Stormwater Management Report
Page 1
Stormwater Management Report Final
Smiths Falls Compost Site Drummond/North Elmsley, Ontario July 9, 2025 Client Project # [Client number] Jp2g Project # 25-5229A
Page 2
Table of Contents Author and Review Panel .................................................................................................................i
1 Introduction ..............................................................................................................................2
2 Site Location and Features .......................................................................................................2
3 Hydrologic Analysis ...................................................................................................................4 3.1 Design Criteria ............................................................................................................................. 4 3.2 Storm Events ............................................................................................................................... 4 3.3 Drainage Area Analysis................................................................................................................ 5 3.3.1 Subcatchment Delineation ............................................................................................. 5 3.3.2 Flow Length & Slope ....................................................................................................... 5 3.3.3 Curve Number (CN) ........................................................................................................ 5 3.4 Runoff Results ............................................................................................................................. 7
4 Stormwater Management Pond ...............................................................................................7 4.1 Storage Volume ........................................................................................................................... 7 4.2 Outlet .......................................................................................................................................... 9 4.3 Modelling Results ........................................................................................................................ 9
5 Impact on Water Quality ........................................................................................................10 5.1 Surface Water ........................................................................................................................... 10 5.2 Groundwater ............................................................................................................................. 10
6 Recommendations ..................................................................................................................10 6.1 Compliance Approvals............................................................................................................... 10 6.1.1 Environmental Protection Act ...................................................................................... 10 6.1.2 Ontario Water Resources Act ....................................................................................... 11
7 Maintenance and Monitoring Plan.........................................................................................11 7.1 Stormwater Management Pond Maintenance ......................................................................... 11 7.1.1 Spring Inspection .......................................................................................................... 11 7.1.2 Inspections following Large Storm Events ................................................................... 12 7.1.3 Groundwater Monitoring ............................................................................................. 12
Smiths Falls Compost Site - Stormwater Management Report (Final) Table of Contents
Page 3
Tables Table 1: IDF Values & Precipitation Volumes .......................................................................................................... 4 Table 2: Subcatchment Characteristics ................................................................................................................... 5 Table 3: Subcatchment Runoff Results ................................................................................................................... 7 Table 4: Stage-Storage Data and 100-Year Event Modelling Results...................................................................... 8
Figures Figure 1: Site Location ............................................................................................................................................. 3 Figure 2: Drainage Areas ......................................................................................................................................... 6 Figure 3: PCSWMM Model Schematic .................................................................................................................... 9
Appendices Appendix 1 – Hydrologic Analysis Appendix 2 – Site Plan
Smiths Falls Compost Site - Stormwater Management Report (FINAL) Table of Contents
Page 4
Author and Review Panel Prepared by:
25/07/09
Kurtis Romanchuk, P.Eng Water Resources Engineer
Reviewed & Approved by:
25/07/09
Stephen Arends, P.Eng Manager, Senior Civil Engineer
Smiths Falls Compost Site - Stormwater Management Report (Final) i
Page 5
1 Introduction Jp2g Consultants Inc. (Jp2g) was retained by the Town of Smiths Falls to provide an updated stormwater management analysis and report for the Smiths Falls Compost Site (hereafter referred to as the “site”). The site was initially established under a previous stormwater management assessment, which is now required to be updated due to requirements from the Ontario Ministry of Environment, Conservation, and Parks (MECP). This report provides details of the updated stormwater management analysis and modelling that was completed for the site, and any necessary remediation measures.
2 Site Location and Features The site location is shown on Figure 1, it is located just west of the Town of Smiths Falls in the Township of Drummond/North Elmsley (Lot 1, Concession 5, Elmsley). The site is accessed via an unnamed road which extends north from Cornelia Street West (Highway 43) between Spinelli Lane to the west and Mazie Street West to the east. The unnamed road has a locked gate at the turnoff from Cornelia Street West. The site is surrounded by the “swale wetland” to the north, east, and west. The wetland areas generally drain in a southerly direction towards the Rideau River. The compost site itself has no natural surface drainage or wetland features, however it does contain a stormwater management pond along the eastern side of the site. The compost site is separated from the surrounding wetland areas by a series of berms, as described in further sections. The site is located within the jurisdiction of the Rideau Valley Conservation Authority (RVCA). Based on a review of RVCA online regulatory mapping, the site is not located within a floodplain. The site may be regulated based on its proximity to the swale wetland, however it is assumed that the existing berms provide adequate separation from the wetland.
