Hydrogeological Assessment Smiths Falls Compost Site 3514 Highway 43, Smiths Falls, Ontario

COMPOST SITE

RLC-HydroG – Hydrogeological Services Ottawa, Ontario July 8, 2025


Table of Contents

1 INTRODUCTION .................................................................................................................................... 1 1.1 Objectives .................................................................................................................................... 1 1.2 Scope of Work ............................................................................................................................. 2 2 SITE DESCRIPTION ................................................................................................................................ 2 2.1 Compost Site ................................................................................................................................ 3 2.2 Zoning .......................................................................................................................................... 4 2.3 Land Use ...................................................................................................................................... 4 2.4 Topography .................................................................................................................................. 5 2.5 Hydrology .................................................................................................................................... 5 3 METHODOLOGY ................................................................................................................................... 7 3.1 Pre-Consultation .......................................................................................................................... 7 3.2 Background Information .............................................................................................................. 8 3.3 Test Pits ....................................................................................................................................... 8 3.4 Boreholes and Monitoring Wells ................................................................................................. 8 3.5 Surface Water Sampling .............................................................................................................. 9 3.6 Elevation Survey ........................................................................................................................ 10 3.7 Groundwater Elevation Monitoring .......................................................................................... 10 3.8 Groundwater Sampling .............................................................................................................. 10 4 GEOLOGY ............................................................................................................................................ 10 4.1 Surficial Geology ........................................................................................................................ 10 4.2 Terrain Analysis ......................................................................................................................... 11 4.3 Bedrock Geology ........................................................................................................................ 13 5 HYDROGEOLOGY ................................................................................................................................ 13 5.1 Water Well Records ................................................................................................................... 15 5.2 Closest Water Supply Wells ....................................................................................................... 17 5.3 Potential Sources of Contamination .......................................................................................... 18 5.4 Hydrogeological Sensitivity........................................................................................................ 18 5.5 Water Budget ............................................................................................................................ 19 6 IMPACT ASSESSMENT ......................................................................................................................... 22 6.1 Soil Impacts ................................................................................................................................ 22 6.2 Surface Water Impacts .............................................................................................................. 24


6.3 Groundwater Impacts ................................................................................................................ 25 6.4 Natural Functions of the Ecosystem .......................................................................................... 27 6.5 Mitigation .................................................................................................................................. 27 7 MONITORING PLAN ............................................................................................................................ 28 7.1 Surface Water Monitoring ......................................................................................................... 28 7.2 Groundwater Monitoring .......................................................................................................... 29 7.3 Reporting ................................................................................................................................... 30 8 CONTINGENCY PLAN .......................................................................................................................... 31 8.1 Trigger Mechanisms .................................................................................................................. 31 9 CONCLUSIONS .................................................................................................................................... 31 10 RECOMMENDATIONS ......................................................................................................................... 32 11 LIMITING CONDITIONS ....................................................................................................................... 33 12 REFERENCES ....................................................................................................................................... 34 ATTACHMENT A Legal Survey ATTACHMENT B Zoning Map ATTACHMENT C Elevation Survey ATTACHMENT D SLT Borehole Logs ATTACHMENT E Town of Smiths Falls IPZ ATTACHMENT F Water Well Records
ATTACHMENT G Laboratory Certificate of Analysis – TP2-9 ATTACHMENT H Laboratory Certificate of Analysis – Borehole Soils ATTACHMENT I Laboratory Certificate of Analysis – Surface Water ATTACHMENT J Laboratory Certificate of Analysis – Overburden Groundwater ATTACHMENT K Spill Response Plan


July 8, 2025 Project Number: 25022

Vanessa Bernicky Town of Smiths Falls 77 Beckwith Street North PO Box 695 Smiths Falls, Ontario K7A 2B8 Email: vbernicky@smithsfalls.ca

Re: Hydrogeological Assessment Smiths Falls Compost Site 3514 Highway 43, Smiths Falls, Ontario

1 INTRODUCTION

RLC-HydroG was retained by St. Lawrence Testing & Inspection Co. Ltd. (SLT) on behalf of the Town of Smiths Falls to conduct a hydrogeological assessment for the Smiths Falls Compost Site located at 3514 Highway 43, Smiths Falls, Ontario. The location of the site is indicated in Figure 1. The Smiths Falls Compost Site has been in operations since 1993.

The site is operated under Provisional Certificate of Approval A450106. The Town of Smiths Falls is currently in the process of obtaining an amendment to the Environmental Compliance Approval (ECA) for the Compost Site.

1.1 Objectives

The objectives of the hydrogeological assessment were determined based on consultation with the Town of Smiths Falls, and MECP technical information requirements for compost sites (MECP, 2013) including the assessment of:

• Physical conditions at the site (outdoor composting operation on a granular base).

• Water use conditions in the area.

• Surface water hydrology and quality.

• Terrain analysis, soil quality, and geology.

• Hydrogeology including water table elevations and groundwater flow directions.

• Overburden groundwater quality.

• Identification of water supply wells, water takings, and other water uses.

• Distance to nearest water supply wells.

• Regulatory requirements.

• Municipal zoning.

• Conservation authority requirements.

• Potential impacts to soils, groundwater, surface water and water users.

• Monitoring and contingency plans to detect and mitigate impacts.


Figure 1: Site Location

SITE SLT - Township of Smiths Falls - Compost Site Smiths Falls SCALE

1.2 Scope of Work

The following scope of work was developed in consultation with SLT and the Town of Smiths Falls:

• Pre-consultation with RVCA.

• Desktop study including a review of background information (water well records, geological databases, hydrology information, topography, known water uses).

• Review of previous site investigation reports by SLT.

• Site Visit

• Traverse the site and view surrounding areas.

• Inspect new overburden monitoring wells.

• Measure groundwater elevations at monitoring wells.

• Conduct an elevation survey to establish well reference elevations.

2 SITE DESCRIPTION

The civic address of the Smiths Falls Compost Site is 3514 Highway 43, Smiths Falls, Ontario. The site occurs on Parts of Concession 5 & 6, Lots 1 & 2, Geographic Township of North Elmsley, Township of Drummond


  • North Elmsley, Ontario. The Compost Site has an area of 1.5 hectares. A Plan of Survey by Callon Dietz Group (2025) is included in Attachment A. The site occurs within the County of Lanark and falls under the jurisdiction of the Rideau Valley Conservation Authority (RVCA).

2.1 Compost Site

The Compost Site includes a cleared area (approximately 80 m by 70 m) with a gravel pad (approximately 60 m by 40 m). The gravel pad was installed in 1993 and consists of a 0.3 m thick layer of compacted Granular B gravel overlain by 0.1 m thick layer of compacted stone dust. The Compost Site is accessed by a roadway (gravel and tarmac). The areas surrounding the clearing are forested. The site layout is indicated in Figure 2. Access to the site is controlled by a gate at Highway 43 that is locked when the site is not in operation. A stormwater management pond is located to the immediate northeast of the clearing/pad area.

Cleared areas to the southeast of the Compost Site were previously used for snow storage. This activity ended in 2023.

Figure 2: Site Layout

Stormwater pond TP2-9 Compost Site Boundary MW7 MW2 Pad MW1 Access Road MW6 MW5 MW3 MW4 Cemetery SCALE 144 m


The Smiths Falls Compost Site receives leaf and garden waste from the residents of Smiths Falls and Drummond - North Elmsley Township. Brush and trees are deposited at a cleared area that is approximately 200 m east of the Compost Site (see Figure 2). Leaf and garden waste is handled, stored and processed at the Compost Site. A loader is used to handle the leaf and garden waste. Machinery and equipment is stored, serviced and refueled at offsite locations. The leaf and garden waste are screened onsite by local contractors. The screening process is monitored by Town of Smiths Falls staff to ensure the equipment is in good working condition and is properly maintained. The screened compost is sampled and tested by the Town of Smiths Falls. Approved compost is used by Town of Smiths Falls staff, Town of Smiths Falls Parks department, and residents of Smiths Falls and Drummond - North Elmsley Township.

Excess screened materials are removed from the site and deposited at a local waste transfer station (Glenview Iron and Metal Ltd. (GIM) at 3954 Highway 43 West, Smiths Falls, ON, K7A 5A5).

In Ontario, a compost site is a waste disposal site and requires an Environmental Compliance Approval (ECA) under Ontario Regulation 347.

2.2 Zoning

Zoning at the Compost Site is ‘Waste Disposal’. The surrounding lands are zoned ‘Institutional’. Hillcrest Cemetery occurs to the south of the Compost Site and is owned by the Town of Smiths Falls. Zoning information for the site and surrounding areas is included in Attachment B (Drummond - North Elmsley Zoning Map).

2.3 Land Use

Land use at the site includes compost handling and processing. There is no agricultural or livestock related use. Surrounding land uses within 700 m of the Compost Site includes:

• North:

o Forest / undeveloped land

o Agricultural land (grazing / crops)

o Carroll Road

o Railway line

o Wetlands

• East:

o Forest / undeveloped land

o Wetlands

o Carroll Road

o Site access roadway

• West:

o Forest / undeveloped land

o Wetland

o Residential properties (north of Highway 43)


• South:

o Forest / undeveloped land

o Wetland

o Residential properties

o Hillcrest Cemetery

o Commercial use (storage locker facility)

2.4 Topography

The site and surrounding areas are undulating. Onsite elevations range from approximately 128.6 m asl (at the top of berms to the north and south of the compost site cleared area) to approximately 123.4 m asl (at the eastern corner of the Compost Site). An analysis of the terrain at the site was conducted using ‘laser imaging, detection, and ranging’ (LIDAR) data. Digital terrain model data was obtained from the Government of Canada Open Maps website (Government of Canada, 2025). A colour shaded digital terrain model image of the site and surrounding areas is provided in Figure 3.

Figure 3: Topography – Colour shaded LIDAR DTM

HSI-046 The HSI Institute of Environmental Science

Compost Site Boundary

SCALE

2.5 Hydrology

The site occurs in the Edmonds Dam - Rideau River Watershed. Onsite drainage is by infiltration and overland flow to the east towards eastern portion of The Swale Wetland which is a provincial significant wetland (PSW). The Swale Wetland occurs to the east and west of the site. The western portion of The Swale Wetland drains to the east via an unnamed creek that occurs approximately 190 m to the southeast of the Compost Site. Wetlands and boundaries from the RVCA online geographic information system (GIS) are shown in Figure 4 (RVCA Geoportal, 2025). Areas of unregulated wetland occur at the margins of the PSW. Parts of the unregulated wetlands extend onto the eastern and southern corners of the site. The closest surface water feature is The Swale Wetland. At its closest point, the PSW portion of The Swale Wetland is approximately 35 m south of the southern corner of the site. Regulation setback boundaries associated with The Swale Wetland are all outside of the Compost Site boundary. Drainage directions at the site are indicated in Figure 4.

It is noted that the Compost Site is in an intake protection zone (IPZ-3 with a score of 8 – see Section 5). The intake for the Town of Smiths Falls water supply system is located at the Rideau River at a point that is approximately 2.3 km southeast of the site.

Figure 4: RVCA GeoPortal - Wetlands and Regulation Boundaries

LOT 9 CON 8 Unregulated wetland LOT 1 CON 8 The Swale Wetland PSW Unregulated wetland Compost Site Boundary (approx.) LOT 2 CON 8 The Swale Wetland PSW strainage Unregulated wetland LOT 4 CON 5 Unregulated wetland The Swale Wetland PSW LOT 2 CON 5 0 50 100m SCALE RVCA GeoPortal

Surface water flow directions of creeks and rivers in the areas surrounding the site are indicated on Figure 5. The Swale Wetland drains to the south towards the Rideau River at a point which is approximately 1.6 km southeast of the site.


Figure 5: Surface Water Drainage

SITE

SMITHS FALLS COMMUNITY HOSPITAL

SMITHS FALLS PASSENGER STATION

Atronto

Smith's Falls

Rideau River

Rideau River

SCALE 0.6km

Ontario Source Protection Information Atlas

3 METHODOLOGY

3.1 Pre-Consultation

3.1 Pre-Consulta�on

A pre-consultation meeting with RVCA was conducted on July 2, 2025. RLC-HydroG presented the scope of work for the hydrogeological assessment including: a desktop analysis of geoscience and hydrology information; site traverse and observation of surrounding areas and surface water features; groundwater elevation monitoring; survey of well reference elevations; the integration of findings from recent drilling and installation of monitoring wells; and recent groundwater sampling by SLT. RCVA appreciated the opportunity to comment on the hydrogeological assessment and provided clarification regarding the suitability of the site with respect to the Mississippi Rideau Source Protection Plan (2014 as amended) (see Section 5 for further details).


3.2 Background Information

3.2 Background Informa�on

A review of available background information was conducted including:

• MECP water well records.

• MECP permit to take water (PTTW) database.

• Topographic data.

• RVCA online geographic information system (GIS).

• Ontario Geological Survey (OGS) databases.

• The Ontario Source Protection Atlas.

• Previous site investigation reports by SLT including:

• SLT, 2024a. Proposed Snow Dump Site, Smiths Falls, ON, Environmental Soil Assessment, Report No.24C049 (March 19, 2024).

• SLT, 2024b. Smiths Fall Compost Site, Smiths Falls, ON, Environmental Soil Assessment, Report No.24C265 (December 30, 2024).

• SLT, 2025a. Smiths Fall Compost Site, Smiths Falls, ON, Creek Water Assessment, Report No.25C050 (April 4, 2025).

• SLT, 2025b. Property Located at the Smiths Falls Compost Site, 3514 Lanark County Road 43, Smiths Falls, ON, Environmental Assessment, Report 25C163 (July 4, 2025).

3.3 Test Pits

Five (5) shallow test pits (TP1-1 to TP1-5) were excavated to the southeast of the Compost Site by SLT on March 7, 2024 (SLT, 2024a). None of the test pits were excavated at the Compost Site.

Ten (10) test pits (TP2-1 to TP2-10) were excavated by SLT on December 12, 2024 (SLT, 2024b). Most of the test pits were located to the southeast of the Compost Site. One test pit (TP2-9) was located at the Compost Site. The location of TP2-9 is indicated in Figure 2. Soil samples were submitted to the Bureau Veritas Mississauga laboratory for analysis of benzene, toluene, ethylbenzene, and xylenes (BTEX), petroleum hydrocarbons (PHCs, F1 to F4), metals, inorganics, and polycyclic aromatic hydrocarbons (PAHs).

3.4 Boreholes and Monitoring Wells

Seven (7) boreholes were drilled at the site by Eastern Ontario Diamond Drilling under the supervision of SLT on June 24 and 25, 2025. Two boreholes are located at the Compost Site (BH1 and BH7) and one borehole is located between the Compost Site and the nearby unnamed creek (MW2). All boreholes were drilled to refusal. A summary and discussion of the drilling and stratigraphy are included in Section 6.1 of this report. Soil samples were submitted to the Bureau Veritas Mississauga laboratory for analysis of benzene, toluene, ethylbenzene, and xylenes (BTEX), petroleum hydrocarbons (PHCs, F1 to F4), metals (including chromium XI, and mercury), and polycyclic aromatic hydrocarbons (PAHs).


Monitoring wells were installed at all seven (7) borehole locations (MW1 to MW7). Monitoring well locations are indicated in Figure 2. Protective casings were installed at all monitoring wells except for MW5.

3.5 Surface Water Sampling

Four (4) surface water samples (S1 to S4) were collected in locations to the southeast of the Compost Site by Town of Smiths Falls staff on March 25, 2025 (SLT, 2025a). Surface water sample locations are indicated in Figure 6. Findings of the surface water sampling program are presented in Section 6.2 of this report.

The surface water samples were submitted to the Bureau Veritas Mississauga laboratory for analysis of BTEX, PHCs (F1 to F4), metals (including chromium XI, and mercury), and PAHs.

Figure 6: Surface Water Sampling Locations

Compost Site S3 S2 S1 SCALE 265 m


3.6 Elevation Survey

3.6 Eleva�on Survey

A survey of monitoring well reference elevations was conducted by RLC-HydroG on June 27, 2025. Ground surface (GS), top of riser (TOR), and top of protective casing (TOC) elevations were surveyed at seven (7) monitoring well locations using a Topcon RL-H5B laser level. Elevation control points s for the survey were established using LIDAR data from the Canada Open Maps website. Three LIDAR control points were used to enhance survey accuracy . Elevation survey data is provided in Attachment C.

3.7 Groundwater Elevation Monitoring

3.7 Groundwater Eleva�on Monitoring

Groundwater elevation monitoring was conducted by RLC-HydroG on June 27, 2025. The depth to water at each monitoring well was measured using an electronic water level tape. Groundwater elevation data is summarized and discussed in Section 5 of this report.

3.8 Groundwater Sampling

SLT conducted groundwater sampling at six monitoring wells (MW1, MW2, MW3, MW4, MW6, and MW7) on June 26, 2025 (SLT, 2025b). Dedicated 5/8 inch (16 mm) tubing and inertial lift foot valves were installed at each monitoring well location. The available water column at MW5 was insufficient for sampling. Each well was purged prior to sampling by removal of three well bore volumes.

Samples were collected in laboratory prepared bottles with preservatives. Samples were delivered to the Bureau Veritas Mississauga laboratory for analysis of BTEX, PHCs (F1 to F4), metals (including chromium XI, and mercury), and PAHs. Overburden groundwater quality results are summarized and discussed in Section 6.3 of this report.

4 GEOLOGY

4.1 Surficial Geology

Surficial geology information from the Ontario Geological Survey (OGS) was obtained from the OGS Earth website (OGS, 2025). The database indicates the site is in an area of till (stone-poor, sandy silt to silty sand) on Paleozoic terrain. The Compost Site occurs in an area of till which extends to the north of the site. This till area is surrounded by organic deposits (peat, muck, marl) associated with the nearby wetlands. Areas of till occur to the south of the site (at the cemetery, and at the storage facility and north of Saumure Circle), and thin drift occurs at Saumure Circle. Surficial geology at the site and surrounding areas is shown in Figure 7.

These descriptions are generally consistent with the findings of the water well records search, test pitting, and recent boreholes by SLT.


Figure 7: Surficial Geology

Bedrock-drift complex in Paleozoic terrain

Fine-textured glaciomarine deposits - silt and clay, minor sand and gravel Massive to well laminated

Organic Deposits

Till -stone-poor, sandy silt to silty sand-textured till on Paleozoic terrain

Organic Deposits - peat, muck, marl

SUT - Township of Smuts Falls - Compost Soil

Bedrock-drift complex in Paleozoic terrain

Organic Deposits

Organic Deposits

Bedrock-drift complex in Paleozoic terrain

SCALE 686 m

4.2 Terrain Analysis

Seven boreholes (BH1 to BH7) were drilled on and near the Compost Site on June 24 and 25, 2025. The locations of the monitoring wells that were installed at each borehole location are indicated in Figure 2. Borehole stratigraphy and observations are summarized in graphical logs provided by SLT (see Attachment D). The boreholes were drilled to provide confirmation of soil conditions in the overburden unit. A summary of borehole information is provided in Table 1.

Table 1: Borehole Stratigraphy and Well Screen Intervals

BH1Description
0.00 to 4.03 mMoist, brown, loose SILTY SAND - gravelly and compact below 0.9 m / very moist and dense below 2.4 m / most and dense below 3.0 m
Auger hole terminated at refusal at 4.03 m
A monitoring well was installed (MW1) with well screen from 0.91 to 4.03 m bgs

BH2Description
0.00 to 0.77 mTOPSOIL
0.77 to 2.44 mMoist, brown, dense SILTY SAND with gravel / loose below 1..5 m / dense below 2.3 m
Auger hole terminated at refusal at 2.44 m
A monitoring well was installed (MW2) with well screen from 0.91 to 2.44 m bgs
BH3Description
0.00 to 0.75 mTOPSOIL
0.75 to 4.37 mMoist, brown, loose SILTY SAND / becoming compact below 0.8 m with silt zone and gravelly / moist and dense below 2.3 m
Auger hole terminated at refusal at 4.37 m
A monitoring well was installed (MW3) with well screen from 0.91 to 4.37 m bgs
BH4Description
0.00 to 1.25 mTOPSOIL
1.25 to 1.98 mMoist, brown, loose SILT & SAND with clay
1.98 to 4.29 mMoist, brown, compact SILTY SAND / becoming brown grey, very moist
Auger hole terminated at refusal at 4.29 m
A monitoring well was installed (MW4) with well screen from 0.91 to 4.29 m bgs
BH5Description
0.00 to 0.61 mTOPSOIL with gravel
0.61 to 2.64 mMoist, black then brown, compact SILTY SAND with gravel / black from 1.5 to 1.8 m / very moist and dense below 2.4 m
Auger hole terminated at refusal at 2.64 m
A monitoring well was installed (MW5) with well screen from 0.91 to 2.64 m bgs
BH6Description
0.00 to 3.07 mMoist, black, compact SILT & SAND / with no gravel from 0.8 to 2.1 m / brown and loose below 0.8 m / becoming compact with gravel below 2.3 m
Auger hole terminated at refusal at 3.07 m
A monitoring well was installed (MW6) with well screen from 0.91 to 3.07 m bgs
BH7Description
0.00 to 0.18 mTOPSOIL
0.18 to 2.36 mMoist, brown, compact SILTY SAND / with gravel below 1.5 m
Auger hole terminated at refusal at 2.36 m
A monitoring well was installed (MW7) with well screen from 0.91 to 2.36 m bgs

In general, the overburden at the site includes a discontinuous thin layer of topsoil (at BH2, BH3, BH4, BH5, and BH7) underlain by ‘silty sand’ or ‘silt and sand’. Refusal was encountered at depths from 2.36 m (at BH7) to 4.37 m (at BH3) which is assumed to be at fractured bedrock.


4.3 Bedrock Geology

Geological mapping information from the OGS Earth website (OGS, 2024) shows that the site is located in an area where the Lower Ordovician March Formation is the uppermost bedrock unit. The March formation occurs at the bottom of the Beekmantown Group. The bedrock lithology is described as sandstone, dolomitic sandstone, and dolostone. The site is not located in an area of known, inferred, or potential karst.

5 HYDROGEOLOGY

An unconfined water table was encountered in the overburden unit. Drainage and infiltration within the overburden unit is expected to be influenced by topography. Groundwater elevations at seven monitoring (MW1 to MW7) wells are shown in Figure 8. Overburden groundwater flow is inferred to be to the east at the Compost Site, towards unregulated wetlands and The Swale Wetland. To the southeast of the unnamed creek overburden groundwater flow is inferred to be to the northwest toward the unnamed creek. The overburden unit is not used as a water supply aquifer in the area, so the ‘first receiving aquifer’ is the bedrock aquifer.

On June 27, 2025 the depth to groundwater at the Compost Site monitoring wells was 1.49 m below ground surface (bgs) at MW1 and 0.92 m bgs at MW7. A summary of monitoring well information and groundwater elevations is provided in Table 2.

Table 2: Overburden Groundwater Elevations (June 27, 2025)

Monitoring Well IDGround Surface Elevation (m asl)Stickup (m)Top of Riser Reference Elevation (m asl)Well Depth (mbgs)27-Jun-25 Depth to Water (m btor)27-Jun-25 Water Level Elevation (masl)
MW1125.831.02126.855.112.51124.34
MW2124.210.76124.973.192.38122.59
MW3123.700.99124.695.121.80122.89
MW4123.880.96124.845.281.97122.87
MW5124.861.02125.883.653.34122.54
MW6124.861.06125.924.133.15122.77
MW7124.851.13125.973.502.04123.93
m asl = metres above sea level
m btor = metres below top of riserm bgs = metres beloww ground surface

Figure 8: Overburden Groundwater Elevations (June 27, 2025) and Flow Directions

The Swale Wetland

MW7 123.9

MW1 124.3

MW2 122.6

MW5 122.5

MW6 122.8

MW3 122.9

MW4 122.9

Unnamed creek

SCALE 123 m

The primary water supply aquifer in the area occurs within the horizontally bedded carbonaceous sedimentary bedrock. The bedrock aquifer has water bearing fracture zones (i.e., horizontal bedding plane fractures) that occur between sedimentary layers of bedrock. Permeability is controlled by fractures. The primary porosity (i.e. the ‘primary fracture network’) is associated with the horizontal bedding plane fractures. A secondary porosity is associated with subvertical fracturing.

On a regional scale recharge to the bedrock aquifer is by infiltration in low lying areas, and discharge is to lakes, rivers, and streams. At the site, the direction of groundwater flow in the upper fractured bedrock unit is assumed to be to the to the south towards the Rideau River. The direction of groundwater flow in the deep bedrock unit is also assumed to be to the to the south (towards the St Lawrence River).

Information from the Ontario Source Protection Atlas, (MECP, 2025) provides the following information:

• The site is not located within a wellhead protection area (WHPA). It is noted that the Compost Site is approximately 1.3 km southwest of the Kemptville WHPA.

• The site is located within an intake protection zone (IPZ-3 with score of 8).

• The site is not within an issue contributing area (ICA).

• The site is not within a significant groundwater recharge area (SGRA).

• The site is in an area where a highly vulnerable aquifer occurs (HVA with a score of 6).


The Mississippi Rideau Source Water Protection Plan (MVCA and RVCA, 2014 as revised) includes specific requirements associated with the ranking IPZ-3 with score of 8. A map showing the Smiths Falls IPZ is included in Attachment E. RVCA confirmed during pre-consultation that the Mississippi Rideau Source Protection Plan does not prohibit waste disposal site activities within the IPZ unless there is a threat associated with transfer processing of hazardous waste and/or liquid industrial waste.

The Town of Smiths Falls Comprehensive Zoning By-law (2022) indicates that a waste disposal site is prohibited in the ‘IPZ-8’ zone unless is has been “demonstrated to the satisfaction of the Corporation and/or RMO that the Use does not represent a significant threat to drinking water.” The findings of this report show that there is no significant threat to drinking water as impacts to soil and overburden groundwater are limited and localised, and the source of potable groundwater in the area (the bedrock aquifer) is unlikely to be adversely affected by the Compost Site.

5.1 Water Well Records

A review of the MECP Water Well Information System database (WWIS - MECP, 2025) was conducted. 27 water well records were identified within an approximately 700 m radius of the site. Individual well records are provided in Attachment F. The well record locations are shown in Figure 9. Please note that the well record locations are based on MECP database coordinates which are subject to varying degrees of error. A summary of relevant information from the water well records is provided in Table 3.

All of the records are for drilled wells completed in the bedrock aquifer. The wells range in depth from 11 to 50 m and have an average depth of 32 m. 21 of the well records indicate fresh water was encountered. Three of the records indicate the water was not tested.

25 of the well records have indications that an adequate quantity of water (for a four-bedroom residence) is available based on yield testing conducted at the time of drilling (i.e. yields of 18 L/min or greater). Two well records indicate the yield was marginal (<16 L/min). Taken collectively the well record information shows that the drilled wells in the area can provide a suitable water supply.


Figure 9: Water Well Records

SITE 3618 Highway 43 SCALE 560 m

A review of the MECP Permit to Take Water (PTTW) database was carried out within a 5 km radius of the site. PTTW information was obtained from the MECP online GIS system (MECP, 2025). One PTTW was identified. PTTW #5545-9FUPKX is held by the Town of Smiths Falls for ‘municipal water supply’ and permits taking of up to 18,100,000 L/day of surface water. No other water taking permits were identified in the search area.


