-006631RO9-Apr-2390,00042.06360.721.90<0.017.4912.6044.7444.62
3230430-000012StartWW2312023-008844RO30-Apr-23154,00054.0291142.101.55<0.016.9212.40-5.88-32.56
3230430-000012EndWW2312523-009580RO5-May-2330,00055.010480.922.93<0.017.279.4039.5652.00
#DIV/0!#DIV/0!
#DIV/0!#DIV/0!
#DIV/0!#DIV/0!
#DIV/0!#DIV/0!
#DIV/0!#DIV/0!
#DIV/0!#DIV/0!
IncidentMOECP Incident #Start or EndChain of Custody # or In house #Report #Sample Date (DD-MM-YYYY)Final Eff. E. Coli (cfu/100mL)Final Eff. BOD5 (mg/L)Final Eff. CBOD5 (mg/L)Final Eff. TSS (mg/L)Final Eff. TP (mg/L)Final Eff. NH3 - TOTAL (mg/L)Final Eff. Final Eff. NH3 - UNIONIZED (mg/L)Final Eff. pHFinal Eff. Temp. °C
11-2FXFRStartWW23-05B23-002985-Jan-233,8001810621.610.17<0.017.259.90
11-2FXFREndWW23-06B23-003846-Jan-23100<3<340.030.03<0.017.5111.00
2230405-000012StartWW2309523-006539R05-Apr-23210,00060272203.110.83<0.017.159.50
2230405-000012EndWW2309923-006631R09-Apr-230<3<3<30.050.05<0.017.279.90
3230430-000012StartWW2312023-008844R030-Apr-237,5001915600.910.95<0.017.0713.70
3230430-000012EndWW2312523-009580R05-May-2328<3<3<30.030.06<0.017.2710.60

ECA Submission Date

Date Submitted to MECP via email

REASON CODES:
1 = Heavy Precipitation
2 = Snow Melt
3 = Equipment Failure
4 = Eq. Maintenance
5 = Sewer Problems
6 = Power Failure
7 = Exceed Design Capacity
0 = Others

All Secondary Treatment Bypass receive preliminary, primary and UV disinfection


APPENDIX D

Maintenance Records


Town of Smiths Falls 2023 Performance Assessment Report - WPCP Works # 120000890 Conventional Tertiary Treatment UV Disinfection / Pelletization

Asset Category Asset Description

Maintenance Type

Date Asset Category

03-Jan-23 Belt Press 04-Jan-23 Alarm 04-Jan-23 Alarm 05-Jan-23 Generator 05-Jan-23 WWTP 05-Jan-23 Other 09-Jan-23 Alarm 09-Jan-23 Alarm 09-Jan-23 Instrumentation 10-Jan-23 Sizer 10-Jan-23 Other

12-Jan-23 WWTP 12-Jan-23 Generator 13-Jan-23 Other 13-Jan-23 WWTP 16-Jan-23 Alarm 16-Jan-23 Alarm 17-Jan-23 Other 18-Jan-23 WWTP 18-Jan-23 Blower 20-Jan-23 Other 20-Jan-23 Generator 24-Jan-23 Alarm 24-Jan-23 Alarm 24-Jan-23 Bar Screen 24-Jan-23 Bar Screen 25-Jan-23 WWTP 26-Jan-23 Tank 26-Jan-23 Tank 26-Jan-23 Tank 26-Jan-23 Generator 27-Jan-23 Pelletizer 27-Jan-23 Building 29-Jan-23 Generator 30-Jan-23 Alarm 30-Jan-23 Alarm 30-Jan-23 Other 31-Jan-23 WWTP 31-Jan-23 Travelling Bridge 01-Feb-23 Other 02-Feb-23 WWTP 02-Feb-23 Generator 02-Feb-23 Tank 02-Feb-23 Pump 03-Feb-23 Other 06-Feb-23 Instrumentation 06-Feb-23 Alarm 06-Feb-23 Alarm 07-Feb-23 Belt Press 07-Feb-23 Sizer 08-Feb-23 WWTP 09-Feb-23 Other 09-Feb-23 Instrumentation 09-Feb-23 Generator 09-Feb-23 WWTP 13-Feb-23 Alarm 13-Feb-23 Alarm 13-Feb-23 WWTP 13-Feb-23 Other 16-Feb-23 WWTP 17-Feb-23 Generator 21-Feb-23 Other 21-Feb-23 WWTP 21-Feb-23 Other

Asset Description

Belt Press Roller Bearings SFWWS2\WIN911 SFWWS1\WIN911 Diesel Generator WPCP RAS (building) SFWWS2\WIN911 SFWWS1\WIN911 LAB Spectro WPCP M1430 Weirs (Primary Tanks)

WPCP Preventative Diesel Generator Preventative Watertrax Data Preventative WPCP Preventative SFWWS2\WIN911 Preventative SFWWS1\WIN911 Preventative Weirs (Secondary Tank) Preventative WPCP Preventative M 401 Preventative Watertrax Data Preventative Diesel Generator Preventative SFWWS2\WIN911 Preventative SFWWS1\WIN911 Preventative screen1 Preventative screen2 Preventative WPCP Preventative Secondary collectors Preventative Secondary collectors Preventative Secondary collectors Preventative Diesel Generator Preventative Pelletizer Preventative Raw Sludge (Building) Preventative Diesel Generator Preventative SFWWS2\WIN911 Preventative SFWWS1\WIN911 Preventative Watertrax Data Preventative WPCP Preventative CP605 Preventative Pelletcyclone Preventative WPCP Preventative Diesel Generator Preventative Secondary collectors Preventative M3020 Preventative Watertrax Data Preventative LT1210 Preventative SFWWS2\WIN911 Preventative SFWWS1\WIN911 Preventative Belt Press Roller Bearings Preventative M1430 Preventative WPCP Preventative Weirs (Primary Tanks) Preventative LAB Spectro WPCP Preventative Diesel Generator Preventative WPCP Preventative SFWWS2\WIN911 Preventative SFWWS1\WIN911 Preventative WPCP Preventative Watertrax Data Preventative WPCP Preventative Diesel Generator Preventative Watertrax Data Preventative WPCP Preventative Weirs (Secondary Tank) Preventative

Maintenance Sub Type Clean and Inspect Verification Verification Genset operation WPCP Pump Rotations Clean and Inspect Verification Verification Verification Clean and Inspect Clean and Inspect

WPCP Pump Rotations Genset operation Verification Alarm Testing Verification Verification Clean and Inspect WPCP Pump Rotations Clean and Inspect Verification Genset operation Verification Verification Clean and Inspect Clean and Inspect WPCP Pump Rotations Clean and Inspect Clean and Inspect Clean and Inspect Genset operation Clean and Inspect Operational Clean and Inspect Verification Verification Verification WPCP Pump Rotations Clean and Inspect Clean and Inspect WPCP Pump Rotations Genset operation Clean and Inspect Clean and Inspect Verification Clean and Inspect Verification Verification Clean and Inspect Clean and Inspect Clean and Inspect Clean and Inspect Verification Genset operation WPCP Pump Rotations Verification Verification Alarm Testing Verification WPCP Pump Rotations Genset operation Verification WPCP Pump Rotations Clean and Inspect

Molly Buckland Molly Buckland Molly Buckland Operators Waste Water Plant Tyler George Tyler George Tyler George Jacob Kerr Molly Buckland Molly Buckland Molly Buckland Steve LaPlante Changed Steve LaPlante Done Jacob Kerr Jacob Kerr Operators Waste Water Plant Rotated Operators Waste Water Plant Completed Operators Waste Water Plant Complete Operators Waste Water Plant Operators Waste Water Plant Molly Buckland Operators Waste Water Plant Operators Waste Water Plant Completed Molly Buckland Molly Buckland Molly Buckland Operators Waste Water Plant Rotated Molly Buckland Tyler George Molly Buckland Operators Waste Water Plant Operators Waste Water Plant Molly Buckland Molly Buckland Tyler George Tyler George Tyler George Tyler George Steve LaPlante Inspected Tyler George Tyler George Tyler George Operators Waste Water Plant Operators Waste Water Plant Rotated Molly Buckland Molly Buckland Operators Waste Water Plant Molly Buckland Molly Buckland Molly Buckland Molly Buckland Molly Buckland Molly Buckland

Comments (2)

Greased all bearings. Changed Changed Generator Check Form Complete Rotate alum and HPEW pumps Exercised Changed Changed

Cleaned off hair balls Not completed Completed maintenance on remaining racks in up bank Completed required maintenance. Generator Check Form Complete Completed Changed Changed Clean

Everything looks good Completed Generator Check Form Complete Changed Done Greased all fittings on screen 1. Greased all fittings on screen 2. Rotated Complete Complete Completed Ran generator on manual for weekly inspection. Completed Exercised valves on pumps 1 & 2 Completed Completed Completed Entered Rotated Completed Checked, all in good shape

Generator Check Form Complete Inspected ok Completed Completed Recently cleaned Changed Changed Greased All good Completed Not in bad shape

Generator Check Form Complete Rotated Completed Completed

Completed Generator Check Form Complete Completed Not completed


21-Feb-23 Alarm 21-Feb-23 Alarm 23-Feb-23 Generator 24-Feb-23 Travelling Bridge 24-Feb-23 Travelling Bridge 27-Feb-23 Redler 27-Feb-23 Alarm 27-Feb-23 Alarm 28-Feb-23 WWTP 01-Mar-23 Generator 01-Mar-23 Pelletizer 03-Mar-23 Travelling Bridge 03-Mar-23 Other 03-Mar-23 Pump 06-Mar-23 Alarm 06-Mar-23 Alarm 06-Mar-23 Travelling Bridge 06-Mar-23 Travelling Bridge 06-Mar-23 Other 07-Mar-23 Generator

07-Mar-23 Sizer

07-Mar-23 Belt Press 09-Mar-23 WWTP 10-Mar-23 Instrumentation 11-Mar-23 Other 13-Mar-23 Alarm 13-Mar-23 Alarm 14-Mar-23 Other 14-Mar-23 WWTP 14-Mar-23 Instrumentation 14-Mar-23 Generator 15-Mar-23 Instrumentation 17-Mar-23 WWTP

20-Mar-23 Alarm

20-Mar-23 Alarm 21-Mar-23 Other 21-Mar-23 WWTP 21-Mar-23 Generator 24-Mar-23 Other 24-Mar-23 Grit Removal 27-Mar-23 Alarm 27-Mar-23 Alarm 28-Mar-23 WWTP

SFWWS1\WIN911 SFWWS2\WIN911 Diesel Generator CP605 CP605 Red1450 SFWWS1\WIN911 SFWWS2\WIN911 WPCP Diesel Generator Pelletizer CP605 Pelletcyclone M3020 SFWWS1\WIN911 SFWWS2\WIN911 CP604 CP604 Watertrax Data Diesel Generator

28-Mar-23 Pelletizer

28-Mar-23 Other 31-Mar-23 Other 31-Mar-23 Generator 03-Apr-23 Alarm 03-Apr-23 Alarm 04-Apr-23 WWTP 06-Apr-23 Generator 11-Apr-23 Alarm 11-Apr-23 Alarm 11-Apr-23 Auger 11-Apr-23 Sizer 11-Apr-23 Other 12-Apr-23 Other 13-Apr-23 WWTP 14-Apr-23 Generator 14-Apr-23 Travelling Bridge 15-Apr-23 Pump 17-Apr-23 WWTP 17-Apr-23 WWTP 17-Apr-23 Instrumentation 17-Apr-23 Alarm 17-Apr-23 Belt Press 17-Apr-23 Other 18-Apr-23 Sampler 18-Apr-23 Alarm 20-Apr-23 Alarm

Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative

Belt Press Roller Bearings WPCP LAB Spectro WPCP Watertrax Data SFWWS1\WIN911 SFWWS2\WIN911 Weirs (Primary Tanks) WPCP Drager Gas Detector Diesel Generator H2S BPR WPCP

SFWWS1\WIN911

Preventative

Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative

Preventative

SFWWS2\WIN911

Watertrax Data WPCP Diesel Generator Watertrax Data M111 SFWWS1\WIN911 SFWWS2\WIN911 WPCP

Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative

Preventative

Pelletcyclone Watertrax Data Diesel Generator SFWWS1\WIN911 SFWWS2\WIN911 WPCP Diesel Generator SFWWS2\WIN911 SFWWS1\WIN911 Farm King Outdoor Auger M1430 Watertrax Data Weirs (Secondary Tank) WPCP Diesel Generator CP605 M3020 WPCP WPCP LAB Spectro WPCP SFWWS2\WIN911 Belt Press Roller Bearings RAS (building) Samplers SFWWS1\WIN911 Fire Alarm System WPCP

Verification Verification Genset operation Clean and Inspect Filter Backwash Operational Verification Verification WPCP Pump Rotations Genset operation Clean and Inspect Clean and Inspect Clean and Inspect Clean and Inspect Verification Verification Clean and Inspect Filter Backwash Verification Genset operation

Clean and Inspect

Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative

Clean and Inspect WPCP Pump Rotations Verification Verification Verification Verification Clean and Inspect Alarm Testing Calibration Genset operation Calibration WPCP Pump Rotations

Verification

Verification

Verification WPCP Pump Rotations Genset operation Verification Clean and Inspect Verification Verification WPCP Pump Rotations

Jacob Kerr Jacob Kerr Steve LaPlante Steve LaPlante Steve LaPlante Molly Buckland Tyler George Tyler George Operators Waste Water Plant Operators Waste Water Plant Operators Waste Water Plant Tyler George Tyler George Tyler George Molly Buckland Molly Buckland Molly Buckland Molly Buckland Molly Buckland Molly Buckland

Clean and Inspect

Clean and Inspect Verification Genset operation Verification Verification WPCP Pump Rotations Genset operation Verification Verification Operational Clean and Inspect Verification Clean and Inspect WPCP Pump Rotations Genset operation Clean and Inspect Clean and Inspect WPCP Pump Rotations Alarm Testing Verification Verification Clean and Inspect Clean and Inspect Calibration Verification Operational

Completed on call list Disinfected

Operators Waste Water Plant Operators Waste Water Plant Molly Buckland Molly Buckland Steve LaPlante Steve LaPlante Operators Waste Water Plant Operators Waste Water Plant Tyler George Operators Waste Water Plant Molly Buckland Operators Waste Water Plant

Removed debris from vibrating sifter.

Jacob Kerr

Jacob Kerr Jacob Kerr Jacob Kerr Molly Buckland Molly Buckland Molly Buckland Molly Buckland Molly Buckland Molly Buckland

Changed on call list. Changed in call list Generator Check Form Complete Disinfected Completed Completed, no fines seeping through brushes Changed Changed Rotated Generator Check Form Complete Inspected and oiled all chains on pelletizer. Completed Checked Greased Completed Completed Completed Completed Completed Generator Check Form Complete Completed cleaning of vibrating sifter. Completed greasing of all fittings on belt press. Rotated Completed Completed Completed N/a

Jacob Kerr

Jacob Kerr Molly Buckland Molly Buckland Steve LaPlante Changed Steve LaPlante Changed Operators Waste Water Plant Rotated Operators Waste Water Plant Tyler George Tyler George Tyler George Tyler George Tyler George Molly Buckland Operators Waste Water Plant Operators Waste Water Plant Operators Waste Water Plant Completed Tyler George Molly Buckland Operators Waste Water Plant Jacob Kerr Jacob Kerr Devin Wilkinson Tyler George Molly Buckland Molly Buckland Molly Buckland

Changed alarm call out list.

Generator Check Form Complete

Rotated Changed list as required.

Changed alarm call out list.

Changed on call list. Completed data entry into watertrax.

Inspected and oiled all chains and sprockets on Pelletizer

Generator Check Form Complete Completed Completed Changed Completed

Completed oiling of all chains and sprockets.