Smiths Falls Compost Site - Stormwater Management Report (Final) 2
Page 6
DWG NAME: C:\USERS\KURTIS ROMANCHUK\DOCUMENTS\JP2G PROJECTS LOCAL\25-5229A-LOCAL SMITHS FALLS COMPOST FACILITY\05 DRAWINGS\1 ONGOING\25-5229A SMITHS FALLS COMPOST FACILITY.DWG LAYOUT: FIG-1 SITE LOCATION SAVED ON 2025-07-07 SMITHS FALLS COMPOST SITE
O RR CA R LL D
ST IE (HWY 43) MAZ CORNELIA ST W TOWN OF SMITHS FALLS
RIDEAU RIVER
DESCRIPTION: SITE LOCATION SMITHS FALLS COMPOST SITE DRAFTED: K.R. CLIENT No.:
TOWMSHIP OF DRUMMOND/NORTH ELMSLEY, ONTARIO DESIGNED: K.R. DATE: 2025/07/02
REVIEWED: S.A. SHEET#
SITE LOCATION Jp2g PROJECT No.: 25-5229A APPROVED: S.A. FIG-1
Page 7
3 Hydrologic Analysis The hydrologic analysis to determine the stormwater management runoff flows and pond performance was completed using the PCSWMM modelling platform. 3.1 Design Criteria As per the MECP guidelines, composting facilities should be designed and operated with the objective of minimizing the production of leachate and preventing its release to the environment. In order to minimize the release of leachate from the site, the stormwater management facility will be assessed with respect to its ability to retain stormwater events up to the 100-year event on site without release to the environment. The MECP guidelines also note that stormwater which does not come into contact with waste, compost, or leachate should be separately controlled. As described in further sections, site areas which are beyond the limits of the composting operations continue to flow as per the existing condition and are not directed towards the stormwater management pond. 3.2 Storm Events For this analysis, three different 100-year storm event patterns were considered: a 6 hour SCS Type II storm event, 12 hour SCS Type II storm event, and 24 hour SCS Type II storm events. The SCS Type II storm events are typically appropriate for rural areas and due to the large volume tend to provide a conservative assessment of stormwater management pond performance. The SCS Type II storm events were created using the PCSWMM Design Storm Creator tool based on the Intensity- Duration-Frequency (IDF) data shown in Table 1 below. IDF values were obtained for this area using the MTO Online IDF Curve Lookup Tool, and are shown in Table 1 below along with rainfall intensities and durations computed for various storm durations. Table 1: IDF Values & Precipitation Volumes Return Period: 2yr 5yr 10yr 25yr 50yr 100yr Source IDF Curve Value 'A' 20.3 27.0 31.4 37.0 41.1 45.2 MTO IDF Curve Lookup Tool IDF Curve Value 'B' -0.699 -0.699 -0.699 -0.699 -0.699 -0.699 MTO IDF Curve Lookup Tool 6 hr. Intensity (mm/hr.) 5.802 7.717 8.974 10.575 11.747 12.918 Calculated from IDF Curve for t = 6 hr. 6 hr. Rainfall Depth (mm) 34.811 46.301 53.846 63.449 70.480 77.511 Calculated from IDF Curve for t = 6 hr. 12 hr. Intensity (mm/hr.) 3.574 4.754 5.528 6.514 7.236 7.958 Calculated from IDF Curve for t = 12 hr. 12 hr. Rainfall Depth (mm) 42.887 57.042 66.338 78.169 86.831 95.493 Calculated from IDF Curve for t = 12 hr. 24 hr. Intensity (mm/hr.) 2.202 2.928 3.405 4.013 4.457 4.902 Calculated from IDF Curve for t = 24 hr. 24 hr. Rainfall Depth (mm) 52.837 70.276 81.728 96.304 106.976 117.647 Calculated from IDF Curve for t = 24 hr.