Hydrogeological Assessment, Smiths Falls Compost Site 3514 Highway 43, Smiths Falls, Ontario

Table 3: Water Well Records Summary

WELL RECORDS SUMMARY
Well Record NumberYear DrilledDepth to Bedrock (m)Overburden MaterialTotal Depth (m)Casing Depth (m)Depth to Water Bearing Zone(s) (m)Static Water Level (m)Recommended Pumping Rate (L/min)Comments
350152819615.5clay24.46.712.2 / 23.83.023fresh
350153019511.5soil15.51.515.26.115fresh
350153119576.1clay and gravel45.77.943.3 - 45.70.923fresh
350153419564.9old well14.61.212.2 - 14.65.523fresh
350153519620.6earth11.64.69.15.518fresh
350157019570.0bedrock at surface11.32.410.75.568fresh
350157219620.9sandy loam39.35.539.35.527fresh
350230619680.0bedrock at surface38.1?38.12.145
350236019680.6sand and fill22.96.422.35.527fresh
350252919690.0bedrock at surface21.97.920.12.445fresh
350277419701.2soil26.27.624.47.923
350277519701.2soil22.37.621.39.123fresh
350277619700.9soil18.37.616.87.923fresh
350284919710.6soil25.37.610.723
350375219744.3clay and gravel41.57.610.7 / 27.4 / 40.50.645fresh
350437219761.2soil and stones48.27.646.66.127fresh
350437619760.9fill41.87.640.24.691fresh
350460119760.6sand and fill30.57.625.05.59fresh
350469819770.6soil37.87.636.09.136fresh
350502519783.4clay43.96.741.83.041fresh
350504019780.0bedrock at surface39.36.138.13.023fresh
35058501980?old well34.1?33.56.123fresh
350649619820.0bedrock at surface34.76.134.16.123fresh
350820419874.3clay and stones / gravel21.36.719.80.691fresh
350964919908.5clay and gravel48.210.144.2 / 46.32.455fresh
351351920011.5sandy soil50.36.749.112.8455not tested
351395620020.6rocky earth43.06.741.57.6227not tested
737847120201.5sand45.16.742.15.291not tested

5.2 Closest Water Supply Wells

The section of Highway 43 to the west of William Street West is not serviced by a municipal water supply system, so all properties in the study area (~700 m radius around the site) are assumed to be serviced by private drilled wells and individual wastewater treatment systems. All of the well records in the study area indicate drilled wells with casing that extends into bedrock.

The closest water supply well is at 3618 Highway 43 (see Figure 9). A well record corresponding to this location was not identified by the well records search. The configuration of the well is not known. This well is approximately 350-400 m south of the Compost Site and is located to the south of the unnamed creek that connects the western and eastern portions of The Swale Wetland. No significant impacts to the 3618 Highway 43 well are anticipated from activities at the Compost Site. The well is located to the south of a hydraulic boundary (the unnamed creek) with respect to the overburden unit. The direction of

RLC-HydroG – Hydrogeological Services

rlc-hydrog.ca


overburden groundwater flow at the 3618 Highway 43 development envelope is assumed to be to the north based on topographic data. The direction of flow in the upper bedrock aquifer is assumed to the to the south towards the Rideau River. The risk of impacts to the 3618 Highway 43 well from the Compost Site is low if the well is a drilled well accessing the bedrock aquifer and has casing that extends several metres into the bedrock unit. Further investigation of the configuration of the 3618 Highway 43 well is warranted.

The next closest water supply well appears to be the well at 114 Saumure Circle (well record #3504601). This well is approximately 560 m west-southwest of the site and is located to the west of the eastern portion of The Swale Wetland. The well has steel casing extending approximately 7 m into the bedrock unit. No impacts to the well are anticipated from activities at the Compost Site.

The closest water supply well to the north of the site (#3508204) is approximately 860 m north of the Compost Site. The well has steel casing extending approximately 2.4 m into the bedrock unit No impacts to the well are anticipated from activities at the Compost Site, and the risk of impacts is considered to be extremely low.

5.3 Potential Sources of Contamination

5.3 Poten�al Sources of Contamina�on

For compost sites that accept only leaf and yard waste (in paper bags), the risk of contamination is relatively low. Potential contaminants include:

• Nutrients (nitrate, ammonia, phosphorus, and potassium).

• Organics (dissolved organic carbon (DOC)).

• Trace metals (typically iron, manganese, copper, and zinc).

• Debris including plastics, paint chips, pressure-treated wood, dyed mulch (phthalates, phenols, metals, chromated copper arsenate).

• Vehicular traffic and machinery use at the site including a loader, and contractor screening equipment (BTEX, and PHCs). All vehicles and machinery are stored, refueled, and serviced offsite.

The site is used during summer months only, so no road salt use is indicated.

5.4 Hydrogeological Sensitivity

5.4 Hydrogeological Sensi�vity

The site is not within an area of ‘known, potential, or inferred karst’ as determined by the OGS Karst map layer (OGS, 2025).

The water well records show that the overburden thickness within approximately 700 m of the subject property varies from 0 to 8.5 m and has an average thickness of 1.9 m. The overburden material is described in well records as sand, clay, gravel, rocks/stones, and fill.

Recent drilling by SLT at seven (7) boreholes included two boreholes that was drilled at the Compost Site (BH1 and BH7). The boreholes encountered silty sand to a depth of 4.03 m at BH1, and a depth of 2.36 m at BH7.


Based on an overburden thickness of less than 2 m, the subject site is considered to be hydrogeologically sensitive due to the presence of thin permeable soils.

5.5 Water Budget

A water budget describes the relationship between the inputs and outputs of a water system. The water budget is defined as:

$$ P=E+1+R+\Delta S $$

Where:

P = total precipitation

E = evaporation

I = infiltration

R = runoff

ΔS = change in storage.

Precipitation and Temperature

The Drummond Centre Climate Station is located approximately 21 km northwest of the site. Temperature and precipitation ‘Normals’ for the period from 1981 to 2020 are presented in Figure 10 (Environment Canada, 2025).

The precipitation and temperature patterns affect overburden groundwater elevations and storage, surface water levels and flow, and vegetation growth.

Figure 10: Drummond Centre Temperature and Precipitation (1981 to 2020)

CategoryDaily Maximum Temperature (°C)Daily Average Temperature (°C)Daily Minimum Temperature (°C)Precipitation (mm, rhs)
Jan-4.7-9.5-14.273
Feb-2.3-8.1-13.655
Mar3.7-2.0-7.566
Apr11.65.90.078
May19.813.26.774
Jun24.418.111.889
Jul27.220.714.289
Aug25.819.513.186
Sep21.115.28.991
Oct13.28.33.384
Nov5.81.8-2.675
Dec-1.3-5.2-9.273

Evaporation and Water Surplus

For this study output from an Environment Canada Engineering Climate Services water balance model was used. The model is described in an Environment Canada information sheet by K. Johnstone and P.Y.T. Louie titled ‘Water Balance Tabulations for Canadian Climate Stations. Hydrometeorology Division, Canadian Climate Centre, Atmospheric Environment Service’. The model is based on the methodology of Thornthwaite and Mather (1957) with Canada specific modifications and uses decades of meteorological data from the nearest weather station up to 2023. The Environment Canada water balance output sheet that was used for this report is provided in Table 4.

Table 4: Environment Canada Climatic Water Balance Model – Drummond Centre

Drummond Centre LAT.... 44.85 LONG... 78.13 DATEDrummond Centre LAT.... 44.85 LONG... 78.13 TEMP (C)WATER BUDGET MEANS FOR THE PERIOD 1985-2023 WATER HOLDING CAPACITY... 75 MM LOWER ZONE............ 45 MM PCPNWATER BUDGET MEANS FOR THE PERIOD 1985-2023 WATER HOLDING CAPACITY... 75 MM LOWER ZONE............ 45 MM RAINWATER BUDGET MEANS FOR THE PERIOD 1985-2023 WATER HOLDING CAPACITY... 75 MM LOWER ZONE............ 45 MM MELTWATER BUDGET MEANS FOR THE PERIOD 1985-2023 WATER HOLDING CAPACITY... 75 MM LOWER ZONE............ 45 MM PEWATER BUDGET MEANS FOR THE PERIOD 1985-2023 WATER HOLDING CAPACITY... 75 MM LOWER ZONE............ 45 MM AEWATER BUDGET MEANS FOR THE PERIOD 1985-2023 WATER HOLDING CAPACITY... 75 MM LOWER ZONE............ 45 MM DEFWATER BUDGET MEANS FOR THE PERIOD 1985-2023 HEAT INDEX... 36.54 A................. 1.077 SURPWATER BUDGET MEANS FOR THE PERIOD 1985-2023 HEAT INDEX... 36.54 A................. 1.077 SNOWWATER BUDGET MEANS FOR THE PERIOD 1985-2023 HEAT INDEX... 36.54 A................. 1.077 SOILDC20492 HEAT INDEX... 36.54 A................. 1.077 ACC P
31- 1-9.2691823110415874304
28- 2-8.0571630110447075360
31- 3-1.96133778801022175420
30- 46.17772263333066074498
31- 513.3757508181010058574
30- 618.095950114105-910038670
31- 720.590900133108-252017760
31- 819.48585011684-322017846
30- 915.0898907671-65031935
31-108.486851373701706286
30-111.67459111111047574160
31-12-5.3732919220443175234
AVE6.5 TTL930746187613542-72390
Drummond CentreSTANDARD DEVIATIONS FOR THE PERIOD 1985-2023DC20492
DATETEMP (C)PCPNRAINMELTPEAEDEFSURPSNOWSOILACC P
31- 13.12623231103831551
28- 22.72115251103343059
31- 32.42822325503642067
30- 41.6403943880550488
31- 51.630300101001702298
30- 61.2464608192023031115
31- 71.337370930338023126
31- 81.245450828319026140
30- 91.4414108131217027133
31-101.5343547712601934
30-111.8282710440339647
31-123.12621152202629046

The Environment Canada Water Balance model indicates:

• Total annual precipitation (PCPN)

930 mm/year

• Potential evaporation (PE)

613 mm/year

• Water surplus (SURP)

390 mm/year

Infiltration and Runoff

An infiltration factor was calculated using MECP guidelines (MOEE, 1995 and MOE, 2008). The infiltration factor is the sum of topographic, soil, and cover (i.e. vegetation) factors. The site occurs within an undulating terrain so a topographic infiltration factor of 0.2 is applicable. Undisturbed soil at the site includes a 2.4 to 4 m layer of silty sand. A soil infiltration factor of 0.4 (open sandy loam) is applicable. 60% of the compost site is cleared and the rest of the site is forested. A cover (i.e. vegetation) infiltration factor of 0.14 was calculated. The combined infiltration factor (topography + soil + cover) is 0.74.

Infiltration is calculated by multiplying the combined infiltration factor by the water surplus. The available infiltration at the site is estimated to be 288.6 mm/year.


Hydrogeological Assessment, Smiths Falls Compost Site 3514 Highway 43, Smiths Falls, Ontario

As discussed in Section 2.5 (Hydrology) drainage at the site is by infiltration and runoff to the onsite stormwater pond. Runoff typically occurs during the spring melt season and immediately after high rainfall events.

Storage is assumed to be stable. Runoff is calculated by subtracting evapotranspiration and infiltration from total precipitation. The water budget for pre and post-development conditions at the site is provided in Table 5.

Table 5: Water Budget (Pre- and Post Development)

Pre-Development Conditions
Site
Area of Compost Site15,000square metres
Area of Compost Site1.50hectares
Precipitation
Total Precipitation (DRUMMOND CENTRE)930mm/year
Total Precipitation (DRUMMOND CENTRE)0.93m/year
Volume of precipitation13,950cubic metres/year
Evaporation
Potential Evapotranspiration (PE)613.0mm/yr
Potential Evapotranspiration (PE)0.613m/year
Potential Evapotranspiration (PE)9,195cubic metres / year
Water Surplus
Water Holding Capacity75mm
EC Water Surplus (DRUMMOND CENTRE - 1985-2023)390mm/year
Water Surplus0.39m/year
Infiltration
Infiltration Factors
Topography0.2undulating
Soil0.4sand
Area of woodland5,700square metres
Area of cleared land9,300square metres
woodland0.2100%
cleared0.10%
Cover0.20woodland
Total0.80
Factored Water Surplus (water available for infiltration)312.0mm/yr
Factored Water Surplus (water available for infiltration)0.312m/year
Factored Water Surplus (water available for infiltration)4,680cubic metres / year
Runoff5.0mm/yr
Runoff0.005m/year
Runoff75cubic metres / year
Post-Development Conditions
Site
Area of Compost Site15,000square metres
Area of Compost Site1.50hectares
Precipitation
Total Precipitation (DRUMMOND CENTRE)930mm/year
Total Precipitation (DRUMMOND CENTRE)0.93m/year
Volume of precipitation13,950cubic metres/year
Evaporation
Potential Evapotranspiration (PE)613.0mm/yr
Potential Evapotranspiration (PE)0.613m/year
Potential Evapotranspiration (PE)9,195cubic metres / year
Water Surplus
Water Holding Capacity75mm
EC Water Surplus (DRUMMOND CENTRE - 1985-2023)390mm/year
Water Surplus0.39m/year
Infiltration
Infiltration Factors
Topography0.2undulating
Soil0.2sand / compacted gravel
Area of woodland5,700square metres
Area of cleared land9,300square metres
woodland0.240%
cleared0.160%
Cover0.14woodland and cleared
Total0.54
Factored Water Surplus (water available for infiltration)210.6mm/yr
Factored Water Surplus (water available for infiltration)0.211m/year
Factored Water Surplus (water available for infiltration)3,159cubic metres / year
Runoff106.4mm/yr
Runoff0.106m/year
Runoff1,596cubic metres / year

The water budget analysis shows that runoff associated with the pre-development condition is estimated to be approximately 75 m<sup>3</sup>/year. Runoff associated with current site conditions (post-development) is estimated to be approximately 1,596 m<sup>3</sup>/year. The change in runoff is due to clearing and installation of compacted fill and accounts for approximately 11% of the water in the system. The net change in runoff is mitigated as most of the runoff from the pad is captured by the onsite stormwater pond, where it infiltrates. Runoff that is not directed to the stormwater pond is to the site’s vegetated buffers where infiltration and evapotranspiration occur.

RLC-HydroG – Hydrogeological Services

rlc-hydrog.ca


6 IMPACT ASSESSMENT

6.1 Soil Impacts

Five (5) shallow test pits (TP1-1 to TP1-5) were excavated to the southeast of the Compost Site by SLT on March 7, 2024 (SLT, 2024a). None of the test pits were excavated at the Compost Site.

Ten (10) test pits (TP2-1 to TP2-10) were excavated by SLT on December 12, 2024 (SLT, 2024b). Most of the test pits were located to the southeast of the Compost Site. One test pit (TP2-9) was located at the Compost Site. The soil samples were submitted for laboratory analysis of BTEX, PHCs, metals, inorganics, and PAHs.

The analytical results from test pit soil samples were compared to O.Reg. 153, Table 2 site condition standards (commercial land use, coarse textured soil, potable groundwater condition). The analytical results for the sample from TP2-9 were below the selected criteria. The relevant pages from the laboratory certificate of analysis are provided in Attachment G (see SLT, 2024b for the full certificate of analysis). It should be noted that soil exceedances were identified at five of the nine test pit locations to the southeast of the Compost Site (SLT, 2024b). Exceedances are noted for PHCs, metals, and PAH parameters. These exceedances are thought to be associated with previous snow storage activities at the clearings to the southeast of the Compost Site. Snow storage activities ended in 2023.

Seven boreholes (BH1 to BH7) were drilled on June 24 and 25, 2025 (SLT, 2025b). Borehole locations are indicated in Figure 2. Analytical results from borehole soil samples from B H1, BH2, and BH7 are compared to O.Reg 153 Table 2 site condition standards (institutional and commercial land use, coarse texture soil, potable groundwater condition) in Table 6 of this report. The laboratory certificate of analysis is provided in Attachment H. The analytical results for borehole soil samples from BH1, BH2, and BH7 were all below the applicable criteria.

It is noted that soil samples BH1-S1, BH2-S3, and BH7-S13 had detectable concentrations of one or more PAH parameters, and that soil sample BH2-S3 had detectable concentrations of PHC F3 and F4, all at levels that are well below the applicable criteria.


Hydrogeological Assessment, Smiths Falls Compost Site 3514 Highway 43, Smiths Falls, Ontario

Table 6: Borehole Soil Geochemistry

PARAMETERUnitsReporting LimitO.Reg 153 limits (Table 2 * Institutional Land Use)O.Reg 153 limits (Table 2 ** Commercial Land Use)BH1-S1 (0.0 to 1.37 m bgs)BH1-S2 (1.52 to 3.66 m bgs)BH2-S3 (0.0 to 2.13 m bgs)BH7-S12 (0.0 to 1.37 m bgs)BH7-S13 (1.52 to 2.59 m bgs)BH7-S13 (DUP)
Metals
Antimonyug/g0.27.540<0.2<0.20.25<0.2<0.2<0.2
Arsenicug/g118181.9<12.41.31.81.7
Bariumug/g0.539067065526297100100
Berylliumug/g0.2480.26<0.20.22<0.20.220.21
Boronug/g5120120<5<5<5<56.25.9
Cadmiumug/g0.11.21.9<0.1<0.1<0.1<0.1<0.1<0.1
Chromiumug/g1160160118.5129.71010
Chromium IVug/g0.1888<0.18<0.18<0.18<0.18<0.18NA
Cobaltug/g0.122804.63.63.14.44.54.5
Copperug/g0.51402309.77.6129.11212
Leadug/g11201207.73.0174.41314
Mercuryug/g0.050.273.9<0.05<0.050.056<0.05<0.05<0.05
Molybdenumug/g0.56.940<0.5<0.51.4<0.5<0.5<0.5
Nickelug/g0.51002707.65.37.57.58.17.9
Seleniumug/g0.52.45.5<0.5<0.5<0.5<0.5<0.5<0.5
Silverug/g0.22040<0.2<0.2<0.2<0.2<0.2<0.2
Thalliumug/g0.0513.30.0740.0520.070.0650.0750.082
Uraniumug/g0.0523330.450.410.40.450.440.46
Vanadiumug/g58686241816101919
Zincug/g5340340191129153232
Polycyclic Aromatics Hydrocarbons (PAHs)
Acenaphtheneug/g0.0057.921<0.005<0.0050.007<0.005<0.005NA
Acenaphthyleneug/g0.0050.150.15<0.005<0.005<0.005<0.005<0.005NA
Anthraceneug/g0.0050.670.67<0.005<0.0050.02<0.005<0.005NA
Benz[a]anthraceneug/g0.0050.50.96<0.005<0.0050.053<0.0050.0092NA
Benzo[a]pyreneug/g0.0050.30.3<0.005<0.0050.052<0.0050.019NA
Benzo[b,j]fluorantheneug/g0.0050.780.96<0.005<0.0050.079<0.0050.033NA
Benzo[g,h,i]peryleneug/g0.0056.69.60.0064<0.0050.035<0.0050.017NA
Benzo[k]fluorantheneug/g0.0050.780.96<0.005<0.0050.025<0.0050.01NA
Chryseneug/g0.00579.6<0.005<0.0050.052<0.0050.012NA
Dibenz[a,h]anthraceneug/g0.0050.10.1<0.005<0.0050.0091<0.005<0.005NA
Fluorantheneug/g0.0050.699.6<0.005<0.0050.13<0.0050.016NA
Fluoreneug/g0.0056262<0.005<0.0050.0093<0.005<0.005NA
Indeno[1,2,3-cd]pyreneug/g0.0050.380.76<0.005<0.0050.036<0.005<0.005NA
Methylnaphthalene-1ug/g0.0050.9930<0.005<0.0050.0084<0.005<0.005NA
Methylnaphthalene-2ug/g0.0050.9930<0.005<0.0050.0092<0.005<0.005NA
Naphthaleneug/g0.0050.69.6<0.005<0.0050.011<0.005<0.005NA
Phenanthreneug/g0.0056.212<0.005<0.0050.13<0.005<0.005NA
Pyreneug/g0.0057896<0.005<0.0050.095<0.0050.012NA
Benzene, Toluene, Ethylbenzene, and Xylenes (BTEX)
Benzeneug/g0.020.210.32<0.02<0.02<0.02<0.02<0.02NA
Tolueneug/g0.022.36.4<0.02<0.02<0.02<0.02<0.02NA
Ethylbenzeneug/g0.021.11.1<0.02<0.02<0.02<0.02<0.02NA
Xylenesug/g0.043.126<0.04<0.04<0.04<0.04<0.04NA
Petroleum Hydrocarbons (PHCs)
F1ug/g105555<10<10<10<10<10NA
F2ug/g798230<7<7<7<7<7NA
F3ug/g503001700<50<5087<50<50NA
F4ug/g5028003300<50<5030<50<50NA
Bold and shaded = result exceeds limit
Ontario Regulation 153/04 (as amended), Records of Site Condition, Soil, Ground Water and Sediment Standards for Use Under Part XV.1 of the Environmental Protection Act (institutional land use*, commercial land use**, coarse texture soil, potable groundwater condition)
NA = not analysedNC - no criteriaND = non-detectablebgs = below ground surface

RLC-HydroG – Hydrogeological Services

rlc-hydrog.ca


6.2 Surface Water Impacts

Surface water features on or near the subject site include:

• Unregulated wetlands onsite and bordering nearby PSW.

• A stormwater pond at the site that receives surface water runoff from the compost site clearing /pad area.

• An unnamed creek that occurs approximately 190 m to the south of the site.

The site has been operating since 1993. The surface water regime in the vicinity of the site is stable and no changes have occurred since 1992, and no significant changes are anticipated in the future.

Table 7: Surface Water Geochemistry (March 25, 2025)

PARAMETERUnitsReporting LimitPWQOS1S1 (DUP)S2S3S4
Metals
Antimonyug/L0.520<0.5<0.5<0.5<0.5<0.5
Arsenicug/L1100<1<1<1<1<1
Bariumug/L2NC4748515541
Berylliumug/L0.411/1100<0.4<0.4<0.4<0.4<0.4
Boronug/L10200<10<10<10<10<10
Cadmiumug/L0.09200<0.09<0.09<0.09<0.09<0.09
Chromiumug/L58.9<5<5<5<5<5
Chromium IVug/L0.51<0.5<0.5<0.5<0.5<0.5
Cobaltug/L0.50.9<0.5<0.5<0.5<0.5<0.5
Copperug/L0.951.01.01.1<0.9<0.9
Leadug/L0.51/3/5<0.5<0.5<0.5<0.5<0.5
Mercuryug/L0.10.2<0.1NA<0.1<0.1<0.1
Molybdenumug/L0.540<0.5<0.5<0.5<0.5<0.5
Nickelug/L125<1<1<1<1<1
Seleniumug/L2100<2<2<2<2<2
Silverug/L0.090.1<0.09<0.09<0.09<0.09<0.09
Sodiumug/L100NC810080007300750023000
Thalliumug/L0.050.3<0.05<0.05<0.05<0.05<0.05
Uraniumug/L0.150.140.140.170.160.16
Vanadiumug/L0.56<0.5<0.5<0.5<0.5<0.5
Zincug/L5308.8138.26.35.5
Polycyclic Aromatics Hydrocarbons (PAHs)
18 parameters tested as per O.Reg. 153variousNDNANDNDND
Benzene, Toluene, Ethylbenzene, and Xylenes (BTEX)
BTEX parametersug/LvariousvariousNDNANDNDND
Petroleum Hydrocarbons (PHCs)
F1 to F4ug/LvariousvariousNDNANDNDND
Bold and shaded = result exceeds limit
Provincial Water Quality Objectives (PWQO), MOEE, 1994. Water Management, Policies, Guidelines, Provincial Water Quality Objectives.
NA = not analysedNC - no criteriaND = non-detectable

Surface water sampling was conducted on March 25, 2025 (SLT, 2025a). Four (4) surface water samples (S1 to S4) were collected in locations to the southeast of the Compost Site by Town of Smiths Falls staff. Surface water sample locations are indicated in Figure 2. Analytical results from the surface water samples are compared to the applicable surface water quality standards (Ontario Provincial Water Quality Objectives (PWQO)) in Table 7 of this report. The laboratory certificate of analysis is provided in Attachment I. The analytical results for all surface water samples were below the PWQO limits. The results for PAHs and PHCs were all non-detectable.

It is noted that low level concentrations of copper, uranium and zinc were detected in one or more of the samples, all at levels that are well below the PWQO limits. Barium and sodium were also detected at low concentrations in all four samples.

6.3 Groundwater Impacts

SLT conducted groundwater sampling at six monitoring wells (MW1, MW2, MW3, MW4, MW6, and MW7) on June 26, 2025. Samples were submitted for laboratory analysis of BTEX, PHCs (F1 to F4), metals (including chromium XI, and mercury), and PAHs.

Analytical results from the groundwater samples from MW1, MW2, and MW7 are compared to the limits provided in O.Reg. 153, Table 2 site condition standards (all types of property use, coarse textures soils) in Table 8 of this report. The laboratory certificate of analysis is provided in Attachment J. The analytical results for groundwater samples from MW1, MW2, and MW7 were all below the applicable Table 2 Site Condition Standards.

It is noted that the groundwater samples from MW1 and MW7 had detectable concentrations of one or more PAH parameters, and that the sample from MW2 had detectable concentrations of benzene and toluene, all at levels that are well below the applicable Table 2 Site Condition Standards.

The results were also compared to the Ontario Drinking Water Standards (MECP – ODWS, 2003, as amended) in Table 8 of this report. There were no exceedances of the ODWS health limits. The concentration of sodium at MW2 exceeded the ODWSOG (MECP, 2003, as amended) aesthetic objective (AO) limit.


Table 8: Groundwater Geochemistry (June 26, 2025)

PARAMETERUnitsReporting LimitO.Reg 153 limits (Table 2 *)ODWS***MW1MW2MW7
Sample Date26-Jun-25
Metals
Antimonyug/L0.566<0.5<0.5<0.5
Arsenicug/L12510<11.9<1
Bariumug/L21,0001,000150350340
Berylliumug/L0.44NC<0.4<0.4<0.4
Boronug/L105,0005,000215640
Cadmiumug/L0.092.75<0.09<0.09<0.09
Chromiumug/L55050<5<5<5
Chromium IVug/L0.525NC<0.5<0.5<0.5
Cobaltug/L0.53.8NC2.42.2<0.5
Copperug/L0.9871,000AO<0.93.43.3
Leadug/L0.51010<0.5<0.5<0.5
Mercuryug/L0.10.291<0.1<0.1<0.1
Molybdenumug/L0.570NC2.6132
Nickelug/L1100NC2.43.2<1
Seleniumug/L21050<2<2<2
Silverug/L0.091.5NC<0.09<0.09<0.09
Sodiumug/L100NC200,000AO17,000300,0007,800
Thalliumug/L0.052NC<0.05<0.05<0.05
Uraniumug/L0.120200.72.62.8
Vanadiumug/L0.56.2NC<0.54.20.59
Zincug/L51,1005,000AO<5<56.1
Polycyclic Aromatics Hydrocarbons (PAHs)
Fluorantheneug/L0.050.41NC0.052NDND
Phenanthreneug/L0.031NC0.18ND0.064
Pyreneug/L0.054.1NC0.073NDND
15 other PAH parametersvariousvariousvariousNDNDND
Benzene, Toluene, Ethylbenzene, and Xylenes (BTEX)
Benzeneug/L0.251<0.20.40<0.2
Tolueneug/L0.22460<0.20.33<0.2
Ethylbenzeneug/L0.22.4140<0.2<0.2<0.2
Xylenesug/L0.430090<0.4<0.4<0.4
Petroleum Hydrocarbons (PHCs)
F1 to F4ug/LvariousvariousNCNDNDND
Bold and shaded = result exceeds health limit
Bold = result exceeds ODWSOG aesthetic objective (AO) limitAO = Aesthetic Objective
* Ontario Regulation 153/04 (as amended), Records of Site Condition. Soil, Ground Water and Sediment Standards for Use Under Part XV.1 of the Environmental Protection Act (Table 2, all types of property use, coarse textured soils)
*** Ontario Ministry of Environment Conservation and Parks (MECP) (MOE, 2003, Revised 2006 as amended). Technical Support Document for Ontario Drinking Water Standards, Objectives and Guidelines (ODWSOG) as amended/revised under Ontario Regulation 169/03, 2021.
NA = not analysedNC - no criteriaND = non-detectable

6.4 Natural Functions of the Ecosystem

6.4 Natural Func�ons of the Ecosystem

The Compost Site is located in a forested area between two portions of the provincially significant Swale Wetland. Unregulated wetlands extend onto the edges of the Compost Site in two places.