Inspected and replaced all mufflers that were plugged. Completed Generator Check Form Complete Changed Changed Rotated Generator Check Form Complete Changed Changed In good condition Checked Entered Completed

Generator Check Form Complete Completed Greased

Switched on call list. Greased belt press. Greased Completed Completed Completed on April 19


21-Apr-23 Other 21-Apr-23 Generator 21-Apr-23 Other 24-Apr-23 Alarm 24-Apr-23 Alarm 24-Apr-23 WWTP 27-Apr-23 Bar Screen 27-Apr-23 Bar Screen 27-Apr-23 Generator 29-Apr-23 WWTP 01-May-23 Other 02-May-23 Alarm 02-May-23 Alarm 02-May-23 WWTP 02-May-23 Pelletizer 02-May-23 Other 02-May-23 Mixer 05-May-23 Generator 05-May-23 Instrumentation 08-May-23 Other 08-May-23 Alarm 08-May-23 Alarm 08-May-23 WWTP 09-May-23 Generator 12-May-23 Sizer 15-May-23 WWTP 15-May-23 Alarm 15-May-23 Alarm 15-May-23 Other 15-May-23 Building 17-May-23 Travelling Bridge

18-May-23 Mixer

19-May-23 Pump 23-May-23 WWTP 23-May-23 Alarm 23-May-23 Belt Press 23-May-23 WWTP 23-May-23 Alarm 23-May-23 Drive Unit 24-May-23 Other 25-May-23 Generator 26-May-23 Other 29-May-23 Alarm 29-May-23 Alarm 29-May-23 Instrumentation 29-May-23 WWTP 02-Jun-23 Generator 02-Jun-23 Other 05-Jun-23 Alarm 05-Jun-23 Alarm 06-Jun-23 WWTP 07-Jun-23 Other 08-Jun-23 Generator 09-Jun-23 Other 13-Jun-23 Alarm 13-Jun-23 Alarm 13-Jun-23 WWTP 15-Jun-23 Generator 18-Jun-23 Other 19-Jun-23 Alarm 19-Jun-23 Alarm 21-Jun-23 WWTP 22-Jun-23 Generator 22-Jun-23 Pump 23-Jun-23 Other 23-Jun-23 WWTP 26-Jun-23 Alarm 26-Jun-23 Alarm 27-Jun-23 Belt Press 28-Jun-23 Other 01-Jul-23 WWTP 04-Jul-23 Alarm 04-Jul-23 Alarm

Watertrax Data Diesel Generator Weirs (Primary Tanks) SFWWS1\WIN911 SFWWS2\WIN911 WPCP screen1 screen2 Diesel Generator WPCP Pelletcyclone SFWWS1\WIN911 SFWWS2\WIN911 WPCP Pelletizer Watertrax Data M920 Diesel Generator LT1210 Watertrax Data SFWWS1\WIN911 SFWWS2\WIN911 WPCP Diesel Generator M1430 WPCP SFWWS1\WIN911 SFWWS2\WIN911 Watertrax Data Raw Sludge (Building) CP605

M930

M3020 WPCP SFWWS1\WIN911 Belt Press Roller Bearings WPCP SFWWS2\WIN911 M1140A Weirs (Secondary Tank) Diesel Generator Watertrax Data SFWWS1\WIN911 SFWWS2\WIN911 LAB Spectro WPCP WPCP Diesel Generator Watertrax Data SFWWS1\WIN911 SFWWS2\WIN911 WPCP Weirs (Primary Tanks) Diesel Generator Watertrax Data SFWWS1\WIN911 SFWWS2\WIN911 WPCP Diesel Generator Watertrax Data SFWWS1\WIN911 SFWWS2\WIN911 WPCP Diesel Generator M3020 Watertrax Data WPCP SFWWS1\WIN911 SFWWS2\WIN911 Belt Press Roller Bearings Weirs (Secondary Tank) WPCP SFWWS1\WIN911 SFWWS2\WIN911

Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative Preventative

Verification Genset operation Clean and Inspect Verification Verification WPCP Pump Rotations Clean and Inspect Clean and Inspect Genset operation WPCP Pump Rotations Clean and Inspect Verification Verification WPCP Pump Rotations Clean and Inspect Verification Clean and Inspect Genset operation Clean and Inspect Verification Verification Verification WPCP Pump Rotations Genset operation Clean and Inspect WPCP Pump Rotations Verification Verification Verification Operational Clean and Inspect

Maintenance (General)

Clean and Inspect WPCP Pump Rotations Verification Clean and Inspect Alarm Testing Verification Maintenance (General) Clean and Inspect Genset operation Verification Verification Verification Verification WPCP Pump Rotations Genset operation Verification Verification Verification WPCP Pump Rotations Clean and Inspect Genset operation Verification Verification Verification WPCP Pump Rotations Genset operation Verification Verification Verification WPCP Pump Rotations Genset operation Clean and Inspect Verification Alarm Testing Verification Verification Clean and Inspect Clean and Inspect WPCP Pump Rotations Verification Verification

Molly Buckland Jacob Kerr Molly Buckland Operators Waste Water Plant Operators Waste Water Plant Complete Operators Waste Water Plant Rotated Operators Waste Water Plant Operators Waste Water Plant Operators Waste Water Plant Operators Waste Water Plant Rotated Tyler George Operators Waste Water Plant Changed Operators Waste Water Plant Changed Operators Waste Water Plant Rotated Molly Buckland Operators Waste Water Plant Entered Operators Waste Water Plant Change oil Operators Waste Water Plant Tyler George Operators Waste Water Plant Operators Waste Water Plant Changed Operators Waste Water Plant Changed Operators Waste Water Plant Rotated Operators Waste Water Plant Tyler George Operators Waste Water Plant Rotated Operators Waste Water Plant Change Operators Waste Water Plant Change Operators Waste Water Plant Entered Operators Waste Water Plant Exercised Operators Waste Water Plant Hosed filters Down for tank cleaning, Steve LaPlante change oil.

Tyler George Operators Waste Water Plant Operators Waste Water Plant Molly Buckland Operators Waste Water Plant Operators Waste Water Plant Operators Waste Water Plant Jacob Kerr Operators Waste Water Plant Operators Waste Water Plant Molly Buckland Molly Buckland Molly Buckland Molly Buckland Operators Waste Water Plant Molly Buckland Tyler George Tyler George Molly Buckland Molly Buckland Molly Buckland Molly Buckland Operators Waste Water Plant Operators Waste Water Plant Operators Waste Water Plant Operators Waste Water Plant Operators Waste Water Plant Molly Buckland Molly Buckland Molly Buckland Jacob Kerr Jacob Kerr Molly Buckland Operators Waste Water Plant Tyler George Tyler George Jacob Kerr Molly Buckland Tyler George Molly Buckland Molly Buckland

Rotated Change Changed Replaced Entered Changed Changed Rotated Entered

Completed Generator Check Form Complete Completed Changed Complete Rotated Greased Greased Generator Check Form Complete Rotated Checked, in good condition Changed Changed Rotated Completed Entered Change oil Generator Check Form Complete Not needed at this time Entered Changed Changed Rotated Generator Check Form Complete Checked Rotated Change Change Entered Exercised Hosed filters

Changed oil while down for tank cleaning. Greased Rotated Change Completed

Changed Replaced Hosed all secondary weirs. Generator Check Form Complete Entered Completed Completed

Generator Check Form Complete Completed Changed Changed

Completed Generator Check Form Complete Completed Changed Changed Rotated Generator Check Form Complete Entered Completed Completed

Generator Check Form Complete Greased all fittings on pump with three pumps of grease. Completeled

Changed Changed Checked all bearings and greased all pillow blocks. Completed

Completed Completed


04-Jul-23WWTPWPCPPreventativeWPCP Pump RotationsMolly Buckland
05-Jul-23InstrumentationLAB Spectro WPCPPreventativeVerificationMolly Buckland
05-Jul-23PelletizerPelletizerPreventativeClean and InspectJacob Kerr
06-Jul-23WWTPWPCPPreventativeWPCP Pump RotationsMolly Buckland
06-Jul-23GeneratorDiesel GeneratorPreventativeGenset operationMolly Buckland
08-Jul-23OtherWeirs (Primary Tanks)PreventativeClean and InspectMolly Buckland
10-Jul-23OtherPelletcyclonePreventativeClean and InspectTyler George
10-Jul-23SizerM1430PreventativeClean and InspectTyler George
10-Jul-23AlarmSFWWS1\WIN911PreventativeVerificationTyler George
10-Jul-23AlarmSFWWS2\WIN911PreventativeVerificationTyler George
10-Jul-23Travelling BridgeCP605PreventativeClean and InspectTyler George
10-Jul-23OtherWatertrax DataPreventativeVerificationMolly Buckland
17-Jul-23AlarmSFWWS1\WIN911PreventativeVerificationMolly Buckland
17-Jul-23AlarmSFWWS2\WIN911PreventativeVerificationMolly Buckland
18-Jul-23WWTPWPCPPreventativeWPCP Pump RotationsMolly Buckland
20-Jul-23GeneratorDiesel GeneratorPreventativeGenset operationMolly Buckland
20-Jul-23OtherWatertrax DataPreventativeVerificationMolly Buckland
21-Jul-23TankWET WELLPreventativeClean and InspectTyler George
21-Jul-23Brit RemovalM111PreventativeClean and InspectMolly Buckland
21-Jul-23OtherRAS (building)PreventativeClean and InspectMolly Buckland
21-Jul-23PumpM3020PreventativeClean and InspectMolly Buckland
21-Jul-23BlowerM401PreventativeClean and InspectMolly Buckland
24-Jul-23AlarmSFWWS1\WIN911PreventativeVerificationTyler George
24-Jul-23AlarmSFWWS2\WIN911PreventativeVerificationTyler George
26-Jul-23WWTPWPCPPreventativeWPCP Pump RotationsTyler George
27-Jul-23GeneratorDiesel GeneratorPreventativeGenset operationJacob Kerr
28-Jul-23Bar Screenscreen1PreventativeClean and InspectTyler George
28-Jul-23Bar Screenscreen2PreventativeClean and InspectTyler George
29-Jul-23OtherWeirs (Secondary Tank)PreventativeClean and InspectTyler George
30-Jul-23Belt PressBelt Press Roller BearingsPreventativeClean and InspectTyler George
31-Jul-23AlarmSFWWS1\WIN911PreventativeVerificationMolly Buckland
31-Jul-23AlarmSFWWS2\WIN911PreventativeVerificationMolly Buckland
01-Aug-23WWTPWPCPPreventativeWPCP Pump RotationsMolly Buckland
01-Aug-23WWTPWPCPPreventativeAlarm TestingMolly Buckland
03-Aug-23WWTPWPCPPreventativeWPCP Pump RotationsMolly Buckland
03-Aug-23GeneratorDiesel GeneratorPreventativeGenset operationJacob Kerr
04-Aug-23PelletizerPelletizerPreventativeClean and InspectMolly Buckland
04-Aug-23UV LampsM501PreventativeClean and InspectMolly Buckland
04-Aug-23OtherWatertrax DataPreventativeVerificationMolly Buckland
09-Aug-23AlarmSFWWS1\WIN911PreventativeVerificationTyler George
09-Aug-23AlarmSFWWS2\WIN911PreventativeVerificationTyler George
09-Aug-23WWTPWPCPPreventativeWPCP Pump RotationsTyler George
09-Aug-23InstrumentationLT1210PreventativeClean and InspectTyler George
09-Aug-23GeneratorDiesel GeneratorPreventativeClean and InspectTyler George
12-Aug-23Travelling BridgeCP605PreventativeClean and InspectTyler George
12-Aug-23SizerM1430PreventativeClean and InspectTyler George
14-Aug-23GeneratorDiesel GeneratorPreventativeGenset operationJacob Kerr
14-Aug-23OtherWatertrax DataPreventativeVerificationTyler George
14-Aug-23AlarmSFWWS1\WIN911PreventativeVerificationMolly Buckland
14-Aug-23AlarmSFWWS2\WIN911PreventativeVerificationMolly Buckland
14-Aug-23InstrumentationLAB Spectro WPCPPreventativeVerificationMolly Buckland
14-Aug-23OtherPelletcyclonePreventativeClean and InspectTyler George
16-Aug-23WWTPWPCPPreventativeWPCP Pump RotationsMolly Buckland
18-Aug-23OtherWatertrax DataPreventativeVerificationMolly Buckland
19-Aug-23AlarmSFWWS1\WIN911PreventativeVerificationTyler George
19-Aug-23AlarmSFWWS2\WIN911PreventativeVerificationTyler George
21-Aug-23UV LampsUV632PreventativeClean and InspectJacob Kerr
22-Aug-23PumpM3020PreventativeClean and InspectJacob Kerr
22-Aug-23GeneratorDiesel GeneratorPreventativeGenset operationJacob Kerr
22-Aug-23BuildingRaw Sludge (Building)PreventativeOperationalJacob Kerr
23-Aug-23OtherWeirs (Primary Tanks)PreventativeClean and InspectJacob Kerr
24-Aug-23WWTPWPCPPreventativeWPCP Pump RotationsTyler George
27-Aug-23OtherWatertrax DataPreventativeVerificationTyler George
28-Aug-23AlarmSFWWS1\WIN911PreventativeVerificationMolly Buckland
28-Aug-23AlarmSFWWS2\WIN911PreventativeVerificationMolly Buckland
31-Aug-23OtherWeirs (Secondary Tank)PreventativeClean and InspectMolly Buckland
31-Aug-23Travelling BridgeCP605PreventativeClean and InspectMolly Buckland
31-Aug-23Travelling BridgeCP605PreventativeFilter BackwashMolly Buckland
01-Sep-23WWTPWPCPPreventativeWPCP Pump RotationsMolly Buckland
01-Sep-23GeneratorDiesel GeneratorPreventativeGenset operationMolly Buckland
01-Sep-23OtherWatertrax DataPreventativeVerificationMolly Buckland
01-Sep-23Travelling BridgeCP604PreventativeClean and InspectMolly Buckland
01-Sep-23Travelling BridgeCP604PreventativeFilter BackwashMolly Buckland
01-Sep-23WWTPWPCPPreventativeAlarm TestingMolly Buckland

Oiled all Pelletizer chains and sprockets.

Wetwell in good shape, will revisit in late summer/fall

Generator Check Form Complete Not needed Not needed Cleaned Completed Completed Completed

Cleaned with Tower Electronics Completed Cleaned No damage Generator Check Form Complete Entered Completed Completed

Bank B now completed racks 1-9, lamp #2 on rack 8 replaced.