Smiths Falls Compost Site - Stormwater Management Report (Final) 4
Page 8
3.3 Drainage Area Analysis The drainage area for the stormwater management pond was determined as described below. 3.3.1 Subcatchment Delineation Subcatchment delineations were determined using the PCSWMM Watershed Delineation Tool (WDT) to analyze the Ontario Lidar-Derived Digital Terrain Model (DTM). The Ontario Lidar DTM is a provincial raster dataset collected by the MNRF, and available online through the Ontario GeoHub. The Ontario Lidar DTM is a compilation of various topographic Lidar data collections over multiple years, and includes Lidar for Eastern Ontario from 2021-22. The Ontario Lidar DTM has a 0.5m cell resolution, which is suitable for hydrologic modelling. The DTM has been processed to remove obstructions such as trees and vegetation, and is intended to represent the bare- earth ground surface, which is ideal for hydrologic modelling and establishing drainage direction. The PCSWMM WDT uses a series of computations to establish watershed delineations based on the DSM including flow direction, flow accumulation, stream definition, and watershed delineation based on a target discretization level (i.e. target watershed size) input by the user. For this analysis, the PCSWMM WDT was executed using a target discretization of 0.1 ha, and resultant watersheds were then manually reviewed and combined into a single subcatchment for the stormwater pond. The stormwater pond subcatchment is shown in Figure 2, with properties summarized in Table 2 below. Contours based on the Ontario Lidar DTM are also shown in Figure 2. As shown on the figure, the site drainage is controlled by a series of berms surrounding the composting area to ensure that any runoff which comes into contact with compost is directed towards the pond. Areas outside of the berms continue to flow as per the existing condition and have been ignored for the stormwater management pond analysis. 3.3.2 Flow Length & Slope The flow path for the subcatchment was manually delineated based on the Ontario Lidar DTM surface contours, and measured using PCSWMM. The average slope along the flow path was determined based on the Ontario LiDAR DTM using PCSWMM tools. The flow length and slope are shown in Table 2 below. 3.3.3 Curve Number (CN) The subcatchment Curve Number (CN) was determined based on the land use and soil type. Based on the Ontario Ministry of Agriculture, Food, and Agribusiness (OMAFA) online Agmaps, the site is located within an area of Tennyson sandy loam soil. The online Agmaps indicate that this soil region is hydrologic soil group “B”, which corresponds with sandy loam soil. CN for the subcatchment was determined using an area-weighted calculation of the various land cover types present in the subcatchment, based on the Ontario Ministry of Transportation (MTO) Drainage Management Manual (DMM) Design Chart 1.09. Refer to Appendix 1 for details of this calculation. The resulting CN is shown Table 2 below. Table 2: Subcatchment Characteristics
AREA ID AREA CN IMPERVIOUS SLOPE FLOW LENGTH Note (ha) % % (m) Compost site drainage area to A1 0.671 69.9 0.0 2.33 86.2 stormwater management pond.
TOTAL 0.671 69.9 0.0
Smiths Falls Compost Site - Stormwater Management Report (FINAL) Page 5 of 12
Page 9
LEGEND DRAINAGE AREA BOUNDARY i | i | i i i | i i | i i |
i i | i i | i i i | i i | i i i | i i | i i | i i | i i | i i | i i | i i | i i | i i | i | i STORMWATER MANAGEMENT POND i | i | i i i | i i | | i | i i | i i | i i | i i | i i | i i | i i | i i i i | i i | i i | i i | i i | i i | i i | i i | i | i i | i i | i i | i i i | i i | i | i| i i i | i | i i DRAINAGE FLOW DIRECTION
DWG NAME: C:\USERS\KURTIS ROMANCHUK\DOCUMENTS\JP2G PROJECTS LOCAL\25-5229A-LOCAL SMITHS FALLS COMPOST FACILITY\05 DRAWINGS\1 ONGOING\25-5229A SMITHS FALLS COMPOST FACILITY.DWG LAYOUT: FIG-2 DRAINAGE AREAS SAVED ON 2025-07-07 i | i i i | i i | i i | i i i | i i | i i | i | i i | i i | i i | i i | i i i i i i | | i | | i | i i | i i | i i i | i | i i | i i | DRAINAGE AREA LABEL i | i i i i | i i i | i i | | i i i REFERENCE NUMBER CURVE NUMBER i i i | i | i i |
i | i PERCENT IMPERVIOUS i | i i | i CN i | | i ID IMP% i | i AREA i i
i | i | i ha i | i i AREA i | i i | i i | i
69.9 i | i A1 0% i | i i | i
i | i i | i 0.671 i | i
ha i | i i | i i | i
i | i i | i i | i
i | i i | i i | i
i | i i | i i | i
i | i i | i i | i
i | i i | i i | i
i | i i | i i | i
i | i i | i i | i
i | i i | i i i |
i | i | i i | i i i | i | i i | i i i | i i | i | i i | i i | i i
i | i i | i i STORMWATER | i i |