Composting activities have the potential to affect adjacent ecological features through the leaching of nutrients and organic compounds. Elevated concentrations of nutrients (typically nitrate, ammonia, phosphorus, and potassium) and biochemical oxygen demand (BOD) are expected in surface water and/or shallow groundwater. Leaching of trace metals, phthalates, and phenolic compounds may also occur, though these are typically of low concentrations in leaf and yard waste.

Analytical results from one test pit soil sample (TP2-9) collected at the Compost Site did not exceed the applicable Table 2 site condition standards. Groundwater sample analytical results from monitoring wells located on and near the Compost Site (MW1, MW2, and MW7) did not exceed the applicable Table 2 site condition standards. These results suggest that impacts to soil and groundwater are minimal under current operating conditions.

The PSW setbacks are intended to provide a protective buffer to preserve the natural functions of adjacent wetland ecosystems. The Compost Site is located outside of the regulated PSW setback areas, as shown on Figure 4, and all composting activities are confined to a topographically elevated area away from the mapped wetland features.

Stormwater generated on the site is directed to an on-site stormwater management pond, which facilitates sedimentation and infiltration. The site has been in operation since 1993. Based on site observations and aerial imagery, there is no evidence of ecological impacts to the downgradient PSW such as algal blooms, or stressed vegetation.

Given the current site configuration, existing management practices, and monitoring results, there is no indication that the natural function of the adjacent PSW has been adversely affected by site operations. Adverse effects are unlikely to occur in the future if the site continues to be carefully managed in accordance with best practices.

6.5 Mitigation

The following mitigation measures have been identified:

• Supervision of onsite equipment use. Leaf and garden waste is screened onsite by local contractors. The screening process is monitored by Town of Smiths Falls staff to ensure the equipment is in good working condition and is properly maintained.

• This risk of contamination from vehicular traffic and heavy equipment (a loader operated by the Town of Smiths Falls, and contractor screening equipment) can be mitigated by implementation of a site specific spill response plan (see Attachment K).

• Diligent site management and operational controls will help to prevent detrimental impacts.


• Monitoring of surface water quality at the established surface water stations will identify any significant impacts if they do occur. Surface water monitoring details are provided in Section 7.1.

• Monitoring of groundwater at selected monitoring wells will identify any significant impacts if they do occur. Groundwater monitoring details are provided in Section 7.2.

7 MONITORING PLAN

The following is a summary of the locations, monitoring requirements, analytical requirements, and reporting schedule.

The methods and protocols for sampling, analysis and recording shall conform, in order of precedence, to the methods and protocols specified in:

• MECP ‘Protocol for the Sampling and Analysis of Industrial/Municipal Wastewater’ (August 1994), ISBN 0-7778-18880-9, as amended.

• The publication ‘Standard methods for the Examination of Water and Wastewater’ (22nd edition) as amended.

7.1 Surface Water Monitoring

Surface water monitoring stations

• S1

• S2

• S3

• S4

Surface water monitoring

• At all locations conduct surface water monitoring including measurement of:

• Field parameters (pH, conductivity, TDS, and temperature) to be measured using a calibrated multimeter instrument.

• Depth and width of channel.

• Flow condition (low / moderate / high)

Surface water sampling

• Surface water samples are to be collected at each surface water station (S1, S2, S3, and S4).

• Surface water samples to be collected according to standard industry practices by suitably trained personnel (i.e. nitrile gloves, laboratory supplied bottles with preservatives, temperature control, samples submitted within holding times, and strict chain-of-custody protocols).

• Laboratory analysis of surface water samples

• Samples to be submitted to a CALA registered environmental laboratory under strict chain-of custody protocols.


• Samples to be submitted for laboratory analysis of:

o Hardness o Alkalinity as CaCO3 o Electrical conductivity o pH o Total oil and grease o Total ammonia o o Nitrate o Nitrite o Total Phosphorus o Potassium o Iron o Manganese o Copper
o Zinc o DOC o Phthalates o Phenols

(un-ionized ammonia to be calculated according to Provincial Water Quality Objectives (PWQO) methodology (MOEE, 1994).

Schedule

• Surface water monitoring and sampling to be conducted once per year in July.

7.2 Groundwater Monitoring

Groundwater monitoring network

• MW1

• MW2

• MW7

Groundwater monitoring

• At all locations conduct groundwater elevation monitoring including measurement of:

• The distance from reference point (top of riser) to water in each well using an electronic water level tape.

• Field parameters (pH, conductivity, TDS, and temperature) to be measured using a calibrated multimeter instrument.

Groundwater sampling

• Groundwater samples are to be collected at each monitoring well.

• Groundwater samples to be collected according to standard industry practices by suitably trained personnel (i.e. nitrile gloves, laboratory supplied bottles with preservatives, temperature control, samples submitted within holding times).


• Field parameters (pH, electrical conductivity, temperature) to be measured using a calibrated multimeter instrument at the time of sampling.

• Laboratory analysis of groundwater samples

• Samples to be submitted to a Canadian Association For Laboratory Accreditation (CALA) registered environmental laboratory under chain-of custody protocols.

• Samples to be submitted for analysis of:

o Hardness o Alkalinity as CaCO3 o Electrical conductivity o pH o Chloride o Nitrate o Nitrite o Total Phosphorus o Potassium o Iron o Manganese o Copper
o Zinc o DOC o Phthalates o Phenols o Sodium o Total oil and grease

Schedule

• Groundwater monitoring and sampling to be conducted at all monitoring wells once per year in July.

7.3 Reporting

An annual water monitoring report to be prepared by a suitable qualified person (environmental geoscientist with P.Geo. or P.Eng. qualification). The annual water monitoring report should include:

• A description of all surface water and groundwater monitoring locations.

• Methodology.

• Results (tabulated and plotted) including a comparison of analytical results with applicable limits.

• Discussion of results.

• Conclusions and recommendations.

Schedule

The annual monitoring report to be submitted to MECP before November 30 of each year.


8 CONTINGENCY PLAN

8.1 Trigger Mechanisms

The following trigger mechanisms will be used:

• A complaint is received.

• Surface water analytical results exceeding PWQO limits.

• Groundwater analytical results at MW1, MW2, or MW7 exceeding the applicable site conditions standards (O.Reg. 153 Table 2 site condition standards, commercial land use, coarse texture soil, for a potable groundwater condition.

• Any indication that the natural environment is being degraded.

The following contingency actions will be taken if triggered:

• If any complaints are received, or if any adverse effects are identified an investigation regarding adverse effects will be conducted immediately.

• The Town of Smiths Falls will retain a qualified person (Ontario licensed environmental geoscientist/engineer with QPESA designation) to define and supervise the investigation. The qualified person will provide an action plan to ensure safe management as soon as possible.

• If significant impacts to the environment and/or potable water users is identified, the MECP will be informed.

• If a neighbouring property owner within 500 m of the site reports a well water quality issue, the Town of Smiths Falls will investigate the nature of the concern and determine if it is potentially associated with the Compost Site. If the Compost Site is confirmed to be the probable cause of the issue the Town of Smiths Falls will inform MECP, investigate the issue, and a provide an action plan for safe management.

9 CONCLUSIONS

• The location of the Compost Site is suitable for use as a compost facility and is compliant with source protection plan, and Zoning By-law requirements.

• There is no significant threat to drinking water as existing impacts to soil and overburden groundwater are limited and localised. The primary source of potable groundwater in the area is the bedrock aquifer, which is unlikely to be adversely affected by the Compost Site.

• Investigations at the site and surrounding areas (test pitting, drilling, monitoring wells, and surface water sampling) are generally sufficient to characterise potential impacts associated with activities at the Compost Site.

• The site has been active since 1993 and has not caused any significant impacts. The local surface water regime is stable and is unlikely to change.

• The closest water supply wells are unlikely to adversely affected by the Compost Site.


• There is no indication that the natural function of the adjacent PSW has been adversely affected by Compost Site operations. Adverse effects are unlikely to occur in the future if the site continues to be carefully managed in accordance with best practices.

10 RECOMMENDATIONS

• A spill response plan (see Attachment K) for the Compost Site should be implemented.

• The monitoring plan presented in this report (Section 7) should be conducted on an annual basis.

• The contingency plan presented in this report (Section 8) should be used to ensure appropriate actions will be taken if any indications of adverse effects are identified.

• Further information should be obtained regarding the closest water supply well at 3618 Highway 43. The well owner should be interviewed, and the depth of the well should be determined (if possible). The well should be inspected to assess general compliance with Ontario Regulation 903 construction requirements. If the well is not a drilled bedrock well with casing that extends into the bedrock unit, the well should be sampled, and the sample should be submitted for analysis if the list of parameters identified in Section 7.2 of this report.

In summary, it is RLC-HydroG`s professional opinion that the site is suitable for use as a Compost Site. The hydrogeological recommendations contained in this report, if followed, will ensure that operation of the Compost Site will be safe and sustainable in the long term, and will not cause any adverse effects to the environment.

RLC-HydroG – Hydrogeological Services

Konny

Russell Laird Chown, P.Geo. QPESA

Senior Hydrogeologist

Filename: SLT-TOSF - Smiths Falls Compost Site - FINAL - 8jul25


11 LIMITING CONDITIONS

This report has been prepared by RLC-HydroG exclusively for the use of the named clients: St. Lawrence Testing & Inspection Co. Ltd. and the Town of Smiths Falls. No other party may rely on or reproduce this report, in whole or in part, without the prior written consent of RLC-HydroG. RLC-HydroG will consider reasonable requests to authorize use by third parties; however, any unauthorized use of this report is at the sole risk of the user.

This report presents the site conditions and observations as documented by RLC-HydroG during the site investigation and is based on information available at the time of the work. The conclusions and recommendations expressed herein are professional opinions based on the scope of work, project objectives, available data, and the limiting conditions stated in this report.

RLC-HydroG has relied in good faith on information provided by third parties and assumes such information to be accurate and complete. This information has not been independently verified unless specifically stated. RLC-HydroG accepts no liability for errors, omissions, or inaccuracies resulting from inaccurate or incomplete information provided by others.

The findings of this report apply only to the site conditions observed at the specific locations and on the dates noted. Unless otherwise indicated, they should not be extrapolated to other areas, times, or environmental conditions beyond the scope of investigation. Similarly, conclusions related to analytical testing are limited to the parameters analyzed by the laboratories retained for this project.

This report does not constitute legal advice and should not be interpreted as such. RLC-HydroG offers no assurance or certification of compliance with environmental laws, regulations, or policies, which remain the responsibility of the client or regulatory authorities.

Any use of this report by parties other than the client is entirely at their own risk. RLC-HydroG disclaims any responsibility or liability for damages or losses incurred by third parties as a result of decisions made or actions taken based on this report.


12 REFERENCES

• Callon Dietz Group, 2025. Plan of Survey.

• Corporation of the Town of Smiths Falls (2022). Comprehensive Zoning By-law (August 22, 2022).

• Environment Canada, 2023. Canadian Climate Normals and Averages.

• Government of Canada, 2025. Open Maps, High Resolution Digital Elevation Model (HRDEM), CanElevation Series. Digital terrain model (DTM) LIDAR data acquired in 2022.

• Government of Ontario, 2004, as amended. Ontario Regulation 153/04, Records of Site Condition. Soil, Ground Water and Sediment Standards for Use Under Part XV.1 of the Environmental Protection Act.

• Government of Ontario, 1990. R.R.O. 1990, as amended, Ontario Regulation 347: General – Waste Management.

• Rideau Valley Conservation Authority (RVCA), 2025. Online Geographic Information System (GIS).

• Mississippi Valley Conservation Authority and Rideau Valley Conservation Authority (MVCA and RVCA), 2014 as revised. Mississippi Rideau Source Protection Plan.

• Ontario GeoHub, 2023. Ontario Watershed Boundaries (OWB) GIS portal.

• Ontario Geological Survey (OGS), OGS Earth website, 2025. Various authors. Surficial Geology, Paleozoic Geology, and Karst layers.

• Ontario Ministry of Environment, 2013. Checklist for Technical Requirements for a Complete Environmental Compliance Approval Submission.

• Ontario Ministry of Environment Conservation and Parks (MECP), 2025. Water Well Information System (WWIS).

• Ontario Ministry of Environment Conservation and Parks (MECP), 2015. Water Supply Wells: Requirements and Best Practices.

• Ontario Ministry of Environment Conservation and Parks (MECP), 2025. Permits to Take Water (PTTW) online GIS.

• Ontario Ministry of Environment Conservation and Parks (MECP), 2025. Ontario Source Protection Information Atlas.

• Ontario Ministry of Environment Conservation and Parks (MECP) (MOE, 2003, Revised 2006 as amended). Technical Support Document for Ontario Drinking Water Standards, Objectives and Guidelines (ODWSOG) as amended/revised under Ontario Regulation 169/03, 2021.

• Ontario Ministry of Environment and Energy (MOEE), 1994. Provincial Water Quality Objectives (PWQO), Water Management, Policies, Guidelines, Provincial Water Quality Objectives (July, 1994).

• Ontario Ministry of Environment and Energy (MOEE), 1995. Hydrogeological Technical Information Requirements for Land Development Applications.

• Ontario Ministry of Environment (MOE), 2008. Design Guidelines for Sewage Works.

• Ontario Safe Drinking Water Act, 2002 as amended. S.O. 2002, c. 32


• Ontario Water Resources Act, 1990. Revised Statute of Ontario (R.S.O.), Ontario Regulation 903, 1990, Wells.

• St. Lawrence Testing & Inspection Co. Ltd. (SLT), 2024a. Proposed Snow Dump Site, Smiths Falls, ON, Environmental Soil Assessment, Report No.24C049 (March 19, 2024).

• St. Lawrence Testing & Inspection Co. Ltd. (SLT), 2024b. Smiths Fall Compost Site, Smiths Falls, ON, Environmental Soil Assessment, Report No.24C265 (December 30, 2024).

• St. Lawrence Testing & Inspection Co. Ltd. (SLT), 2025a. Smiths Fall Compost Site, Smiths Falls, ON, Creek Water Assessment, Report No.25C050 (April 4, 2025).

• St. Lawrence Testing & Inspection Co. Ltd. (SLT), 2025b. Property Located at the Smiths Falls Compost Site, 3514 Lanark County Road 43, Smiths Falls, ON, Environmental Assessment, Report 25C163 (July 4, 2025).

• Thornthwaite, and Mather, 1957: Instructions and tables for computing potential evaporation and the water balance. Publications in Climatology, Volume 10(3), Laboratory of Climatology.


RLC-HydroG

ATTACHMENT A

Legal Survey


INTEGRATION DATA

OBSERVED REFERENCE POINTS (ORP'S) DERIVED FROM REAL TIME NETWORK OBSERVATIONS (RTN) AND ARE REFERRED TO UTM ZONE 18 NAD83 (CSRS)(2010) COORDINATES COMPLY WITH RURAL ACCURACY PER SEC.14 (2) OF O. REG. 216/10
POINT IDNORTHINGEASTING
ORP A4973831.7417589.4
ORP B4974004.8417582.3
COORDINATES CANNOT, IN THEMSELVES, BE USED TO RE-ESTABLISH CORNERS OR BOUNDARIES SHOWN ON THIS PLAN

PLAN OF LOTS CONC

OF SURVEY PART OF 1 AND 2 ESSION 6

GEOGRAPHIC TOWNSHIP OF NORTH ELMSLEY TOWNSHIP OF DRUMMOND/NORTH ELMSLEY COUNTY OF LANARK

LEGEND:

DENOTES SURVEY MONUMENT SET

SURVEY MONUMENT FOUND STANDARD IRON DAD

STANDARD IRON BAR

SSIB SHORT STANDARD IRON BAR

IB " IRON BAR

RIB " ROUND IRON BAR

CC " CUT CROSS

OU * ORIGIN UNKNOWN

ORP OBSERVED REFERENCE POINT

WIT ” WITNESS

M " MEASURED

S ” SET

1054 GEORGE BRACKEN O.L.S.

BEARING NOTE

BEARINGS ARE UTM GRID, DERIVED FROM OBSERVED REFERENCE POINTS A & B, BY REAL TIME NETWORK (RTN) OBSERVATIONS, UTM ZONE 18, CENTRAL MERIDIAN 75'00"00"W, NAD83 (CSRS)

DISTANCES ARE GROUND AND CAN BE CONVERTED TO GRID BY MULTIPLYING BY THE COMBINED SCALE FACTOR OF 0.999669

METRIC DISTANCES AND COORDINATES SHOWN ON THIS PLAN ARE IN METRES AND CAN BE CONVERTED TO FEET BY DIVIDING BY 0.3048

SURVEYOR'S CERTIFICATE

CERTIFY THAT:

(1) THIS SURVEY AND PLAN ARE CORRECT AND IN ACCORDANCE WITH THE SURVEYS ACT,THE SURVEYORS ACT AND LAND TITLES ACT, AND THE REGULATIONS MADE UNDER THEM.

(2) THE SURVEY WAS COMPLETED ON THE 17TH DAY OF APRIL, 2025

THIS PLAN OF SURVEY RELATES TO AOLS PLAN SUBMISSION FORM NUMBER V-96306

Callon Dietz INCORPORATED

ONTARIO LAND SURVEYORS

requests@callondietz.com


RLC-HydroG

ATTACHMENT B

Zoning Map


Schoffle 236 W RU RU-28 M1 RU 158 146 Carroll Rd WD W Drummond North Elmsley Township Zoning Map Compost Facility within WD Zoning CH 3846 3820 3810 101 114 112 CRU-18 754 CH-RU-16 Hillcrest Cemetery Rideau River RU 8 3845 3825 3809 3787 43 Hy CH-9 3678 3639 43 Hy 424 Poonamalie St CG 3689 3689 3659 3841 3624 3575 Estate St. Elsie St. MHP Spinelli Ln.


RLC-HydroG

ATTACHMENT C

Elevation Survey


Elevation survey at Smiths Falls Compost Site - 27jun25
Bench Mark CONTROL POINT AElev at centre of roadway in front of white-blue shed at compost siteLIDAR ->masl 126.58
Setup levelSTN-0measurementmasl
Setup levelElevation of laser level (1st setup)1.344127.924
MW7GS3.078124.846
MW7TOC5 cm above TOR126.022
MW7TOR1.952125.972
MW1GS2.098125.826
MW1TOC1.002126.922
MW1TOR1.077126.847
Move levelSTN-A
Move levelBS to BH1-TOR (above)0.196126.651
Move levelFS to TP-A1.901124.750
Move levelSTN-B
Move levelBS to TP-A0.836125.586
MW3GS1.887123.699
MW3TOC0.852124.734
MW3TOR0.898124.688
Move levelSTN-C
BS to MW3-TOR1.037125.725
MW2GS1.514124.211
MW2TOC0.682125.043
MW2TOR0.753124.972
Move levelSTN-D
BS to MW3-TOR1.027125.715
FS to TP-B1.311124.404
CONTROL POINT BCentre of bridge1.782123.933
Move levelSTN-E
BS to TP-B1.920126.324
MW4GS2.444123.880
MW4TOC1.445124.879
MW4TOR1.487124.837
MW5GS1.464124.860
MW5TOC no casing
MW5TOR0.443125.881
FS to TP-C1.234125.090
Move levelSTN-F
BS to TP-C0.896125.986
BS to MW5-TOR0.104125.882
need another TPFS to TP-D1.372124.614
Move levelSTN-G
BS to TP-D1.711126.325
MW6GS1.466124.859
TOC0.336125.989
TOR0.403125.922
CONTROL POINT CCentre of tarmac road adjacent to centre of access to MW61.876124.449
IDGSTOR
MW1125.83126.85
MW2124.21124.97
MW3123.70124.69
MW4123.88124.84
MW5124.86125.88
MW6124.86125.92
MW7124.85125.97

RLC-HydroG

ATTACHMENT D

SLT Borehole Logs


OFFICE BOREHOLE RECORD

REPORT NO. 25C163

BOREHOLE NO. ____ 1

DEPTHSOIL PROFILELAB TEST RESULTS WATER CONTENT & ATTERBERG LIMITS. WP WL
DEPTHELEVATION DEPTHSOIL DESCRIPTIONSTRAT PLOTWATER CONDITIONSCONDITIONTYPENUMBERRECOVERYN-VALUELABORATORY TESTS PERFORMEDLAB TEST RESULTS WATER CONTENT & ATTERBERG LIMITS. WP WL
DEPTHELEVATION DEPTHSOIL DESCRIPTIONSTRAT PLOTWATER CONDITIONSCONDITIONTYPENUMBERRECOVERYN-VALUELABORATORY TESTS PERFORMEDLAB TEST RESULTS WATER CONTENT & ATTERBERG LIMITS. WP WL
-0Silty Sand Brown, moist, loose, becoming gravelly and compact below 0.9 m, and very moist and dense below 2.4 m and moist and dense below 3.0 mSS1306
-1Silty Sand Brown, moist, loose, becoming gravelly and compact below 0.9 m, and very moist and dense below 2.4 m and moist and dense below 3.0 m
-2Silty Sand Brown, moist, loose, becoming gravelly and compact below 0.9 m, and very moist and dense below 2.4 m and moist and dense below 3.0 m
-3Silty Sand Brown, moist, loose, becoming gravelly and compact below 0.9 m, and very moist and dense below 2.4 m and moist and dense below 3.0 m
-4Auger refusal Well Installed Screen: 4.03 to 0.91 m Sand: 4.03 to 0.61 m Hole Plug: 0.61 to surfaceSilty Sand Brown, moist, loose, becoming gravelly and compact below 0.9 m, and very moist and dense below 2.4 m and moist and dense below 3.0 m
-5Auger refusal Well Installed Screen: 4.03 to 0.91 m Sand: 4.03 to 0.61 m Hole Plug: 0.61 to surfaceSilty Sand Brown, moist, loose, becoming gravelly and compact below 0.9 m, and very moist and dense below 2.4 m and moist and dense below 3.0 m
-6Auger refusal Well Installed Screen: 4.03 to 0.91 m Sand: 4.03 to 0.61 m Hole Plug: 0.61 to surfaceSilty Sand Brown, moist, loose, becoming gravelly and compact below 0.9 m, and very moist and dense below 2.4 m and moist and dense below 3.0 m
-7Auger refusal Well Installed Screen: 4.03 to 0.91 m Sand: 4.03 to 0.61 m Hole Plug: 0.61 to surfaceSilty Sand Brown, moist, loose, becoming gravelly and compact below 0.9 m, and very moist and dense below 2.4 m and moist and dense below 3.0 m

St. Lawrence Testing & Inspection Co. Ltd.

OFFICE BOREHOLE RECORD

REPORT NO. 25C163

DEPTHSOIL PROFILESAMPLESLAB TEST RESULTS
DEPTHELEVATION DEPTHSOIL DESCRIPTIONSTRAT PLOTWATER CONDITIONSCONDITIONTYPENUMBERRECOVERYN - VALUELAB TEST RESULTS
DEPTHELEVATION DEPTHSOIL DESCRIPTIONSTRAT PLOTWATER CONDITIONSCONDITIONTYPENUMBERRECOVERYN - VALUEWATER CONTENT & ATTERBERG LIMITS.LAB TEST RESULTS
-0SS15057
-175 mm Topsoil Silty Sand Brown, moist, dense, with gravel, becoming loose below 1.5 m and dense below 2.3 mSS24040
-2SS3108
-32.44Auger refusal Well Installed Screen: 2.44 to 0.91 m Sand: 2.44 to 0.61 m Hole Plug: 0.61 m to surface
-4
-5

OFFICE BOREHOLE RECORD

REPORT NO. 25C163

SOIL PROFILE
DEPTHELEVATION DEPTHSOIL DESCRIPTIONSTRAT PLOTWATER CONDITIONSCONDITIONTYPENUMBERRECOVERYN. VALUELABORATORY TESTS PERFORMEDLAB TEST RESULTS
DEPTHELEVATION DEPTHSOIL DESCRIPTIONSTRAT PLOTWATER CONDITIONSCONDITIONTYPENUMBERRECOVERYN. VALUELABORATORY TESTS PERFORMEDWATER CONTENT & ATTERBERG LIMITS.
-075 mm Topsoil Silty Sand Brown, moist, loose, becoming compact below 0.8 m with wet zone and gravel and gravelly, moist and dense below 2.3 mSS1352
-75 mm Topsoil Silty Sand Brown, moist, loose, becoming compact below 0.8 m with wet zone and gravel and gravelly, moist and dense below 2.3 m
-75 mm Topsoil Silty Sand Brown, moist, loose, becoming compact below 0.8 m with wet zone and gravel and gravelly, moist and dense below 2.3 m
175 mm Topsoil Silty Sand Brown, moist, loose, becoming compact below 0.8 m with wet zone and gravel and gravelly, moist and dense below 2.3 m
-75 mm Topsoil Silty Sand Brown, moist, loose, becoming compact below 0.8 m with wet zone and gravel and gravelly, moist and dense below 2.3 m
-75 mm Topsoil Silty Sand Brown, moist, loose, becoming compact below 0.8 m with wet zone and gravel and gravelly, moist and dense below 2.3 m
275 mm Topsoil Silty Sand Brown, moist, loose, becoming compact below 0.8 m with wet zone and gravel and gravelly, moist and dense below 2.3 m
-75 mm Topsoil Silty Sand Brown, moist, loose, becoming compact below 0.8 m with wet zone and gravel and gravelly, moist and dense below 2.3 m
-75 mm Topsoil Silty Sand Brown, moist, loose, becoming compact below 0.8 m with wet zone and gravel and gravelly, moist and dense below 2.3 m
375 mm Topsoil Silty Sand Brown, moist, loose, becoming compact below 0.8 m with wet zone and gravel and gravelly, moist and dense below 2.3 m
-75 mm Topsoil Silty Sand Brown, moist, loose, becoming compact below 0.8 m with wet zone and gravel and gravelly, moist and dense below 2.3 m
475 mm Topsoil Silty Sand Brown, moist, loose, becoming compact below 0.8 m with wet zone and gravel and gravelly, moist and dense below 2.3 m
4.37Auger refusal Well Installed Screen: 4.37 to 0.91 m Sand: 4.37 to 0.61 m Hole Plug: 0.61 m to surface75 mm Topsoil Silty Sand Brown, moist, loose, becoming compact below 0.8 m with wet zone and gravel and gravelly, moist and dense below 2.3 m
4.37Auger refusal Well Installed Screen: 4.37 to 0.91 m Sand: 4.37 to 0.61 m Hole Plug: 0.61 m to surface
4.37Auger refusal Well Installed Screen: 4.37 to 0.91 m Sand: 4.37 to 0.61 m Hole Plug: 0.61 m to surface
4.37Auger refusal Well Installed Screen: 4.37 to 0.91 m Sand: 4.37 to 0.61 m Hole Plug: 0.61 m to surface

OFFICE BOREHOLE RECORD

CLIENT Town of Smiths Falls

REPORT NO. 25C163

BOREHOLE NO. ____ 4

LOCATION DATE OF BORING SOIL PROFILE
Location Date of bering SiteCASING HY Auger DATUM
Date of writingJune 24, 2025DATE OF WL READINGJune 26, 2025DATUM
SOIL PROFILESAMPLESLAB TEST RESULTS
DEPTHELEVATIONDEPTHSOIL DESCRIPTIONSTRAT. PLOTWATER CONDITIONSCONDITIONTYPENUMBERRECOVERYN-VALUELAB PERFORMEDWATER CONTENT & ATTERBERG LIMITS. WP W WL
DEPTHELEVATIONDEPTHSOIL DESCRIPTIONSTRAT. PLOTWATER CONDITIONSCONDITIONTYPENUMBERRECOVERYN-VALUELAB PERFORMEDDYNAMIC PENETRATION TEST BLOWS PER FOOT... K
0 20 40 60 80
125 mm Topsoil
Silt & Sand Brown, moist, loose with clay
SS 2 30 9
SS3554
21.98Silty Sand Brown, moist, gravelly, compact, becoming brown grey, very moist and dense below 3.0 m
Silty Sand Brown, moist, gravelly, compact, becoming brown grey, very moist and dense below 3.0 mSS46023
Silty Sand Brown, moist, gravelly, compact, becoming brown grey, very moist and dense below 3.0 m
Silty Sand Brown, moist, gravelly, compact, becoming brown grey, very moist and dense below 3.0 m
Silty Sand Brown, moist, gravelly, compact, becoming brown grey, very moist and dense below 3.0 m
SS55550+
Well Installed Screen: 4.29 to 0.91 m Sand: 4.29 to 0.61 m Hole Plug: 0.61 to surface
Well Installed Screen: 4.29 to 0.91 m Sand: 4.29 to 0.61 m Hole Plug: 0.61 to surface
Well Installed Screen: 4.29 to 0.91 m Sand: 4.29 to 0.61 m Hole Plug: 0.61 to surface
Well Installed Screen: 4.29 to 0.91 m Sand: 4.29 to 0.61 m Hole Plug: 0.61 to surface
Well Installed Screen: 4.29 to 0.91 m Sand: 4.29 to 0.61 m Hole Plug: 0.61 to surface
Well Installed Screen: 4.29 to 0.91 m Sand: 4.29 to 0.61 m Hole Plug: 0.61 to surface
Well Installed Screen: 4.29 to 0.91 m Sand: 4.29 to 0.61 m Hole Plug: 0.61 to surface
Well Installed Screen: 4.29 to 0.91 m Sand: 4.29 to 0.61 m Hole Plug: 0.61 to surface
Well Installed Screen: 4.29 to 0.91 m Sand: 4.29 to 0.61 m Hole Plug: 0.61 to surface

St. Lawrence Testing & Inspection Co. Ltd.