05-Sep-23Belt PressBelt Press Roller BearingsPreventativeClean and InspectTyler George
05-Sep-23AlarmSFWWS1\WIN911PreventativeVerificationTyler George
05-Sep-23AlarmSFWWS2\WIN911PreventativeVerificationTyler George
06-Sep-23WWTPWPCPPreventativeWPCP Pump RotationsMolly Buckland
06-Sep-23WWTPWPCPPreventativeWPCP Pump RotationsMolly Buckland
11-Sep-23AlarmSFWWS1\WIN911PreventativeVerificationMolly Buckland
11-Sep-23AlarmSFWWS2\WIN911PreventativeVerificationMolly Buckland
12-Sep-23PelletizerPelletizerPreventativeClean and InspectAndrew Stoll
12-Sep-23Travelling BridgeCP605PreventativeClean and InspectMolly Buckland
12-Sep-23GeneratorDiesel GeneratorPreventativeGenset operationMolly Buckland
14-Sep-23WWTPWPCPPreventativeWPCP Pump RotationsMolly Buckland
15-Sep-23OtherWatertrax DataPreventativeVerificationMolly Buckland
15-Sep-23InstrumentationLAB Spectro WPCPPreventativeVerificationMolly Buckland
18-Sep-23SizerM1430PreventativeClean and InspectMolly Buckland
18-Sep-23OtherPelletcyclonePreventativeClean and InspectMolly Buckland
19-Sep-23AlarmSFWWS1\WIN911PreventativeVerificationTyler George
19-Sep-23AlarmSFWWS2\WIN911PreventativeVerificationTyler George
21-Sep-23GeneratorDiesel GeneratorPreventativeGenset operationMolly Buckland
21-Sep-23WWTPWPCPPreventativeWPCP Pump RotationsMolly Buckland
22-Sep-23OtherWeirs (Primary Tanks)PreventativeClean and InspectMolly Buckland
25-Sep-23AlarmSFWWS1\WIN911PreventativeVerificationMolly Buckland
25-Sep-23AlarmSFWWS2\WIN911PreventativeVerificationMolly Buckland
25-Sep-23OtherWatertrax DataPreventativeVerificationMolly Buckland
26-Sep-23PumpM3020PreventativeClean and InspectMolly Buckland
26-Sep-23GeneratorDiesel GeneratorPreventativeGenset operationMolly Buckland
29-Sep-23OtherWatertrax DataPreventativeVerificationMolly Buckland
29-Sep-23WWTPWPCPPreventativeWPCP Pump RotationsMolly Buckland
02-Oct-23AlarmSFWWS1\WIN911PreventativeVerificationTyler George
02-Oct-23AlarmSFWWS2\WIN911PreventativeClean and InspectTyler George
05-Oct-23OtherWeirs (Secondary Tank)PreventativeClean and InspectTyler George
07-Oct-23WWTPWPCPPreventativeWPCP Pump RotationsTyler George
07-Oct-23WWTPWPCPPreventativeWPCP Pump RotationsTyler George
10-Oct-23AlarmSFWWS1\WIN911PreventativeVerificationMolly Buckland
10-Oct-23AlarmSFWWS2\WIN911PreventativeVerificationMolly Buckland
10-Oct-23Pelletizer1510 - Dust CollectorPreventativeClean and InspectMolly Buckland
10-Oct-23OtherPelletcyclonePreventativeClean and InspectJacob Kerr
10-Oct-23PelletizerPelletizerPreventativeClean and InspectJacob Kerr
11-Oct-23GeneratorDiesel GeneratorPreventativeGenset operationMolly Buckland
11-Oct-23WWTPWPCPPreventativeAlarm TestingAndrew Stoll
13-Oct-23WWTPWPCPPreventativeWPCP Pump RotationsMolly Buckland
13-Oct-23OtherWatertrax DataPreventativeVerificationMolly Buckland
13-Oct-23Travelling BridgeCP605PreventativeClean and InspectMolly Buckland
16-Oct-23AlarmSFWWS1\WIN911PreventativeVerificationTyler George
16-Oct-23AlarmSFWWS2\WIN911PreventativeVerificationTyler George
16-Oct-23PelletizerPelletizerPreventativeRun Time HoursTyler George
18-Oct-23PelletizerPelletizerPreventativeMaintenance (General)Jacob Kerr
18-Oct-23PelletizerPelletizerPreventativeClean and InspectJacob Kerr
18-Oct-23PelletizerPelletizerPreventativeClean and InspectJacob Kerr
18-Oct-23PelletizerPelletizerPreventativeMaintenance (General)Jacob Kerr
18-Oct-23PelletizerPelletizerPreventativeClean and InspectJacob Kerr
18-Oct-23PelletizerPelletizerPreventativeMaintenance (General)Jacob Kerr
20-Oct-23OtherWatertrax DataPreventativeVerificationMolly Buckland
23-Oct-23AlarmSFWWS1\WIN911PreventativeVerificationMolly Buckland
23-Oct-23AlarmSFWWS2\WIN911PreventativeVerificationMolly Buckland
24-Oct-23FacilityLaboratoryPreventativeLab (WPCP)Harrison Leitch
24-Oct-23WWTPWPCPPreventativeWPCP Pump RotationsMolly Buckland
24-Oct-23FacilityLaboratoryPreventativeLab (WPCP)Molly Buckland
25-Oct-23Belt PressBelt Press Roller BearingsPreventativeClean and InspectAndrew Stoll
25-Oct-23FacilityLaboratoryPreventativeLab (WPCP)Molly Buckland
25-Oct-23PelletizerPelletizerPreventativeRun Time HoursJacob Kerr
25-Oct-23PelletizerPelletizerPreventativeClean and InspectJacob Kerr
26-Oct-23GeneratorDiesel GeneratorPreventativeGenset operationMolly Buckland
26-Oct-23OtherRAS (building)PreventativeClean and InspectTyler George
26-Oct-23OtherWeirs (Primary Tanks)PreventativeClean and InspectTyler George
27-Oct-23FacilityLaboratoryPreventativeLab (WPCP)Molly Buckland
27-Oct-23SizerM1430PreventativeClean and InspectMolly Buckland
30-Oct-23AlarmSFWWS1\WIN911PreventativeVerificationTyler George
30-Oct-23AlarmSFWWS2\WIN911PreventativeVerificationTyler George
30-Oct-23Bar Screenscreen1PreventativeClean and InspectTyler George
30-Oct-23Bar Screenscreen2PreventativeClean and InspectTyler George
31-Oct-23PelletizerPelletizerPreventativeClean and InspectMolly Buckland
Greased Changed Changed
Complete Completed
Completed
Oiled all chains. All chains in good condition.
Completed by TG
Generator Check Form Complete
Completed
Completed. Only hair no insulation
All looked okay, did not need to change
Changed
Changed
Generator Check Form Complete
Completed
Completed
Completed
Greased and tightened packing
Generator Check Form Complete
Entered
Changed
Changed
Cleaned
ChangedHpew changed #2 duty
ChangedChanged
ChangedChanged
ChangedNot completed, will inspect once sludge levels are down
ChangedReplaced all mufflers on Pelletizer last Thursday.
ChangedOiled all Pelletizer chains
ChangedGenerator Check Form Complete
Completed
Completed by AS
Changed
Changed
Completed
Greased all equipment on dry side.
Cleaned drying drum area.Completed sweep of drying drum area.
Cleaned drying drum area..
Cleaned drying drum area.Checked all oil reservoirs.
Cleaned drying drum area.Clean belt press room floor with bleach.
Cleaned drying drum area.Uses pressurized air to clean compressor filter.
Cleaned drying drum area.Emptied compressor oil bucket into 55 gallon drum.
Cleaned drying drum area.Completed
Cleaned drying drum area.Completed
Cleaned drying drum area.Changed
Cleaned drying drum area.Changed
All pillow blocks greased.Inspect all pillow blocks. Good.
All pillow blocks greased.Completed daily totals from September 22nd to October 13.
All pillow blocks greased.Ensured bathroom was correctly stocked and cleaned.
All pillow blocks greased.Generator Check Form Complete
All pillow blocks greased.Greased
All pillow blocks greased.Cleaned
All pillow blocks greased.Completed by As
All pillow blocks greased.Changed
All pillow blocks greased.Changed
All pillow blocks greased.Done
All pillow blocks greased.Done
All pillow blocks greased.completed

Cleaned all drying drum wheels and swept floor surface

01-Nov-23PelletizerPelletizerPreventativeRun Time HoursMolly Buckland
01-Nov-23PelletizerPelletizerPreventativeMaintenance (General)Molly Buckland
01-Nov-23PumpM3020PreventativeClean and InspectMolly Buckland
02-Nov-23FacilityLaboratoryPreventativeLab (WPCP)Tyler George
02-Nov-23GeneratorDiesel GeneratorPreventativeGenset operationTyler George
02-Nov-23PelletizerPelletizerPreventativeClean and InspectTyler George
02-Nov-23OtherWatertrax DataPreventativeVerificationTyler George
02-Nov-23WWTPWPCPPreventativeWPCP Pump RotationsTyler George
03-Nov-23FacilityLaboratoryPreventativeLab (WPCP)Tyler George
04-Nov-23FacilityLaboratoryPreventativeLab (WPCP)Tyler George
06-Nov-23AlarmSFWWS1\WIN911PreventativeVerificationMolly Buckland
06-Nov-23AlarmSFWWS2\WIN911PreventativeVerificationMolly Buckland
06-Nov-23FacilityLaboratoryPreventativeLab (WPCP)Molly Buckland
06-Nov-23InstrumentationLAB Spectro WPCPPreventativeVerificationMolly Buckland
06-Nov-23SamplerSamplersPreventativeCalibrationMolly Buckland
06-Nov-23Grit RemovalM111PreventativeClean and InspectMolly Buckland
07-Nov-23WWTPWPCPPreventativeWPCP Pump RotationsMolly Buckland
08-Nov-23FacilityLaboratoryPreventativeLab (WPCP)Molly Buckland
08-Nov-23PelletizerPelletizerPreventativeClean and InspectJacob Kerr
09-Nov-23WWTPWCPPreventativeWPCP Pump RotationsMolly Buckland
09-Nov-23PelletizerPelletizerPreventativeRun Time HoursJacob Kerr
10-Nov-23FacilityLaboratoryPreventativeLab (WPCP)Molly Buckland
10-Nov-23OtherWatertrax DataPreventativeVerificationMolly Buckland
10-Nov-23GeneratorDiesel GeneratorPreventativeGenset operationMolly Buckland
10-Nov-23PelletizerPelletizerPreventativeClean and InspectMolly Buckland
10-Nov-23WWTPWPCPPreventativeAlarm TestingMolly Buckland
14-Nov-23PelletizerPelletizerPreventativeClean and InspectAndrew Stoll
14-Nov-23AlarmSFWWS1\WIN911PreventativeVerificationTyler George
14-Nov-23AlarmSFWWS2\WIN911PreventativeVerificationTyler George
14-Nov-23PelletizerPelletizerPreventativeMaintenance (General)Andrew Stoll
16-Nov-23FacilityLaboratoryPreventativeLab (WPCP)Tyler George
16-Nov-23GeneratorDiesel GeneratorPreventativeGenset operationTyler George
17-Nov-23Travelling BridgeCP605PreventativeClean and InspectTyler George
17-Nov-23WWTPWPCPPreventativeWPCP Pump RotationsTyler George
17-Nov-23OtherWatertrax DataPreventativeVerificationTyler George
20-Nov-23AlarmSFWWS1\WIN911PreventativeVerificationMolly Buckland
20-Nov-23AlarmSFWWS2\WIN911PreventativeVerificationMolly Buckland
20-Nov-23FacilityLaboratoryPreventativeLab (WPCP)Molly Buckland
21-Nov-23BuildingRaw Sludge (Building)PreventativeOperationalMolly Buckland
21-Nov-23PelletizerPelletizerPreventativeMaintenance (General)Jacob Kerr
21-Nov-23PelletizerPelletizerPreventativeClean and InspectJacob Kerr
21-Nov-23OtherPelletcyclonePreventativeClean and InspectJacob Kerr
21-Nov-23PelletizerPelletizerPreventativeClean and InspectJacob Kerr
22-Nov-23FacilityLaboratoryPreventativeLab (WPCP)Molly Buckland
23-Nov-23InstrumentationLT1210PreventativeClean and InspectTyler George
23-Nov-23PelletizerPelletizerPreventativeMaintenance (General)Tyler George
23-Nov-23WWTPWPCPPreventativeWPCP Pump RotationsMolly Buckland
23-Nov-23OtherWeirs (Secondary Tank)PreventativeClean and InspectAndrew Stoll
23-Nov-23PelletizerPelletizerPreventativeClean and InspectMolly Buckland
23-Nov-23PelletizerPelletizerPreventativeClean and InspectJacob Kerr
23-Nov-23PelletizerPelletizerPreventativeRun Time HoursJacob Kerr
23-Nov-23PelletizerPelletizerPreventativeClean and InspectJacob Kerr
23-Nov-23PelletizerPelletizerPreventativeClean and InspectJacob Kerr
24-Nov-23GeneratorDiesel GeneratorPreventativeGenset operationMolly Buckland
24-Nov-23FacilityLaboratoryPreventativeLab (WPCP)Molly Buckland
24-Nov-23OtherWatertrax DataPreventativeVerificationMolly Buckland
27-Nov-23AlarmSFWWS2\WIN911PreventativeVerificationMolly Buckland
27-Nov-23AlarmSFWWS1\WIN911PreventativeVerificationMolly Buckland
28-Nov-23FacilityLaboratoryPreventativeLab (WPCP)Tyler George
28-Nov-23SizerM1430PreventativeClean and InspectTyler George
30-Nov-23InstrumentationH2S BPRPreventativeCalibrationTyler George
30-Nov-23Belt PressBelt Press Roller BearingsPreventativeClean and InspectJacob Kerr
30-Nov-23PelletizerPelletizerPreventativeClean and InspectJacob Kerr
30-Nov-23OtherWeirs (Primary Tanks)PreventativeClean and InspectAndrew Stoll
01-Dec-23GeneratorDiesel GeneratorPreventativeGenset operationMolly Buckland
01-Dec-23PelletizerPelletizerPreventativeClean and InspectMolly Buckland
01-Dec-23WWTPWPCPPreventativeWPCP Pump RotationsMolly Buckland
01-Dec-23PumpM3020PreventativeClean and InspectMolly Buckland
01-Dec-23FacilityLaboratoryPreventativeLab (WPCP)Molly Buckland
01-Dec-23OtherWatertrax DataPreventativeVerificationMolly Buckland
04-Dec-23AlarmSFWWS2\WIN911PreventativeVerificationMolly Buckland

Completed Checked all oil reservoirs ensuring proper levels. Cleaned bathroom. All mufflers are still good as they are larger than previous mufflers and were done not long ago. Oiled all chains in Pelletizer building.

Completed Completed

Hosed off weirs. Completed Completed full sweep of downstairs and pressure washed belt press room. Entered previous weeks daily totals. Completed pressure washing of room Sprayed downstairs channel. Completed

Greased and inspected belt press. Bathroom cleaned and toilet paper replaced. Hosed down all weirs. Generator Check Form Complete Completed

Completed Changed


04-Dec-23AlarmSFWWS1\WIN911PreventativeVerificationMolly Buckland
04-Dec-23FacilityLaboratoryPreventativeLab (WPCP)Molly Buckland
04-Dec-23InstrumentationLAB Spectro WPCPPreventativeVerificationMolly Buckland
05-Dec-23GeneratorDiesel GeneratorPreventativeGenset operationMolly Buckland
06-Dec-23FacilityLaboratoryPreventativeLab (WPCP)Molly Buckland
07-Dec-23WWTPWPCPPreventativeWPCP Pump RotationsMolly Buckland
08-Dec-23FacilityLaboratoryPreventativeLab (WPCP)Molly Buckland
08-Dec-23OtherWatertrax DataPreventativeVerificationMolly Buckland
08-Dec-23PelletizerPelletizerPreventativeClean and InspectMolly Buckland
08-Dec-23PelletizerPelletizerPreventativeRun Time HoursJacob Kerr
08-Dec-23PelletizerPelletizerPreventativeClean and InspectJacob Kerr
08-Dec-23PelletizerPelletizerPreventativeMaintenance (General)Jacob Kerr
12-Dec-23AlarmSFWWS2\WIN911PreventativeVerificationTyler George
12-Dec-23AlarmSFWWS1\WIN911PreventativeVerificationTyler George
12-Dec-23FacilityLaboratoryPreventativeLab (WPCP)Andrew Stoll
12-Dec-23Flow MeterFT507PreventativeCalibrationTyler George
12-Dec-23Flow MeterFT617PreventativeCalibrationTyler George
12-Dec-23InstrumentationFT128PreventativeCalibrationTyler George
12-Dec-23PelletizerPelletizerPreventativeClean and InspectAndrew Stoll
14-Dec-23FacilityLaboratoryPreventativeLab (WPCP)Andrew Stoll
14-Dec-23Travelling BridgeCP605PreventativeClean and InspectAndrew Stoll
16-Dec-23WWTPWPCPPreventativeWPCP Pump RotationsTyler George
16-Dec-23InstrumentationDrager Gas DetectorPreventativeCalibrationTyler George
17-Dec-23FacilityLaboratoryPreventativeLab (WPCP)Tyler George
18-Dec-23AlarmSFWWS2\WIN911PreventativeVerificationMolly Buckland
18-Dec-23AlarmSFWWS1\WIN911PreventativeVerificationMolly Buckland
18-Dec-23FacilityLaboratoryPreventativeLab (WPCP)Molly Buckland
19-Dec-23PelletizerPelletizerPreventativeMaintenance (General)Jacob Kerr
19-Dec-23PelletizerPelletizerPreventativeClean and InspectJacob Kerr
19-Dec-23GeneratorDiesel GeneratorPreventativeGenset operationJacob Kerr
19-Dec-23PelletizerPelletizerPreventativeMaintenance (General)Jacob Kerr
22-Dec-23WWTPWPCPPreventativeWPCP Pump RotationsMolly Buckland
22-Dec-23FacilityLaboratoryPreventativeLab (WPCP)Molly Buckland
22-Dec-23OtherWatertrax DataPreventativeVerificationMolly Buckland
27-Dec-23AlarmSFWWS2\WIN911PreventativeVerificationTyler George
27-Dec-23AlarmSFWWS1\WIN911PreventativeVerificationTyler George
28-Dec-23FacilityLaboratoryPreventativeLab (WPCP)Tyler George
29-Dec-23PelletizerPelletizerPreventativeMaintenance (General)Jacob Kerr
29-Dec-23SizezM1430PreventativeClean and InspectTyler George
29-Dec-23PelletizerPelletizerPreventativeMaintenance (General)Tyler George
29-Dec-23PelletizerPelletizerPreventativeClean and InspectJacob Kerr
29-Dec-23PelletizerPelletizerPreventativeClean and InspectTyler George
29-Dec-23PelletizerPelletizerPreventativeClean and InspectJacob Kerr
29-Dec-23OtherPelletcyclonePreventativeClean and InspectTyler George
29-Dec-23PelletizerPelletizerPreventativeClean and InspectJacob Kerr
29-Dec-23GeneratorDiesel GeneratorPreventativeGenset operationJacob Kerr
29-Dec-23PumpM3020PreventativeClean and InspectJacob Kerr
31-Dec-23FacilityLaboratoryPreventativeLab (WPCP)Tyler George

Changed

Generator Check Form Complete

Completed Completed All reports are up to date Sprayed down channel downstairs. Emptied out compressor oil bucket. Changed Changed Complete Completed Completed Completed Complete Complete Complete Not due yet Completed Completed Dry side greased less than two weeks ago. Sweeping of full building completed two weeks ago, still up to standards. Generator ran last week. Test. Emptied compressor oil bucket. Entered Changed Changed Oil levels still good. Cleaned Completed Blew out compressor filter. Cleaned Cleaned trough. No change needed Floor has been swept. Ran generator on test for 30 minutes. Press feed pump greased.