MANAGEMENT i i | i i | i | i i POND | i i | i i i | i i | i i i i | i i | i i | i | i i i | i | i | i i | i i i | i | i i | i i i i | i i | i | i | i i i | i i | i i | i i | i i | i i | i i | i i i | i i | i i | | i i i i | i | i i | i i i | i i | i i | i | i | i | i i i i | i i | i | i i | i i | i i | i i i i | i | i i | i | i | i i | i i i | i i | i i | i
PROJECT CLIENT No.: NORTH SCALE
SMITHS FALLS COMPOST SITE DRAFTED: K.R. 1:500 TR 0m 10 20 UE NO TOWNSHIP OF DRUMMOND/NORTH ELMSLEY, ONTARIO DESIGNED: K.R. RT 5 15 25 m H DRAWING REVIEWED: S.A. SHEET#
No. YYYY-MM-DD BY DESCRIPTION Jp2g PROJECT No.: 25-5229A DRAINAGE AREAS APPROVED: S.A. FIG-2
Page 10
3.4 Runoff Results The modelled peak subcatchment runoff flows from PSCWMM for each storm event are shown in Table 3 below. Also shown in the table are the maximum ponding elevations and storage volumes for the stormwater management pond, which is described in more detail in sections below. As shown on the table, the pond is able to retain the 100-year event runoff from all modelled storm events without overtopping. Table 3: Subcatchment Runoff Results 100-Year Event 6 hr SCS II 12 hr SCS II 24 hr SCS II Subcatchments Area Peak Runoff Peak Runoff Peak Runoff
(ha) (m3/s) (m3/s) (m3/s) A1 0.671 0.060 0.090 0.120 Total 0.671 0.060 0.090 0.120 Outfalls Contributing Area Peak Flow Peak Flow Peak Flow
(ha) (m3/s) (m3/s) (m3/s) Pond_Outfall 0.671 0.000 0.000 0.000 Total 0.671 0.000 0.000 0.000 Storage Elevations Top Elevation Storage Elev. Storage Elev. Storage Elev. (m) (m) (m) (m) Pond 125.40 124.86 125.09 125.35 Storage Elevations Maximum Volume Storage Vol. Storage Vol. Storage Vol.
(m3) (m3) (m3) (m3) Pond 398 176 262 374
4 Stormwater Management Pond 4.1 Storage Volume Storage volumes for the stormwater management pond have been computed based on contours generated from the topographic survey data, as shown on the attached Site Plan (drawing C1 in Appendix 2). The stage-storage data is shown in Table 4 below at 0.05m intervals. Based on the survey the pond bottom is approximately elevation 123.75m, and has a total storage volume of 398m 3 up to its overtopping elevation of 125.395m. At elevation 125.395m, there is a low point on the southeast side of the pond, which would cause flow to overtop the pond and flow overland in a southeasterly direction.
Smiths Falls Compost Site - Stormwater Management Report (FINAL) Page 7 of 12
Page 11
Table 4: Stage-Storage Data and 100-Year Event Modelling Results Total Depth End Area Method PCSWMM Results Incremental Elevation (from Incremental Total 100-year Peak Ponding Depth Area Outflow Bottom) Volume Volume Storm Type Volume Elevation (m) (m) (m) (m2) (m3) (m3) (m3) (m) (m3/s) 123.75 0.00 0.00 0.4 0.0 0.0 123.80 0.05 0.05 2.3 0.1 0.1 123.85 0.05 0.10 5.3 0.2 0.3 123.90 0.05 0.15 10.8 0.4 0.7 123.95 0.05 0.20 20.6 0.8 1.4 124.00 0.05 0.25 32.7 1.3 2.8 124.05 0.05 0.30 47.1 2.0 4.8 124.10 0.05 0.35 63.8 2.8 7.5 124.15 0.05 0.40 82.7 3.7 11.2 124.20 0.05 0.45 102.5 4.6 15.8 124.25 0.05 0.50 131.7 5.9 21.7 124.30 0.05 0.55 168.1 7.5 29.2 124.35 0.05 0.60 209.6 9.4 38.6 124.40 0.05 0.65 221.3 10.8 49.4 124.45 0.05 0.70 233.5 11.4 60.8 124.50 0.05 0.75 245.4 12.0 72.7 124.55 0.05 0.80 257.4 12.6 85.3 124.60 0.05 0.85 269.5 13.2 98.5 124.65 0.05 0.90 281.7 13.8 112.3 124.70 0.05 0.95 293.9 14.4 126.6 124.75 0.05 1.00 306.2 15.0 141.6 124.80 0.05 1.05 318.7 15.6 157.3 124.85 0.05 1.10 331.2 16.2 173.5 6 hr SCS II 176 124.86 0.000 124.90 0.05 1.15 343.9 16.9 190.4 124.95 0.05 1.20 356.6 17.5 207.9 125.00 0.05 1.25 369.4 18.1 226.1 125.05 0.05 1.30 382.2 18.8 244.8 125.10 0.05 1.35 395.2 19.4 264.3 12 hr SCS II 262 125.09 0.000 125.15 0.05 1.40 408.2 20.1 284.4 125.20 0.05 1.45 421.3 20.7 305.1 125.25 0.05 1.50 434.6 21.4 326.5 125.30 0.05 1.55 499.2 23.3 349.8 125.35 0.05 1.60 540.3 26.0 375.8 24 hr SCS II 374 125.35 0.000 125.40 0.05 1.65 580.8 28.0 403.9 Top of Pond 398 125.395 0.000 125.45 0.05 1.70 622.5 30.1 433.9 125.50 0.05 1.75 670.0 32.3 466.3 125.52 0.02 1.77 690.1 13.6 479.9
Smiths Falls Compost Site - Stormwater Management Report (FINAL) Page 8 of 12
Page 12
4.2 Outlet As described above, the pond overtops towards the southeast at elevation 125.395m, based on the low point of the topographic survey surrounding the pond. Based on the survey data, the outlet was modelled in PCSWMM as a V-shaped weir with a height of 0.13m (above elevation 125.52m the pond may additionally overtop to the south) and a length of 4.3m based on the survey data. If the modelled ponding elevation were to exceed 125.52m, additional outlets would have to be added to the pond in PSCWMM, but this was not the case. 4.3 Modelling Results As shown by the outflow modelling results displayed in Table 4 above, there was no outflow from the pond in PSCWMM for any modelled 100-year storm event, as the pond has sufficient volume to contain the 100-year events without overtopping. A screenshot of the PCSWMM model schematic is shown in Figure 3 below. The Ontario Lidar DTM is displayed as background imagery for the model, which shows the berms surrounding the site. Figure 3: PCSWMM Model Schematic