OFFICE BOREHOLE RECORD

REPORT NO. 25C163

CLIENTE TOWN OF Smiths Falls BOREHOLE NO. 5 LOCATION Compost Site CASING HF Auger DATE OF BORING June 24, 2025 DATE OF WL READING June 26, 2025 DATUM
SOIL PROFILESAMPLESLAB TEST RESULTS
DEPTHELEVATIONDEPTHSOIL DESCRIPTIONSTRAT. PLOTWATER CONDITIONSCONDITIONTYPENUMBERRECOVERYN - VALUELAB PERFORMED WATER CONTENT & ATTERBERG LIMITS. WP W WL
DEPTHELEVATIONDEPTHSOIL DESCRIPTIONSTRAT. PLOTWATER CONDITIONSCONDITIONTYPENUMBERRECOVERYN - VALUELAB PERFORMED WATER CONTENT & ATTERBERG LIMITS. WP W WL
0DYNAMIC PENETRATION TEST BLOWS PER FOOT... K...
00 20 40 60 80
Topsoil with gravelSS15519
Topsoil with gravel
0.61Silty Sand Black then brown, moist, compact with gravel, with black below 1.5 m to 1.8 m and very moist and dense below 2.4 m
0.61SS25012
0.61
2.64Auger refusalWell Installed
2.64Auger refusalWell Installed
2.64
Screen: 2.64 to 0.91 m Sand: 2.64 to 0.61 m Hole Plug: 0.61 m to surface
-5
-5

St. Lawrence Testing & Inspection Co. Ltd.

OFFICE BOREHOLE RECORD

REPORT NO. 25C163

SOIL PROFILESAMPLESLAB TEST RESULTS
DEPTHELEVATION DEPTHSOIL DESCRIPTIONSTRAT. PLOTWATER CONDITIONSCONDITIONTYPENUMBERRECOVERYLAB TEST RESULTSN-VALUE
DEPTHELEVATION DEPTHSOIL DESCRIPTIONSTRAT. PLOTWATER CONDITIONSCONDITIONTYPENUMBERRECOVERYLAB TEST RESULTSN-VALUEWATER CONTENT& ATTERBERG LIMITS. WP W WL
DYNAMIC PENETRATION TEST BLOWS PER FOOT...K...
020406080
Silt&Sand black moist, compact, with gravel, with no gravel from 0.8m to 2.1m,brown and loose below 0.8m,becoming compact with gravel below2.3mSS15013
Silt&Sand black moist, compact, with gravel, with no gravel from 0.8m to 2.1m,brown and loose below 0.8m,becoming compact with gravel below2.3mSS15013
Silt&Sand black moist, compact, with gravel, with no gravel from 0.8m to 2.1m,brown and loose below 0.8m,becoming compact with gravel below2.3mSS15013
SS2505
SS2505
SS35511
3.07Auger refusalSS410010
3.07
3.07

St. Lawrence Testing & Inspection Co. Ltd.

OFFICE BOREHOLE RECORD

REPORT NO. 25C163

CLIENTE TOWN OF SHITHS FALLSREPORT NO. 25C163 BOREHOLE NO. 7 CASING HF Auger DATUM
LOCATION DATE OF BORING JUNE 24, 2025 DATE OF WL READING JUNE 26, 2025 SOIL PROFILE
DEPTHELEVATIONDEPTHSOIL DESCRIPTIONSTRAT. PLOTWATER CONDITIONSCONDITIONTYPENUMBERRECOVERYN - VALUELAB TEST PERFORMEDWATER CONTENT & ATTERBERG LIMITS. WP W WL DYNAMIC PENETRATION TEST BLOWS PER FOOT... .K ...
DEPTHELEVATIONDEPTHSOIL DESCRIPTIONSTRAT. PLOTWATER CONDITIONSCONDITIONTYPENUMBERRECOVERYN - VALUE020406080
TopsoilSS15020
0.18Silt & Sand Brown, moist, compact with gravel noted below 1.5 mSS15020
Silt & Sand Brown, moist, compact with gravel noted below 1.5 m
Silt & Sand Brown, moist, compact with gravel noted below 1.5 m
Silt & Sand Brown, moist, compact with gravel noted below 1.5 m
Silt & Sand Brown, moist, compact with gravel noted below 1.5 mSS210012
Silt & Sand Brown, moist, compact with gravel noted below 1.5 mSS210012
Silt & Sand Brown, moist, compact with gravel noted below 1.5 mSS210012
Silt & Sand Brown, moist, compact with gravel noted below 1.5 mSS210012
2.36Auger refusalWell InstalledScreen: 2.36 to 0.91 mSand: 2.36 to 0.61 m
Hole Drug: 0.61 m to surface
-5
-5
-5
-5
-5
-5
-5
-5
-5

RLC-HydroG

ATTACHMENT E

Town of Smiths Falls IPZ


Mississippi-Rideau Source Protection Plan 2013

Compost Site

TOWNSHIP OF DRUMMOND/NORTH ELMSLEY

TOWN OF SMITHS FALLS

LEGEND Municipal Surface Water Intake Road Railway Municipal Boundary Stream Water

Intake Protection Zone IPZ Scored 10 IPZ Scored 8

Smiths Falls Intake Protection Zone

Schedule K


RLC-HydroG

ATTACHMENT F

Water Well Records


The Ontario Water Resources Commission Act

Elev. R

014016

ONTARIO WATER

WATER WE

LL RECORD

Basin 215 County or District Con. 5

LANARK Lot

Township, Village, Town or City Date completed 9th (day Tues. address Smiths

North Elmsley 5 1961 month year ) Falls auto.

Casing and Screen Record

Casing and Screen RecordPumping Test
Inside diameter of casing 4 in.✓Static level 10
✓Total length of casing 22 ft.Test-pumping rate 5 G.P.M.
Type of screen✓Pumping level 40
Length of screenDuration of test pumping 1 hr.
Depth to top of screenWater clear or cloudy at end of test clear.
Diameter of finished hole 4 in.Recommended pumping rate 5 G.P.M. with pump setting of 70 feet below ground surface
Well LogWater Record
Overburden and Bedrock RecordFrom ft.To ft.Depth(s) at which water(s) foundKind of water (fresh, salty, sulphur)
Soil0240
Clay218Fresh
Sandstone188078

For what purpose(s) is the water to drinking payrox Is well on upland, in valley, or on hi Drilling or Boring Firm c.

Address.

Licence Number 275 Name of Driller or Borer Carl Address East Sts Corner Date June 14th 62 W Mouine (Signature of Licensed Drilling or Bo

Watering taws toilets . . upland . . V. Morism

Desaulniers .. on ing Contractor)

Form 7 15M Sets 60-5930

nkville Ont.

Location of Well

In diagram below show distances of well from road and lot line. Indicate north by arrow.

N


DEPARTMENT OF MIN OCT 22 1951 TO ___

35 N. <sup>0</sup>

Water

Well Record

p, Village, Town or

City . Elmley North .

Date Completed (day) (month) (year) Cost of Well (excluding pum


Pipe and Casing RecordPumping Test
Casing diameter(s)Date
Length(s) of casing(s)Static level
Type of screenPumping level
Length of screenPumping rate
Distance from top of screen to ground levelDuration of test
Is well a gravel-wall type?Distance from cylinder or bowls to ground level

Water Record

Kind (fresh or mineral).... fresh Quality (hard, soft, contains iron, sulphur, etc.)... hard Appearance (clear, cloudy, coloured)... clear For what purpose(s) is the water to be used?... house How far is well from possible source of contamination? What is the source of contamination?... outdoor house Enclose a copy of any mineral analysis that has been made of water.

Depth(s) to Water Horizon(s)Kind of WaterNo. of Feet Water Rises
Well Log
Overburden and Bedrock RecordFromTo
0 ft.....ft.
Systool
T. andolstone & Kingston
imikend55/1

Location of Well

In diagram below well from road and dicate north by a

show distances of and lot line. In- row.

Situation: Is well on upland, in valley, or on hillside? ..

Address.....

Name of Driller.

Licence Number. Sig

nature of Licensee

FORM 5


Water-Well

Record

County or Territorial District.Lanark Township, Village, Town Elmsley.

in Village, Town or City).

Address % George D. Howe 337 Creighton Agent.

th Street, Ottawa.

Pipe and Casing RecordPumping Test
Casing diameter(s)Static level
Length(s)Pumping rate
Type of screenPumping level
Length of screenDuration of test

Well Log

Water Record

Overburden and Bedrock RecordFrom ft.To ft.Depth(s) at which water(s) foundNo. of feet water risesKind of water (fresh, salty, or sulphur)
20
Clay and ground142.5/150147
Crime Stone30150
Pits

For what purpose(s) is the water t

Is water clear or cloudy?..... Is well on upland, in valley, or on h

Drilling firm ..... Address .....

Name of Driller ..... Address .....

Licence Number.....I certify that the fo statements of fact a

be used?

llside?.

regoing

e true.

Date.....Signature of Licensee

Location of Well

In diagram below show distances of well from road and lot line. Indicate north by arrow.

Approx.

Mike K Smiths Falls


Water-Well

Record

County or Territorial District... LANARK Township Village Address ...

(day) (month) (year)

Town or City NORTH ELMSLEY Town or City ) .

Pipe and Casing RecordPumping Test
Casing diameter(s)Static level
Length(s)Pumping rate
Type of screenPumping level
Length of screenDuration of test

Well Log

Water Record

Overburden and Bedrock Record old well, 16 ftFrom ft. 0To ft. 16Depth(s) at which water(s) foundNo. of feet water risesKind of water (fresh, salty, or sulphur)
steep40 to 48 ft30 ftfresh
hard and stone1648 ft

For what purpose(s)

Is water clear or cl Is well on upland, in

Drilling firm ...

Address ...

Name of Driller ...

Address ...

Licence Number.....I cert stater

Date...aug 24

is the water to be used?

udy? clear

valley, or on hillside?

ify that the foregoing ents of fact are true.

In diagram below show road and lot line. In

distances of well from licate north by arrow.

Form 5


UTM |1|8|z

4161711515E

GROUND WATER BRANCH

15 R 14 9 7 3 0 8 9 N The Ontario

Water Resources Commission Act

35 N° AUG 7

1533 1962

WATER W

ELL RECORD

ONTARIO WRESOURCES COM

WATER MISSION

Township, Village, Town or Date completed 17 (day ress RR+2, S

NORTH ELMSLEY MAY 1962 month year) ITHS FALLS, DNT.

Casing and Screen RecordPumping Test
Inside diameter of casing 6 5/8 INStatic level 18 FT.
Total length of casing 18 FT.Test-pumping rate 5 G.P.M.
Type of screen 0Pumping level 28 FT.
Length of screen 0Duration of test pumping 2 HR.
Depth to top of screen 0Water clear or cloudy at end of test CLEAR
Diameter of finished hole 5 3/4 INRecommended pumping rate 4 G.P.M. with pump setting of 25 feet below ground surface
Well Log Overburden and Bedrock RecordWell Log From ft.Well Log To ft.Water Record Depth(s) at which water(s) foundWater Record Kind of water (fresh, salty, sulphur)
BROWN EARTH0230FRESH
BROWN SANDSTONE238

Licence Number 644 Name of Driller or Borer GER Address RR#3, LA

OLD THOMPSON ARK DNT.

In diagram below show dista road and lot line. Indicate

nces of well from north by arrow.


Elev. 9 R 0 4 2 1

Basin 25

RECE MAR 28 GEOLOGICAL DEPARTMENT

VED 957

Water-Well Record

County or Territorial District.....Township, Village, T Con.....6 Lot.....3 Street and Number (if in Village, Tow Owner .....Address ... Date completed .....18. July 57 1957 (day) (month) (year)

n or City North Elmandy or City) Smith Falls

Casing diameter(s) 6/4Length(s) 7/8Type of screen NoneLength of screenStatic level 18ftPumping rate 900gal/minPumping level 25ftDuration of test 1hr

Well Log

Water Record

Overburden and Bedrock Record SandstoneFrom ft. 0To ft. 37Depth(s) at which water(s) found 35-No. of feet water rises 17Kind of water (fresh, salty, or sulphur)

For what purpose (a

Is water clear or cl Is well on upland, in

Drilling firm ..... Address .....

Name of Driller ..... Address .....

Licence Number..... I cert stater

Date...Mar26

is the water to be used?

cloudy? Clear

valley, or on hillside?

surface

W. W. Muggett

Larach

Lucil Munro

Larach

077

ify that the foregoing ents of fact are true.

Cecil Munro

Signature of Licensee

Location In diagram below show road and lot line. Ind

of Well distances of well from cate north by arrow.

Form 5


Elev R

0.415

WATER WELL

RECORD

Township, Village, Town or City Date completed (day dress SMITHS F

NORTH ELMSLEY 8 , 1962 month year)

Casing and Screen RecordPumping Test
Inside diameter of casing2"Static level18 ft
Total length of casing18 ft.Test-pumping rateX G.P.M.
Type of screen—Pumping level20
Length of screen—Duration of test pumping2 HRS.
Depth to top of screen—Water clear or cloudy at end of testCLEAR
Diameter of finished hole2"Recommended pumping rate6 G.P.M.
with pump setting of35 feet below ground surface
Well LogWater Record
Overburden and Bedrock RecordFrom ft.To ft.Depth(s) at which water(s) foundKind of water (fresh, salty, sulphur)
SANDY LOAM03129FRESH
GREY LIME STONE3129
For what purpose(s) is the water to be used?Location of Well
INDUSTRIALIn diagram below show distances of well from road and lot line. Indicate north by arrow.
Is well on upland, in valley, or on hillside?
Drilling or Boring Firm
R.H.MILLER
AddressR.R.3
BROOKVILLE3
Licence Number580
Name of Driller or BorerC.ROBERTSON
AddressNORTH GOWER
DateOct. 2, 1962
(Signature of Licensed Drilling or Boring Contractor)
Form 7 10M-62-1152

JTM 187 4 4

1 7 6 2 0 K 2 3 0 0 0 N

3 / 4 / 14

35023

C6J

Elev.

5 0 4 1 5

NOV25

1968

ONTARIO RESOURCES

WATER OMMISSION

Well Log Overburden and Bedrock RecordWell Log From ft.Well Log To ft.Water Record Depth(s) at which water(s) foundWater Record Kind of water (fresh, salty, sulphur)
Heal Santon RockG4125
For what purpose(s) is the water to be used?Location of Well
Is well on upland, in valley, or on hillside?In diagram below show distances of well from road and lot line. Indicate north by arrow.
Drilling or Boring Firm
Address
Licence Number
Name of Driller or Borer.
Address
Date
(Signature of Licensed Drilling or Boring Contractor)
Form 7 15M-60-4138
O W R C COPY

CTM $ \angle 1 8 \angle 2 4 $

1 7 0 3 0 E

31c

16 E

4 ? 4

9123300 $ N $

3502

360

= ev. 5 R 0 4 2 5 Basin 2 5 V

The Ontario Water Resources Commission Act WATER WELL RECORD

Casing and Screen RecordPumping Test
Inside diameter of casing. 5"Static level 18"
Total length of casing. 21'Test-pumping rate 8 G.P.M.
Type of screenPumping level 60'
Length of screenDuration of test pumping 2 hrs
Depth to top of screenWater clear or cloudy at end of test clear
Diameter of finished hole (5\frac{{1}}{{2}}")Recommended pumping rate 6 G.P.M. with pump setting of 70 feet below ground surface
Well LogWater Record
Overburden and Bedrock RecordFrom ft.To ft.Depth(s) at which water(s) foundKind of water (fresh, salty, sulphur)
Sand and fill02
Sandstone Shale212
Solid Brown Sandstone127573fresh
For what purpose(s) is the water to be used?Location of Well
Domestic useIn diagram below show distances of well from road and lot line. Indicate north by arrow.
Is well on upland, in valley, or on hillside? uplandIn diagram below show distances of well from road and lot line. Indicate north by arrow.
Drilling or Boring FirmIn diagram below show distances of well from road and lot line. Indicate north by arrow.
Lloyd TrodannIn diagram below show distances of well from road and lot line. Indicate north by arrow.
AddressR. R. # 2, Smiths Falls, Ont
Licence Number2827
Name of Driller or BorerLloyd Trodann
AddressR. R. # 2, Smiths Falls, Ont.
DateJune 28, 1968
(Signature of Licensed Drilling or Boring Contractor)10 ml.200°
Form 75M 60-2091210 ml.SMITHS PALLS
OWRC COPY10 ml.
CategoryDistance from road (ft)Distance from lot line (ft)
well300440

4 R 4 9 2

3 2 8 0 N

Township, Village, Town or Date completed 7 (day) ress. AA#2 S

NORTH ELMSLEY MAY 1969 month year) MITH FALLS

Casing and Screen RecordPumping Test
Inside diameter of casingStatic level8
Total length of casingTest-pumping rate20 G.P.M.
Type of screenPumping level50
Length of screenDuration of test pumping1 Hour
Depth to top of screenWater clear or cloudy at end of testChowdy
Diameter of finished holeRecommended pumping rate10 G.P.M.
with pump setting of60 feet below ground surface
Well Log Overburden and Bedrock RecordWell Log From ft.Well Log To ft.Water Record Depth(s) at which water(s) foundWater Record Kind of water (fresh, salty, sulphur)
CAFE SANDSTONE07266FAFSA

Is well on upland, in valle Drilling or Boring Firm.

DOMESTIC or on hillside ? THOMPSON BAOS

Licence Number 350 Name of Driller or Borer Address CLAY Date (Signature of Licensed

0 CAM FRAON ON BR #2 1969 Drilling or Boring Contractor)

In diagram below show road and lot line. In

distances of well from dicate north by arrow.

O


The Ontario Water Resour WATER WEL

- RECORD

COUNTY OR DISTRICTTOWNSHIP, BOROUGH, CITY, TOWN, VILLAGECON., BLOCK, TRACT, SURVEY, ETC.LOT25-27
COUNTY OR DISTRICTNMsLeyII子003
DATE COMPLETED48-53
SMITT FALLSDAY1870
INGRC.ELEVATIONRC-BASIN CODEIV
9733.504042.5525
242526303147
LOG OF OVERBURDEN AND BEDROCK MATERIALS (SEE INSTRUCTIONS)
GENERAL COLOURMOST COMMON MATERIALOTHER MATERIALSGENERAL DESCRIPTIONDEPTH - FEET
GENERAL COLOURMOST COMMON MATERIALOTHER MATERIALSGENERAL DESCRIPTIONFROMTO
lrownrawl04
sandstone486
321 21014 1521324354657580
41WATER RECORD51 CASING & OPEN HOLE RECORDSIZE(S) OF OPENING (SLOT NO.)31-33DIAMETER34-38LENGTH39-40
WATER FOUND AT - FEETKIND OF WATERINSIDE DIAMINCHESMATERIALWALL THICKNESS INCHESDEPTH - FEETMATERIAL AND TYPEINCHESDEPTH TO TOP OF SCREEN41-44FEET
10-131 ☐ FRESH 3 ☐ SULPHUR 2 ☐ SALTY 5 4 ☐ MINERAL1410-11STEEL GALVANIZED CONCRETE OPEN HOLEFROM13-1661 PLUGGING & SEALING RECORD
08015-181 ☐ FRESH 3 ☐ SULPHUR 2 ☐ SALTY 4 ☐ MINERAL1917-181 ☐ STEEL GALVANIZED CONCRETE OPEN HOLE020-23DEPTH SET AT - FEET FROMTOMATERIAL AND TYPE(CEMENT GROUT, LEAD PACKER, ETC.)
20-231 ☐ FRESH 3 ☐ SULPHUR 2 ☐ SALTY 4 ☐ MINERAL2424-251 ☐ STEEL GALVANIZED CONCRETE OPEN HOLE27-3010-1314-17
25-281 ☐ FRESH 3 ☐ SULPHUR 2 ☐ SALTY 4 ☐ MINERAL2934 801 ☐ STEEL GALVANIZED CONCRETE OPEN HOLE18-2122-25
30-331 ☐ FRESH 3 ☐ SULPHUR 2 ☐ SALTY 4 ☐ MINERAL3434 803 ☐ CONCRETE OPEN HOLE26-2930-3380
TEST PUMP2 ☐ BAILER0003 GPM. HOURS MINS.
TEST PUMPSTATIC LEVELWATER LEVEL END OF PUMPING25 WATER LEVELS DURING1 ☐ PUMPING RECOVERY
TEST PUMP19-21 FEET22-24 FEET15 MINUTES 26-28 FEET45 MINUTES 32-34 FEET
TEST PUMPIF FLOWING, GIVE RATE38-41 GPM.PUMP INTAKE SET AT FEETWATER AT END OF TEST 42 CLEAR 2 CLOUDY
TEST PUMPRECOMMENDED PUMP TYPERECOMMENDED PUMP SETTING43-45 FEETRECOMMENDED PUMPING 46-49 RATE 0005 GPM.
TEST PUMP50-53 QCL.Q GPM./FT. SPECIFIC CAPACITY
USE 074 ☐ INDUSTRIAL 8 ☐ COOLING OR AIR CONDITIONING ☐ OTHER 9 ☐ NOT USED
METHOD OF DRILLING1 ☐ CABLE TOOL 6 ☐ BORING 2 ☐ ROTARY (CONVENTIONAL) 7 ☐ DIAMOND 3 ☐ ROTARY (REVERSE) 8 ☐ JETTING 4 ☐ ROTARY (AIR) 9 ☐ DRIVING 5 ☐ AIR PERCUSSION
CONTRACTORNAME OF WELL CONTRACTORLICENCE NUMBERDRILLERS REMARKS:
CONTRACTORADDRESSDATE OF INSPECTIONCONTRACTORDATE RECEIVEDDATE RECEIVED63-6880
CONTRACTORNAME OF DRILLER OR BORERLICENCE NUMBERDATE OF INSPECTIONDATE OF INSPECTIONINSPECTOR220371
CONTRACTORSIGNATURE OF CONTRACTORSUBMISSION DATEREMARKS:
CONTRACTORDAY _____ MO _____ YR _____

