RESIDENTIAL RENOVATION (Alter/Repair Building Systems) – PROJECT GUIDE

<u>Applicant and/or Designer:</u> The following information will assist in preparing to file a more complete application with required drawings from the Town of Smiths Falls Building By-Law. Explaining full extent of work is key.

-‘Building Systems’ is a defined term under Ontario Building Code Part 11-Renovation. It means a combination of elements or components that form a complete major division of construction in the design of a building (or part of) and include the following systems; Structural-Framing, Waterproofing, Drainage, Exterior Cladding, Roofing, Window, Partition (non-loadbearing wall), Corridor, Stair, Fire Alarm & Detection, Sprinkler, Heating, Ventilation or A/C (Hvac), Foundation, Standpipe & Hose, Flooring, Plumbing (Water-Sewer), Sewage system or Electrical.

  • Inner Building Systems include: Framing/Walls/Stair, Plumbing/Electrical/Hvac or Insulation/Fire Separation
  • Outer Building Systems include: Foundation/Waterproof/Drainage, Plumbing, Cladding/Window or Roofing -Basic renovation is often a partial area of work or part building/floor (ie. Room) with limited alterations/repair -Extensive Renovation is more an entire area of work (ie. Floor) with more involved alterations/repair -Finish Basement permit includes new finish material to ceiling, new partitions to create room(s) and/or plumbing bath rough-in connection. <u>Note</u>: Any conversion to a private apartment within a house (ie. secondary dwelling unit), refer to project guide for apartment/duplex (ie. Apartment permit is not a finish basement permit).
  • Roofing permit includes material change shingle to metal and/or if old material removed (ie. eave protection)
  • Cladding permit includes material change vinyl/wood siding to full height Brick veneer.
  • Window permit where wall openings made wider and structural lintel/header review in loadbearing wall. – Hvac permit includes any Woodstove Installation/Alteration (ie. Solid-Fuel Burning Appliance/Equipment). <u>Designer; Prepare Two (2) Full Sets of Working Drawings dimensioned and detailed to scale</u>: Architectural-Structural Design; to meet Ontario Building Code minimum requirements: a) Existing Demolition Layout; Clearly identify all building systems to be removed or relocated b) Proposed Floor Plan(s); Layout of all new Wall Partitions/Rooms/Use and building systems c) New Building Elevations; for any new exterior building systems (ie. Cladding/window/roofing) d) Construction assembly for any new footing, wall, post, beam, floor, insulation or roof details e) <u>Designer to complete ‘Schedule 1: Designer Information’ form</u> (depending on scope of work) Any Mechanical Heating & Ventilation (HVAC) Review by experienced person (if ductwork altered)

f) Mechanical Air Exchange report/layout; and/or if new woodstove (provide manufacturer info.) Ø <u>Applicant: File form ‘Application for a Permit to Construct’ form, with above drawings</u>;

-If Agent signs application; Owner to authorize agent to act on their behalf (ie. provide letter)

<u>On the ‘Section A. Project Information’ of the application form</u>; Calculate the total, -Area of Work (Square Feet); as the Gross building area, and the corresponding -Project Value ($) for all Labour, Materials, Services & Equipment to complete work in full. -Permit Fee calculated per the Town Building By-Law Fees Schedule; other flat fees may apply. -Separate fee to Public Works Dept. (per By-Law) for any water meter/service connection. -Final permit fee due prior to permit pickup of issued building plans. Cheque, debit or cash.

<u>Note</u>: This is a general list only for an average project; Other information may be required. 10/20