Smiths Falls Compost Site - Stormwater Management Report (FINAL) Page 9 of 12
Page 13
5 Impact on Water Quality 5.1 Surface Water As the stormwater pond on site is sufficient to contain surface runoff up to the 100-year storm event, the site is not expected to have any impact on surrounding surface water quality. Any runoff which has come into contact with the compost will be retained on site in the stormwater management pond. 5.2 Groundwater A groundwater monitoring well was established near the outlet of the stormwater management pond through the Hydrogeological Assessment completed by RLC-HydroG, report dated July 7, 2025 (MW7 in that report). The location of the monitoring well is shown on the attached Site Plan. Based on the Hydrogeological Assessment, the groundwater quality at the monitoring well near the pond outlet is no worse, and in some cases better, than that at monitoring wells completed elsewhere in the surrounding area. Based on the Hydrogeological Assessment results it does not appear that the compost site is having a negative effect on groundwater quality.
6 Recommendations Based on the analysis and results described above, the site does not appear to have had negative impacts on surface or groundwater quality in the area. It is therefore recommended that the Smiths Falls Compost Site continue its operations as it has previously done since the establishment of the site. To ensure that the site does not have negative impacts on surface or groundwater quality in the future, it is further recommended that maintenance and monitoring of the site be completed as described below. 6.1 Compliance Approvals 6.1.1 Environmental Protection Act The Environmental Protection Act, R.S.O. 1990, c. E.19 (EPA) is intended to provide for the protection and conservation of the natural environment. Section 27(1) of the EPA states that:
27(1) No person shall use, operate, establish, alter, enlarge or extend a waste management system or a waste disposal site except under and in accordance with an environmental compliance approval. Further, Section 41 of the EPA states that:
41 No person shall use, or cause, permit or arrange for the use of, any facilities or equipment for the storage, handling, treatment, collection, transportation, processing or disposal of waste that is not part of a waste management system for which an environmental compliance approval or renewable energy approval has been issued or a registration under Part II.2 is in effect and except in accordance with the terms and conditions of the approval or the regulations made for the purposes of Part II.2. In this case, “waste” is defined in the EPA as: ashes, garbage, refuse, domestic waste, industrial waste, or municipal refuse and such other materials as are designated in the regulations. The recycling and composting of municipal waste is further regulated by Ontario Regulation 101/94 of the EPA (O.Reg. 101/94). In addition to listing several requirements for the operation of leaf and yard waste composting sites in Section 31, Section 34 of O.Reg. 101/94 states that:
- A leaf and yard waste composting site is exempt from sections 9, 27, 40 and 41 of the Act if all buildings and processing or storage areas that are part of the site are at least 100 metres Smiths Falls Compost Site - Stormwater Management Report (FINAL) Page 10 of 12
Page 14
from the boundaries of the parcel of land upon which the buildings and processing or storage areas are located and from any lake, river, pond, stream, reservoir, spring or well. Despite the nearby wetland areas, the compost processing area of the site does not appear to be within 100m of any defined lake, river, pond, stream, reservoir, spring, or well. However, the compost processing area is within 100m of the property line of the site, therefore the exemption under Section 34 of O.Reg. 101/94 may not apply. Therefore an ECA may be required under the EPA for the compost site. 6.1.2 Ontario Water Resources Act The Ontario Water Resources Act, R.S.O. 1990, c. O.40 (OWRA) is intended to provide for the conservation, protection and management of Ontario’s waters and for their efficient and sustainable use, in order to promote Ontario’s long-term environmental, social, and economic well-being. Section 53(1) of the OWRA states that:
53(1) Subject to section 47.3 of the Environmental Protection Act, no person shall use, operate, establish, alter, extend or replace new or existing sewage works except under and in accordance with an environmental compliance approval. In this case, “sewage” is defined in the OWRA as: drainage, storm water, commercial wastes and industrial wastes and such other matter or substance as is specified by the regulations. Therefore, stormwater runoff and leachate from the compost site meets the definition of sewage under the OWRA, and an Environmental Compliance Approval (ECA) may be required. However, Section 53(6)(a) of the OWRA states that:
53(6) This section does not apply,
(a) to a sewage works from which sewage is not to drain or be discharged directly or indirectly into a ditch, drain or storm sewer or a well, lake, river, pond, spring, stream, reservoir or other water or watercourse; As the stormwater pond is not designed to discharge to any surface water, and has sufficient volume to store the 100 year event runoff from the compost site, it is our understanding that the site is therefore exempt from Section 53 of the OWRA.
7 Maintenance and Monitoring Plan 7.1 Stormwater Management Pond Maintenance The following maintenance operations activities for the stormwater management pond are suggested: Inspections Weed Control Sediment Removal Pollution Removal These activities are discussed below. It is recommended to maintain a log of inspections and maintenance activities, which can help establish maintenance requirements. 7.1.1 Spring Inspection 7.1.1.1 Trash & Debris Removal Once the danger of ice accumulation has passed, the stormwater management pond should be inspected each spring, and any trash or debris which has accumulated over the winter removed at that time.
Smiths Falls Compost Site - Stormwater Management Report (FINAL) Page 11 of 12
Page 15
7.1.1.2 Sediment Accumulation During the spring inspection, the level of sediment accumulation in the pond should also be reviewed. In order to ensure that the pond functions as intended, it is important to maintain the available storage volume in the pond. If sediment accumulation is observed at a depth greater than 0.20m (approximately 8 inches), sediment removal is recommended. As there is wild parsnip present on site, to avoid injury it is recommended to perform the sediment inspection in the spring before the wild parsnip has had time to grow. Information regarding risks and protection from wild parsnip should be obtained from relevant sources prior to inspecting the pond. 7.1.1.3 Sediment Removal When sediment removal is deemed necessary, a backhoe and hand tools should be used. The equipment should be able to reach all sediment-covered areas. Care should be taken to minimize the impact on the existing vegetation surrounding the stormwater management pond. Any damage to the stormwater management pond berm or vegetation should be remediated as soon as possible. 7.1.2 Inspections following Large Storm Events The stormwater management pond should be inspected following major storm events to ensure that it continues to function as intended. It is recommended that the inspections include observations of the elements described below. 7.1.2.1 Water Levels As the stormwater management pond is intended to store the 100-year event with no runoff, water levels in the pond should be inspected following major storm events to ensure the pond is not at risk of overtopping. The water level in the pond should be checked against the low point at the southeastern end. If water levels are reaching the top of the pond and additional rainfall is expected, pumping and proper disposal should be considered to remove effluent from the pond so it does not flow into the adjacent wetland. 7.1.2.2 Vegetation & Weed Control Vegetation surrounding the stormwater management pond should be maintained in order to provide bank stability and nutrient uptake. However, excess vegetation that interferes with inspection of the pond and water levels is considered a nuisance and should be removed as necessary. Particular attention should be paid to invasive plant species such as wild parsnip which post a hazard to both human health and the environment. Pesticide and herbicide use are not recommended in the vicinity of the pond to avoid potential water quality problems. 7.1.3 Groundwater Monitoring Periodic sampling should be conducted on a yearly basis from the newly established groundwater monitoring well near the pond outlet. The monitoring schedule should endeavor to sample at approximately the same time each year in order to provide comparable results over multiple years. Groundwater quality parameters should be recorded and compared to the baseline that has been established through the Hydrogeological Assessment.