The Ontario Water Resou WATER WEL

S Commission Act L RECORD

  1. PRINT ONLY IN SPACES PROVIDED
  2. CHECK CORRECT BOX WHERE APPLICABLE
WATER MANAGEMENT INOTARIO WATER MANAGEMENT IN ONTARIO 1. PRINT ONLY IN SPACES PROVIDED 2. CHECK CORRECT BOX WHERE APPLICABLE 11 TOWNSHIP, BOROUGH, CITY, TOWN, VILLAGE
COUNTY OR DISTRICT LANAKESLEEDSTOWNSHIP, BOROUGH, CITY, TOWN, VILLAGE N.K.LSLEYSON, BLOCK, TRACT, SURVEY, ETC. VILOT 25-27
JMIFAXDATE COMPLETED DAY 18 MOYR48-53 YR
AGRC.ELEVATIONRC.BASIN CODEIV
7342040425525
242526303147
LOG OF OVERBURDEN AND BEDROCK MATERIALS (SEE INSTRUCTIONS)
GENERAL COLOURMOST COMMON MATERIALOTHER MATERIALSGENERAL DESCRIPTIONDEPTH - FEET
GENERAL COLOURMOST COMMON MATERIALOTHER MATERIALSGENERAL DESCRIPTIONFROMTO
BROWNsoil04
1.SANDSTONE473
#3 WE
3100040020073618
32
1 21014 15213243SIZE(S) OF OPENING (SLOT NO.)65DIAMETER34-38LENGTH39-40
WATER FOUND AT = FEETKIND OF WATER51 CASING & OPEN HOLE RECORDMATERIAL AND TYPEINCHESDEPTH TO TOP OF SCREEN41-44FEET
00701 ☐ FRESH 2 ☐ SALTY 1 ☐ FRESH 2 ☐ SALTY 1 ☐ FRESH 2 ☐ SALTY 1 ☐ FRESH 2 ☐ SALTYINSIDE DIAMINCHESMATERIALWALL THICKNESS INCHESDEPTH - FEETMATERIAL AND TYPEINCHESDEPTH TO TOP OF SCREEN41-44FEET
00701 ☐ FRESH 2 ☐ SALTY 1 ☐ FRESH 2 ☐ SALTY 1 ☐ FRESH 2 ☐ SALTY 1 ☐ FRESH 2 ☐ SALTYINSIDE DIAMINCHESMATERIALWALL THICKNESS INCHESFROMTOMATERIAL AND TYPEINCHESDEPTH TO TOP OF SCREEN41-44FEET
00701 ☐ FRESH 2 ☐ SALTY 1 ☐ FRESH 2 ☐ SALTY 1 ☐ FRESH 2 ☐ SALTY 1 ☐ FRESH 2 ☐ SALTY10-11STEEL 2 ☐ GALVANIZED 3 ☐ CONCRETE 4 ☐ OPEN HOLE 1 ☐ STEEL 2 ☐ GALVANIZED 3 ☐ CONCRETE 4 ☐ OPEN HOLE013-16 0025 20-2361 PLUGGING & SEALING RECORD
20-231 ☐ FRESH 2 ☐ SALTY 1 ☐ FRESH 2 ☐ SALTY 1 ☐ FRESH 2 ☐ SALTY17-1819DEPTH SET AT - FEET FROM TO 10-13MATERIAL AND TYPE(CEMENT GROUT, LEAD PACKER, ETC.)
25-281 ☐ FRESH 2 ☐ SALTY 1 ☐ FRESH 2 ☐ SALTY24-252627-3018-2122-25
30-331 ☐ FRESH 2 ☐ SALTY 1 ☐ FRESH 2 ☐ SALTY34 8024-252626-2930-3380
PUMPING TESTSTATIC LEVELWATER LEVEL END OF PUMPING25WATER LEVELS DURING1PUMPING RECOVERYIN DIAGRAM BELOW SHOW DISTANCES OF WELL FROM ROAD AND LOT LINE IN INDICATE NORTH BY ARROW.Lc+4
PUMPING TEST19-2122-2415 MINUTES30 MINUTES45 MINUTES60 MINUTES35-37
PUMPING TESTFEETFEET26-28FEETFEETFEETFEET
PUMPING TESTIF FLOWING, GIVE RATE33-41PUMP INTAKE SET ATWATER AT END OF TEST42
PUMPING TESTRECOMMENDED PUMP TYPEPEEP43-45PEEP1 □ CLEAR2 □ CLOUDY
PUMPING TEST□ SHALLOWDEEPRECOMMENDED43-45RECOMMENDED46-49
PUMPING TEST50-53□ DEEPGETTPEEPPUMPING46-494.13
PUMPING TEST54□ GPM/FT. SPECIFIC CAPACITY744
PUMPING TESTFINAL STATUS OF WELL1 □ WATER SUPPLY5 □ ABANDONED, INSUFFICIENT SUPPLY
PUMPING TESTFINAL STATUS OF WELL2 □ OBSERVATION WELL6 □ ABANDONED, POOR QUALITY
PUMPING TESTFINAL STATUS OF WELL3 □ TEST HOLE7 □ UNFINISHED
PUMPING TESTFINAL STATUS OF WELL4 □ RECHARGE WELL
PUMPING TEST55-561 □ DOMESTIC5 □ COMMERCIAL
PUMPING TESTWATER2 □ STOCK6 □ MUNICIPAL
PUMPING TESTWATER3 □ IRRIGATION7 □ PUBLIC SUPPLY
USE OF METHOLOGY4 ☐ INDUSTRIAL 8 ☐ COOLING OR AIR CONDITIONING ☐ OTHER 9 ☐ NOT USEDDRILLERS REMARKS:
METHOD OF DRILLING571 ☐ CABLE TOOL 6 ☐ BORING 2 ☐ ROTARY (CONVENTIONAL) 7 ☐ DIAMOND 3 ☐ ROTARY (REVERSE) 8 ☐ JETTING 4 ☐ ROTARY (AIR) 9 ☐ DRIVING 5 ☐ AIR PERCUSSIONDRILLERS REMARKS:
CONTRACTORNAME OF WELL CONTRACTORLICENCE NUMBERDATE58CONTRACTOR59-62DATE RECEIVED63-68
CONTRACTORC V Morrison3705SOURCE13705220371
CONTRACTORADDRESSDATE OF INSPECTIONINSPECTOR
CONTRACTORNAME OF DRILLER OR BORERLICENCE NUMBERDATE OF INSPECTIONINSPECTOR
CONTRACTORSIGNATURE OF CONTRACTORSUBMISSION DATEREMARKS:P 1
CONTRACTORDAY______MO______YR______REMARKS:WI

OWRC COPY


The Ontario Water Resources Commission Act WATER WELL RECORD

WATERWELL RECORDS
Wafer management in Ontario1. PRINT ONLY IN SPACES PROVIDED 2. CHECK CORRECT BOX WHERE APPLICABLE3502776 - MUNICIP. 35007 GDN CON. 10 14 15 16 CON. BLOCK, TRACT SURVEY, ETC.22 23 24 LOT 25-27 003
COUNTY OR DISTRICTTOWNSHIP, BOROUGH, CITY, TOWN, VILLAGE3502776 - MUNICIP. 35007 GDN CON. 10 14 15 16 CON. BLOCK, TRACT SURVEY, ETC.22 23 24 LOT 25-27 003
LANARKELMSLEY NORTH3502776 - MUNICIP. 35007 GDN CON. 10 14 15 16 CON. BLOCK, TRACT SURVEY, ETC.22 23 24 LOT 25-27 003
SMITH FALLSDATE COMPLETED 48-53 DAY MOYR 70
NG RC ELEVATION RC BASIN CODE II IV 973350 4 0425 5 25 31
LOG OF OVERBURDEN AND BEDROCK MATERIALS (SEE INSTRUCTIONS)
GENERAL COLOURMOST COMMON MATERIALOTHER MATERIALSGENERAL DESCRIPTIONDEPTH - FEET
GENERAL COLOURMOST COMMON MATERIALOTHER MATERIALSGENERAL DESCRIPTIONFROMTO
Lysom soil03
Lyson sand stone360
32
PUMPING TESTSTATIC LEVELWATER LEVEL END OF PUMPING25 WATER LEVELS DURING (\text{1} \square) PUMPING (\text{2} \square) RECOVERY
PUMPING TEST19-21 FEET22-24 FEET15 MINUTES 26-28 FEET30 MINUTES 29-31 FEET45 MINUTES 32-34 FEET
PUMPING TESTIF FLOWING, GIVE RATE38-41 GPM.PUMP INTAKE SET AT FEETWATER AT END OF TEST 42 CLEAR (2 \square) CLOUDY
PUMPING TESTRECOMMENDED PUMP TYPERECOMMENDED PUMP SETTING43-45 FEETRECOMMENDED PUMPING 46-49 RATE 0005 GPM.
PUMPING TEST☐ SHALLOW☐ DEEP50-53 GPM./FT. SPECIFIC CAPACITY
FINAL STATUS OF WELL 54 OF WELL 55-56 WATER USE 011 ☑ WATER SUPPLY 5 ☐ ABANDONED, INSUFFICIENT SUPPLY 2 ☐ OBSERVATION WELL 6 ☐ ABANDONED, POOR QUALITY 3 ☐ TEST HOLE 7 ☐ UNFINISHED 4 ☐ RECHARGE WELL
FINAL STATUS OF WELL 54 OF WELL 55-56 WATER USE 01WATER1 ☑ DOMESTIC 5 ☐ COMMERCIAL 2 ☐ STOCK 6 ☐ MUNICIPAL 3 ☐ IRRIGATION 7 ☐ PUBLIC SUPPLY 4 ☐ INDUSTRIAL 8 ☐ COOLING OR AIR CONDITIONING
METHOD OF DRILLING57OTHER☐ OTHER ______ 9 ☐ NOT USEDDRILLERS REMARKS: Suspension.
METHOD OF DRILLING571☐ CABLE TOOL6 ☐ BORINGDRILLERS REMARKS: Suspension.
METHOD OF DRILLING572☐ ROTARY (CONVENTIONAL)7 ☐ DIAMONDDRILLERS REMARKS: Suspension.
METHOD OF DRILLING573☐ ROTARY (REVERSE)8 ☐ JETTINGDRILLERS REMARKS: Suspension.
METHOD OF DRILLING574☐ ROTARY (AIR)9 ☐ DRIVINGDRILLERS REMARKS: Suspension.
METHOD OF DRILLING575☐ AIR PERCUSSIONDRILLERS REMARKS: Suspension.
CONTRACTOR NAME OF WELL CONTRACTOR C U mөрrison ADDRESS RR 2 JSasrex. NAME OF DRILLER OR BORER SIGNATURE OF CONTRACTOR OWRC COPYLICENCE NUMBER58 CONTRACTOR 59-62 DATE RECEIVED 63-68 80 SOURCE 1 3705 INSPECTOR
CONTRACTOR NAME OF WELL CONTRACTOR C U mөрrison ADDRESS RR 2 JSasrex. NAME OF DRILLER OR BORER SIGNATURE OF CONTRACTOR OWRC COPYLICENCE NUMBERDATE OF INSPECTIONDATE OF INSPECTION
CONTRACTOR NAME OF WELL CONTRACTOR C U mөрrison ADDRESS RR 2 JSasrex. NAME OF DRILLER OR BORER SIGNATURE OF CONTRACTOR OWRC COPYLICENCE NUMBERREMARKS:
CONTRACTOR NAME OF WELL CONTRACTOR C U mөрrison ADDRESS RR 2 JSasrex. NAME OF DRILLER OR BORER SIGNATURE OF CONTRACTOR OWRC COPYLICENCE NUMBER
CONTRACTOR NAME OF WELL CONTRACTOR C U mөрrison ADDRESS RR 2 JSasrex. NAME OF DRILLER OR BORER SIGNATURE OF CONTRACTOR OWRC COPYLICENCE NUMBER
CONTRACTOR NAME OF WELL CONTRACTOR C U mөрrison ADDRESS RR 2 JSasrex. NAME OF DRILLER OR BORER SIGNATURE OF CONTRACTOR OWRC COPYSUBMISSION DATE DAY _____ MO _____ YR _____

iM 18 Z 5 4R 491

16935 73270

I am

WATER WELL

RECORD

Township, Village, Town or City Date completed 16 (day) Address R Q 3 J

North & Lemosey June 1971 month year) muths Falls

Well Log Overburden and Bedrock RecordWell Log From ft.Well Log To ft.Water Record Depth(s) at which water(s) foundWater Record Kind of water (fresh, salty, sulphur)
soil02
munual water
sandy limestone283

In diagram below show distances of well from road and lot line. Indicate north by arrow.


MINISTRY OF THE ENVIRONMENT The Ontario Water Res WATER WELL

ONMENT urces Act RECORD

  1. PRINT ONLY IN SPACES PROVIDED
  2. CHECK CORRECT BOX WHERE APPLICABLE

MUNICIP. 35007 CON. CΦ 10 14 15

0.5 22 23 24

GENERAL COLOURMOST COMMON MATERIALOTHER MATERIALSGENERAL DESCRIPTIONDEPTH - FEET
BrownSoil0 2
Blue Clay and Gravel2 14
White Sandy Limestone14 136

MINISTRY OF THE ENVIRONMENT COPY


WATER WELL

RECORD

31℃/16

E.

LOG OF OVERBURDEN AND BEDROCK MATERIALS (SEE INSTRUCTIONS)
GENERAL COLOURMOST COMMON MATERIALOTHER MATERIALSGENERAL DESCRIPTIONDEPTH/FEET FROM TO
spill stone0 4
grey limestone4 30
grey sandy30 158

MINISTRY OF THE ENVIRONMENT COPY


MINISTRY OF THE ENVIRONMENT The Ontario Water Resources Act WATER WELL RECORD

  1. PRINT ONLY IN SPACES PROVIDED
  2. CHECK CORRECT BOX WHERE APPLICABLE

31% 16

E.

3504376

MUNICIP. 35007 CON. CΦN

COUNTY OR DISTRICTTOWNSHIP, BOROUGH, CITY, TOWN, VILLAGECON. BLOCK. TRACT. SURVEY. ETC.LOT 25-27
LancasterNorth Elmsley3003
RSRR 73 Smith's Falls 007DATE COMPLETED 48-53
RSRR 73 Smith's Falls 007DAY 24 MO 03 YR
THINGREC ELEVATIONBASIN CODEIIIIV
10129,7320050425526
2425263031
LOG OF OVERBURDEN AND BEDROCK MATERIALS (SEE INSTRUCTIONS)
GENERAL COLOURMOST COMMON MATERIALOTHER MATERIALSGENERAL DESCRIPTIONDEPTH - FEET
GENERAL COLOURMOST COMMON MATERIALOTHER MATERIALSGENERAL DESCRIPTIONFROMTO
Fill03
greyLimestone335
//Sandy II3.5137
310003010035215013721581
32
WATER FOUND AT - FEETWATER RECORD51 CASING & OPEN HOLE RECORDSIZE(S) OF OPENING (SLOT NO.)31-33DIAMETER34-38LENGTH39-40
WATER FOUND AT - FEETKIND OF WATERINSIDE DIAM. INCHESMATERIALWALL THICKNESS INCHESDEPTH - FEETSIZE(S) OF OPENING (SLOT NO.)31-33DIAMETER34-38LENGTH39-40
WATER FOUND AT - FEETKIND OF WATERINSIDE DIAM. INCHESMATERIALWALL THICKNESS INCHESFROMTOSIZE(S) OF OPENING (SLOT NO.)31-33DIAMETER34-38LENGTH39-40
10-131 FRESH 3 ☐ SULPHUR1410-111 STEEL 12 GALVANIZED0025MATERIAL AND TYPEDEPTH TO TOP OF SCREEN41-4480
0/322 FALLY 4 ☐ MINERAL0617-181 STEEL 19 GALVANIZED013-16PLUGGING & SEALING RECORD
0/321 FRESH 3 ☐ SULPHUR1917-181 STEEL 19 GALVANIZED18820-23DEPTH SET AT - FEETMATERIAL AND TYPE(CEMENT GROUT. LEAD PACKER, ETC.)
0/322 FALLY 4 ☐ MINERAL2424-251 STEEL 26 GALVANIZEDFROMTO
0/321 FRESH 3 ☐ SULPHUR2524-251 STEEL 26 GALVANIZED10-1314-17
0/322 FALLY 4 ☐ MINERAL30-3324-251 STEEL 26 GALVANIZED18-2122-25
0/321 FRESH 3 ☐ SULPHUR3424-251 STEEL 26 GALVANIZED26-2930-3380
0/322 FALLY 4 ☐ MINERAL30-3324-251 STEEL 26 GALVANIZED
PUMPING TEST METHOD10PUMPING RATE11-14DURATION OF PUMPINGLOCATION OF WELL1773
1 ☒ PUMP 2 ☐ BAILER0020 GPM00 15-16 HOURS 3017-18 MINS.IN DIAGRAM BELOW SHOW DISTANCES OF WELL FROM ROAD AND LOT LINE. INDICATE NORTH BY ARROW.
PUMPING TESTSTATIC LEVELWATER LEVEL END OF PUMPING25WATER LEVELS DURING RECOVERYPUMPING RECOVERYIN DIAGRAM BELOW SHOW DISTANCES OF WELL FROM ROAD AND LOT LINE. INDICATE NORTH BY ARROW.
PUMPING TEST19-2122-2415 MINUTES30 MINUTES45 MINUTES60 MINUTESFEETN.个
PUMPING TEST015 FEET035 FEET26-28 FEET29-31 FEET32-34 FEET35-37 FEET42 FEET1 ☒ CLEAR 2 ☐ CLOUDYLOT 4.
PUMPING TESTIF PLOWING, GIVE RATE38-41 GPMPUMP INTAKE SET AT FEETWATER AT END OF TEST42 FEET1 ☒ CLEAR 2 ☐ CLOUDYLOT 3.
PUMPING TESTRECOMMENDED PUMP TYPERECOMMENDED PUMP SETTING43-45 FEETRECOMMENDED PUMPING RATE46-49 GPM47 ☒ CLEAR 2 ☐ CLOUDY48 ☒ CLEAR 2 ☐ CLOUDY1 ☒ WATER SUPPLY5 ☐ ABANDONED, INSUFFICIENT SUPPLY
FINAL STATUS OF WELL1 ☒ OBSERVATION WELL5 ☐ ABANDONED, INSUFFICIENT SUPPLY5 ☐ OBSERVATION WELL5 ☐ ABANDONED, POOR QUALITY1 ☒ TEST HOLE
55-564 ☐ RECHARGE WELL7 ☐ UNFINISHED7 ☐ RECHARGE WELL7 ☐ UNFINISHED1 ☒ TEST HOLE
WATER USE1 ☑ DOMESTIC 5 ☐ COMMERCIALDRILLERS REMARKS:
WATER USE2 ☐ STOCK 6 ☐ MUNICIPALDRILLERS REMARKS:
WATER USE3 ☐ IRRIGATION 7 ☐ PUBLIC SUPPLYDRILLERS REMARKS:
WATER USE4 ☐ INDUSTRIAL 8 ☐ COOLING OR AIR CONDITIONINGDRILLERS REMARKS:
WATER USE☐ OTHER 9 ☐ NOT USEDDRILLERS REMARKS:
METHOD OF DRILLING1 ☐ CABLE TOOL 6 ☐ BORINGDRILLERS REMARKS:
METHOD OF DRILLING2 ☑ ROTARY (CONVENTIONAL) 7 ☐ DIAMONDDRILLERS REMARKS:
METHOD OF DRILLING3 ☐ ROTARY (REVERSE) 8 ☐ JETTINGDRILLERS REMARKS:
METHOD OF DRILLING4 ☐ ROTARY (AIR) 9 ☐ DRIVINGDRILLERS REMARKS:
METHOD OF DRILLING5 ☐ AIR PERCUSSIONDRILLERS REMARKS:
CONTRACTOR NAME OF WELL CONTRACTOR GIFT - Rock Drilling Co LTD 1119 ADDRESS RR #2 Jasper Oat Name Of Drilled On BONER Well Name Deseylniers SIGNATURE OF CONTRACTOR WELL Name DeseylinierDay 24 Mo. 6 YR 26 MINISTRY OF THE ENVIRONMENT COPYLICENSE NUMBERDATA SOURCE 58CONTRACTOR 59-62DATE RECEIVED 63-68
CONTRACTOR NAME OF WELL CONTRACTOR GIFT - Rock Drilling Co LTD 1119 ADDRESS RR #2 Jasper Oat Name Of Drilled On BONER Well Name Deseylniers SIGNATURE OF CONTRACTOR WELL Name DeseylinierDay 24 Mo. 6 YR 26 MINISTRY OF THE ENVIRONMENT COPYLICENSE NUMBERDATE OF INSPECTIONDATE OF INSPECTOR PSPECTOR PHODATE RECEIVED 63-68
CONTRACTOR NAME OF WELL CONTRACTOR GIFT - Rock Drilling Co LTD 1119 ADDRESS RR #2 Jasper Oat Name Of Drilled On BONER Well Name Deseylniers SIGNATURE OF CONTRACTOR WELL Name DeseylinierDay 24 Mo. 6 YR 26 MINISTRY OF THE ENVIRONMENT COPYLICENSE NUMBERREMARKS:P
CONTRACTOR NAME OF WELL CONTRACTOR GIFT - Rock Drilling Co LTD 1119 ADDRESS RR #2 Jasper Oat Name Of Drilled On BONER Well Name Deseylniers SIGNATURE OF CONTRACTOR WELL Name DeseylinierDay 24 Mo. 6 YR 26 MINISTRY OF THE ENVIRONMENT COPYLICENSE NUMBERFORM 7 MOE 07-091

MINISTRY OF THE ENVIRONMENT The Ontario Water Resources Act WATER WELL RE

CORD

GENERAL COLOURMOST COMMON MATERIALOTHER MATERIALSGENERAL DESCRIPTIONDEPTH/FEETFROMTO
RedSand02
GraySand Stone2100

FORM 7 MOE 07-091


  1. PM.

WATER WELL RECORD

31C16

GENERAL COLOURMOST COMMON MATERIALOTHER MATERIALSGENERAL DESCRIPTIONDEPTH - FEET
GENERAL COLOURMOST COMMON MATERIALOTHER MATERIALSGENERAL DESCRIPTIONFROMTO
greysoil Sandy Limestone02
greysoil Sandy Limestone2124
310002 02012421581
32
1210141521324354657580
2 SALTY 4 MINERAL
25-281 FRESH 3 SULPHUR29
25-282 SALTY 4 MINERAL
25-281 FRESH 3 SULPHUR29
30-332 SALTY 4 MINERAL34
30-33
30-33
PUMPING GIVE RATEGPMFEET1 CLEAR2 CLOUDY
RECOMMENDED PUMP TYPE ☐ SHALLOW ☐ DEEPRECOMMENDED PUMP SETTING43-45 FEETRECOMMENDED PUMPING46-49 FEET
50-53 GPM./FT. SPECIFIC CAPACITY
CONTRACTORNAME OF WELL CONTRACTORLICENCE NUMBER
CONTRACTORAir-Rock Drilling Co. Ltd.1119
CONTRACTORRR #2 Jesper OnT.
CONTRACTORWallace DesawniersLICENCE NUMBER
SIGNATURE OF CONTRACTORSUBMISSION DATE DAY 3 MO. 8 YR

MINISTRY OF THE ENVIRONMENT COPY


The Ontario Water Resources Act 31C16 WATER WELL RECORD

COUNTY OR DISTRICTTOWNSHIP, BOROUGH, CITY, TOWN, VILLAGECON. BLOCK TRACT SURVEY LLCLOT 25-27
North Elmsley5 1/21002
DATE COMPLETED
RR 3 South the Falle Ont.29.0378
772.999.55725.526DAY11YR
LOG OF OVERBURDEN AND BEDROCK MATERIALS (SEE INSTRUCTIONS)
GENERAL COLOURMOST COMMON MATERIALOTHER MATERIALSGENERAL DESCRIPTIONDEPTH, FEET
GENERAL COLOURMOST COMMON MATERIALOTHER MATERIALSGENERAL DESCRIPTIONFROMTO1
clay011
grey limestone1190
sandstone901441
31 00.11 02 0090215 0144218
32 10 14 15 21CASING & OPEN HOLE RECORDSCREENSIZES OF OPENING (SLOT NO.)DIAMETER 34-38 LENGTH 39-40
WATER FOUND AT - FEETKIND OF WATERINSIDE DARK INCREESWALL THANLESS INCHESDEPTH, FEETINCHESFEET
10-231 ♦ FRESH 3 ♦ SULPHUR 1206-111 ♦ STEEL 12FROM 10WATERIAL AND TYPEDEPTH TO TOP 41-44 OF OVEREN80
01392 ♦ SALTY 4 ♦ MINERAL06-112 ♦ GALVANIZED 3 ♦ CONCRETE 18813-16FEST
15-181 ♦ FRESH 3 ♦ SULPHUR 1907-181 ♦ STEEL 1918-22PLUGGING & SEALING RECORD
20-232 ♦ SALTY 4 ♦ MINERAL24-252 ♦ GALVANIZED 3 ♦ CONCRETE 18820-23DEPTH SET AT - FEET MATERIAL AND TYPE LEAD PACKER, ETC.
25-281 ♦ FRESH 3 ♦ SULPHUR 2924-251 ♦ STEEL 2627-30FROM 1014-17 ICEMENT GROUT
30-332 ♦ SALTY 4 ♦ MINERAL24-252 ♦ GALVANIZED 3 ♦ CONCRETE 18827-3010-13 MATERIAL AND TYPE LEAD PACKER, ETC.
30-331 ♦ FRESH 3 ♦ SULPHUR 3007-181 ♦ STEEL 2627-3018-21 ICEMENT GROUT14-17 ICEMENT GROUT
1 ♦ PUMP 2 ♦ BAILEFPUMPING RATE 11-14 DURATION OF PUMPING26-29 30-33 80
PUMPING TEST1 ♦ PUMP 2 ♦ BAILEF0009 00 30LOCATION OF WELL
1 19-21WATER LEVEL, END OF PUMPING 22-2425 WATER LEVELS DURING 15 MINUTES 30 MINUTES 29-311 19 PUMPING 2 ♦ RECOVERY 45 MINUTES 60 MINUTES 32-34IN DIAGRAM BELOW SHOW DISTANCES OF WELL FROM ROAD AND LOT LINE INDICATE NORTH BY ARROW
010 FEETFEET 025025 025FEET 025 025FEET 025 025FEETFEET
IF FLOORING GIVE RATE 58-61 GPMPUMP INTAKE SET AT 33-45 PUMPING RATE 43-45 RECOMMENDED PUMPING RATE 030 FEE030 030 PUMPING RATE 46-491 19 SMOKING PUMPING 0009 GPM
RECOMMENDED PUMP TYPE ♦ SHALLOW ♦ DEEPRECOMMENDED PUMP SETTING 030 FEE1 19 SMOKING PUMPING 0009 GPM
54 1 ♦ WATER SUPPLY 5 ♦ ABANDONED, INSUFFICIENT SUPPLY
FINAL STATUS OF WELL1 ♦ OBSERVATION WELL 2 ♦ OBSERVATION WELL 3 ♦ TEST HOLE 4 ♦ RECHARGE WELL 5 ♦ COMMERCIAL 7 ♦ UNFINISHED1 19 SMOKING PUMPING 0009 GPM
55-56 WATER USE1 ♦ DOMESTIC 2 ♦ STOCK 3 ♦ IRRIGATION 4 ♦ INDUSTRIAL 5 ♦ CABLE TOOL 6 ♦ BORING 7 ♦ DIAMOND 8 ♦ ROTARY (CONVENTIONAL) 9 ♦ JETTING 10 ♦ ORTARY (REVERSE) 11 ♦ ROBINING 12 ♦ ROTARY (REVERSE) 12 ♦ ROBINING 13 ♦ ROBINING 14 ♦ ROBINING 15 ♦ ROBINING 16 ♦ ROBINING 17 ♦ DIAMOND 18 ♦ JETTING 19 ♦ DRIVING 20 ♦ AIR PERCUSSIONDRILLERS REMARKS:
CONTRACTORNAME OF WELL CONTRACTORLICENCE NUMBEROFFICE USE ONLYDATACONTRACTORDATE RECEIVED
CONTRACTORAir-Coch Drilling Caltd1119111191119060428
CONTRACTORAIR-2 Jasper OnT1119DATE OF INSPECTIONINSPECTOR
CONTRACTORNAME OF DRILLER OR BORERLICENCE NUMBERREMARKS:
CONTRACTORWallace Desaunier1119①CSS.S8
CONTRACTORSIGNATURE OF CONTRACTORDISMISSION DATE