2023 Corrective Maintenance

Town of Smiths Falls 2023 Performance Assessment Report - WPCP Works # 120000890 Conventional Tertiary Treatment UV Disinfection / Pelletization

DateAsset CategoryAsset DescriptionMaintenance TypeMaintenance Sub TypeCompleted ByDescription of Maintenance RequiredComments (1)Comments (2)
09-Jan-23PumpP101CorrectiveRepairSteve LaPlante, Jake KerrEarth fault, send out for o/hRebuilt - Hewitts, wired by Solid State.
20-Jan-23PumpM3050CorrectiveRepairS.L. TG. MB JKPump binding up, not turning freely. Dismantle entire pump end to end. Joint between drive and auger is worn and cylinder pin broken into three pieces. Replace joint parts. Pin holding auger in place also broken - replace. Replace auger and coupling rods and pins both ends. Reuse rotor and stator. Inspect inside gear box, ok. Change oil.Rebuilt - Hewitts, wired by Solid State.
26-Jan-23TankSecondary collectorsCorrectiveInspectionS.LaPlanteInspect sprockets bushings etc.Leaving down for winter, but back in service Dec 23/22 for high flows
26-Jan-23TankPrimary tanksCorrectiveRepairTylerSouth Primary tankOil change not complete
06-Feb-23FanM1120FanCorrectiveRepairS. LaPlanteDrain, Remove grit. Replace sprockets, bushings, 23 flights, change oil. Out of service sept 16,2022.Replace 2 B45 belts
07-Feb-23DecanterBeltpressCorrectiveRepairTG/SL/JKReplace 2 B45 belts
07-Feb-23Drive UnitM1140CCorrectiveRepairSL,JK, DwChanged top belt
08-Mar-23Odour ControlSCRUB101CorrectiveRepairSL, JKReplace B42 beltReplace belt and grease bearings
14-Mar-23PumpM 202CorrectiveRepairS LaPlante, J KerrRing gear @ drive end stripped. Isolate pump and drain. Remove guard, drive belt and wheel. Replaced gear ball, ring gear, gear joint seal, secondary and primary thrust plate and seal support. Fill with grease and reassemble. Grease bearing and stuffing box. Replace rotor stator, clean and grease gear joint. Replace seal. Tighten drive belt.N/c
30-Mar-23PumpM 201CorrectiveRepairSL, JK, MB, DWTried to start pump, VFD showing nothing. Reboot VFD then pushed start in bypass, tripped the main breaker. Lock out call SSE for Monday. Bad ballast on module 8, lamps 1 & 2
31-Mar-23PumpP101CorrectiveRepairSLTried to start pump, VFD showing nothing. Reboot VFD then pushed start in bypass, tripped the main breaker. Lock out call SSE for Monday.Pump P 101 out of service.
04-Apr-23UVUV631CorrectiveRepairSL, MB, DWBad ballast on module 8, lamps 1 & 2
11-Apr-23DecanterBeltpressCorrectiveRepairMB/SL/TG/JKChanged top belt on belt press
19-Apr-23Drive UnitM1140ACorrectiveRepairKilsmarrockWheel worn. Replaced wheel, shaft and bearings. Reused coupling
19-Apr-23Drive UnitM1140BCorrectiveRepairKilsmarrockBroken wheel - replace wheel, shaft and bearings.
02-May-23PelletizerPelletizerCorrectiveRepairMB/JKReplace gasket around inlet of drying drum
03-May-23PumpM406CorrectiveRepairS LaPlanteCoupling is loose, realign motor an pump, replace 2 hubs, grid and grid cover. Fill with Falk grease.
23-May-23GrinderGrind3020CorrectiveRepairS LaPlante, M. BucklandMuffin monster clogged with hair. Clean out thru port on inlet side.
18-Jun-23VFDVFD405CorrectiveRepairS LaPlanteCooling fan overheating, needs replacement
05-Jul-23TankPrimary tanksCorrectiveRepairTylerCross Collectors damaged, chain off sprockets, 6 Long collectors brokenReplaced all broken cross Collectors, replaced long connectors, replaced idler sprockets on cross collector
10-Jul-23PelletizerPelletizerCorrectiveRepairMB/KilsmarrockChanged valve V1280 on pelletizer, condensate discharge valveCompleted
10-Jul-23ValveV417CorrectiveRepairTG/MB/KilsmarrockReplaced WAS Valve done by kilmarnockCompleted
04-Aug-23TankPrimary tanksCorrectiveRepairMBPillow block lost bolt causing wheel to come off track.

2023 Corrective Maintenance

29-Aug-23DecanterBeltpressCorrectiveRepairMB/ASChanged bottoms belt
07-Sep-23DecanterBeltpressCorrectiveRepairMBEFP replaced all air lines on belt press
11-Sep-23DecanterBeltpressCorrectiveRepairMB/TG/JK/ASChanged bottom belt
14-Sep-23PumpM 201CorrectiveRepairMBReplaced packing using 9/16 packing
14-Sep-23PumpM 202CorrectiveRepairMBIsolated pump and drained out to replace packing using 9/16 packing.
19-Sep-23Odour ControlSCRUB101CorrectiveRepairMBRepaired broken belt (B42)
20-Oct-23PelletizerPelletizerCorrectiveRepairMB/JKCleaned out airlock M1512, full of rags which was causing the augur M1511 to jam
20-Oct-23DecanterBeltpressCorrectiveRepairMB/JKChanged top belt
20-Oct-23DecanterBeltpressCorrectiveRepairMB/TG/JKChanged bottom belt
05-Dec-23DecanterBeltpressCorrectiveRepairAS/ JPBReplaced shaft and T bar roller.
Replaced taper locks

APPENDIX E

Solids Handling


2023 Solids Handling

Town of Smiths Falls

2023 Performance Assessment Report - WPCP

Works # 120000890

Conventional Tertiary Treatment UV Disinfection / Pelletization

YearRun Time (Hrs)Sludge Processed (m3)Total Number of Pellet bags filledTotal Number of Pellets Produced (Kg)Total Number of Pellets Produced (Tonnes)
Jan-23189.91,254.04828,982.529.0
Feb-23238.81,607.65834,946.534.9
Mar-23183.71,046.93218,690.018.7
Apr-23219.81,219.15126,173.026.2
May-23179.1967.33621,494.521.5
Jun-23183.61,289.084,712.04.7
Jul-23142.3832.31610,704.010.7
Aug-23142.8791.01610,093.510.1
Sep-23252.81,773.83220,954.521.0
Oct-23258.41,756.23625,783.525.8
Nov-23147.01,147.33221,314.021.3
Dec-2384.3469.0169,747.59.7
Totals2,222.614,153.4381.0233,595.5233.6

$$ (m^{3}) $$

YearRun Time HoursSludge Processed cubic metersTotal Number of Pellet bags filledTotal Number of Pellets Produced kgTotal Number of Pellets Produced (Tonnes)
20192,373.115,496.5653.0458,941.8458.9
20202,469.217,216.1492.0358,891.2358.9
20212,224.815,614.3481.0326,732.5326.7
20222,457.716,490.8557.0358,821.9358.8
20232,222.614,153.4381.0233,595.5233.6

Note: The weight of the pellets depends on the bulk density of the pellets. The bulk density changes depending on how the pellets are processed (i.e.temperature during processing, amount of poly used etc.). This is why sometimes there is more sludge processed but a lighter pellet weight.


Smiths Falls WPCP Yearly Solids Handling 2018 to 2022

YearTotal Number of Pellets Produced (Tonnes)Sludge Processed (m3, rhs)
201842715400
201945815500
202035817250
202134117000
202235816500

APPENDIX F

2023 Municipal Utility Monitoring Program (MUMPS)


Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Fields marked with an asterisk (*) are mandatory.
Project Name Smiths Falls Water Pollution Control Plant
Facility Address
Unit NumberStreet Number180Street NameQueen StreetPO Box
Municipality/City/TownTown of Smiths FallsProvinceON - OntarioPostal CodeK7A 5B8
Operating Authority Town of Smiths Falls
Mailing Address
Unit NumberStreet Number77Street NameBeckwith StreetPO Box695
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A 4T6
File No.Works Number*Data Period*DaysDischarge TypeUpdate Code
4612000890MonthYearDaysDischarge TypeUpdate Code
1231116193122280
C.P.1213Flows Total Flow (103m3)
011213Flows Total Flow (103m3)
Parameter CodeDec.Monthly Results
500103333.511
Average Daily Flow(10 3 m³ /d)50015310.758
Maximum Daily Flow(10 3 m³ /d)50020329.181
26# of Occurrences
1213
Plant Bypass Volume(103m3)500263
Duration(hours)805631
Secondary Bypass Volume(103m3)5004033.3701
Duration(hours)805651
03# of Samples
1213
BOD5(mg/L)0000101227
Suspended Solids(mg/L)00006019010
TKN(mg/L)00020217.704
Total Phosphorus(mg/L)0003311.89
0430343538
1213Final Effluent
BOD5(mg/L)0000115.07
CBOD 5 (mg/L)0000214.07
Suspended Solids (mg/L)0000619.514
Ammonia + Ammonium(mg/L)0001920.118
TKN (mg/L)0002020.804
Total Phosphorus (mg/L)0003320.1914
07Disinfection
1213Chlorine Used(kg as Cl2)501001
Chlorine Dosage(mg/L as Cl2)804101
Chlorine Residual(mg/L as Cl2)804201
Operator Telephone Number 613-283-4124
Operator Email Address * scooke@smithsfalls.ca
Comments UV disinfection, revised to included bypass
Return completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. Ministry Contact Email Address * brenda.beaudoin@ontario.ca

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

$$ \mathsf{BOD}_{5} $$

$$ \mathrm{BOD}_{5} $$

$$ \mathrm{CBOD_{5}} $$

2062E (2020/10) © Queen's Printer for Ontario, 2020


Facility Address
Unit NumberStreet Number 180Street Name Queen StreetPO Box
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A5B8
Operating Authority Town of Smiths Falls
Town of Smiths Falls
Mailing Address
Unit NumberStreet Number 77Street Name Beckwith StreetPO Box 695
Municipality/City/Town of Smiths FallsProvince ON - OntarioPostal Code K7A4T6
File No.Works Number *Data Period *DaysDischarge TypeUpdate Code
File No.Works Number *MonthYearDaysDischarge TypeUpdate Code
4612000890012023312R
12311161920212280

Not Applicable

Not Applicable

Not Applicable

C.P. 0C.P. 3Raw SewageParameter CodeDecMonthly Average Results# of Samples
1213

Not Applicable

Not Applicable

Not Applicable

04Final EffluentParameter CodeDecMonthly Average Results# of Samples
1213Alkalinity, Total (mg/L)000514
1213Conductivity 25°C (µS/cm)910044
1213E. Coli (CT/100ml)91000413.00007
1213Nitrate, Unfiltered reactive (mg/L)000224
1213Nitrite, Unfiltered reactive (mg/L)000214
1213pH8077047.34008
1213Temperature, Water (°C)8025048.200011
1213Un-ionized Ammonia (mg/L)9101240.01005
1213Dissolved Oxygen (mg/L)000034
1213Hydrogen Sulphide (mg/L)830084
1213pH min8077047.16008
1213pH max8077047.56008
1213
1213
1213
Operator Telephone Number 613-283-4124Return completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https:// www.ontario.ca/environment-and-energy/ministry- environment-district-locator)
Operator Email Address scooke@smithsfalls.caReturn completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https:// www.ontario.ca/environment-and-energy/ministry- environment-district-locator)
Comments UV disinfection, revised to included bypassReturn completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https:// www.ontario.ca/environment-and-energy/ministry- environment-district-locator)

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Fields marked with an asterisk (*) are mandatory. Project Name Smiths Falls Water Pollution Control Plant
Facility Address
Unit NumberStreet Number 180Street Name Queen StreetPO Box
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A 5B8
Operating Authority Town of Smiths Falls
Mailing Address
Unit NumberStreet Number 77Street Name Beckwith StreetPO Box 695
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A 4T6
File No.Works Number *Data Period * MonthYearDaysDischarge TypeUpdate Code
4612000282R
12340002192280
C.P.
01FlowsParameter CodeDec.Monthly Results
1213Total Flow(103 m3)500103271.594
Average Daily Flow(103 m3)/d)5001539.811
Maximum Daily Flow(103 m3)/d)50020317.101
26Bypass30343538
1213Plant Bypass Volume(103 m3)500263
Duration(hours)805631
Secondary Bypass Volume(103 m3)500403
Duration(hours)805651
03Raw Sewage30343538
1213BOD5(mg/L)00201# of Occurrences
Suspended Solids(mg/L)002550
TKN(mg/L)0021.00# of Samples
Total Phosphorus(mg/L)003.44
04Final Effluent30343538
1213BOD5(mg/L)003.04
CBOD5(mg/L)003.04
Suspended Solids(mg/L)000.711
Ammonia + Ammonium(mg/L)000.076
TKN(mg/L)000.804
Total Phosphorus(mg/L)000.099
07Disinfection30343538
1213Chlorine Used(kg as Cl2)501001
Chlorine Dosage(mg/L as Cl2)804101
Chlorine Residual(mg/L as Cl2)804201
Operator Telephone Number 613-283-4124303435Return completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. Ministry Contact Email Address * brenda.beaudoin@ontario.ca
Operator Email Address * scooke@smithsfalls.ca303435Return completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. Ministry Contact Email Address * brenda.beaudoin@ontario.ca
Comments303435Return completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. Ministry Contact Email Address * brenda.beaudoin@ontario.ca
UV disinfection303435Return completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. Ministry Contact Email Address * brenda.beaudoin@ontario.ca

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

$$ \mathsf{BOD}_{5} $$

$$ \mathrm{BOD}_{5} $$

$$ \mathrm{CBOD_{5}} $$

2062E (2020/10) © Queen's Printer for Ontario, 2020


Facility Address
Unit NumberStreet Number 180Street Name Queen StreetPO Box
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A5B8
Operating Authority Town of Smiths Falls
Mailing Address
Unit NumberStreet Number 77Street Name Beckwith StreetPO Box 695
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A4T6
File No.Works Number *Data Period * MonthYearDaysDischarge TypeUpdate Code
4612000890020232R
123111619202180

Not Applicable

Not Applicable

Not Applicable

C.P. 0C.P. 3Raw SewageParameter CodeDecMonthly Average Results# of Samples
1213

Not Applicable

Not Applicable

Not Applicable

04Final EffluentParameter CodeDecMonthly Average Results# of Samples
1213Alkalinity, Total (mg/L)000514
1213Conductivity 25°C (µS/cm)910044
1213E. Coli (CT/100ml)9100041.00004
1213Nitrate, Unfiltered reactive (mg/L)000224
1213Nitrite, Unfiltered reactive (mg/L)000214
1213pH8077047.220010
1213Temperature, Water (°C)8025047.300014
1213Un-ionized Ammonia (mg/L)9101240.11006
1213Dissolved Oxygen (mg/L)000034
1213Hydrogen Sulphide (mg/L)830084
1213pH min8077046.860010
1213pH max8077047.420010
1213
1213
1213
Operator Telephone Number 613-283-4124Return completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)
Operator Email Address scooke@smithsfalls.caReturn completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)
Comments UV disinfectionReturn completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Fields marked with an asterisk (*) are mandatory. Project Name Smiths Falls Water Pollution Control Plant
Facility Address
Unit NumberStreet Number 180Street Name Queen StreetPO Box
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A 5B8
Operating Authority Town of Smiths Falls
Mailing Address
Unit NumberStreet Number 77Street Name Beckwith StreetPO Box 695
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A 4T6
File No.Works Number *Data Period * MonthYearDaysDischarge TypeUpdate Code
4612000312R
1234000232280
C.P.
01FlowsParameter CodeDec.Monthly Results
1213Total Flow(103 m3)500103300.773
Average Daily Flow(103 m3)/d)50015310.310
Maximum Daily Flow(103 m3)/d)50020317.446
26Bypass30343538
1213Plant Bypass Volume(103 m3)500263
Duration(hours)805631
Secondary Bypass Volume(103 m3)500403
Duration(hours)805651
03Raw Sewage30343538
1213BOD5(mg/L)00139# of Occurrences
Suspended Solids(mg/L)001544
TKN(mg/L)0017.508
Total Phosphorus(mg/L)002.44
04Final Effluent30343538
1213BOD5(mg/L)001# of Samples
CBOD5(mg/L)003.04
Suspended Solids(mg/L)003.04
Ammonia + Ammonium(mg/L)000.714
TKN(mg/L)000.027
Total Phosphorus(mg/L)000.704
Disinfection3034350.0813
07Chlorine Used(kg as Cl2)501001
1213Chlorine Dosage(mg/L as Cl2)804101
Chlorine Residual(mg/L as Cl2)804201
Operator Telephone Number 613-283-4124303435Return completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. Ministry Contact Email Address * brenda.beaudoin@ontario.ca
Operator Email Address * scooke@smithsfalls.ca303435Return completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. Ministry Contact Email Address * brenda.beaudoin@ontario.ca
Comments303435Return completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. Ministry Contact Email Address * brenda.beaudoin@ontario.ca
UV disinfection303435Return completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. Ministry Contact Email Address * brenda.beaudoin@ontario.ca

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

$$ \mathsf{BOD}_{5} $$

$$ \mathrm{BOD}_{5} $$

$$ \mathrm{CBOD_{5}} $$

2062E (2020/10) © Queen's Printer for Ontario, 2020


Facility Address
Unit NumberStreet Number 180Street Name Queen StreetPO Box
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A5B8
Operating Authority Town of Smiths Falls
Mailing Address
Unit NumberStreet Number 77Street Name Beckwith StreetPO Box 695
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A4T6
File No.Works Number *Data Period * MonthYearDaysDischarge TypeUpdate Code
4612000890032331R
12311161920212280

Not Applicable

Not Applicable

Not Applicable

C.P. 0C.P. 3Raw SewageParameter CodeDecMonthly Average Results# of Samples
1213

Not Applicable

Not Applicable

Not Applicable

04Final EffluentParameter CodeDecMonthly Average Results# of Samples
1213Alkalinity, Total (mg/L)000514
1213Conductivity 25°C (µS/cm)910044
1213E. Coli (CT/100ml)9100041.00004
1213Nitrate, Unfiltered reactive (mg/L)000224
1213Nitrite, Unfiltered reactive (mg/L)000214
1213pH8077047.270012
1213Temperature, Water (°C)8025048.300016
1213Un-ionized Ammonia (mg/L)9101240.01005
1213Dissolved Oxygen (mg/L)000034
1213Hydrogen Sulphide (mg/L)830084
1213pH min8077047.090012
1213pH max8077047.460012
1213
1213
1213
Operator Telephone Number 613-283-4124Return completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)
Operator Email Address scooke@smithsfalls.caReturn completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)
Comments UV disinfectionReturn completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)

Fields marked with an asterisk (*) are mandatory.