End of report.
Smiths Falls Compost Site - Stormwater Management Report (FINAL) Page 12 of 12
Page 16
Appendix 1 Hydrologic Analysis
Page 17
TABLE A-4: SUBCATCHMENT CALCULATIONS
Land Cover - Area Weighted CN Calculation Land Cover: Gravel Wooded Grassed Water Total Pervious Flow Runoff Time of Concentration (TC) Name Area Impervious Area Impervious % Area-Weighted CN CN: 85.00 58.00 65.00 50.00 Area Slope Length Coeff. Bransby-Williams (C > 0.4) Airport (C < 0.4) 2 2 2 2 2 (ha) (m ) (ha) (%) Area: (m ) (m ) (m ) (m ) (ha) (%) (m) C min. hr. min. hr. A1 0.671 0 0.000 0.0 2756 2765 986 206 0.671 69.9 2.332 86.201 0.35 4.3 0.0719 17.2 0.2861
TOTAL 0.671 0 0.000 0.0 2756 2765 986 206 0.671 69.9
Page 18
Appendix 2 Site Plan
Page 19
CLIENT LOGO
i | i i | i i | i LEGEND i | i | i i 126.65 i | i | i i TREES / THICK VEGETATION (FROM SURVEY) i | 126.95 126.89 i i |126.29126.38 i 126.46 i | i | i i | i TOP OF SLOPE 127.03 | i EXISTING BERM i 126.46 i i i | i i i 126.85| i | i PROPERTY LINE (APPROXIMATE) i | i i KEYPLAN (NTS) i i | i i | STORMWATER MANAGEMENT POND i | i | i | i TRUE NORTH
i | i 127.09 0.25m SURFACE CONTOUR (BASED ON SURVEY ELEVATIONS) i | i126.60 i i i | | i 128.70 | i 128.91| i i | i | i i i | 126.66 i i GRAVEL PAD (FROM SURVEY) O i RR i128.90 i | i CA i | i| i i | i 125.68 i | i 126.06 i | i i | LL i 126.25126.55 i 126.32 i | | i 129.01 i | i 126.02 126.45 EXISTING SPOT ELEVATION (FROM SURVEY) SITE RD i |i i i 126.16 126.34 126.09 | i i | i | i 125.56 i i i 126.41 i 126.26 | | W GROUNDWATER MONITORING WELL i i | 126.22 125.22 i 128.88 i | i i | i i | i | 125.56 126.11 i | i i128.82 i 125.18 ST i | | i i | E i i | ZI TOWN OF i i i | i128.56 126.47 i 126.45 125.42 CORNELIA ST W (HWY MA i | i | i 43) SMITHS FALLS i i i i | i i i | 126.43 i | 126.35i | i | i | 128.64 126.60 DISCLAIMER NOTES i i i 124.16 i | i 1. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ISSUES/PROBLEMS WHICH MAY OCCUR AS A RESULT OF i 126.44 124.32 i | 126.56 128.58 i | A FAILURE TO FOLLOW THESE PLANS, SPECIFICATIONS AND THE DESIGN INTENT THEY CONVEY. 126.64 125.83 i | i 126.60 i | i i i | i 126.59 2. WHERE THERE ARE ALLEGED ERRORS, OMISSIONS, INCONSISTENCIES OR AMBIGUITIES PRESENT IN THE
i | CONTRACT DOCUMENTS, THE CONTRACTOR MUST SEEK CLARIFICATION FROM JP2G. ANY COSTS OR SCHEDULE | i i 126.75 126.74 DELAYS WHICH RESULT AS A FAILURE TO CONTACT JP2G FOR DIRECTION SHALL BE SOLELY THE RESPONSIBILITY i | i | i 126.68 126.73 124.33 i OF THE CONTRACTOR. i | i | i | 125.52 i 126.14 i | i i i 124.79 3. DO NOT SCALE DRAWINGS. REFER ANY DIMENSIONAL CLARIFICATIONS AND/OR POSSIBLE TRADE EXISTING BERM i 126.27 125.90 INTERFERENCE/CONFLICTS TO JP2G FOR CLARIFICATION PRIOR TO COMMENCEMENT OF THE WORK. i 125.87 i | i | | i 125.51 i 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COORDINATION WITH SUBTRADES AND SHALL ADDRESS i i | i | i i CONSTRUCTION TEAM COORDINATION ITEMS PRIOR TO ISSUING REQUESTS FOR INFORMATION FROM JP2G.