MINISTRY OF THE ENVIRONMENT COPY

FORM NO. 0506-4-77


WATER WE

LL RECORD

WATER WE

LL RECORD

LOG OF OVERBURDEN AND BEDROCK MATERIALS (SEE INSTRUCTIONS)
GENERAL COLOURMOST COMMON MATERIALOTHER MATERIALSGENERAL DESCRIPTIONDEPTH - FEET
GENERAL COLOURMOST COMMON MATERIALOTHER MATERIALSGENERAL DESCRIPTIONFROMTO
BRNSTANDSTONO129
31 0/1296/18
32 10 14 15 21 32 43 54 65 75 80
WATER RECORD
WATER FOUND AT - FEETKIND OF WATER
10-131 FRESH 3 SULPHUR
0/252 SALTY 4 MINERAL
15-181 FRESH 3 SULPHUR
2 SALTY 4 MINERAL
20-231 FRESH 3 SULPHUR 24
2 SALTY 4 MINERAL
25-281 FRESH 3 SULPHUR 29
2 SALT 4 MINERAL
30-331 FRESH 3 SULPHUR 34
2 SALT 4 MINERAL
51 CASING & OPEN HOLE RECORD
INSIDE DIAM. INCHESMATERIALWALL THICKNESS INCHESDEPTH - FEET
INSIDE DIAM. INCHESMATERIALWALL THICKNESS INCHESFROMTO
10-11STEEL 1218613-16
06GALVANIZED CONCRETE OPEN HOLE20-23
17-18STEEL 19
24-25STEEL 2627-30
GALVANIZED CONCRETE OPEN HOLE
SCREENSIZE(S) OF OPENING (SLOT NO.)DIAMETERLENGTH39-40
SCREENSIZE(S) OF OPENING (SLOT NO.)INCHESFEET
SCREENMATERIAL AND TYPEDEPTH TO TOP OF SCREEN41-4450
SCREENMATERIAL AND TYPEFEET
DEPTH SET AT - FEET FROMDEPTH SET AT - FEET TOMATERIAL AND TYPE (CEMENT GROUT LEAD PACKER, ETC.)
10-1314-17
18-2122-25
26-2930-3380
PUMPING TEST METHODPUMPING RATE11-14DURATION OF PUMPING
1 ☐ PUMP 2 ☑ BAILER0010 GPM01 15-16 HOURS 00 MIN17-18 MIN
PUMPING TESTSTATIC LEVELWATER LEVEL - END OF PUMPING25 WATER LEVELS DURING1 ☑ PUMPING 2 ☐ RECOVERY
PUMPING TEST19-2122-2415 MINUTES30 MINUTES45 MINUTES60 MINUTES
PUMPING TEST010 FEET060 FEET040 FEET060 FEET060 FEET060 FEET
PUMPING TESTIF FLOWING GIVE RATE38-41 GPMPUMP INTAKE SET AT 90 FEETWATER AT END OF TEST 1 ☐ CLEAR 2 ☑ CLOUDY
PUMPING TESTRECOMMENDED PUMP TYPE ☑ SHALLOW ☑ DEEPRECOMMENDED PUMP SETTING 43-45 FEETRECOMMENDED PUMPING RATE 0005 GPM
PUMPING TEST50-53
FINAL STATUS OF WELL 541 ☑ WATER SUPPLY 5 ☐ ABANDONED, INSUFFICIENT SUPPLY
FINAL STATUS OF WELL 542 ☐ OBSERVATION WELL 6 ☐ ABANDONED, POOR QUALITY
FINAL STATUS OF WELL 543 ☐ TEST HOLE 7 ☐ UNFINISHED
FINAL STATUS OF WELL 544 ☐ RECHARGE WELL
WATER USE 55-56 011 ☑ DOMESTIC 5 ☐ COMMERCIAL
WATER USE 55-56 012 ☐ STOCK 6 ☐ MUNICIPAL
WATER USE 55-56 013 ☐ IRRIGATION 7 ☐ PUBLIC SUPPLY
WATER USE 55-56 014 ☐ INDUSTRIAL 8 ☐ COOLING OR AIR CONDITIONING
WATER USE 55-56 01☐ OTHER 9 ☐ NOT USED
METHOD OF DRILLING 571 ☑ CABLE TOOL 6 ☐ BORING
METHOD OF DRILLING 572 ☐ ROTARY (CONVENTIONAL) 7 ☐ DIAMOND
METHOD OF DRILLING 573 ☐ ROTARY (REVERSE) 8 ☐ JETTING
METHOD OF DRILLING 574 ☐ ROTARY (AIR) 9 ☐ DRIVING
METHOD OF DRILLING 575 ☐ AIR PERCUSSION
CONTRACTORNAME OF WELL CONTRACTORLICENCE NUMBER
CONTRACTORHenry L. Davis707
CONTRACTORADDRESS
CONTRACTORAddison
CONTRACTORNAME OF DRILLER OR BORERLICENCE NUMBER
CONTRACTORGary Eagle
CONTRACTORSIGNATURE OF CONTRACTORSUBMISSION DATE
CONTRACTORDate of BirthDAY 6 MO. 5 YR.
OFFICE USE ONLYDATA SOURCE58CONTRACTOR59-62DATE RECEIVED63-6880
OFFICE USE ONLYDATA SOURCE11707160678
OFFICE USE ONLYDATE OF INSPECTIONINSPECTOR
OFFICE USE ONLYREMARKS:

MINISTRY OF THE ENVIRONMENT COPY

FORM NO. 0506-4-77


WATER W

ELL RECORD

COUNTY OR DISTRICTTOWNSHIP, BOROUGH CITY, TOWN, VILLAGECON. BLOCK. TRACT SURVEY. ETCLOT 27 029
DATE COMPLETED48-53
DAYM06 80 YR
74199.5 0425 5 8.6IV
LOG OF OVERBURDEN AND BEDROCK MATERIALS (SEE INSTRUCTIONS)
GENERAL COLOURMOST COMMON MATERIALOTHER MATERIALSGENERAL DESCRIPTIONDEPTH - FEET
GENERAL COLOURMOST COMMON MATERIALOTHER MATERIALSGENERAL DESCRIPTIONFROMTO
newingdotted0071
2oyLimestems71112
31 0071 24 0112215
32 10 14 15 21 32 4354657A
WATER RECORD
WATER FOUND AT - FEETKIND OF WATER
10-131 FRESH 3 ☐ SULPHUR
0/102 ☐ SALTY 4 ☐ MINERAL
15-181 ☐ FRESH 3 ☐ SULPHUR
20-232 ☐ SALTY 4 ☐ MINERAL
25-281 ☐ FRESH 3 ☐ SULPHUR
30-331 ☐ FRESH 3 ☐ SULPHUR
2 ☐ SALTY 4 ☐ MINERAL
51 CASING & OPEN HOLE RECORD
INSIDE DIAM INCHESMATERIALWALL THICKNESS INCHESDEPTH - FEET
INSIDE DIAM INCHESMATERIALWALL THICKNESS INCHESFROMTO
1213-16
1 ☐ STEEL
1 ☐ GALVANIZED
1 ☐ CONCRETE
4 ☐ OPEN HOLE
17-101920-23
1 ☐ STEEL
2 ☐ GALVANIZED
2 ☐ CONCRETE
4 ☐ OPEN HOLE
24-251 ☐ STEEL2627-30
2 ☐ GALVANIZED
3 ☐ CONCRETE
4 ☐ OPEN HOLE
SIZE(S) OF OPENING (SLOT NO.) 31-33DIAMETER 34-38 INCHESLENGTH 39-40 FEET
MATERIAL AND TYPEDEPTH TO TOP OF SCREEN41-44 FEET
DEPTH SET AT - FEETMATERIAL AND TYPE (CEMENT GROUT LEAD PACKER, ETC.)
FROMTOMATERIAL AND TYPE (CEMENT GROUT LEAD PACKER, ETC.)
10-1314-17
18-2122-25
26-2930-3380
PUMPING TEST METHOD10PUMPING RATE11-14DURATION OF PUMPING
PUMPING TEST1 ☐ PUMP 2 ☒ BAILER00/0GPM0115-16 HOURS ☐ HOURS ☐ HOURS
PUMPING TESTSTATIC LEVELWATER LEVEL END OF PUMPING25 WATER LEVELS DURING1 ☒ PUMPING 2 ☐ RECOVERY
PUMPING TEST19-21 FEET22-24 FEET15 MINUTES30 MINUTES45 MINUTES60 MINUTES
PUMPING TEST1F FLOWING GIVE RATE38-41 GPMFEETFEETFEETFEET
PUMPING TESTRECOMMENDED PUMP TYPE ☐ SHALLOW ☑ DEEPPUMP INTAKE SET AT 43-45 PUMP SETTINGFEETWATER AT END OF TEST 1 ☐ CLEAR 2 ☐ CLOUDY
PUMPING TEST50-5346-49 GPM
FINAL STATUS OF WELL1 ☐ WATER SUPPLY 5 ☐ ABANDONED. INSUFFICIENT SUPPLY
FINAL STATUS OF WELL2 ☐ CBSERVATION WELL 6 ☐ ABANDONED. POOR QUALITY
FINAL STATUS OF WELL3 ☐ TEST HOLE 7 ☐ UNFINISHED
FINAL STATUS OF WELL4 ☐ RECHARGE WELL
WATER USE1 ☑ DOMESTIC 5 ☐ COMMERCIAL
WATER USE2 ☐ STOCK 6 ☐ MUNICIPAL
WATER USE3 ☐ IRRIGATION 7 ☐ PUBLIC SUPPLY
WATER USE4 ☐ INDUSTRIAL 8 ☐ COOLING OR AIR CONDITIONING
WATER USE☐ OTHER 9 ☐ NOT USED
METHOD OF DRILLING1 ☑ CABLE TOOL 6 ☐ BORING
METHOD OF DRILLING2 ☐ ROTARY (CONVENTIONAL) 7 ☐ DIAMOND
METHOD OF DRILLING3 ☐ ROTARY (REVERSE) 8 ☐ JETTING
METHOD OF DRILLING4 ☐ ROTARY (AIR) 9 ☐ DRIVING
METHOD OF DRILLING5 ☐ AIR PERCUSSION
CONTRACTORNAME OF WELL CONTRACTORLICENCE NUMBER
CONTRACTORAddress1707
CONTRACTORSignatureLICENSE NUMBER
CONTRACTORDayLICENCE NUMBER
CONTRACTORMonthDay
CONTRACTORMonthLICENCE NUMBER
CONTRACTORDateDay

MINISTRY OF THE ENVIRONMENT COPY

OFFICE USE ONLYDATA SOURCE58CONTRACTOR59.62DATE RECEIVED21078080
OFFICE USE ONLYDATE OF INSPECTIONINSPECTOR
OFFICE USE ONLYREMARKSCSS.ES

FORM NO. 0506----4----77 FORM 7


WATER WELL

RECORD

LOG OF OVERBURDEN AND BEDROCK MATERIALS (SEE INSTRUCTIONS)
GENERAL COLOURMOST COMMON MATERIALOTHER MATERIALSGENERAL DESCRIPTIONDEPTH TESTFROMTO
0114
WATER RECORD WATER FOUND AT TEST 0112
CASING & OPEN HOLE RECORD MATERIAL 06 STEEL CONTAINER OPEN HOLE STEEL CONTAINER OPEN HOLE STEEL CONTAINER OPEN HOLE SCREEN MATERIAL AND TYPE DEPT. TOP OF WINDOW
PLUGGING & SEALING RECORD DEFENSE AT TEST MATERIAL AND TYPE DEPT. TOP OF WINDOW
PUMPING TEST PUMPING MATE 0010 STATIC LINE WATER LEVEL DURING 020 WATER LEVEL DURING 025 WATER LEVEL DURING 025 WATER LEVEL DURING 025 RECOMMENDED PUMP TYPE SHallow OCEAN RECOMMENDED PUMP TYPE Shallow OCEAN RECOMMENDED PUMP TYPE Cloudy BEETTING RECOMMENDED PUMP TYPE Cloudy BEETTING RECOMMENDED PUMP TYPE Cloudy BEETTING
FINAL STATUS OF WELL WATER SUPPLY OBSERVATION WELL TEST Hole RECARRIAGE WILL DOMESTIC SKY IRRIGATION INDUSTRIAL OFFER EARLY DOOR BORING DOTRY (CONVENTIONAL) DOTRY (REVERSE) DOTRY (REVERSE) DOTRY (DRILLING) AIR PEROXIDUS BORING DOTRY (CONVENTIONAL) DOTRY (REVERSE) DOTRY (DRILLING) AIR PEROXIDUS DRILLING REHEARS
METHOD OF DRILLING EARLY DOOR BORING DOTRY (CONVENTIONAL) DOTRY (REVERSE) DOTRY (DRILLING) AIR PEROXIDUS BORING DOTRY (CONVENTIONAL) DOTRY (REVERSE) DOTRY (DRILLING) AIR PEROXIDUS DRILLING REHEARS
OFFICE USE ONLY NAME OF WELL CONTRACTOR LICENSE NUMBER DATA SOURCE 1707 DATE OF INSERTION INSPECTOR REMARKS CSS.ES

MINISTRY OF THE ENVIRONMENT COPY


WATER WELL

RECORD

3508204

COUNTY OR DISTRICTTOWNSHIP, BOROUGH CITY, TOWN VILLAGECON BLOCK TRACT SURVEY ETCLOT 25-87
LaurashkMontague Smith Falls OST630
DATE COMPLETED 48-53
DAY 9 NO. 6 18-21
INGRECEIPTNC ELEVATIONMAIN CODEN
LOG OF OVERBURDEN AND BEDROCK MATERIALS (SEE INSTRUCTIONS)
GENERAL COLOURMOGT COMMON MATERIALOTHER MATERIALSGENERAL DESCRIPTIONDEPTH FEET
FROMTO
clay Stones.012
gravel1214
gray Brown Sandstone1490
31
3210 14 15 2151 CASING & OPEN HOLE15 17 18 19188022SCREENDIAMETR 31-33LENGTH 39-40 FEET
41WATER RECORD AT - FEETKIND OF WATERINSIDE DARK INCHESMATERIAL WALL SLICANZESSINCHESDEPTH FEETMATERIAL AND TYPEINCHES DEPTH TO TOP OF SCREEN41-48 FEET
6510-13 1 □ FRESH 3 □ SULPHUR 10 □ SALTY 4 □ MINERALS 6 □ GAS10-11 1 □ STEEL 12 □ GALVANIZED 3 □ CONCRETE 4 □ OPEN HOLE 5 □ PLASTIC1 □ STEEL 12 □ GALVANIZED 3 □ CONCRETE 4 □ OPEN HOLE 5 □ PLASTICFROM13-1610-13PLUGGING & SEALING RECORD
13-18 1 □ FRESH 3 □ SULPHUR 10 □ SALTY 4 □ GAS10-13 1 □ FRESH 3 □ SULPHUR 10 □ SALTY 4 □ GAS1 □ STEEL 12 □ GALVANIZED 3 □ CONCRETE 4 □ OPEN HOLE 5 □ PLASTIC1 □ STEEL 12 □ GALVANIZED 3 □ CONCRETE 4 □ OPEN HOLE 5 □ PLASTIC1 18820-2327-3010-1318-2110-1218-2110-12
20-23 1 □ FRESH 3 □ SULPHUR 24 □ SALTY 4 □ MINERALS 6 □ GAS1 □ STEEL 12 □ GALVANIZED 3 □ CONCRETE 4 □ OPEN HOLE 5 □ PLASTIC1 □ STEEL 12 □ GALVANIZED 3 □ CONCRETE 4 □ OPEN HOLE 5 □ PLASTIC1 18820-2327-3010-1318-2110-1218-2110-1218-21
23-28 1 □ FRESH 3 □ SULPHUR 29 □ SALTY 4 □ MINERALS 6 □ GAS1 □ STEEL 12 □ GALVANIZED 3 □ CONCRETE 4 □ OPEN HOLE 5 □ PLASTIC1 □ STEEL 12 □ GALVANIZED 3 □ CONCRETE 4 □ OPEN HOLE 5 □ PLASTIC1 18820-2327-3010-1318-2110-1218-2110-1218-21
30-33 1 □ FRESH 3 □ SULPHUR 34 □ GAS1 □ STEEL 12 □ GALVANIZED 3 □ CONCRETE 4 □ OPEN HOLE 5 □ PLASTIC1 □ STEEL 12 □ GALVANIZED 3 □ CONCRETE 4 □ OPEN HOLE 5 □ PLASTIC1 18820-2327-3010-1318-2110-1218-2110-1218-21
PUMPING TEST METHOD10 14 15 16 DURATION OF PUMPING
711 □ PUMP 2 □ BAILERPUMPING RATE 20 GPM1 18-16 17-18 HOURS1 17-16 WINSLOCATION OF WELL
PUMPING TESTSTATIC LEVELWATER LEVEL PUMPING25 WATER LEVELS DURING 1 □ PUMPING □ RECOVERYIN DIAGRAM BELOW SHOW DISTANCES OF WELL FROM ROAD AND LOT LINE INDICATE NORTH BY ARROW
PUMPING TEST19-21 2 40 FEET22-24 15 MINUTES 26-28 40 FEET30 MINUTES 29-31 40 FEET45 MINUTES 28-34 40 FEET60 MINUTES 33-37 40 FEET1 □ PUMPING □ RECOVERYN. 9
PUMPING TEST17 FLOWING GIVE RATE38-41 38-41 PUMP INTAKE SET ATWATER AT END OF TEST 1 □ CLEAR 3 □ CLOUDY1 □ PUMPING □ RECOVERY
PUMPING TESTRECOMMENDED PUMP TYPE43-48 PUMP SETTING 50 FEETRECOMMENDED PUMPING RATE 20 GPM1 □ PUMPING □ RECOVERY
PUMPING TEST10-33 □ SHALLOW □ DEEPRECOMMENDED PUMPING RATE 20 GPM66-69 64-69 FLOWING RATE 20 GPM1 □ PUMPING □ RECOVERY
FINAL STATUS OF WELL54 1 □ WATER SUPPLY 2 □ OBSERVATION WELL 3 □ TEST HOLE 4 □ RECHARGE WELL6 □ ABANDONED INSUFFICIENT SUPPLY 8 □ ABANDONED POOR QUALITY 7 □ UNFINISHED 9 □ DEWATERING1 □ PUMPING □ RECOVERY
WATER USE55-56 1 □ DOMESTIC 3 □ STOCK 4 □ IRIGATION 5 □ PUBLIC SUPPLY 6 □ INDUSTRIAL 7 □ COOLING OR AIR CONDITIONING 8 □ OTHER 9 □ NOT USED1 □ PUMPING □ RECOVERY
METHOD OF CONSTRUCTION57 1 □ CABLE TOOL 2 □ ROTARY (CONVENTIONAL) 3 □ ROTARY (REVERSE) 4 □ ROTARY (AIR) 5 □ AIR PERCUSSION 6 □ DIGGING 7 □ DIPPING 8 □ OTHER1 □ PUMPING □ RECOVERY
CONTRACTORNAME OF WELL CONTRACTORWELL CONTRACTOR'S LICENSE NUMBEROFFICE USE ONLYDRILLERS REMARKSDATE CONTRACTORDATE RECEIVED11015DATE RECEIVED JAN 08 1988
CONTRACTORAir-Rock Drilling Gilt O1117OFFICE USE ONLYDRILLERS REMARKSDATE CONTRACTORDATE RECEIVED11015DATE RECEIVED JAN 08 1988
CONTRACTORRip # 2 Taper On T1117OFFICE USE ONLYDRILLERS REMARKSDATE CONTRACTORDATE RECEIVED11015DATE RECEIVED JAN 08 1988
CONTRACTORNAME OF WELL TECHNICIANWELL TECHNICIAN'S LICENSE NUMBER1117OFFICE USE ONLYREMARKSINSPECTOR
CONTRACTORBarracel Galloway1117OFFICE USE ONLYREMARKSINSPECTOR
CONTRACTORSIGNATURE OF TECHNICIAN/CONTRACTORSUBMISSION DATE70 12 18 20OFFICE USE ONLYREMARKSINSPECTOR

MINISTRY OF THE ENVIRONMENT COPY

FORM NO. 0506 (11/86) FORM 9


WATER

WATER RESOURCES ACT ELL RECORD

GENERAL COLOURMOST COMMON MATERIALOTHER MATERIALSGENERAL DESCRIPTIONDEPTH - FEET
GENERAL COLOURMOST COMMON MATERIALOTHER MATERIALSGENERAL DESCRIPTIONFROMTO
clay x-gravel028
graysbondstone28158
31
32
1 210 14 1521 32 4354657580
WATER FOUND AT - FEETKIND OF WATER
10-131 ☑ FRESH 3 ☐ SJLPHUR 2 ☐ SALTY 4 ☐ MINERALS 6 ☐ GAS
15-181 ☐ FRESH 3 ☐ SJLPHUR 2 ☐ SALTY 4 ☐ MINERALS 6 ☐ GAS
20-231 ☐ FRESH 3 ☐ SULPHUR 2 ☐ SALTY 4 ☐ MINERALS 6 ☐ GAS
25-281 ☐ FRESH 3 ☐ SULPHUR 2 ☐ SALTY 4 ☐ MINERALS
30-331 ☐ FRESH 3 ☐ SULPHUR 2 ☐ SALTY 4 ☐ MINERALS 6 ☐ GAS
51 CASING & OPEN HOLE RECORD
INSIDE DIAM INCHESMATERIALWALL THICKNESS INCHESDEPTH - FEET
INSIDE DIAM INCHESMATERIALWALL THICKNESS INCHESFROMTO
10-1112 STEEL13-16
10-112 ☐ GALVANIZED
10-113 ☐ CONCRETE
10-114 ☐ OPEN HOLE
10-115 ☐ PLASTIC
17-181920-23
17-181 ☐ STEEL
17-182 ☐ GALVANIZED
17-183 ☐ CONCRETE
17-184 ☐ OPEN HOLE
17-185 ☐ PLASTIC
24-252627-30
24-251 ☐ STEEL
24-252 ☐ GALVANIZED
24-253 ☐ CONCRETE
24-254 ☐ OPEN HOLE
24-255 ☐ PLASTIC
SCREENSIZE(S) OF OPENING (SLOT NO.) 31-33DIAMETER 34-38LENGTH 39-40
SCREENSIZE(S) OF OPENING (SLOT NO.) 31-33INCHESFEET
SCREENMATERIAL AND TYPEDEPTH TO TOP OF SCREEN 41-44 FEET3D
DEPTH SET AT - FEETMATERIAL AND TYPE (CEMENT GROUT LEAD PACKER ETC.)
FROMTOMATERIAL AND TYPE (CEMENT GROUT LEAD PACKER ETC.)
10-1214-17
10-2122-25
26-2930-3380
PUMPING TEST METHOD 10PUMPING RATE 11-14DURATION OF PUMPING
1 2 PUMP 2 ☐ BAILER12 GPM1 15-16 HOURS 17-18 MINS
PUMPING TESTSTATIC LEVELWATER LEVEL END OF PUMPING25 WATER LEVELS DURING1 2 ☐ PUMPING RECOVERY
PUMPING TEST19-21 FEET22-24 FEET15 MINUTES 26-28 FEET30 MINUTES 29-31 FEET45 MINUTES 32-34 FEET
PUMPING TESTIF FLOWING, GIVE RATE 38-41 GPMPUMP INTAKE SET AT FEETWATER AT END OF TEST 1 CLEAR 2 ☐ CLOUDY
PUMPING TESTRECOMMENDED PUMP TYPE ☐ SHALLOW ☑ DEEPRECOMMENDED PUMP SETTING 60 FEETRECOMMENDED PUMPING RATE 12 GPM
FINAL STATUS OF WELL1 ☑ WATER SUPPLY $ ☐ ABANDONED, INSUFFICIENT SUPPLY
FINAL STATUS OF WELL2 ☐ OBSERVATION WELL $ ☐ ABANDONED POOR QUALITY
FINAL STATUS OF WELL3 ☐ TEST HOLE 7 ☐ UNFINISHED
FINAL STATUS OF WELL4 ☐ RECHARGE WELL ☐ DEWATERING
WATER USE1 ☑ DOMESTIC $ ☐ COMMERCIAL
WATER USE2 ☐ STOCK $ ☐ MUNICIPAL
WATER USE3 ☐ IRRIGATION 7 ☐ PUBLIC SUPPLY
WATER USE4 ☐ INDUSTRIAL $ ☐ COOLING OR AIR CONDITIONING
WATER USE☐ OTHER $ ☐ NOT USED
METHOD OF CONSTRUCTION1 ☐ CABLE TOOL $ ☐ BORING
METHOD OF CONSTRUCTION2 ☐ ROTARY (CONVENTIONAL) $ ☐ DIAMOND
METHOD OF CONSTRUCTION3 ☐ ROTARY (REVERSE) $ ☐ JETTING
METHOD OF CONSTRUCTION4 ☐ ROTARY (AIR) $ ☐ DRIVING
METHOD OF CONSTRUCTION5 ☑ AIR PERCUSSION ☐ DIGGING ☐ OTHER
OFFICE USE ONLYDATA SOURCE58CONTRACTOR 59-62DATE RECEIVED JAN 18 199163.6880
OFFICE USE ONLYDATE OF INSPECTIONINSPECTOR
OFFICE USE ONLYREMARKS

MINISTRY OF THE ENVIRONMENT COPY

FORM NO. 0506 (11/86) FORM 9


Print only in spaces provided Mark correct box with a checkmark, where applicable.

3513519

Municipality Cons. 35007 CO 10 14 15

N 06 22 23 24

LOG OF OVERBURDEN AND BEDROCK MATERIALS (see instructions)
General colourMost common materialOther materialsGeneral descriptionDepth - feet
General colourMost common materialOther materialsGeneral descriptionFromTo
Sandy soil05
grainSandy limestone585
Sandstone85165
31
32
41 WATER RECORD
Water found at - feetKind of water
10-13Fresh 3 ☐ Sulphur 14 2 ☐ Salty 4 ☑ Minerals Gas
15-181 ☐ Fresh 3 ☐ Sulphur 49 2 ☐ Salty 4 ☐ Minerals Gas
20-231 ☐ Fresh 3 ☐ Sulphur 24 2 ☐ Salty 4 ☐ Minerals Gas
25-281 ☐ Fresh 3 ☐ Sulphur 29 2 ☐ Salty 4 ☐ Minerals Gas
30-331 ☐ Fresh 3 ☐ Sulphur 34 2 ☐ Salty 4 ☐ Minerals Gas
51 CASING & OPEN HOLE RECORD
Inside diam inchesMaterialWall thickness inchesDepth - feet
Inside diam inchesMaterialWall thickness inchesFromTo
10-111 ☐ Steel 12 2 ☐ Galvanized 3 ☐ Concrete 4 ☐ Open hole 5 ☐ Plastic188013-16
17-181 ☐ Steel 19 2 ☐ Galvanized 3 ☐ Concrete 4 ☐ Open hole 5 ☐ Plastic020-23
24-251 ☐ Steel 26 2 ☐ Galvanized 3 ☐ Concrete 4 ☐ Open hole 5 ☐ Plastic2027-30
SCREENSizes of opening (Slot No.) 31-33Diameter 34-38 inchesLength 39-40 feet
SCREENMaterial and typeDepth at top of screen 41-44 feet30
61 PLUGGING & SEALING RECORD
☐ Annular space ☐ Abandonment
Depth set at - feetMaterial and type (Cement grout, bentonite, etc.)
FromToMaterial and type (Cement grout, bentonite, etc.)
2010-1311-17cement grout
18-2122-25
26-2930-3380
71Pumping test method 10 ☐ Pump 2 ☐ BailerPumping rate 100 GPMDuration of pumping 1 15-16 Hours 17-18 Mins
PUMPING TESTStatic levelWater level end of pumping25 Water levels during 1 ☐ Pumping 2 Recovery
PUMPING TEST19-21 42 feet22-24 80 feet15 minutes 26-28 42 feet30 minutes 29-31 42 feet45 minutes 32-34 42 feet60 minutes 35-37 42 feet
PUMPING TESTIf flowing give rate 38-41 GPMPump intake set at feetWater at end of test ☐ Clear ☑ Cloudy
PUMPING TESTRecommended pump type ☐ Shallow ☑ DeepRecommended pump setting 80 feetRecommended pump rate 100 GPM
PUMPING TEST50-53
FINAL STATUS OF WELL54
☑ Water supply5 ☐ Abandoned, insufficient supply9 ☐ Unfinished
2 ☐ Observation well6 ☐ Abandoned, poor quality10f ☐ Replacement well
3 ☐ Test hole7 ☐ Abandoned (Other)
4 ☐ Recharge well8 ☐ Dewatering
WATER USE55-56
☑ Domestic5 ☐ Commercial9 ☐ Not use
2 ☐ Stock6 ☐ Municipal10 ☐ Other ........................................................
3 ☐ Irrigation7 ☐ Public supply
4 ☐ Industrial8 ☐ Cooling & air conditioning
METHOD OF CONSTRUCTION
1 ☐ Cable tool5 ☑ Air percussion9 ☐ Driving
2 ☐ Rotary (conventional)6 ☐ Boring10 ☐ Digging
3 ☐ Rotary (reverse)7 ☐ Diamond11 ☐ Other ........................................................
4 ☐ Rotary (air)8 ☐ Jetting
MINISTRY USE ONLYData source58Contractor 111959-62Date received OCT 09 200163-6880
MINISTRY USE ONLYDate of inspectionInspector
MINISTRY USE ONLYRemarks

2 - MINISTRY OF THE ENVIRONMENT COPY

0506 (07/00) Front Form 9


Print only in spaces provided. Mark correct box with a checkmark, where applicable.