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Project Name Smiths Falls Water Pollution Control Plant
Facility Address
Unit NumberStreet Number 180Street Name Queen StreetPO Box
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A 5B8
Operating Authority Town of Smiths Falls
Mailing Address
Unit NumberStreet Number 77Street Name Beckwith StreetPO Box 695
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A 4T6
File No.Works Number *Data Period *DaysDischarge TypeUpdate Code
File No.Works Number *MonthYearDaysDischarge TypeUpdate Code
4612000089004202R
123111619202122
C.P.
01FlowsParameter CodeDec.Monthly Results
1213Total Flow(103 m3)500103403.592
Average Daily Flow(103 m3/d)50015313.761
Maximum Daily Flow(103 m3/d)50020351.419
26Bypass30343538# of Occurrences
1213Plant Bypass Volume(103 m3)500263
Duration(hours)805631
Secondary Bypass Volume(103 m3)500403111.9782
Duration(hours)805651181.8
03Raw Sewage30343538# of Samples
1213BOD5(mg/L)000010967
Suspended Solids(mg/L)00006011812
TKN(mg/L)00020218.204
Total Phosphorus(mg/L)0003311.79
30343538
04Final Effluent
1213BOD5(mg/L)00001113.07
CBOD5(mg/L)0000218.07
Suspended Solids(mg/L)00006120.912
Ammonia + Ammonium(mg/L)0001920.2710
TKN(mg/L)0002020.504
Total Phosphorus(mg/L)0003320.3912
07Disinfection
1213Chlorine Used(kg as Cl2)501001
Chlorine Dosage(mg/L as Cl2)804101
Chlorine Residual(mg/L as Cl2)804201
Operator Telephone Number 613-283-4124303435 38
Operator Email Address * scooke@smithsfalls.caReturn completed form to:
Comments UV disinfection1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. Ministry Contact Email Address * brenda.beaudoin@ontario.ca

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

$$ \mathsf{BOD}_{5} $$

$$ \mathrm{BOD}_{5} $$

$$ \mathrm{CBOD_{5}} $$

$$ \left|\mathsf{Cl}_{2}\right\rangle $$

2062E (2020/10) © Queen's Printer for Ontario, 2020


Facility Address
Unit NumberStreet Number 180Street Name Queen StreetPO Box
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A5B8
Operating Authority Town of Smiths Falls
Mailing Address
Unit NumberStreet Number 77Street Name Beckwith StreetPO Box 695
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A4T6
File No.Works Number *Data Period * MonthYearDaysDischarge TypeUpdate Code
4612000890042032R
123111619202180

Not Applicable

Not Applicable

Not Applicable

C.P. 0C.P. 3Raw SewageParameter CodeDecMonthly Average Results# of Samples
1213

Not Applicable

Not Applicable

Not Applicable

04Final EffluentParameter CodeDecMonthly Average Results# of Samples
1213Alkalinity, Total (mg/L)000514
1213Conductivity 25°C (µS/cm)910044
1213E. Coli (CT/100ml)91000420.60007
1213Nitrate, Unfiltered reactive (mg/L)000224
1213Nitrite, Unfiltered reactive (mg/L)000214
1213pH8077046.980010
1213Temperature, Water (°C)8025049.400017
1213Un-ionized Ammonia (mg/L)9101240.01007
1213Dissolved Oxygen (mg/L)000034
1213Hydrogen Sulphide (mg/L)830084
1213pH min8077046.980010
1213pH max8077047.900010
1213
1213
1213
Operator Telephone Number 613-283-4124Return completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)
Operator Email Address scooke@smithsfalls.caReturn completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)
Comments UV disinfectionReturn completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Fields marked with an asterisk (*) are mandatory. Project Name Smiths Falls Water Pollution Control Plant
Facility Address
Unit NumberStreet Number 180Street Name Queen StreetPO Box
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A 5B8
Operating Authority Town of Smiths Falls
Mailing Address
Unit NumberStreet Number 77Street Name Beckwith StreetPO Box 695
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A 4T6
File No.Works Number *Data Period * MonthYearDaysDischarge TypeUpdate Code
4612000312R
1234000232280
C.P.
01FlowsParameter CodeDec.Monthly Results
1213Total Flow(103 m3)50010340.692
Average Daily Flow(103 m3)/d)50015310.711
Maximum Daily Flow(103 m3)/d)50020345.150
26Bypass30343538# of Occurrences
1213Plant Bypass Volume(103 m3)500263
Duration(hours)805631
Secondary Bypass Volume(103 m3)500403
Duration(hours)805651
03Raw Sewage30343538# of Samples
1213BOD5(mg/L)001136
Suspended Solids(mg/L)001879
TKN(mg/L)0017.605
Total Phosphorus(mg/L)003.37
04Final Effluent30343538# of Samples
1213BOD5(mg/L)0016
CBOD5(mg/L)003.06
Suspended Solids(mg/L)003.06
Ammonia + Ammonium(mg/L)002.812
TKN(mg/L)000.228
Total Phosphorus(mg/L)000.905
Disinfection3034353811
07Chlorine Used(kg as Cl2)501001
1213Chlorine Dosage(mg/L as Cl2)804101
Chlorine Residual(mg/L as Cl2)804201
Operator Telephone Number 613-283-4124303435Return completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. Ministry Contact Email Address * brenda.beaudoin@ontario.ca
Operator Email Address * scooke@smithsfalls.ca
Comments
UV disinfection
2062E (2020/10) © Queen's Printer for Ontario, 2020

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

$$ \mathsf{BOD}_{5} $$

$$ \mathrm{BOD}_{5} $$

$$ \mathrm{CBOD_{5}} $$

2062E (2020/10) © Queen's Printer for Ontario, 2020


Facility Address
Unit NumberStreet Number 180Street Name Queen StreetPO Box
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A5B8
Operating Authority Town of Smiths Falls
Mailing Address
Unit NumberStreet Number 77Street Name Beckwith StreetPO Box 695
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A4T6
File No.Works Number *Data Period * MonthYearDaysDischarge TypeUpdate Code
46120008900520331
123111619202122

Not Applicable

Not Applicable

Not Applicable

C.P. 0C.P. 3Raw SewageParameter CodeDecMonthly Average Results# of Samples
1213

Not Applicable

Not Applicable

Not Applicable

04Final EffluentParameter CodeDecMonthly Average Results# of Samples
1213Alkalinity, Total (mg/L)000514
1213Conductivity 25°C (µS/cm)910044
1213E. Coli (CT/100ml)9100044.81006
1213Nitrate, Unfiltered reactive (mg/L)000224
1213Nitrite, Unfiltered reactive (mg/L)000214
1213pH8077047.36009
1213Temperature, Water (°C)8025049.800015
1213Un-ionized Ammonia (mg/L)9101240.01006
1213Dissolved Oxygen (mg/L)000034
1213Hydrogen Sulphide (mg/L)830084
1213pH min8077047.12009
1213pH max8077047.55009
1213
1213
1213
Operator Telephone Number 613-283-4124Return completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)
Operator Email Address scooke@smithsfalls.caReturn completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)
Comments UV disinfectionReturn completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Fields marked with an asterisk (*) are mandatory. Project Name Smiths Falls Water Pollution Control Plant
Facility Address
Unit NumberStreet Number 180Street Name Queen StreetPO Box
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A 5B8
Operating Authority Town of Smiths Falls
Mailing Address
Unit NumberStreet Number 77Street Name Beckwith StreetPO Box 695
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A 4T6
File No.Works Number *Data Period * MonthYearDaysDischarge TypeUpdate Code
46120008232
12390192022
C.P.
01FlowsParameter CodeDec.Monthly Results
1213Total Flow(103 m3)500103129.557
Average Daily Flow(103 m3)/d5001534.688
Maximum Daily Flow(103 m3)/d5002037.755
26Bypass30343538
1213Plant Bypass Volume(103 m3)500263
Duration(hours)805631
Secondary Bypass Volume(103 m3)500403
Duration(hours)805651
03Raw Sewage30343538
1213BOD5(mg/L)000010191# of Samples
Suspended Solids(mg/L)0000602364
TKN(mg/L)00020226.106
Total Phosphorus(mg/L)0003312.44
04Final Effluent30343538
1213BOD5(mg/L)0000113.04
CBOD5(mg/L)0000213.04
Suspended Solids(mg/L)0000610.713
Ammonia + Ammonium(mg/L)0001920.035
TKN(mg/L)0002020.704
Total Phosphorus(mg/L)0003320.5013
07Disinfection30343538
1213Chlorine Used(kg as Cl2)501001
Chlorine Dosage(mg/L as Cl2)804101
Chlorine Residual(mg/L as Cl2)804201
Operator Telephone Number30343538
613-283-4124
Operator Email Address * scooke@smithsfalls.ca
Comments
UV disinfection
2062E (2020/10) © Queen's Printer for Ontario, 2020

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Return completed form to:

$$ \mathsf{BOD}_{5} $$

$$ \mathrm{BOD}_{5} $$

$$ \mathrm{CBOD_{5}} $$

2062E (2020/10) © Queen's Printer for Ontario, 2020


Facility Address
Unit NumberStreet Number 180Street Name Queen StreetPO Box
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A5B8
Operating Authority Town of Smiths Falls
Mailing Address
Unit NumberStreet Number 77Street Name Beckwith StreetPO Box 695
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A4T6
File No.Works Number *Data Period * MonthYearDaysDischarge TypeUpdate Code
46120008900620332
123111619202122

Not Applicable

Not Applicable

Not Applicable

C.P. 0C.P. 3Raw SewageParameter CodeDecMonthly Average Results# of Samples
1213

Not Applicable

Not Applicable

Not Applicable

04Final EffluentParameter CodeDecMonthly Average Results# of Samples
1213Alkalinity, Total (mg/L)000514
1213Conductivity 25°C (µS/cm)910044
1213E. Coli (CT/100ml)9100041.00004
1213Nitrate, Unfiltered reactive (mg/L)000224
1213Nitrite, Unfiltered reactive (mg/L)000214
1213pH8077047.210010
1213Temperature, Water (°C)80250411.100014
1213Un-ionized Ammonia (mg/L)9101240.01005
1213Dissolved Oxygen (mg/L)000034
1213Hydrogen Sulphide (mg/L)830084
1213pH min8077046.840010
1213pH max8077047.440010
1213
1213
1213
Operator Telephone Number 613-283-4124Return completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)
Operator Email Address scooke@smithsfalls.caReturn completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)
Comments UV disinfectionReturn completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Fields marked with an asterisk (*) are mandatory. Project Name Smiths Falls Water Pollution Control Plant
Facility Address
Unit NumberStreet Number 180Street Name Queen StreetPO Box
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A 5B8
Operating Authority Town of Smiths Falls
Mailing Address
Unit NumberStreet Number 77Street Name Beckwith StreetPO Box 695
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A 4T6
File No.Works Number *Data Period * MonthYearDaysDischarge TypeUpdate Code
461200022R
12340002380
C.P.
01FlowsParameter CodeDec.Monthly Results
1213Total Flow(103 m3)500103175.821
Average Daily Flow(103 m3)/d)5001535.672
Maximum Daily Flow(103 m3)/d)50020314.372
26Bypass30343538# of Occurrences
1213Plant Bypass Volume(103 m3)500263
Duration(hours)805631
Secondary Bypass Volume(103 m3)500403
Duration(hours)805651
03Raw Sewage30343538# of Samples
1213BOD5(mg/L)00151
Suspended Solids(mg/L)00312
TKN(mg/L)0028.90
Total Phosphorus(mg/L)004.9
04Final Effluent30343538# of Samples
1213BOD5(mg/L)004
CBOD5(mg/L)003.0
Suspended Solids(mg/L)003.0
Ammonia + Ammonium(mg/L)002.1
TKN(mg/L)000.03
Total Phosphorus(mg/L)000.80
Disinfection303435380.06
07Chlorine Used(kg as Cl2)501001
1213Chlorine Dosage(mg/L as Cl2)804101
Chlorine Residual(mg/L as Cl2)804201
Operator Telephone Number 613-283-4124303435Return completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. Ministry Contact Email Address * brenda.beaudoin@ontario.ca
Operator Email Address * scooke@smithsfalls.ca
Comments
UV disinfection
2062E (2020/10) © Queen's Printer for Ontario, 2020

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

$$ \mathsf{BOD}_{5} $$

$$ \mathrm{BOD}_{5} $$

$$ \mathrm{CBOD_{5}} $$

$$ \left|\mathsf{Cl}_{2}\right\rangle $$

2062E (2020/10) © Queen's Printer for Ontario, 2020


Facility Address
Unit NumberStreet Number 180Street Name Queen StreetPO Box
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A5B8
Operating Authority Town of Smiths Falls
Mailing Address
Unit NumberStreet Number 77Street Name Beckwith StreetPO Box 695
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A4T6
File No.Works Number *Data Period * MonthYearDaysDischarge TypeUpdate Code
46120008900720331
123111619202122

Not Applicable

Not Applicable

Not Applicable

C.P. 0C.P. 3Raw SewageParameter CodeDecMonthly Average Results# of Samples
1213

Not Applicable

Not Applicable

Not Applicable

04Final EffluentParameter CodeDecMonthly Average Results# of Samples
1213Alkalinity, Total (mg/L)000514
1213Conductivity 25°C (µS/cm)910044
1213E. Coli (CT/100ml)9100041.00004
1213Nitrate, Unfiltered reactive (mg/L)000224
1213Nitrite, Unfiltered reactive (mg/L)000214
1213pH8077047.22009
1213Temperature, Water (°C)80250414.70009
1213Un-ionized Ammonia (mg/L)9101240.01004
1213Dissolved Oxygen (mg/L)000034
1213Hydrogen Sulphide (mg/L)830084
1213pH min8077047.00009
1213pH max8077047.45009
1213
1213
1213
Operator Telephone Number 613-283-4124Return completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)
Operator Email Address scooke@smithsfalls.caReturn completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)
Comments UV disinfectionReturn completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)

Fields marked with an asterisk (*) are mandatory.