i | 126.78 i | 5. THE POSITION OF POLE LINES, CONDUITS, WATERMAINS, SEWERS AND OTHER UNDERGROUND AND OVERGROUND i i i | 126.03 i | | i UTILITIES AND STRUCTURES IS NOT NECESSARILY SHOWN ON THE CONTRACT DRAWING, AND, WHERE SHOWN, i i 126.06 i THE ACCURACY OF THE POSITION OF SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED. BEFORE STARTING 126.72 i | 125.58 i WORK, THE CONTRACTOR SHALL INFORM THEMSELVES OF THE EXACT LOCATION OF ALL SUCH UTILITIES AND i | i i | STRUCTURES, AND SHALL ASSUME ALL LIABILITY FOR DAMAGE TO THEM. i i | 125.94 i | i E i | i LIN 125.75 i i | i i T i | i OU i | i | i i | L i i A VE i | | | GR i i i i i 126.46 i | i | i i | i | i | i 126.92 i 125.94i STORMWATER MANAGEMENT POND 125.33 i i 125.91 | i | i | i | i 125.74 i 125.90 i | i i i | i 124.33 i | EXISTING STANDING WATER IN POND i i i | 124.31 i i | i AT TIME OF SURVEY i | | | i i 126.82 i 125.42 123.86 i i 126.84 124.31 i i | i | | EL i | i i 127.00 AV 124.36 GR i i i | i 126.66 i | 126.00 i | IN i | LOW POINT OF POND TL OU i | i 126.11 i | i E i 125.28124.32 i | i
i | i 123.90 i | i 125.31 124.33 123.88 125.17 i 123.71 124.32 123.81 124.29 i | i 126.62 126.85 i | 124.34 | i | i 125.40 NOT FOR 126.86 125.92 W 125.32 124.33 i i 126.44 CONSTRUCTION i 127.09 125.26 | i i | i 125.56 i i |
127.00 126.45 125.54 125.53 i 127.01 | i i | i | i i 126.58 GROUNDWATER MONITORING WELL i i | | 126.97 125.85 i i 126.22 i i | | 126.30 i i 126.80 i i | | i i 126.84 i | i | i 126.78 No. YYYY-MM-DD BY DESCRIPTION i 126.82 STAMP STAMP 126.49 i i | i | i 126.63 126.36 i i | i | i 126.76
DWG NAME: C:\USERS\KURTIS ROMANCHUK\DOCUMENTS\JP2G PROJECTS LOCAL\25-5229A-LOCAL SMITHS FALLS COMPOST FACILITY\05 DRAWINGS\1 ONGOING\25-5229A SITE PLAN.DWG LAYOUT: C1 SITE PLAN SAVED ON 2025-07-07 i 126.77 i 126.49 126.53 | i | 126.78 E 126.21 i AV | i GR i E | 126.47 IN LO i L i UT UT O i i L | LIN VE i | 126.74 A i GR E 126.58 i | i PROJECT i | 126.76 126.35 i | i i i 126.76 i | SMITHS FALLS COMPOST SITE | i 126.55 i i 126.85 i 126.52 | i | i 126.61 i 126.33 i | TOWNSHIP OF DRUMMOND/NORTH ELMSLEY, ONTARIO | i 126.86 i 126.90 i i i | DRAWING i | | i 126.77 126.59 i i | i i | | i i i | i i | i EXISTING BERM SITE PLAN i | i i i | i | i | i i 126.62 i | i i i i 126.73 | i | i i | i | i Jp2g Consultants Inc. i | i i ENGINEERS ▪ PLANNERS ▪ PROJECT MANAGERS | i i i i | i | i | i 16 EDWARD STREET SOUTH, SUITE 211, ARNPRIOR, ON, K7S 3W4 T: 613-626-0780 | i i i ARNPRIOR@JP2G.COM Jp2g PROJECT No.: 25-5229A | i i i i | | NORTH i i CLIENT No.: i i | | DRAFTED: K.ROMANCHUK i i i TRUE NORTH | DESIGNED: K.ROMANCHUK i i i |
REVIEWED: S.ARENDS
APPROVED: S.ARENDS SCALE SHEET # 1:200 0m 2 4 6 8 10 m C1