3513956

Municipality Con. 35007 CON 06 10 14 15 22 23 24

LOG OF OVERBURDEN AND BEDROCK MATERIALS (see instructions)
General colourMost common materialOther materialsGeneral descriptionDepth - feet
General colourMost common materialOther materialsGeneral descriptionFromTo
rocky earth02
grey limestone2141
31
32
41 WATER RECORD
Water found at - feetKind of water
10-131 ☐ Fresh 3 ☐ Sulphur 14
1362 ☐ Salt 4 ☐ Minerals
1 ☐ Fresh 3 ☐ Sulphur 19
15-182 ☐ Salty 6 ☐ Gas
20-231 ☐ Fresh 3 ☐ Sulphur 24
2 ☐ Salty 6 ☐ Gas
25-281 ☐ Fresh 3 ☐ Sulphur 29
2 ☐ Salty 6 ☐ Gas
30-331 ☐ Fresh 3 ☐ Sulphur 34
2 ☐ Salty 6 ☐ Gas
51 CASING & OPEN HOLE RECORD
Inside diam inchesMaterialWall thickness inchesDepth - feet
Inside diam inchesMaterialWall thickness inchesFromTo
10-111 Steel 12 Galvanized188013-16
643 Concrete188013-16
644 Open hole188013-16
645 Plastic188013-16
17-181 Steel 19 Galvanized020-23
833 Concrete020-23
834 Open hole020-23
835 Plastic020-23
24-251 Steel 26 Galvanized20141
62 Galvanized20141
63 Concrete20141
64 Open hole20141
65 Plastic20141
SCREENSizes of opening (Slot No.) 31-33Diameter 34-38 inchesLength 39-40 feet
SCREENMaterial and typeDepth at top of screen 41-44 feet30
71Pumping test method 10 1 Pump 2 ☐ BailerPumping rate 11-14 50 GPMDuration of pumping 15-16 Hours 17-18 Mins
PUMPING TESTStatic levelWater level end of pumping25 Water levels during 1 ☐ Pumping 2 Recovery
PUMPING TEST19-21 25 feet22-24 130 feet15 minutes 26-28 feet30 minutes 29-31 feet45 minutes 32-34 feet60 minutes 35-37 feet
PUMPING TESTIf flowing give rate 38-41 GPMPump intake set at feetWater at end of test ☐ Clear ☑ Cloudy
PUMPING TESTRecommended pump type ☐ Shallow ☑ DeepRecommended pump setting 130 feetRecommended pump rate 50 GPM
PUMPING TEST50-53
61 PLUGGING & SEALING RECORD
Annular space ☐ Abandonment
Depth set at - feetMaterial and type (Cement grout, bentonite, etc.)
FromToMaterial and type (Cement grout, bentonite, etc.)
10-1314-17Cement grout
222-25
18-21
26-2930-3380
FINAL STATUS OF WELL 1FINAL STATUS OF WELL ☑ Water supply54 554 ☐ Abandoned, insufficient supply54 9 ☐ Unfinished
2☐ Observation well6☐ Abandoned, poor quality10 ☐ Replacement well
3☐ Test hole7☐ Abandoned (Other)
4☐ Recharge well8☐ Dewatering
WATER USE55-56
1☑ Domestic5☐ Commercial9 ☐ Not use
2☐ Stock6☐ Municipal10 ☐ Other
3☐ Irrigation7☐ Public supply
4☐ Industrial8☐ Cooling & air conditioning
METHOD OF CONSTRUCTION
1☐ Cable tool5☑ Air percussion9 ☐ Driving
2☐ Rotary (conventional)6☐ Boring10 ☐ Digging
3☐ Rotary (reverse)7☐ Diamond11 ☐ Other
4☐ Rotary (air)8☐ Jetting
Name of Well Contractor Aikoch D. WigoldtWell Contractor's Licence No. 1119
Address Re 1 Richmond, D.T.
Name of Well Technician Ken DesauniersWell Technician's Licence No. T4
Signature of Technician/ContractorSubmission date 38/10/2023

2 - MINISTRY OF THE ENVIRONMENT COPY

MINISTRY USE ONLYData source58Contractor 111959-62Date received NOV 04 200263-6880
MINISTRY USE ONLYDate of inspectionInspector
MINISTRY USE ONLYRemarks

0506 (07/00) Front Form 9


General ColourMost Common MaterialOther MaterialsGeneral DescriptionDepth (m/f) FromDepth (m/f) To
BrownSand05
GrayLimestone323
GrayLimestone2280
GrayBrown Sandstone80148

CHloren Residuals Collected And Recorded At 125 Miligram s Per liter

Annular Space
Depth Set at (m/ft) FromToType of Sealant Used (Material and Type)Volume Placed (m3/ft3)
022Aitch Group3 Bass
Method of ConstructionWell/Use
☐ Cable Tool ☐ Rotary (Conventional) ☐ Rotary (Reverse) ☐ Boring ☒ Air percussion ☐ Other, specify ________☐ Diamond ☐ Jetting ☐ Driving ☐ Digging☐ Public ☒ Domestic ☐ Livestock ☐ Irrigation ☐ Industrial ☐ Other, specify ________☐ Commercial ☐ Municipal ☐ Test Hole ☐ Cooling & Air Conditioning☐ Not used ☐ Dewatering ☐ Monitoring
Construction Record - CasingStatus of Well
Inside Diameter (cm/in)Open Hole OR Material (Galvanized, Fibreglass, Concrete, Plastic, Steel)Wall Thickness (cm/in)Depth (m/ft) FromTo☒ Water Supply ☐ Replacement Well ☐ Test Hole ☐ Recharge Well ☐ Dewatering Well ☐ Observation and/or Monitoring Hole ☐ Alteration (Construction) ☐ Abandoned, Insufficient Supply ☐ Abandoned, Poor Water Quality ☐ Abandoned, other, specify ☐ Other, specify ________
6/8Stcc/l188022☒ Water Supply ☐ Replacement Well ☐ Test Hole ☐ Recharge Well ☐ Dewatering Well ☐ Observation and/or Monitoring Hole ☐ Alteration (Construction) ☐ Abandoned, Insufficient Supply ☐ Abandoned, Poor Water Quality ☐ Abandoned, other, specify ☐ Other, specify ________
☒ Water Supply ☐ Replacement Well ☐ Test Hole ☐ Recharge Well ☐ Dewatering Well ☐ Observation and/or Monitoring Hole ☐ Alteration (Construction) ☐ Abandoned, Insufficient Supply ☐ Abandoned, Poor Water Quality ☐ Abandoned, other, specify ☐ Other, specify ________
☒ Water Supply ☐ Replacement Well ☐ Test Hole ☐ Recharge Well ☐ Dewatering Well ☐ Observation and/or Monitoring Hole ☐ Alteration (Construction) ☐ Abandoned, Insufficient Supply ☐ Abandoned, Poor Water Quality ☐ Abandoned, other, specify ☐ Other, specify ________
Construction Record - Screen☒ Water Supply ☐ Replacement Well ☐ Test Hole ☐ Recharge Well ☐ Dewatering Well ☐ Observation and/or Monitoring Hole ☐ Alteration (Construction) ☐ Abandoned, Insufficient Supply ☐ Abandoned, Poor Water Quality ☐ Abandoned, other, specify ☐ Other, specify ________
Outside Diameter (cm/in)Material (Plastic, Galvanized, Steel)Slot No.Depth (m/ft) FromTo☒ Water Supply ☐ Replacement Well ☐ Test Hole ☐ Recharge Well ☐ Dewatering Well ☐ Observation and/or Monitoring Hole ☐ Alteration (Construction) ☐ Abandoned, Insufficient Supply ☐ Abandoned, Poor Water Quality ☐ Abandoned, other, specify ☐ Other, specify ________
☒ Water Supply ☐ Replacement Well ☐ Test Hole ☐ Recharge Well ☐ Dewatering Well ☐ Observation and/or Monitoring Hole ☐ Alteration (Construction) ☐ Abandoned, Insufficient Supply ☐ Abandoned, Poor Water Quality ☐ Abandoned, other, specify ☐ Other, specify ________
☒ Water Supply ☐ Replacement Well ☐ Test Hole ☐ Recharge Well ☐ Dewatering Well ☐ Observation and/or Monitoring Hole ☐ Alteration (Construction) ☐ Abandoned, Insufficient Supply ☐ Abandoned, Poor Water Quality ☐ Abandoned, other, specify ☐ Other, specify ________
Water DetailsHole Diameter
Water found at Depth 138 (m/ft) ☐ GasKind of Water: ☐ Fresh ☒ Untested ☐ Other, specify ________Depth (m/ft) FromDiameter (cm/in)
Water found at Depth (m/ft) ☐ GasKind of Water: ☐ Fresh ☐ Untested ☐ Other, specify ________0221011
Water found at Depth (m/ft) ☐ GasKind of Water: ☐ Fresh ☐ Untested ☐ Other, specify ________221481611
Well Contractor and Well Technician Information
Business Name of Well Contractor 382845 On LimitedWell Contractor's Licence No. 6151615
Business Address (Street Number/Name) 446 Huray Rd BochvilleMunicipality Elzebald�
Province OntPostal Code HV5F4Business E-mail Address
Bus Telephone No. (inc. area code)Name of Well Technician (Last Name, First Name)
6131926+284Date Submitted
Well Technician's Licence No. 10-144Signature of Technician and/or Contractor
0506E (2018/12)
Results of Well Yield Testing
After test of well yield, water was: ☒ Clear and sand free ☐ Other, specify ________Draw DownRecovery
After test of well yield, water was: ☒ Clear and sand free ☐ Other, specify ________Time (min)Water Level (m/ft)Time (min)
After test of well yield, water was: ☒ Clear and sand free ☐ Other, specify ________Static Level17
If pumping discontinued, give reason: ☑1181
Pump intake set at (m/ft) 140 Ft2182
Pumping rate (l/min/GPM) 20 GPM3183
Duration of pumping 1 hrs + 2 min4184
Duration of pumping 1 hrs + 2 min5165
Final water level end of pumping (m/ft) 16 Ft101810
If flowing give rate (l/min/GPM) 100 Ft151815
If flowing give rate (l/min/GPM) 100 Ft201820
Recommended pump depth (m/ft) 100 Ft251825
Recommended pump rate (l/min/GPM) 15 GPM301830
Well production (l/min/GPM) 20 GPM401840
Well production (l/min/GPM) 20 GPM501850
Disinfected? ☒ Yes ☐ No 125 MPL601860

Comments:

Well owner's information package delivered ☒ Yes ☐ NoDate Package Delivered 2020 1128Ministry Use Only
Well owner's information package delivered ☒ Yes ☐ NoDate Package Delivered 2020 1128Audit No. Z325275
Well owner's information package delivered ☒ Yes ☐ NoDate Work Completed 2020 1128JAN 26 2021
Well owner's information package delivered ☒ Yes ☐ NoDate Work Completed 2020 1128Received

Ministry's Copy

$ \textcircled{c} $Queen's Printer for Ontario, 2018


ATTACHMENT G

Laboratory Certificate of Analysis – TP2-9


Your Project #: SMITH FAL Site Location: SMITH FA Your C.O.C. #: N/A

LS SNOW DUMP LLS

Attention: Gib McIntee

St Lawrence Testing & Inspection Co Ltd

814 Second St PO Box 997 Cornwall, ON CANADA

W K6H 5V1

Report Data Rep

te:2024/12/27 port #:R8461482 Version:1-Final

CERTIFICATE OF ANALYSIS

BUREAU VERITAS JOB #: C4BK543

Received: 2024/12/17, 10:02

Sample Matrix: Soil # Samples Received: 10

AnalysesQuantityDate ExtractedDate AnalyzedLaboratory MethodAnalytical Method
Methylnaphthalene Sum10N/A2024/12/23CAM SOP-00301EPA 8270D m
Hot Water Extractable Boron102024/12/202024/12/23CAM SOP-00408R153 Ana. Prot. 2011
Free (WAD) Cyanide102024/12/232024/12/23CAM SOP-00457OMOE E3015 m
Conductivity12024/12/202024/12/21CAM SOP-00414OMOE E3530 v1 m
Conductivity92024/12/212024/12/21CAM SOP-00414OMOE E3530 v1 m
Hexavalent Chromium in Soil by IC (1)102024/12/242024/12/24CAM SOP-00436EPA 3060A/7199 m
Petroleum Hydro. CCME F1 & BTEX in Soil (2)10N/A2024/12/20CAM SOP-00315CCME PHC-CWS m
Petroleum Hydrocarbons F2-F4 in Soil (3)22024/12/212024/12/22CAM SOP-00316CCME CWS m
Petroleum Hydrocarbons F2-F4 in Soil (3)82024/12/212024/12/23CAM SOP-00316CCME CWS m
F4G (CCME Hydrocarbons Gravimetric)62024/12/242024/12/24CAM SOP-00316CCME PHC-CWS m
Acid Extractable Metals by ICPMS102024/12/202024/12/23CAM SOP-00447EPA 6020B m
Moisture10N/A2024/12/20CAM SOP-00445Carter 2nd ed 70.2 m
PAH Compounds in Soil by GC/MS (SIM)102024/12/212024/12/21CAM SOP-00318EPA 8270E
pH CaCl2 EXTRACT102024/12/232024/12/23CAM SOP-00413EPA 9045 D m
Sodium Adsorption Ratio (SAR)10N/A2024/12/24CAM SOP-00102EPA 6010C

Remarks:

Bureau Veritas is accredited to ISO/IEC 17025 for specific parameters on scopes of accreditation. Unless otherwise noted, procedures used by Bureau Veritas are based upon recognized Provincial, Federal or US method compendia such as CCME, EPA, APHA or the Quebec Ministry of Environment.

All work recorded herein has been done in accordance with procedures and practices ordinarily exercised by professionals in Bureau Veritas' profession using accepted testing methodologies, quality assurance and quality control procedures (except where otherwise agreed by the client and Bureau Veritas in writing). All data is in statistical control and has met quality control and method performance criteria unless otherwise noted. All method blanks are reported; unless indicated otherwise, associated sample data are not blank corrected. Where applicable, unless otherwise noted, Measurement Uncertainty has not been accounted for when stating conformity to the referenced standard.

Bureau Veritas liability is limited to the actual cost of the requested analyses, unless otherwise agreed in writing. There is no other warranty expressed or implied. Bureau Veritas has been retained to provide analysis of samples provided by the Client using the testing methodology referenced in this report. Interpretation and use of test results are the sole responsibility of the Client and are not within the scope of services provided by Bureau Veritas, unless otherwise agreed in writing. Bureau Veritas is not responsible for the accuracy or any data impacts, that result from the information provided by the customer or their agent.


Your Project #: SMITH FALLS SNOW DUMP Site Location: SMITH FALLS Your C.O.C. #: N/A

Attention: Gib McIntee St Lawrence Testing & Inspection Co Ltd

814 Second St W PO Box 997 Cornwall, ON CANADA K6H 5V1

Report Date: 2024/12/27 Report #: R8461482 Version: 1 - Final

CERTIFICATE OF ANALYSIS

BUREAU VERITAS JOB #: C4BK543 Received: 2024/12/17, 10:02

Solid sample results, except biota, are based on dry weight unless otherwise indicated. Organic analyses are not recovery corrected except for isotope dilution methods. Results relate to samples tested. When sampling is not conducted by Bureau Veritas, results relate to the supplied samples tested. This Certificate shall not be reproduced except in full, without the written approval of the laboratory.

Reference Method suffix “m” indicates test methods incorporate validated modifications from specific reference methods to improve performance.

  • RPDs calculated using raw data. The rounding of final results may result in the apparent difference.

(1) Soils are reported on a dry weight basis unless otherwise specified. (2) No lab extraction date is given for F1BTEX & VOC samples that are field preserved with methanol. Extraction date is the date sampled unless otherwise stated. (3) All CCME PHC results met required criteria unless otherwise stated in the report. The CWS PHC methods employed by Bureau Veritas conform to all prescribed elements of the reference method and performance based elements have been validated. All modifications have been validated and proven equivalent following "Alberta Environment's Interpretation of the Reference Method for the Canada-Wide Standard for Petroleum Hydrocarbons in Soil Validation of Performance-Based Alternative Methods September 2003". Documentation is available upon request. Modifications from Reference Method for the Canada-wide Standard for Petroleum Hydrocarbons in Soil-Tier 1 Method: F2/F3/F4 data reported using validated cold solvent extraction instead of Soxhlet extraction.

Encryption Key

Jolanta Goralczyk Project Manager 27 Dec 2024 15:24:09

Please direct all questions regarding this Certificate of Analysis to: Jolanta Goralczyk, Project Manager Email: Jolanta.Goralczyk@bureauveritas.com Phone# (905)817-5751

=========================================================================== Bureau Veritas has procedures in place to guard against improper use of the electronic signature and have the required "signatories", as per ISO/IEC 17025, signing the reports. For Service Group specific validation, please refer to the Validation Signatures page if included, otherwise available by request. For Department specific Analyst/Supervisor validation names, please refer to the Test Summary section if included, otherwise available by request. This report is authorized by Rodney Major, General Manager responsible for Ontario Environmental laboratory operations.

Total Cover Pages: 2 Page 2 of 25

Bureau Veritas 6740 Campobello Road, Mississauga, Ontario, LSN 218 Tel: (905) 817-5700 Toll-Free: 800 563-6286 Fax: (905) 817-5777 www.bvna.com

Microbiology testing is conducted at 6660 Campobello Rd. Chemistry testing is conducted at 6740 Campobello Rd.


St Lawrence Testing & Client Project #: SMITH Site Location: SMITH

nspection Co Ltd FALLS SNOW DUMP FALLS

Sampler Initials: GM

O.REG 153 METALS & INORGANICS PKG (SOIL)

TP2-9

Bureau Veritas IDALZV70ALZV71ALZV72
Sampling Date2024/12/12 14:002024/12/12 14:302024/12/12 15:00
COC NumberN/AN/AN/A
UNITSS8 Lab-DupRDLQC BatchS9S10RDLQC Batch
Calculated Parameters
Sodium Adsorption RatioN/A0.27 (1)0.25 (1)9833362
Inorganics
ConductivitymS/cm0.170.00298422160.260.170.0029842216
Available (CaCl2) pHpH7.7498433567.627.779843356
WAD Cyanide (Free)ug/gNDND0.019843083
Chromium (VI)ug/gNDND0.189845363
Metals
Hot Water Ext. Boron (B)ug/g0.180.120.0509840710
Acid Extractable Antimony (Sb)ug/gND0.480.209840566
Acid Extractable Arsenic (As)ug/g1.82.91.09840566
Acid Extractable Barium (Ba)ug/g811000.509840566
Acid Extractable Beryllium (Be)ug/g0.260.290.209840566
Acid Extractable Boron (B)ug/gNDND5.09840566
Acid Extractable Cadmium (Cd)ug/gND0.160.109840566
Acid Extractable Chromium (Cr)ug/g12131.09840566
Acid Extractable Cobalt (Co)ug/g5.04.90.109840566
Acid Extractable Copper (Cu)ug/g11160.509840566
Acid Extractable Lead (Pb)ug/g6.1671.09840566
Acid Extractable Molybdenum (Mo)ug/g0.650.700.509840566
Acid Extractable Nickel (Ni)ug/g8.08.90.509840566
Acid Extractable Selenium (Se)ug/gNDND0.509840566
Acid Extractable Silver (Ag)ug/gNDND0.209840566
Acid Extractable Thallium (TI)ug/g0.0950.110.0509840566
Acid Extractable Uranium (U)ug/g0.450.420.0509840566
Acid Extractable Vanadium (V)ug/g26275.09840566
Acid Extractable Zinc (Zn)ug/g15465.09840566
Acid Extractable Mercury (Hg)ug/gND0.100.0509840566
RDL = Reportable Detection Limit QC Batch = Quality Control Batch Lab-Dup = Laboratory Initiated Duplicate ND = Not Detected at a concentration equal or greater than the indicated Detection Limit. (1) Sodium was not detected. To report SAR the sodium detection limit was used in the calculation. This value represents a maximum ratio.

St Lawrence Testing & Client Project #: SMITH Site Location: SMITH

nspection Co Ltd FALLS SNOW DUMP FALLS

Sampler Initials: GM

O.REG 153 PAHS (SOIL)

TP2-9

Bureau Veritas IDALZV67ALZV69ALZV70ALZV71ALZV72
Sampling Date2024/12/12 13:002024/12/12 13:302024/12/12 14:002024/12/12 14:302024/12/12 15:00
COC NumberN/AN/AN/AN/AN/A
UNITSS6S7RDLS8S9RDLS10RDLQC Batch
Calculated Parameters
Methylnaphthalene, 2-(1-)ug/gND0.130.071NDND0.0071ND0.0719833271
Polyaromatic Hydrocarbons
Acenaphtheneug/gND0.120.050NDND0.0050ND0.0509842259
Acenaphthyleneug/gNDND0.050NDND0.0050ND0.0509842259
Anthraceneug/g0.100.280.050NDND0.0050ND0.0509842259
Benzo(a)anthraceneug/g0.370.350.050NDND0.00500.0990.0509842259
Benzo(a)pyreneug/g0.420.300.050NDND0.00500.140.0509842259
Benzo(b,j)fluorantheneug/g0.540.370.050NDND0.00500.170.0509842259
Benzo(g,h,i)peryleneug/g0.350.190.050NDND0.00500.110.0509842259
Benzo(k)fluorantheneug/g0.210.150.050NDND0.00500.0580.0509842259
Chryseneug/g0.320.280.050NDND0.00500.0810.0509842259
Dibenzo(a,h)anthraceneug/g0.0810.0560.050NDND0.0050ND0.0509842259
Fluorantheneug/g0.900.980.050NDND0.00500.210.0509842259
Fluoreneug/gND0.190.050NDND0.0050ND0.0509842259
Indeno(1,2,3-cd)pyreneug/g0.350.200.050NDND0.00500.100.0509842259
1-Methylnaphthaleneug/gND0.0660.050NDND0.0050ND0.0509842259
2-Methylnaphthaleneug/gND0.0680.050NDND0.0050ND0.0509842259
Naphthaleneug/gND0.0810.050NDND0.0050ND0.0509842259
Phenanthreneug/g0.421.10.050NDND0.00500.100.0509842259
Pyreneug/g0.760.730.050NDND0.00500.220.0509842259
Surrogate Recovery (%)
D10-Anthracene%10411291971209842259
D14-Terphenyl (FS)%999980891009842259
D8-Acenaphthylene%94938392949842259
RDL = Reportable Detection Limit QC Batch = Quality Control Batch ND = Not Detected at a concentration equal or greater than the indicated Detection Limit.

St Lawrence Testing & Inspe Client Project #: SMITH FAL Site Location: SMITH FAL Sampler Initials: GM

ction Co Ltd S SNOW DUMP S

O.REG 153 PHCS, BTEX/F1-F4 (SOIL)

TP2-9

Bureau Veritas IDALZV71ALZV72
Sampling Date2024/12/12 14:302024/12/12 15:00
COC NumberN/AN/A
UNITSS9S10RDLQC Batch
BTEX & F1 Hydrocarbons
Benzeneug/gNDND0.0209841741
Tolueneug/gNDND0.0209841741
Ethylbenzeneug/gNDND0.0209841741
o-Xyleneug/gNDND0.0209841741
p+m-Xyleneug/gNDND0.0409841741
Total Xylenesug/gNDND0.0409841741
F1 (C6-C10)ug/gNDND109841741
F1 (C6-C10) - BTEXug/gNDND109841741
F2-F4 Hydrocarbons
F2 (C10-C16 Hydrocarbons)ug/g8.5147.09842094
F3 (C16-C34 Hydrocarbons)ug/gND110509842094
F4 (C34-C50 Hydrocarbons)ug/gND450509842094
Reached Baseline at C50ug/gYesNo9842094
Surrogate Recovery (%)
1,4-Difluorobenzene%1031029841741
4-Bromofluorobenzene%86919841741
D10-o-Xylene%99979841741
D4-1,2-Dichloroethane%1031019841741
o-Terphenyl%1001059842094
RDL = Reportable Detection Limit QC Batch = Quality Control Batch ND = Not Detected at a concentration equal or greater than the indicated Detection Limit.

ATTACHMENT H

Laboratory Certificate of Analysis – Borehole Soils


Your Project #: C0 Site Location: S Your C.O.C. #: N/

OMPOST SITE SMITH FALLS

Attention: Gib Mclntee

St Lawrence Testing & Inspection Co Ltd

814 Second St PO Box 997 Cornwall, ON CANADA K

W 6H 5V1

Report Re

Date: 2025/07/03 port #: R8569338 Version: 1 - Final

CERTIFICATE OF ANALYSIS

BUREAU VERITAS JOB #: C577434

Received: 2025/06/28,11:30

Sample Matrix: Soil # Samples Received: 13

AnalysesDate QuantityDate ExtractedDate AnalyzedDate Laboratory MethodAnalytical Method
Methylnaphthalene Sum (1)13N/A2025/07/03CAM SOP-00301EPA 8270D m
Hot Water Extractable Boron (1)132025/07/032025/07/03CAM SOP-00408R153 Ana. Prot. 2011
Hexavalent Chromium in Soil by IC (1, 2)132025/07/032025/07/03CAM SOP-00436EPA 3060A/7199 m
Petroleum Hydro. CCME F1 & BTEX in Soil (1, 3)7N/A2025/06/30CAM SOP-00315CCME PHC-CWS m
Petroleum Hydro. CCME F1 & BTEX in Soil (1, 3)6N/A2025/07/01CAM SOP-00315CCME PHC-CWS m
Petroleum Hydrocarbons F2-F4 in Soil (1, 4)132025/06/302025/07/01CAM SOP-00316CCME CWS m
F4G (CCME Hydrocarbons Gravimetric) (1)42025/07/032025/07/03CAM SOP-00316CCME PHC-CWS m
Acid Extractable Metals by ICPMS (1)132025/07/022025/07/02CAM SOP-00447EPA 6020B m
Moisture (1)13N/A2025/06/28CAM SOP-00445Carter 2nd ed 70.2 m
PAH Compounds in Soil by GC/MS (SIM) (1)12025/07/022025/07/02CAM SOP-00318EPA 8270E
PAH Compounds in Soil by GC/MS (SIM) (1)122025/07/022025/07/03CAM SOP-00318EPA 8270E

Remarks:

Bureau Veritas is accredited to ISO/IEC 17025 for specific parameters on s Veritas are based upon recognized Provincial, Federal or US method compen

pes of accreditation. Unless otherwise noted, procedures used by Bureau such as CCME, EPA, APHA or the Quebec Ministry of Environment.