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Facility Address
Unit NumberStreet Number180Street NameQueen StreetPO Box
Municipality/City/TownTown of Smiths FallsProvinceON - OntarioPostal CodeK7A 5B8
Operating Authority Town of Smiths Falls
Mailing Address
Unit NumberStreet Number77Street NameBeckwith StreetPO Box695
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A 4T6
File No.Works Number*Data Period*DaysDischarge TypeUpdate Code
4612000890MonthYearDaysDischarge TypeUpdate Code
1231116192021312R
C.P.
01Flows
1213Total Flow (103m3)Parameter CodeDec.Monthly Results
500103183.091
Average Daily Flow(10 3 m³ /d)5001535.906
Maximum Daily Flow(10 3 m³ /d)5002039.396
2630343538# of Occurrences
1213
Plant Bypass Volume(103m3)500263
Duration(hours)805631
Secondary Bypass Volume(103m3)5004030
Duration(hours)805651
0330343538# of Samples
1213
BOD5(mg/L)0000101415
Suspended Solids (mg/L)0000603106
TKN (mg/L)00020227.705
Total Phosphorus (mg/L)0003315.65
0430343538
1213Final Effluent
BOD5(mg/L)0000113.05
CBOD 5 (mg/L)0000213.05
Suspended Solids (mg/L)0000611.011
Ammonia + Ammonium (mg/L)0001920.046
TKN (mg/L)0002020.705
Total Phosphorus (mg/L)0003320.057
07Disinfection
1213Chlorine Used(kg as Cl2)501001
Chlorine Dosage(mg/L as Cl2)804101
Chlorine Residual(mg/L as Cl2)804201
Operator Telephone Number 613-283-4124
Operator Email Address * scooke@smithsfalls.ca
Comments UV disinfection
Return completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. Ministry Contact Email Address * brenda.beaudoin@ontario.ca

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

$$ \mathsf{BOD}_{5} $$

$$ \mathrm{BOD}_{5} $$

$$ \mathrm{CBOD_{5}} $$

$$ \left|\mathsf{Cl}_{2}\right\rangle $$

2062E (2020/10) © Queen's Printer for Ontario, 2020


Facility Address
Unit NumberStreet Number 180Street Name Queen StreetPO Box
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A5B8
Operating Authority Town of Smiths Falls
Town of Smiths Falls
Mailing Address
Unit NumberStreet Number 77Street Name Beckwith StreetPO Box 695
Municipality/City/Town of Smiths FallsProvince ON - OntarioPostal Code K7A4T6
File No.Works Number *Data Period *DaysDischarge TypeUpdate Code
File No.Works Number *MonthYearDaysDischarge TypeUpdate Code
46120000890082023312
12311161920212280

Not Applicable

Not Applicable

Not Applicable

C.P. 0C.P. 3Raw SewageParameter CodeDecMonthly Average Results# of Samples
1213

Not Applicable

Not Applicable

Not Applicable

04Final EffluentParameter CodeDecMonthly Average Results# of Samples
1213Alkalinity, Total (mg/L)000514
1213Conductivity 25°C (µS/cm)910044
1213E. Coli (CT/100ml)9100041.15005
1213Nitrate, Unfiltered reactive (mg/L)000224
1213Nitrite, Unfiltered reactive (mg/L)000214
1213pH8077047.390010
1213Temperature, Water (°C)80250415.000010
1213Un-ionized Ammonia (mg/L)9101240.01005
1213Dissolved Oxygen (mg/L)000034
1213Hydrogen Sulphide (mg/L)830084
1213pH min8077047.090010
1213pH max8077047.390010
1213
1213
1213
Operator Telephone Number 613-283-4124Return completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)
Operator Email Address scooke@smithsfalls.caReturn completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)
Comments UV disinfectionReturn completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Fields marked with an asterisk (*) are mandatory. Project Name Smiths Falls Water Pollution Control Plant
Facility Address
Unit NumberStreet Number 180Street Name Queen StreetPO Box
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A 5B8
Operating Authority Town of Smiths Falls
Mailing Address
Unit NumberStreet Number 77Street Name Beckwith StreetPO Box 695
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A 4T6
File No.Works Number *Data Period * MonthYearDaysDischarge TypeUpdate Code
461200022R
12340002280
C.P.
01FlowsParameter CodeDec.Monthly Results
1213Total Flow(103 m3)500103133.983
Average Daily Flow(103 m3)/d)5001534.466
Maximum Daily Flow(103 m3)/d)5002036.533
26Bypass30343538
1213Plant Bypass Volume(103 m3)500263
Duration(hours)805631
Secondary Bypass Volume(103 m3)500403
Duration(hours)805651
03Raw Sewage30343538
1213BOD5(mg/L)00237# of Samples
Suspended Solids(mg/L)006064
TKN(mg/L)0034.305
Total Phosphorus(mg/L)005.74
04Final Effluent30343538
1213BOD5(mg/L)003.04
CBOD5(mg/L)003.04
Suspended Solids(mg/L)000.711
Ammonia + Ammonium(mg/L)000.226
TKN(mg/L)001.104
Total Phosphorus(mg/L)000.0712
07Disinfection30343538
1213Chlorine Used(kg as Cl2)501001
Chlorine Dosage(mg/L as Cl2)804101
Chlorine Residual(mg/L as Cl2)804201
Operator Telephone Number 613-283-4124303435Return completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. Ministry Contact Email Address * brenda.beaudoin@ontario.ca
Operator Email Address * scooke@smithsfalls.ca
Comments
UV disinfection
2062E (2020/10) © Queen's Printer for Ontario, 2020

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

$$ \mathsf{BOD}_{5} $$

$$ \mathrm{BOD}_{5} $$

$$ \mathrm{CBOD_{5}} $$

2062E (2020/10) © Queen's Printer for Ontario, 2020


Facility Address
Unit NumberStreet Number 180Street Name Queen StreetPO Box
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A5B8
Operating Authority Town of Smiths Falls
Mailing Address
Unit NumberStreet Number 77Street Name Beckwith StreetPO Box 695
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A4T6
File No.Works Number *Data Period * MonthYearDaysDischarge TypeUpdate Code
46120008900920332
123111619202122

Not Applicable

Not Applicable

Not Applicable

C.P. 0C.P. 3Raw SewageParameter CodeDecMonthly Average Results# of Samples
1213

Not Applicable

Not Applicable

Not Applicable

04Final EffluentParameter CodeDecMonthly Average Results# of Samples
1213Alkalinity, Total (mg/L)000514
1213Conductivity 25°C (µS/cm)910044
1213E. Coli (CT/100ml)9100041.00004
1213Nitrate, Unfiltered reactive (mg/L)000224
1213Nitrite, Unfiltered reactive (mg/L)000214
1213pH8077047.330011
1213Temperature, Water (°C)80250411.500015
1213Un-ionized Ammonia (mg/L)9101240.00307
1213Dissolved Oxygen (mg/L)000034
1213Hydrogen Sulphide (mg/L)830084
1213pH min8077047.080011
1213pH max8077047.630011
1213
1213
1213
Operator Telephone Number 613-283-4124Return completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)
Operator Email Address scooke@smithsfalls.caReturn completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)
Comments UV disinfectionReturn completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)

Fields marked with an asterisk (*) are mandatory.

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Facility Address
Unit NumberStreet Number180Street NameQueen StreetPO Box
Municipality/City/TownTown of Smiths FallsProvinceON - OntarioPostal CodeK7A 5B8
Operating Authority Town of Smiths Falls
Mailing Address
Unit NumberStreet Number77Street NameBeckwith StreetPO Box695
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A 4T6
File No.Works Number*Data Period*DaysDischarge TypeUpdate Code
4612000890MonthYearDaysDischarge TypeUpdate Code
123111619312R80
C.P.1213Flows Total Flow (103m3)
011213Flows Total Flow (103m3)
Parameter CodeDec.Monthly Results
500103129.604
Average Daily Flow(10 3 m³ /d)5001534.181
Maximum Daily Flow(10 3 m³ /d)5002036.013
2630343538# of Occurrences
1213Bypass
Plant Bypass Volume(103m3)500263
Duration(hours)805631
Secondary Bypass Volume(103m3)5004030
Duration(hours)805651
03Raw Sewage# of Samples
1213BOD5(mg/L)0000102344
Suspended Solids (mg/L)0000603956
TKN (mg/L)00020236.904
Total Phosphorus (mg/L)0003316.25
0430343538
1213Final Effluent
BOD5(mg/L)0000113.04
CBOD 5 (mg/L)0000213.04
Suspended Solids (mg/L)0000611.29
Ammonia + Ammonium (mg/L)0001920.036
TKN (mg/L)0002020.704
Total Phosphorus (mg/L)0003320.0510
07Disinfection
1213Chlorine Used(kg as Cl2)501001
Chlorine Dosage(mg/L as Cl2)804101
Chlorine Residual(mg/L as Cl2)804201
Operator Telephone Number 613-283-4124
Operator Email Address * scooke@smithsfalls.ca
Comments UV disinfection
Return completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. Ministry Contact Email Address * brenda.beaudoin@ontario.ca

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

$$ \mathsf{BOD}_{5} $$

$$ \mathrm{BOD}_{5} $$

$$ \mathrm{CBOD_{5}} $$

$$ \left|\mathsf{Cl}_{2}\right\rangle $$

2062E (2020/10) © Queen's Printer for Ontario, 2020


Facility Address
Unit NumberStreet Number 180Street Name Queen StreetPO Box
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A5B8
Operating Authority Town of Smiths Falls
Mailing Address
Unit NumberStreet Number 77Street Name Beckwith StreetPO Box 695
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A4T6
File No.Works Number *Data Period * MonthYearDaysDischarge TypeUpdate Code
46120008901020331
123111619202122

Not Applicable

Not Applicable

Not Applicable

C.P. 0C.P. 3Raw SewageParameter CodeDecMonthly Average Results# of Samples
1213

Not Applicable

Not Applicable

Not Applicable

04Final EffluentParameter CodeDecMonthly Average Results# of Samples
1213Alkalinity, Total (mg/L)000514
1213Conductivity 25°C (µS/cm)910044
1213E. Coli (CT/100ml)9100041.00004
1213Nitrate, Unfiltered reactive (mg/L)000224
1213Nitrite, Unfiltered reactive (mg/L)000214
1213pH8077047.30009
1213Temperature, Water (°C)80250411.80009
1213Un-ionized Ammonia (mg/L)9101240.01006
1213Dissolved Oxygen (mg/L)000034
1213Hydrogen Sulphide (mg/L)830084
1213pH min8077046.96009
1213pH max8077047.48009
1213
1213
1213
Operator Telephone Number 613-283-4124Return completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)
Operator Email Address scooke@smithsfalls.caReturn completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)
Comments UV disinfectionReturn completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)

Fields marked with an asterisk (*) are mandatory.

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Facility Address
Unit NumberStreet Number180Street NameQueen StreetPO Box
Municipality/City/TownTown of Smiths FallsProvinceON - OntarioPostal CodeK7A 5B8
Operating Authority Town of Smiths Falls
Mailing Address
Unit NumberStreet Number77Street NameBeckwith StreetPO Box695
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal CodeK7A 4T6
File No.Works Number*Data Period*MonthYearDaysDischarge TypeUpdate Code
46112023302R
123161920212280
C.P.01FlowsTotal Flow(103m3)Parameter Code50010Dec.3Monthly Results120.866
1213FlowsTotal Flow(103m3)Parameter Code50010Dec.3Monthly Results120.866
Average Daily Flow(10 3 m³ /d)5001534.029
Maximum Daily Flow(10 3 m³ /d)5002035.818
26# of Occurrences
1213
Plant Bypass Volume(103m3)500263
Duration(hours)805631
Secondary Bypass Volume(103m3)5004030
Duration(hours)805651
03# of Samples
1213
BOD5(mg/L)0000102175
Suspended Solids(mg/L)0000602877
TKN(mg/L)00020234.005
Total Phosphorus(mg/L)0003315.45
0430343538
1213Final Effluent
BOD5(mg/L)0000113.05
CBOD 5 (mg/L)0000213.05
Suspended Solids (mg/L)0000611.911
Ammonia + Ammonium (mg/L)0001920.047
TKN (mg/L)0002020.905
Total Phosphorus (mg/L)0003320.1610
07Disinfection
1213Chlorine Used(kg as Cl2)501001
Chlorine Dosage(mg/L as Cl2)804101
Chlorine Residual(mg/L as Cl2)804201
Operator Telephone Number613-283-4124
Operator Email Address*scooke@smithsfalls.ca
CommentsUV disinfection
Return completed form to:1. Environmental Monitoring and Reporting Branch, MECP, atWasteWaterReporting@ontario.caAnd2. Your Environmental Officer at your local District/AreaMECP Office.Ministry Contact Email Address*brenda.beaudoin@ontario.ca

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

$$ \mathsf{BOD}_{5} $$

$$ \mathrm{BOD}_{5} $$

$$ \mathrm{CBOD_{5}} $$

$$ \left|\mathsf{Cl}_{2}\right\rangle $$

2062E (2020/10) © Queen's Printer for Ontario, 2020


Facility Address
Unit NumberStreet Number 180Street Name Queen StreetPO Box
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A5B8
Operating Authority Town of Smiths Falls
Mailing Address
Unit NumberStreet Number 77Street Name Beckwith StreetPO Box 695
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A4T6
File No.Works Number *Data Period * MonthYearDaysDischarge TypeUpdate Code
4612000890112330R
123111619202180

Not Applicable

Not Applicable

Not Applicable

C.P. 0C.P. 3Raw SewageParameter CodeDecMonthly Average Results# of Samples
1213

Not Applicable

Not Applicable

Not Applicable

04Final EffluentParameter CodeDecMonthly Average Results# of Samples
1213Alkalinity, Total (mg/L)000514
1213Conductivity 25°C (µS/cm)910044
1213E. Coli (CT/100ml)9100041.00004
1213Nitrate, Unfiltered reactive (mg/L)000224
1213Nitrite, Unfiltered reactive (mg/L)000214
1213pH8077047.260010
1213Temperature, Water (°C)8025048.300010
1213Un-ionized Ammonia (mg/L)9101240.01007
1213Dissolved Oxygen (mg/L)000034
1213Hydrogen Sulphide (mg/L)830084
1213pH min8077046.980010
1213pH max8077047.520010
1213
1213
1213
Operator Telephone Number 613-283-4124Return completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)
Operator Email Address scooke@smithsfalls.caReturn completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)
Comments UV disinfectionReturn completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Fields marked with an asterisk (*) are mandatory. Project Name Smiths Falls Water Pollution Control Plant
Facility Address
Unit NumberStreet Number 180Street Name Queen StreetPO Box
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A 5B8
Operating Authority Town of Smiths Falls
Mailing Address
Unit NumberStreet Number 77Street Name Beckwith StreetPO Box 695
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A 4T6
File No.Works Number *Data Period * MonthYearDaysDischarge TypeUpdate Code
461200022R
12300000080
1116120000090
C.P.
01FlowsParameter CodeDec.Monthly Results
1213Total Flow(103 m3)500103210.972
Average Daily Flow(103 m3)/d)5001536.806
Maximum Daily Flow(103 m3)/d)50020315.077
30343538
26Bypass# of Occurrences
1213Plant Bypass Volume(103 m3)500263
Duration(hours)805631
Secondary Bypass Volume(103 m3)500403
Duration(hours)805651
30343538
03Raw Sewage# of Samples
1213BOD5(mg/L)01494
Suspended Solids(mg/L)02005
TKN(mg/L)025.204
Total Phosphorus(mg/L)04.45
30343538
04Final Effluent
1213BOD5(mg/L)03.04
CBOD5(mg/L)03.04
Suspended Solids(mg/L)01.413
Ammonia + Ammonium(mg/L)00.036
TKN(mg/L)00.904
Total Phosphorus(mg/L)00.0413
30343538
07Disinfection
1213Chlorine Used(kg as Cl2)501001
Chlorine Dosage(mg/L as Cl2)804101
Chlorine Residual(mg/L as Cl2)804201
Operator Telephone Number 613-283-412430343538
Operator Email Address * scooke@smithsfalls.caReturn completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. Ministry Contact Email Address * brenda.beaudoin@ontario.ca
Comments UV disinfection
2062E (2020/10) © Queen's Printer for Ontario, 2020Page 1 of 2

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

Not Applicable

$$ \mathsf{BOD}_{5} $$

$$ \mathrm{BOD}_{5} $$

$$ \mathrm{CBOD_{5}} $$

$$ \left|\mathsf{Cl}_{2}\right\rangle $$

2062E (2020/10) © Queen's Printer for Ontario, 2020


Facility Address
Unit NumberStreet Number 180Street Name Queen StreetPO Box
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A5B8
Operating Authority Town of Smiths Falls
Mailing Address
Unit NumberStreet Number 77Street Name Beckwith StreetPO Box 695
Municipality/City/Town Town of Smiths FallsProvince ON - OntarioPostal Code K7A4T6
File No.Works Number *Data Period * MonthYearDaysDischarge TypeUpdate Code
46120008901202312
123111619202122

Not Applicable

Not Applicable

Not Applicable

C.P. 0C.P. 3Raw SewageParameter CodeDecMonthly Average Results# of Samples
1213

Not Applicable

Not Applicable

Not Applicable

04Final EffluentParameter CodeDecMonthly Average Results# of Samples
1213Alkalinity, Total (mg/L)000514
1213Conductivity 25°C (µS/cm)910044
1213E. Coli (CT/100ml)9100041.00004
1213Nitrate, Unfiltered reactive (mg/L)000224
1213Nitrite, Unfiltered reactive (mg/L)000214
1213pH8077047.470012
1213Temperature, Water (°C)8025046.700012
1213Un-ionized Ammonia (mg/L)9101240.01006
1213Dissolved Oxygen (mg/L)000034
1213Hydrogen Sulphide (mg/L)830084
1213pH min8077047.120012
1213pH max8077047.730012
1213
1213
1213
Operator Telephone Number 613-283-4124Return completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)
Operator Email Address scooke@smithsfalls.caReturn completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)
Comments UV disinfectionReturn completed form to: 1. Environmental Monitoring and Reporting Branch, MECP, at WasteWaterReporting@ontario.ca And 2. Your Environmental Officer at your local District/Area MECP Office. (Find your local MECP office: https://www.ontario.ca/environment-and-energy/ministry-environment-district-locator)

APPENDIX G

Operators Licenses


Smiths Falls Water Polluction Control Plant Class 4 Certificate #1974, Issued March 8, 1993 Works # 120000890 Conventional Tertiary Treatment UV Disinfection / Pelletization

OperatorOperator IDClassLicense #Expiry Date (DD/MM/YY)TypeORO/ OIC
Jason Barlow9001098741244830-Apr-25WWTORO
Tyler George9005401246824031-Jan-25WWTOIC/ORO alternative
Molly Buckland90087406211208430-Apr-24WWTOIC
Jacob Kerr90091849112603928-Feb-27WWTOIC
Andrew Stoll90095128OITOT12357231-Aug-26WWT
Taylor Corney90096051OITOT12497931-Dec-26WWT
Other Departments
Andrew MacNaughton9005313549261730-Apr-24WWTOIC
Sarah E. Cooke90010541OIT4274030-Sep-24WWT
Harrison Leitch90086060OITOT10239930-Sep-24WWT
Peter Wansbrough90065604OITOT12056231-Jan-26WWT

APPENDIX H

Notice of Modifications to Sewage Works


Notice of Modification to Sewage Works

RETAIN COPY OF COMPLETED FORM AS PART OF THE ECA ON-SITE PRIOR TO THE SCHEDULED IMPLEMENTATION DATE.

Part 1 – Environmental Compliance Approval (ECA) with Limited Operational Flexibility (Insert the ECA's owner, number and issuance date and notice number, which should start with “01” and consecutive numbers thereafter)
ECA Number 5671-AE7HFTIssuance Date (mm/dd/yy) 01/11/2017Notice number (if applicable)
ECA Owner Corporation of the Separated Town of Smiths FallsMunicipality Smiths Falls

Part 2: Description of the modifications as part of the Limited Operational Flexibility (Attach a detailed description of the sewage works)

The project involves replacement of the two (2) existing screens and de-watering press, along with associated upgrades to the screenings disposal bin and hazardous gas detection system. There are no changes to the rated capacity of the screening system, and the upgrades are undertaken due to the existing equipment reaching end of life. See the appended preliminary design report for further details.

Description shall include: 1. A detail description of the modifications and/or operations to the sewage works (e.g. sewage work component, location, size, equipment type/model, material, process name, etc.) 2. Confirmation that the anticipated environmental effects are negligible. 3. List of updated versions of, or amendments to, all relevant technical documents that are affected by the modifications as applicable, i.e. submission of documentation is not required, but the listing of updated documents is (design brief, drawings, emergency plan, etc.)

Part 3 – Declaration by Professional Engineer
I hereby declare that I have verified the scope and technical aspects of this modification and confirm that the design: 1. Has been prepared or reviewed by a Professional Engineer who is licensed to practice in the Province of Ontario; 2. Has been designed in accordance with the Limited Operational Flexibility as described in the ECA; 3. Has been designed consistent with Ministry’s Design Guidelines, adhering to engineering standards, industry’s best management practices, and demonstrating ongoing compliance with s.53 of the Ontario Water Resources Act; and other appropriate regulations. I hereby declare that to the best of my knowledge, information and belief the information contained in this form is complete and accurate
Name (Print) Cameron WoodPEO License Number 100173798
SignatureDate (mm/dd/yy) 10/16/23
Name of Employer R. V. Anderson Associates Ltd.
Part 4 – Declaration by Owner
I hereby declare that: 1. I am authorized by the Owner to complete this Declaration; 2. The Owner consents to the modification; and 3. This modifications to the sewage works are proposed in accordance with the Limited Operational Flexibility as described in the ECA. 4. The Owner has fulfilled all applicable requirements of the Environmental Assessment Act. I hereby declare that to the best of my knowledge, information and belief the information contained in this form is complete and accurate
Name of Owner Representative (Print)Owner representative's title (Print)
Owner Representative's SignatureDate (mm/dd/yy)

EAPB Form July 26, 2018


BAR SCREEN 1 CAUTION MACHINE STARTS AUTONATICALLY KEEP HANDS AWAY

BAR SCREEN 2 CAUTION MACHINE STARTS AUTONATICALLY KEEP HANDS AWAY

HVAC SW

Smiths Falls WWTP Bar Screen Replacement

Preliminary Design Report FINAL

August 13, 2020

Prepared for:


SMITHS FALLS RISE AT THE FALLS

Smiths Falls WWTP Bar Screen Replacement

Preliminary Design Report FINAL

Town of Smiths Falls

This document is protected by copyright and was prepared by R.V. Anderson Associates Limited for the account of the Town of Smiths Falls. It shall not be copied without permission. The material in it reflects our best judgment in light of the information available to R.V. Anderson Associates Limited at the time of preparation. Any use which a third party makes of this report, or any reliance on or decisions to be made based on it, are the responsibility of such third parties. R.V. Anderson Associates Limited accepts no responsibility for damages, if any, suffered by any third party as a result of decisions made or actions based on this report.

RVA 194444

August 13, 2020


Smiths Falls WWTP Bar Screen Replacement Preliminary Design Report

TABLE OF CONTENTS

1.1 Background ..............................................................................................1 1.2 Project Objectives ....................................................................................1 1.2.1 Scope of Preliminary Design .........................................................1 2.1 Existing Conditions ...................................................................................2 2.2 Design Parameters ...................................................................................2 2.3 Hydraulics ................................................................................................3 3.1 Procurement .............................................................................................4 3.2 Screen Types ...........................................................................................4 3.2.1 Mechanical Bar Screens ...............................................................4 3.2.2 Step Screens ................................................................................4 3.3 Screening Packages.................................................................................5 3.3.1 Comparison ..................................................................................6 3.4 Evaluation ................................................................................................9 3.4.1 Technical ......................................................................................9 3.4.2 Financial Scoring ........................................................................11 3.4.3 Evaluation Summary ...................................................................13 4.1 Building Classification & Fire Protection .................................................14 4.2 Electrical.................................................................................................15 4.2.1 Existing Power Supply ................................................................15 4.2.2 Power Requirements for New Systems .......................................15 4.3 Instrumentation & Controls .....................................................................15 4.3.1 Existing Controls .........................................................................15 4.3.2 Proposed ....................................................................................15 4.4 Constructability Review ..........................................................................16 4.4.1 Removal and Installation .............................................................16 4.4.2 Construction Sequencing ............................................................16 4.4.3 Lifting of Equipment ....................................................................16


LIST OF FIGURES

Figure 2.1 Screen Channel Configuration .....................................................................3 Figure 3.1 Step Screen Schematic (Huber Technology) ...............................................5

LIST OF TABLES

Table 2.1 Design Basis .................................................................................................2 Table 3.1 Screening Package Comparison ...................................................................7 Table 3.2 Technical Evaluation Matrix ........................................................................10

APPENDICES

APPENDIX 1
Appendix 1-1
Appendix 1-2A
Appendix 1-2B
Appendix 1-3
Appendix 1-4
Appendix 1-5
Appendix 1-6A Appendix 1-6B APPENDIX 2
Appendix 2-1
Appendix 2-2
Appendix 2-3

  • BUDGET QUOTES & DATA SHEETS FOR BAR SCREENS
  • AquaGuard
  • Duperon® FlexRake® (5º from vertical) without Conveyor Package
  • Duperon® FlexRake® (15º from vertical) with Conveyor Package
  • JCW Environmental Monster Chain and Rake
  • Huber RakeMax
  • Headworks International
  • Veolia CONT-FLO without Conveyor Package
  • Veolia CONT-FLO with Conveyor Package
  • BUDGET QUOTES & DATA SHEETS FOR STEP SCREENS
  • Claro Step Screens
  • Andersson Stair Screens
  • Huber Step Screen

INTRODUCTION

1.1 Background

The Smiths Falls wastewater treatment plant (WWTP) is a conventional activated sludge process plant with rated capacity of 14,700 m<sup>3</sup>/d and a peak flow of 50,700 m<sup>3</sup>/d. The existing screening system is located in the Raw Sewage Pumping Station and Headworks Building. There are two parallel screen channels equipped with automatic self-cleaning screens (6 mm bar spacing), each rated for a peak flow of 25,230 m<sup>3</sup>/d. Screenings are transferred to a bin for disposal via a screw conveyor with a de-watering press.

$$ 14,700\ m^3/o $$

$$ 50,700\ m^3/d $$

$$ 25,230\ m^3/d. $$

1.2 Project Objectives

R.V. Anderson Associates Limited (RVA) was retained to undertake design of the WWTP bar screen replacement.

The key project objectives and desired outcomes include:

Life-cycle replacement of the existing screens:-

for-screens will have the same capacity and screen size as the existing system.

Maintaining discharge criteria during construction: construction staging requirements are thought out in advance and appropriately coordinated with operations staff to mitigate risk of unplanned shutdowns.

1.2.1 Scope of Preliminary Design

The purpose of the Preliminary Design Report (PDR) is to summarize the design basis for replacement of the screening equipment, to document equipment pre-selection, and to identify key design considerations for the screen replacement.


DESIGN BASIS

2.1 Existing Conditions

The existing two (2) bar screens are Aqua Guard screens (model AG-MN-A) with dimensions of 3 ft wide x 11 ft discharge height, constructed of 304 SS construction with NEMA 4X control panels. The screening system is original to the facility construction in 1993 and it is reaching the end of its useful life due to age. As such, the lifecycle replacement of the existing screens is essential to maintain reliability and robustness of the preliminary treatment system.

Town noted that conveyor system is in good working condition, with the most recent rehabilitated approximately 10 years ago, except for the compactor and gearbox which are original equipment. While replacement of the conveyor and compactor is not required, the Town will evaluate the best value for replacement of the screening system, which may include replacement of the conveyance system.

Preliminary screening is an essential part of the wastewater treatment process, as it protects downstream treatment processes from damage due to debris and foreign objects.

2.2 Design Parameters

The screen replacement will be a like-for-like replacement, with no increase in capacity. The Town of Smiths Falls has indicated that the existing screen size (6mm bar spacing) has generally been adequate. As such, the original design parameters have been used in the evaluation of available technologies and product. The parameters for design basis are summarized in the table below.

Table 2.1 Design Basis

Design Parameters
Quantity of Screens2
Screen TypeMulti-Rake Bar Screen
Design Flow per Screen25,230 m3/d (peak)
Bar Spacing6 mm
Channel Width915 mm
Channel Depth1800 mm
Water Depth in Channel at Peak Flow900 mm
Existing Discharge Height3353 mm

$$ m^{3}/d $$


2.3 Hydraulics

Wastewater from the pumping station discharges to a single concrete channel to the Screen and Grit Room where the main channel splits into two equal-sized, smaller channels. These two smaller channels are the screening channels, as shown in Figure 2.1. Each channel is 915 mm wide by 1800 mm deep. Based on the site visit, the channel wall seems to be in good condition. No channel modification is anticipated to accommodate new screening equipment of the same capacity. As such there would be are no anticipated changes to the hydraulics through the screen channels or to upstream processes.

Legend: <u><strong>Flow direction</strong></u>

<u><strong>Screen Channels</strong></u>

EXCAVATION SHORING SYSTEM

4820

111.590

1100

105.322

PROVIDE 25M DWLS FOR 25M BARS

TOP OF CONCRETE FILL CONCRETE (TYPE.)

111.590

300

STOP LOW GUIDE SEE PROCESS DWGS (TYPE.)

300

START OF TOPPING

300

BAW SCREEN GUIDE SEE PROCESS DWGS.

SLUICE GATE SHAFT SUPPORTS NOT SHOWN.

LOCATION OF OPENINGS TO SUIT GATE BELOW.

15H • 300 DWLS.

25mm SLOPE (TYPE.)

F.O.

25mm SLOPE (TYPE.)

SAW OUT CONTROL JOINT (C.A.)

200mm* OPENING (TYPE.)

100mm* OPENING

EQUIP BASE FOR MOC SEE ELECTRICAL DWGS FOR SIZE AND LOCATION.

25mm SLOPE

75mm SLOPE (TYPE.)

Figure 2.1 Screen Channel Configuration


PROCESS EQUIPMENT REVIEW

Primary screens and associated components are reviewed in this section in order to determine the most appropriate technology and best value for the Town of Smiths Falls.

3.1 Procurement

Equipment pre- obtain increased levels of quality in many cases. Without a pre-selection process, it can be difficult to list equivalent items of equipment where each manufacturer has pros or cons when compared to the others. This is especially true for screens, where the selected manufacturer can have significant impacts on other components of the design, such as modifications to the screen channel, electrical connections and system controls. Preselection of the screening package will reduce risks to the Town during design and construction, allow for selection of a screen which does not require channel modifications, and reduce overall project costs.

The procurement option for the screens would have the first name preferred manufacturer/model in the tender package with options for alternatives. If the contractor proposes an alternative other than the tender package, they will have to provide justification which will be evaluated at that time considering the design implications.

3.2 Screen Types

3.2.1 Mechanical Bar Screens

The existing screens at the Smiths Falls WWTP are mechanical bar screens with 6 mm bar spacing. Mechanical bar screens generally consist of vertical bars with defined spacing that sit within the wastewater channel. Automatic rakes remove debris from the screen and transfer it to the conveyance system for disposal. Mechanical bar screens have been in use for several decades for primary screening and are considered a robust and proven technology, with relatively simple operations and maintenance.

3.2.2 Step Screens

Step screens consist of vertical bars with defined spacing that sit within the wastewater channel. screenings when a defined head loss threshold is achieved and move the screening upwards, clearing the bottom of the screen. This process is shown schematically in Figure 3.1. This process continues and screenings are transferred to the conveyance system for disposal.


Phase 1

Phase 2

Phase 3

Phase 4

Figure 3.1 Step Screen Schematic (Huber Technology)

Step screens are used in similar applications as mechanical bar screens and may offer some advantages over bar screens, as follows:

Screenings capture ratio (SCR) for step screens is higher.

Step screens have lower head loss compared to multi-rake bar screens.

Step screens are usually fully enclosed with option for baggers for hygienic operation and odour control.

Low operation time for step screens compared to multi-rake bar screens resulting in lower operational cost (energy savings) and lower mechanical wear & tear.

The step screen system avoids maintenance-prone elements such as brushes, pulling spirals, chains, belts, tensioners, scrapers, scraper springs, and lower bearings that are exposed to unscreened influent and grit.

Step screens produce a drier screenings product, and a compactor may not be required.

Step screens were considered herein as an alternative to mechanical bar screens.

3.3 Screening Packages

The primary screening will generally consist of screens and a conveyance system to bins for disposal. The conveyance system may include a screenings washer to minimize organics, and a compactor to remove water and produce drier screenings.

For the purpose of evaluating appropriate screening packages, RVA has contacted various suppliers and obtained quotes for screening packages from eight different manufacturers based on the design parameters presented in Section 2. All quotes obtained are for replacement of screens with the same capacity and screening size as the existing system. Quotes have been obtained for the following types of screening packages:

Replacement of screens only

Replacement of screens and conveyance system

Quotes have been obtained for both mechanical bar screens and step screens.

3.3.1 Comparison

A comparison of nine different screens from different manufacturers is presented in Table 3.1. Preliminary pricing presented in the table includes the features of the screens to be considered for the comparison. Detailed quotes and data sheets for each screen proposal are provided in the appendices.


Table 3.1 Screening Package Comparison

Bar Screens ManufacturerBar Screens Aqua GuardBar Screens Duperon® FlexRake® (5° from vertical)Bar Screens Duperon® FlexRake® (15° from vertical)Bar Screens JWC EnvironmentalBar Screens Huber Bar ScreenBar Screens Headworks InternationalBar Screens VeoliaStep Screens ClaroStep Screens Andersson Stair ScreensStep Screens Huber Step Screen® Flexible Series
Model1. The Original Aqua Guard 2. The Aqua Guard UltraCleanFPFS-F - Full Penetration, Fine Screen, Flexor Option 915 mm x 4878 mmFPFS, Full Penetration, Fine Screen 914 mm x 4385 mmMCR (Monster® Chain and Rake) 5029.4mm x 615.55mmRakeMax (3520x675/6)Bar Screen MS2 (4340 x 870)CONT-FLO® Type ER Multi-Rake Bar Screen Model ERS6-28XA (4222.8 mm X 720 mm)Fine Step Screen, Model 2200-700-6mm (860 wide x 2270 discharge height)Option A - Model PSS 2600-700-2 (2mm) Option B- Model ASS 2300-700-6 (6mm)Model SSF-HE 5000x726/6mm
Screen TypeMulti-rake bar screenMulti-Rake Bar ScreenMulti-Rake Bar ScreenMulti-Rake Bar ScreenMulti-Rake Bar ScreenMulti-Rake Bar ScreenMulti-Rake Bar ScreenStep-ScreenStep-ScreenStep-Screen
Discharge Height (m)3.353 (11')Match Existing (3.353m)Match Existing (3.353)Match existing height (3.353m)3.24m (Cost to match existing height = $10,000)Will match existing heightWill Match existing height (3.353m)2.270mOption A - 2.560m Option B - 2.15m to 2.32m3.111
Screen Weight (kg)Not providedNot provided1607.5135211081245.9513201000Option A - 3400 Option B - 18001600
Installation Angle85°85°75°85°80°85°75°50°Option A - 40°-45° Option B - 50°45°
Screen Drive Motor1/2 HP (Original Aqua Guard) 1 HP (AquaGuard UltraClean)1/2 HP1/2 HP2 HP constant speed motor with a 380:1 speed reducer1.5 HP3 HP, 575 V0.75 HP, 575V / 3Ph / 60Hz (main power supply)SEW 1.5 kW (2 HP), CSA 575V, 60Hz, 3 phaseOption A - 3 HP Option B - 2HP2 HP
Control PanelNEMA 4X Cost adder for two local explosion proof panels - $5400°NEMA 4X with 1 Local Push Button NEMA 4/7/9 EnclosureNEMA 4X with 1 Local Push Button NEMA 4/7/9 EnclosureMain NEMA 4X and 2 Local NEMA 7Main NEMA 4X & Local NEMA 7Main NEMA 4X & Local NEMA 7 Price adder for NEMA 4X is $8340°Main NEMA 4X & Local NEMA 7NEMA 4/12, Local NEMA 7 HOA StationsMain NEMA 4X and two local explosion proof push buttonsNEMA 4X and One (1) 3-hole, NEMA7 LCS
Head loss254 mm (maximum design head loss)91 mm @ 25% BlindingNot Provided220 mm @ 30% Blinding111 mm @ 30% Blinding265 mm @ 0.9 m/s channel velocity 231 mm @ 0.6 m/s channel velocity220.67 mm @ 50% Blinding, [-110 mm @ 30 % Blinding from graph]85 mm @ 35% screen blockageNot Provided45 mm @ 30% blinding
Supply cost (CAD)$255,340* for Aqua Guard Original without new conveyor system $343,090* with new conveyor system ($87,750* Cost adder for Aqua Wash Press unit model AWP10-5) +$33,776* for UltraClean screen model$268,650* (without new conveyor system) Includes Spare parts, On-site Technical Assistance No price adder provided for washer-compactor for this model$271,350* including one Duperon® Washer Compactor of model WC3.A2.5$202,538* (without new conveyor system) Includes start-Up Assistance and Training$353,500 (without new conveyor system)$245,124* (without new conveyor system) Includes Start-Up and Operator Training$143,450 without new conveyor system $174,250 with new conveyor system ($30,800 cost adder for conveyor system) Includes Factory Start-Up Service and Freight Charges to Site DEDUCT applicable for standard discharge height (1.204m) is $35002 screens each with dedicated Wash Press Arrangement-$24,000 2 screens with 1 common Wash Press Arrangement-$230,000 Could provide taller step screens to match the existing conveyor & wash press but cost will increase approx. $15,000-$20,0002 screens (Option A) each with dedicated Wash Press Compactors (Model WPC 250-600) feeding the common conveyor - $240,000$290,250* (for one screen and one wash press)

ManufacturerBar Screens Aqua GuardBar Screens Duperon® FlexRake® (5° from vertical)Bar Screens Duperon® FlexRake® (15° from vertical)Bar Screens JWC EnvironmentalBar Screens Huber Bar ScreenBar Screens Headworks InternationalBar Screens VeoliaStep Screens ClaroStep Screens Andersson Stair ScreensStep Screens Huber Step Screen® Flexible Series
Standard Warranty2 year standard warranty1 year Standard material & workmanship and 5 years on rotating parts of Flex rake1 year Standard material & workmanship and 5 years on rotating parts of Flex rake1 year standard warranty12 months from date of start-up or 18 months after shipment whichever occurs first12 months from date of start-up or 18 months after shipment whichever occurs first12 months from date of start-up or 18 months after shipment whichever occurs first5 years standard warranty12 months after preliminary commissioning (first wastewater intake) or 18 months after delivery12 months from date of start-up or 18 months after shipment whichever occurs first
Lead TimeSubmittal 4-6 weeks Delivery 12-14 weeks after approvalSubmittal 4-6 weeks Delivery 8-12 weeks after approvalSubmittal 4-6 weeks Delivery 8-12 weeks after approvalSubmittal 4-6 weeks Delivery 14 weeks after approvalNot providedDelivery 16-20 weeks after approval of shop drawingsSubmittal 4-6 weeks Delivery 14-16 weeks after approvalSubmittal 4 weeks Delivery 12-16 weeks after approvalSubmittals 2-3 weeks Delivery 10-14 weeks after approvalNot Provided
ReferencesCurrently existing screen at WPCPNot providedNot providedNot providedNot providedCity of London, City of Greater Sudbury, Region of Niagara, Norfolk County, and most recently the Municipality of NationNot providedPetawawa WWTP (ongoing), Chalk River (just completed), Mississippi Mills ON (2012), Alliston WWTP ON (2014)Not providedNot provided
Maintenance- Annual inspections for wear and adjustment of brush chain every 2 or 3 months depending upon the operating hours are the regularly scheduled maintenance. - UltraClean reduces routine maintenance by up to 75% over the original version.- Checking for wear and gearbox oil change in every 24 months are the only regularly scheduled maintenance.- Checking for wear and gearbox oil change in every 24 months are the only regularly scheduled maintenance.- Checking for wear and annual inspections of the level transmitters (gearbox lubrication) are the only regularly scheduled maintenance.- No information provided- No Lower Bearing Maintenance (The lower sprocket assembly is an exclusive self-lubricating ceramic bearing). - Annual inspection for wear and changing gear box oil are the only regularly scheduled maintenance. - Units have been in operation for over 10 years without a single part being replaced- All wearing surfaces should be lubricated every three (3) months - Chain must be checked as a minimum twice per year for wear (recommended once a year)- Pivots out of channel for ease of access & maintenance without ladders - Low operation times / low mechanical wear- &-tear - Minimal maintenance or spare parts req'd (no brushes, pulling spirals, chains, belts, tensioners, scrapers, and lower bearings exposed to unscreened influent and grit) - 24-hour Claro hotline for O&M advice- Low operation times/low mechanical wear & tear - Scheduled maintenance includes: - Checking for wear and gearbox oil change monthly/yearly depending on gearbox size - Checking channel wall seals twice a year- Low operation times/low mechanical wear & tear - No lower bearing and completely enclosed

*Price quoted in USD and converted to Canadian dollars at rate of $1.35CAD per USD Note: The material of construction for screens from all manufacturers is 304 SS.


3.4 Evaluation

3.4.1 Technical

A technical evaluation matrix was developed based on the following criteria to determine the most suitable type of screen:

-Rake Design: screen capturing ratio and efficiency of screen is dependent on rake design.

-Head Loss: factor to determine the technical performance of the bar screen.

-Discharge Height Requirement: it was assumed that the Town prefers to use the existing screening compactor and conveyor. As such, it is required to match the existing discharge height to avoid any modifications or custom fabrication.

-Ease of Maintenance and Warranty: frequency of routine maintenance and provided warranty plays a vital role on the overall lifecycle cost of the screening package.

-Power Requirement: operational cost depends on the power requirement of the screen drive motor and estimate run time.

For each of the evaluation criterion, a score from 1 to 10 was assigned for every screen package. A weight was also assigned to each criterion based on the value and importance. A total weighted technical score was then calculated for each screen package. The technical evaluation matrix is shown in Table 3.2. The evaluation of options will be reviewed with the Town and scores may be adjusted based on specific preferences and operations requirements.

Based on the Technical Evaluation, step screens generally scored higher than bar screens due to the improved screen design (more robust rake design with fewer moving parts), lower head loss through the screen as screenings accumulate on the surface of the bars, lower maintenance requirements and lower energy costs due to shorter screen run time. The Claro Fine Step Screen achieved the highest technical score with the primary differentiator being an extended warranty of 5 years and local references.

Aqua Guard Original was the highest scoring bar screen package, primarily due to the ease of maintenance and power requirements, compared to other bar screens. Screen packages from Duperon scored the next highest among bar screens.


Table 3.2 Technical Evaluation Matrix

Weighting:Rake Design 7 ScoreRake Design 7 Weighted ScoreDischarge Height Req's 5 ScoreDischarge Height Req's 5 Weighted ScoreHead Loss 5 ScoreHead Loss 5 Weighted ScoreEase of Maintenance & Warranty 10 ScoreEase of Maintenance & Warranty 10 Weighted ScorePower Req's / O&M Cost 10 ScorePower Req's / O&M Cost 10 Weighted ScoreTotal ScoreRank
Bar Screens
Aqua Guard74910506308808802894
Duperon (5' from Vertical)74910507357708802845
Duperon (15' from Vertical)74910507357708802845
JWC Environmental74910506306605502399
Huber7495257356607702399
Headworks International74910506308804402498
Veolia74910507357707702747
Step Screens
Claro Fine Steps Screens8561050840101009903361
Andersson Stair Screens85610507359909903213
Huber Step Screens85610509459909903312

3.4.2 Financial Scoring

Upon completion of the technical evaluation, supply cost was factored into the evaluation of screening packages. Supply cost is a factor for the selection of screen based on available budget and funding. The financial score was calculated based on the percentage difference between the supply cost and the lowest supply cost from all suppliers. The lowest supply cost received the highest score (10/10 points) and other suppliers received points based on the extent to which they deviated from the lowest offer.

In order to compare packages with and without conveyance systems, a total score was assigned for each package with a conveyance system included and for screen replacement only (where applicable).

Note that all step screen packages include replacement of the conveyor system as the standard step screen design is generally shorter and does not work with the existing discharge height to the conveyance system.

The weighted technical and weighted financial scores were added to assign final rankings based on the best value to the Town. The preliminary evaluation matrix is shown in Table 3.3.


Table 3.3

Financial Evaluation Matrix

Technical ScoreScreening Package with Conveyor Replacement Weight = 6 ScoreScreening Package with Conveyor Replacement Weight = 6 Weighted ScoreScreening Package with Conveyor Replacement Total ScoreScreening Package with Conveyor Replacement RankScreen Replacement Only Weight = 6 ScoreScreen Replacement Only Weight = 6 Weighted ScoreScreen Replacement Only Total ScoreScreen Replacement Only Rank
Bar Screens
Original Aqua Guard2899.05434349.4563451
Duperon (5° from Vertical)284N/AN/A9.3563402
Duperon (15° from Vertical)2849.4573415N/AN/A
JWC Environmental239N/AN/A9.7582975
Huber Bar Screen239N/AN/A8.8532926
Headworks International249N/AN/A9.4563054
Veolia27410.060334610.0603343
Step Screens
Claro Fine Steps Screens3369.7583941N/AN/A
Andersson Stair Screens3219.6583793N/AN/A
Huber Step Screens3319.3563872N/AN/A

3.4.3 Evaluation Summary

Based on the combined evaluation matrix (technical and financial scores), the screening package that provides the best value to the Town is the Claro Step Screen, which includes replacement of the conveyance system and wash-press. The operational cost for the proposed step screen would be lower than the multi-rake bar screen due to lower runtimes (10-30 minutes less on average per 24-hour cycle). It would also require less maintenance as it has fewer maintenance-prone elements such as brushes, pulling spirals, chains, belts, tensioners, scrapers, scraper springs, and lower bearings that are exposed to unscreened influent and grit. In addition, a 5-year standard warranty is included for this screen package. Detailed information and quote from the supplier are provided in Appendix 2.

If replacement of the conveyance system is not preferred, then the highest scoring screen package (without conveyor) is the Aqua Guard screen. The Original Aqua Guard bar screen is a replacement model for the existing screens in the facility and would have similar operation and maintenance requirements. Detailed information and quote from the supplier are provided in Appendix 1.


OTHER DESIGN CONSIDERATIONS

4.1 Building Classification & Fire Protection

All equipment to be supplied for the proposed upgrades will be compliant with the most recent NFPA 820 and OESC standards. However, given that this facility was constructed in 1992, there are compliance issues with current NFPA 820 standards (Standard for Fire Protection in Wastewater Treatment and Collection Facilities) and the Ontario Electrical Safety Code (OESC) for existing equipment and systems within the headworks building. While the purpose of this project is simply like-for-like replacement of the screens (ESA) may review non-compliant items beyond the scope of the project.

To fully understand the scope of changes required to comply with NFPA 820 and the OESC, a classification study should be performed to fully detail all compliance issues. Based on a preliminary, high-level review of as-built drawings and site visits to the WWTP, we have identified the following key issues:

All equipment within screening area & pump room must be rated for Class 1, Zone 1.

Includes items like motors, lights, electric garage door openers, control panels, HVAC equipment, etc.

The mechanical room is directly connected to the screening room & pump rooms.

This would require everything within the mechanical room to be rated for Class 1, Zone 1. As this is typically not feasible, the building would require modification to isolate the mechanical room from the screening & pump rooms.

Regulatory requirements include combustible gas detection, fire extinguishers, and hydrant protection.

There are likely further non-compliance issues which would be discovered during a classification study. All drawings produced by RVA will indicate the appropriate area classification for the location. In our experience, ESA may require facility modifications be made to comply with the current NFPA 820 and OESC standards, within a specified time period.

RVA has experience conducting classification studies to identify code compliance issues and can recommend solutions to ensure code compliance. If requested, RVA can provide a proposal to perform a classification study of the headworks building.


4.2 Electrical

4.2.1 Existing Power Supply

The existing screens are powered through Motor Control Center (MCC) #1, specifically buckets F5C and F5D. These buckets each contain a 15A breaker, which powers the screen control panels.

4.2.2 Power Requirements for New Systems

Power draw for the replacement screens varies from 0.5HP 3HP per screen, depending on the selected screen. The existing breakers are of suitable size to power any of the new screen options presented herein and will not require modifications to the MCC. Once a screen is selected, detailed design will examine the impact (if any) of the replacement screens on the overall plant electrical system, including confirmation that the existing generator is suitable for a minor load increase (if required). Given that the load size increase will be minimal to none depending on the selected screen, overall impacts to the electrical system are expected to be minimal.

4.3 Instrumentation & Controls

4.3.1 Existing Controls

The existing screen control panels are located directly adjacent to the existing screens. The control panels contain a disconnect and a local start/stop switch. The local control panel has inputs from the RPU for remote start/stop functionality, and outputs local status, motor status, and an alarm signal. A level transmitter within the combined inlet channel is tied directly back to the RPU.

4.3.2 Proposed

The new screens would contain the same control functionality as the existing screen, allowing for both local operation and remote operation, with appropriate status and alarm signals returning to the RPU. Depending on the selected screen, additional alarm and control functionality may be available; however, ability to implement additional functionality will depend on the existing plant control system (available spare inputs for use, etc.). All the screens that were evaluated can operate based on the existing inputs/outputs available and any additional functionality is optional.

The existing level transmitter within the screen channel is tied back to the RPU. Given the location of the transmitter, it will likely require removal during installation of the new screens. It would be possible to re-instate the transmitter, however the control packages for each of the screens evaluated includes appropriate level control devices for operation of the screens and replacement is recommended.

Further to the Hazardous Area Classification discussion in Section 4.1, in order to ensure that the proposed works are in compliance with current standards, new control panels must meets these requirements (designed as explosion proof) or be located in a separated area such as the electrical room. The panels will be placed within the electrical room with an appropriately rated local operator panel located near the screens to provide local control.

4.4 Constructability Review

4.4.1 Removal and Installation

Access to the screening room for construction will be through the two existing overhead normal operation. The existing doors are approximately 3.6m high and 3.2m wide, which is sufficient for both removal of the existing screening equipment and installation of the new screening equipment. A forklift could be used to lift the new equipment up to the floor level of the screen room, at which point a temporary A-Frame crane could be used to install the new equipment within the channels. The screen area was noted to be relatively free from obstructions during the site visit, which will facilitate easier installation of the screens as compared to a congested area.

4.4.2 Construction Sequencing

Proper sequencing of construction activities will be essential for this project. As the plant will remain in operation during construction, installation of the new screens will be done in a staged approach. The first screen to be replaced will be isolated, removed, and the new screen installed and commissioned before work on the second screen begins. It may be required to disable the screenings conveyor briefly during construction in order to facilitate installation of the new screen and tie in of the new screen to the conveyor; during such a time the contractor would be responsible for making alternate arrangements for screenings from the in-use screen. This could include a temporary bagging setup which the contractor would manually deposit into the bin, or other arrangements as required.

4.4.3 Lifting of Equipment

Currently, there is no permanently installed lifting equipment for the screens. At this point in time, it is important to consider if a permanent lifting solution should be provided to allow for future maintenance of the screens., supply of an


A-frame gantry crane would be included in the contract, which would be moved on an as-needed basis for screen maintenance. A portable crane would be limited in that it would not be able to lift equipment directly to the overhead double doors but would assist in removing heavy screen components for replacement or maintenance. It is not expected that a crane would be required on a frequent basis for maintenance purposes.


APPROVALS

It is anticipated the following approvals and permits will be required prior to construction:

ECA:

Operational Flexibility of the existing ECA, Schedule B (1.2, e). The MECP Water Supervisor must be notified with a description of the proposed modifications. Additional consultation with the MECP is not expected to be required.

ESA: Appropriate consultation and inspection by ESA will be required. As noted above, this may trigger a review of area classification compliance of the entire headworks building.


RECOMMENDATIONS / CONCLUSIONS

Based on the evaluation presented herein, the Claro Step Screen package offers the best value to the Town, including replacement of the conveyance system and washpress. Detailed design be based on the Claro Step Screen package, as descried herein and in accordance with the information provided by the supplier (refer to Appendix 2-1). The Town s preference is to use one common conveyor and wash-press to serve both screens.

Upgrades to the screening system will include the following:

Replacement of the two existing 6 mm bar screens with two 6 mm step screens.

Replacement of the existing screenings conveyor and wash-press.

Replacement of screen control panels and associated wiring (control panels to be located in the electrical room, with an appropriately rated local control panels provided near the screens to provide local control).

Supply of A-frame gantry crane to facilitate maintenance activities.