All work recorded herein has been done in accordance with procedures and practices ordinarily exercised by professionals in Bureau Veritas' profession using accepted testing methodologies, quality assurance and quality control procedures (except where otherwise agreed by the client and Bureau Veritas in writing). All data is in statistical control and has met quality control and method performance criteria unless otherwise noted. All method blanks are reported; unless indicated otherwise, associated sample data are not blank corrected. Where applicable, unless otherwise noted, Measurement Uncertainty has not been accounted for when stating conformity to the referenced standard.

Bureau Veritas liability is limited to the actual cost of the requested analyses, unless otherwise agreed in writing. There is no other warranty expressed or implied. Bureau Veritas has been retained to provide analysis of samples provided by the Client using the testing methodology referenced in this report. Interpretation and use of test results are the sole responsibility of the Client and are not within the scope of services provided by Bureau Veritas, unless otherwise agreed in writing. Bureau Veritas is not responsible for the accuracy or any data impacts, that result from the information provided by the customer or their agent.

Solid sample results, except biota, are based on dry weight unless otherw dilution methods.

indicated. Organic analyses are not recovery corrected except for isotope

Results relate to samples tested. When sampling is not conducted by Bureau Veritas, results relate to the supplied samples tested.

This Certificate shall not be reproduced except in full, without the written approval of the laboratory.


Your Project #: COMPOST SITE Site Location: SMITH FALLS Your C.O.C. #: N/A

Attention: Gib Mclntee St Lawrence Testing & Inspection Co Ltd

814 Second St W PO Box 997 Cornwall, ON CANADA K6H 5V1

Report Date: 2025/07/03 Report #: R8569338 Version: 1 - Final

CERTIFICATE OF ANALYSIS

BUREAU VERITAS JOB #: C577434 Received: 2025/06/28, 11:30 Reference Method suffix “m” indicates test methods incorporate validated modifications from specific reference methods to improve performance.

  • RPDs calculated using raw data. The rounding of final results may result in the apparent difference.

(1) This test was performed by Bureau Veritas Mississauga, 6740 Campobello Rd , Mississauga, ON, L5N 2L8 (2) Soils are reported on a dry weight basis unless otherwise specified. (3) No lab extraction date is given for F1BTEX & VOC samples that are field preserved with methanol. Extraction date is the date sampled unless otherwise stated. (4) All CCME PHC results met required criteria unless otherwise stated in the report. The CWS PHC methods employed by Bureau Veritas conform to all prescribed elements of the reference method and performance based elements have been validated. All modifications have been validated and proven equivalent following “Alberta Environment’s Interpretation of the Reference Method for the Canada-Wide Standard for Petroleum Hydrocarbons in Soil Validation of Performance-Based Alternative Methods September 2003”. Documentation is available upon request. Modifications from Reference Method for the Canada-wide Standard for Petroleum Hydrocarbons in Soil-Tier 1 Method: F2/F3/F4 data reported using validated cold solvent extraction instead of Soxhlet extraction.

Encryption Key

Jolanta Goralczyk Project Manager 03 Jul 2025 17:46:45

Please direct all questions regarding this Certificate of Analysis to: Jolanta Goralczyk, Project Manager Email: Jolanta.Goralczyk@bureauveritas.com Phone# (905)817-5751

===========================================================================

Bureau Veritas has procedures in place to guard against improper use of the electronic signature and have the required "signatories", as per ISO/IEC 17025, signing the reports. For Service Group specific validation, please refer to the Validation Signatures page if included, otherwise available by request. For Department specific Analyst/Supervisor validation names, please refer to the Test Summary section if included, otherwise available by request. This report is authorized by Rodney Major, General Manager responsible for Ontario Environmental laboratory operations.


Site Location: SMITH FALLS

Sampler Initials: GM

O.REG 153 METALS PACKAGE (SOIL)

Bureau Veritas IDASLF63ASLF64ASLF64ASLF65
Sampling Date2025/06/24 10:002025/06/24 10:302025/06/24 10:302025/06/25 10:00
COC NumberN/AN/AN/AN/A
UNITSS1S2RDLQC BatchS2 Lab-DupRDLQC BatchS3RDLQC Batch
Inorganics
Chromium (VI)ug/gNDND0.189962182ND0.189962182ND0.189962182
Metals
Hot Water Ext. Boron (B)ug/g0.15ND0.05099623240.220.0509962324
Acid Extractable Antimony (Sb)ug/gNDND0.2099619050.250.209961905
Acid Extractable Arsenic (As)ug/g1.9ND1.099619052.41.09961905
Acid Extractable Barium (Ba)ug/g65520.509961905620.509961905
Acid Extractable Beryllium (Be)ug/g0.26ND0.2099619050.220.209961905
Acid Extractable Boron (B)ug/gNDND5.09961905ND5.09961905
Acid Extractable Cadmium (Cd)ug/gNDND0.109961905ND0.109961905
Acid Extractable Chromium (Cr)ug/g118.51.09961905121.09961905
Acid Extractable Cobalt (Co)ug/g4.63.60.1099619053.10.109961905
Acid Extractable Copper (Cu)ug/g9.77.60.509961905120.509961905
Acid Extractable Lead (Pb)ug/g7.73.01.09961905171.09961905
Acid Extractable Molybdenum (Mo)ug/gNDND0.5099619051.40.509961905
Acid Extractable Nickel (Ni)ug/g7.65.30.5099619057.50.509961905
Acid Extractable Selenium (Se)ug/gNDND0.509961905ND0.509961905
Acid Extractable Silver (Ag)ug/gNDND0.209961905ND0.209961905
Acid Extractable Thallium (TI)ug/g0.0740.0520.05099619050.0700.0509961905
Acid Extractable Uranium (U)ug/g0.450.410.05099619050.400.0509961905
Acid Extractable Vanadium (V)ug/g24185.09961905165.09961905
Acid Extractable Zinc (Zn)ug/g19115.09961905295.09961905
Acid Extractable Mercury (Hg)ug/gNDND0.05099619050.0560.0509961905
RDL = Reportable Detection Limit QC Batch = Quality Control Batch Lab-Dup = Laboratory Initiated Duplicate ND = Not Detected at a concentration equal or greater than the indicated Detection Limit.

Site Location: SMITH FALLS

Sampler Initials: GM

O.REG 153 METALS PACKAGE (SOIL)

Bureau Veritas IDASLF66ASLF67ASLF68ASLF69ASLF69
Sampling Date2025/06/25 10:302025/06/25 10:452025/06/25 11:302025/06/25 10:452025/06/25 10:45
COC NumberN/AN/AN/AN/AN/A
UNITSS4S5S6S7RDLQC BatchS7 Lab-DupRDLQC Batch
Inorganics
Chromium (VI)ug/gNDNDNDND0.189962182
Metals
Hot Water Ext. Boron (B)ug/g0.240.0700.430.110.05099623240.0980.0509962324
Acid Extractable Antimony (Sb)ug/gNDND0.55ND0.209961905
Acid Extractable Arsenic (As)ug/g1.51.12.81.41.09961905
Acid Extractable Barium (Ba)ug/g77511101000.509961905
Acid Extractable Beryllium (Be)ug/gNDND0.34ND0.209961905
Acid Extractable Boron (B)ug/gNDNDNDND5.09961905
Acid Extractable Cadmium (Cd)ug/gNDND0.25ND0.109961905
Acid Extractable Chromium (Cr)ug/g118.618111.09961905
Acid Extractable Cobalt (Co)ug/g3.33.14.83.10.109961905
Acid Extractable Copper (Cu)ug/g6.86.5169.00.509961905
Acid Extractable Lead (Pb)ug/g303.1754.01.09961905
Acid Extractable Molybdenum (Mo)ug/g0.80ND1.3ND0.509961905
Acid Extractable Nickel (Ni)ug/g5.95.3256.00.509961905
Acid Extractable Selenium (Se)ug/gNDNDNDND0.509961905
Acid Extractable Silver (Ag)ug/gNDNDNDND0.209961905
Acid Extractable Thallium (Tl)ug/g0.094ND0.10ND0.0509961905
Acid Extractable Uranium (U)ug/g0.430.440.510.470.0509961905
Acid Extractable Vanadium (V)ug/g201926205.09961905
Acid Extractable Zinc (Zn)ug/g281193145.09961905
Acid Extractable Mercury (Hg)ug/gNDND0.082ND0.0509961905
RDL = Reportable Detection Limit QC Batch = Quality Control Batch Lab-Dup = Laboratory Initiated Duplicate ND = Not Detected at a concentration equal or greater than the indicated Detection Limit.

Site Location: SMITH FALLS

Sampler Initials: GM

O.REG 153 METALS PACKAGE (SOIL)

Bureau Veritas IDASLF70ASLF71ASLF72ASLF73ASLF74ASLF75
Sampling Date2025/06/25 13:002025/06/25 13:302025/06/25 14:002025/06/24 14:302025/06/24 13:002025/06/25 13:30
COC NumberN/AN/AN/AN/AN/AN/A
UNITSS8S9S10S11S12S13RDLQC Batch
Inorganics
Chromium (VI)ug/gNDNDNDNDNDND0.189962182
Metals
Hot Water Ext. Boron (B)ug/g0.180.130.26ND0.121.50.0509962324
Acid Extractable Antimony (Sb)ug/g0.39ND0.41NDNDND0.209961905
Acid Extractable Arsenic (As)ug/g2.82.82.31.21.31.81.09961905
Acid Extractable Barium (Ba)ug/g5137014088971000.509961905
Acid Extractable Beryllium (Be)ug/g0.210.280.25NDND0.220.209961905
Acid Extractable Boron (B)ug/gNDNDNDNDND6.25.09961905
Acid Extractable Cadmium (Cd)ug/g0.11ND0.43NDNDND0.109961905
Acid Extractable Chromium (Cr)ug/g111327119.7101.09961905
Acid Extractable Cobalt (Co)ug/g3.24.83.74.54.44.50.109961905
Acid Extractable Copper (Cu)ug/g209.134119.1120.509961905
Acid Extractable Lead (Pb)ug/g4215744.74.4131.09961905
Acid Extractable Molybdenum (Mo)ug/g0.911.21.1NDNDND0.509961905
Acid Extractable Nickel (Ni)ug/g7.49.5117.77.58.10.509961905
Acid Extractable Selenium (Se)ug/gNDNDNDNDNDND0.509961905
Acid Extractable Silver (Ag)ug/gNDND1.7NDNDND0.209961905
Acid Extractable Thallium (TI)ug/g0.0700.0980.100.0650.0650.0750.0509961905
Acid Extractable Uranium (U)ug/g0.400.490.510.430.450.440.0509961905
Acid Extractable Vanadium (V)ug/g2424232220195.09961905
Acid Extractable Zinc (Zn)ug/g44231101615325.09961905
Acid Extractable Mercury (Hg)ug/g0.089ND0.20NDNDND0.0509961905
RDL = Reportable Detection Limit QC Batch = Quality Control Batch ND = Not Detected at a concentration equal or greater than the indicated Detection Limit.

O.REG 153 METALS PACKAGE (SOIL)

Bureau Veritas IDASLF75
Sampling Date2025/06/25 13:30
COC NumberN/A
UNITSS13 Lab-DupRDLQC Batch
Metals
Acid Extractable Antimony (Sb)ug/gND0.209961905
Acid Extractable Arsenic (As)ug/g1.71.09961905
Acid Extractable Barium (Ba)ug/g1000.509961905
Acid Extractable Beryllium (Be)ug/g0.210.209961905
Acid Extractable Boron (B)ug/g5.95.09961905
Acid Extractable Cadmium (Cd)ug/gND0.109961905
Acid Extractable Chromium (Cr)ug/g101.09961905
Acid Extractable Cobalt (Co)ug/g4.50.109961905
Acid Extractable Copper (Cu)ug/g120.509961905
Acid Extractable Lead (Pb)ug/g141.09961905
Acid Extractable Molybdenum (Mo)ug/gND0.509961905
Acid Extractable Nickel (Ni)ug/g7.90.509961905
Acid Extractable Selenium (Se)ug/gND0.509961905
Acid Extractable Silver (Ag)ug/gND0.209961905
Acid Extractable Thallium (Tl)ug/g0.0820.0509961905
Acid Extractable Uranium (U)ug/g0.460.0509961905
Acid Extractable Vanadium (V)ug/g195.09961905
Acid Extractable Zinc (Zn)ug/g325.09961905
Acid Extractable Mercury (Hg)ug/gND0.0509961905
RDL = Reportable Detection Limit QC Batch = Quality Control Batch Lab-Dup = Laboratory Initiated Duplicate ND = Not Detected at a concentration equal or greater than the indicated Detection Limit.

Client Project #: COMPOST SITE

Site Location: SMITH FALLS

Sampler Initials: GM

O.REG 153 PAHS (SOIL)

Bureau Veritas IDASLF63ASLF64ASLF64ASLF65
Sampling Date2025/06/24 10:002025/06/24 10:302025/06/24 10:302025/06/25 10:00
COC NumberN/AN/AN/AN/A
UNITSS1S2RDLQC BatchS2 Lab-DupRDLQC BatchS3RDLQC Batch
Calculated Parameters
Methylnaphthalene, 2-(1-)ug/gNDND0.007199599800.0180.00719959980
Polyaromatic Hydrocarbons
Acenaphtheneug/gNDND0.00509961299ND0.005099612990.00700.00509961299
Acenaphthyleneug/gNDND0.00509961299ND0.00509961299ND0.00509961299
Anthraceneug/gNDND0.00509961299ND0.005099612990.0200.00509961299
Benzo(a)anthraceneug/gNDND0.00509961299ND0.005099612990.0530.00509961299
Benzo(a)pyreneug/gNDND0.00509961299ND0.005099612990.0520.00509961299
Benzo(b,j)fluorantheneug/gNDND0.00509961299ND0.005099612990.0790.00509961299
Benzo(g,h,i)peryleneug/g0.0064ND0.00509961299ND0.005099612990.0350.00509961299
Benzo(k)fluorantheneug/gNDND0.00509961299ND0.005099612990.0250.00509961299
Chryseneug/gNDND0.00509961299ND0.005099612990.0520.00509961299
Dibenzo(a,h)anthraceneug/gNDND0.00509961299ND0.005099612990.00910.00509961299
Fluorantheneug/gNDND0.00509961299ND0.005099612990.130.00509961299
Fluoreneug/gNDND0.00509961299ND0.005099612990.00930.00509961299
Indeno(1,2,3-cd)pyreneug/gNDND0.00509961299ND0.005099612990.0360.00509961299
1-Methylnaphthaleneug/gNDND0.00509961299ND0.005099612990.00840.00509961299
2-Methylnaphthaleneug/gNDND0.00509961299ND0.005099612990.00920.00509961299
Naphthaleneug/gNDND0.00509961299ND0.005099612990.0110.00509961299
Phenanthreneug/gNDND0.00509961299ND0.005099612990.130.00509961299
Pyreneug/gNDND0.00509961299ND0.005099612990.0950.00509961299
Surrogate Recovery (%)
D10-Anthracene%90949961299929961299939961299
D14-Terphenyl (FS)%74809961299789961299779961299
D8-Acenaphthylene%83839961299829961299899961299
RDL = Reportable Detection Limit QC Batch = Quality Control Batch Lab-Dup = Laboratory Initiated Duplicate ND = Not Detected at a concentration equal or greater than the indicated Detection Limit.

St Lawrence Testing & Inspection Co Ltd

Client Project #: COMPOST SITE

Site Location: SMITH FALLS

Sampler Initials: GM

O.REG 153 PAHS (SOIL)

Bureau Veritas IDASLF66ASLF67ASLF68ASLF69ASLF70ASLF71
Sampling Date2025/06/25 10:302025/06/25 10:452025/06/25 11:302025/06/25 10:452025/06/25 13:002025/06/25 13:30
COC NumberN/AN/AN/AN/AN/AN/A
UNITSS4S5S6S7RDLS8RDLS9RDLQC Batch
Calculated Parameters
Methylnaphthalene, 2-(1-) Polyaromatic Hydrocarbonsug/g0.090NDNDND0.0071ND0.071ND0.00719959980
Acenaphtheneug/g0.20ND0.0087ND0.0050ND0.050ND0.00509961299
Acenaphthyleneug/g0.039ND0.0072ND0.0050ND0.050ND0.00509961299
Anthraceneug/g0.560.0110.034ND0.0050ND0.050ND0.00509961299
Benzo(a)anthraceneug/g1.20.0230.0880.00520.00500.0600.0500.0140.00509961299
Benzo(a)pyreneug/g1.10.0180.0860.00500.00500.0730.0500.0170.00509961299
Benzo(b,c,g,h,i)fluorantheneug/g1.50.0240.120.00600.00500.110.0500.0250.00509961299
Benzo(g,h,i)pyreneug/g0.600.0110.054ND0.00500.110.0500.0180.00509961299
Benzo(k)fluorantheneug/g0.500.00960.041ND0.0050ND0.0500.00790.00509961299
Chryseneug/g0.980.0200.074ND0.00500.0560.0500.0130.00509961299
Dibenzo(a,h)anthraceneug/g0.16ND0.014ND0.0050ND0.050ND0.00509961299
Fluorantheneug/g2.60.0450.190.0100.00500.120.0500.0320.00509961299
Fluoreneug/g0.24ND0.011ND0.0050ND0.050ND0.00509961299
Indeno(1,2,3-cd)pyreneug/g0.660.0110.055ND0.00500.0660.0500.0140.00509961299
1-Methylnaphthaleneug/g0.044NDNDND0.0050ND0.050ND0.00509961299
2-Methylnaphthaleneug/g0.046NDNDND0.0050ND0.050ND0.00509961299
Naphthaleneug/g0.080NDNDND0.0050ND0.050ND0.00509961299
Phenanthreneug/g2.00.0330.110.00550.00500.0580.0500.0150.00509961299
Pyreneug/g2.00.0340.150.00820.00500.130.0500.0260.00509961299
Surrogate Recovery (%)
D10-Anthracene%86898792100929961299
D14-Terphenyl (FS)%7371757997799961299
D8-Acenaphthylene%85838276104879961299
RDL = Reportable Detection Limit QC Batch = Quality Control Batch ND = Not Detected at a concentration equal or greater than the indicated Detection Limit.

Sampler Initials: GM

O.REG 153 PAHS (SOIL)

Bureau Veritas IDASLF72ASLF73ASLF74ASLF75
Sampling Date2025/06/25 14:002025/06/24 14:302025/06/24 13:002025/06/25 13:30
COC NumberN/AN/AN/AN/A
UNITS$10RDL$11$12$13RDLQC Batch
Calculated Parameters
Methylnaphthalene, 2-(1-) Polyaromatic Hydrocarbonsug/gND0.071NDNDND0.00719959980
Acenaphtheneug/gND0.050NDNDND0.00509961299
Acenaphthyleneug/gND0.050NDNDND0.00509961299
Anthraceneug/gND0.050NDNDND0.00509961299
Benzo(a)anthraceneug/g0.0580.050NDND0.00920.00509961299
Benzo(a)pyreneug/g0.0740.050NDND0.0190.00509961299
Benzo(b/j)fluorantheneug/g0.110.050NDND0.0330.00509961299
Benzo(g,h,i)peryleneug/g0.0770.050NDND0.0170.00509961299
Benzo(k)fluorantheneug/gND0.050NDND0.0100.00509961299
Chryseneug/g0.0540.050NDND0.0120.00509961299
Dibenzo(a,h)anthraceneug/gND0.050NDNDND0.00509961299
Fluorantheneug/g0.130.050NDND0.0160.00509961299
Fluoreneug/gND0.050NDNDND0.00509961299
Indeno(1,2,3-cd)pyreneug/g0.0600.050NDND0.0160.00509961299
1-Methylnaphthaleneug/gND0.050NDNDND0.00509961299
2-Methylnaphthaleneug/gND0.050NDNDND0.00509961299
Naphthaleneug/gND0.050NDNDND0.00509961299
Phenanthreneug/gND0.050NDNDND0.00509961299
Pyreneug/g0.110.050NDND0.0120.00509961299
Surrogate Recovery (%)
D10-Anthracene%1088994929961299
D14-Terphenyl (FS)%1017279769961299
D8-Acenaphthylene%1048281889961299
RDL = Reportable Detection Limit QC Batch = Quality Control Batch ND = Not Detected at a concentration equal or greater than the indicated Detection Limit.

Site Location: SMITH FALLS

Sampler Initials: GM

O.REG 153 PHCS, BTEX/F1-F4 (SOIL)

Bureau Veritas IDASLF63ASLF63ASLF64ASLF65
Sampling Date2025/06/24 10:002025/06/24 10:002025/06/24 10:302025/06/25 10:00
COC NumberN/AN/AN/AN/A
UNITSS1RDLQC BatchS1 Lab-DupRDLQC BatchS2S3RDLQC Batch
BTEX & F1 Hydrocarbons
Benzeneug/gND0.0209960382ND0.0209960382NDND0.0209960382
Tolueneug/gND0.0209960382ND0.0209960382NDND0.0209960382
Ethylbenzeneug/gND0.0209960382ND0.0209960382NDND0.0209960382
o-Xyleneug/gND0.0209960382ND0.0209960382NDND0.0209960382
p+m-Xyleneug/gND0.0409960382ND0.0409960382NDND0.0409960382
Total Xylenesug/gND0.0409960382ND0.0409960382NDND0.0409960382
F1 (C6-C10)ug/gND109960382ND109960382NDND109960382
F1 (C6-C10) - BTEXug/gND109960382ND109960382NDND109960382
F2-F4 Hydrocarbons
F2 (C10-C16 Hydrocarbons)ug/gND7.09960611NDND7.09960611
F3 (C16-C34 Hydrocarbons)ug/gND509960611ND87509960611
F4 (C34-C50 Hydrocarbons)ug/gND509960611ND130509960611
Reached Baseline at C50ug/gYes9960611YesYes9960611
Surrogate Recovery (%)
1,4-Difluorobenzene%102996038210499603821051059960382
4-Bromofluorobenzene%95996038294996038294969960382
D10-o-Xylene%101996038210099603821011029960382
D4-1,2-Dichloroethane%100996038299996038297969960382
o-Terphenyl%90996061190909960611
RDL = Reportable Detection Limit QC Batch = Quality Control Batch Lab-Dup = Laboratory Initiated Duplicate ND = Not Detected at a concentration equal or greater than the indicated Detection Limit.

Sampler Initials: GM

O.REG 153 PHCS, BTEX/F1-F4 (SOIL)

Bureau Veritas IDASLF66ASLF67ASLF68ASLF69ASLF69
Sampling Date2025/06/25 10:302025/06/25 10:452025/06/25 11:302025/06/25 10:452025/06/25 10:45
COC NumberN/AN/AN/AN/AN/A
UNITSS4S5S6S7RDLQC BatchS7 Lab-DupRDLQC Batch
BTEX & F1 Hydrocarbons
Benzeneug/gNDNDNDND0.0209960382
Tolueneug/gNDNDNDND0.0209960382
Ethylbenzeneug/gNDNDNDND0.0209960382
o-Xyleneug/gNDNDNDND0.0209960382
p+m-Xyleneug/gNDNDNDND0.0409960382
Total Xylenesug/gNDNDNDND0.0409960382
F1 (C6-C10)ug/gNDNDNDND109960382
F1 (C6-C10) - BTEXug/gNDNDNDND109960382
F2-F4 Hydrocarbons
F2 (C10-C16 Hydrocarbons)ug/g7.0NDNDND7.09960611ND7.09960611
F3 (C16-C34 Hydrocarbons)ug/g120ND69ND509960611ND509960611
F4 (C34-C50 Hydrocarbons)ug/g160ND56ND509960611ND509960611
Reached Baseline at C50ug/gNoYesYesYes9960611Yes9960611
Surrogate Recovery (%)
1,4-Difluorobenzene%1031021021019960382
4-Bromofluorobenzene%949595969960382
D10-o-Xylene%1081101001099960382
D4-1,2-Dichloroethane%981011011019960382
o-Terphenyl%908887909960611979960611
RDL = Reportable Detection Limit QC Batch = Quality Control Batch Lab-Dup = Laboratory Initiated Duplicate ND = Not Detected at a concentration equal or greater than the indicated Detection Limit.

Sampler Initials: GM

O.REG 153 PHCS, BTEX/F1-F4 (SOIL)

Bureau Veritas IDASLF70ASLF71ASLF72ASLF73ASLF74ASLF75
Sampling Date2025/06/25 13:002025/06/25 13:302025/06/25 14:002025/06/24 14:302025/06/24 13:002025/06/25 13:30
COC NumberN/AN/AN/AN/AN/AN/A
UNITSS8S9S10S11S12S13RDLQC Batch
BTEX & F1 Hydrocarbons
Benzeneug/gNDNDNDNDNDND0.0209960382
Tolueneug/gNDND0.024NDNDND0.0209960382
Ethylbenzeneug/gNDNDNDNDNDND0.0209960382
o-Xyleneug/gNDNDNDNDNDND0.0209960382
p+m-Xyleneug/gNDNDNDNDNDND0.0409960382
Total Xylenesug/gNDNDNDNDNDND0.0409960382
F1 (C6-C10)ug/gNDNDNDNDNDND109960382
F1 (C6-C10) - BTEXug/gNDNDNDNDNDND109960382
F2-F4 Hydrocarbons
F2 (C10-C16 Hydrocarbons)ug/g8.9NDNDNDNDND7.09960611
F3 (C16-C34 Hydrocarbons)ug/g140ND170NDNDND509960611
F4 (C34-C50 Hydrocarbons)ug/g1000110360NDNDND509960611
Reached Baseline at C50ug/gNoNoNoYesYesYes9960611
Surrogate Recovery (%)
1,4-Difluorobenzene%1051021041021041039960382
4-Bromofluorobenzene%9496949696969960382
D10-o-Xylene%106961001021011079960382
D4-1,2-Dichloroethane%1011011031021021019960382
o-Terphenyl%8987858887919960611
RDL = Reportable Detection Limit QC Batch = Quality Control Batch ND = Not Detected at a concentration equal or greater than the indicated Detection Limit.

St Lawrence Te Client Project # Site Location: Sampler Initial:

sting & Inspection Co Ltd : COMPOST SITE SMITH FALLS : GM

RESULTS OF ANALYSES OF SOIL

Bureau Veritas IDASLF63ASLF64ASLF65ASLF66ASLF67ASLF68ASLF69
Sampling Date2025/06/24 10:002025/06/24 10:302025/06/25 10:002025/06/25 10:302025/06/25 10:452025/06/25 11:302025/06/25 10:45
COC NumberN/AN/AN/AN/AN/AN/AN/A
UNITSS1S2S3S4S5S6S7RDLQC Batch
Inorganics
Moisture%12109.2198.529131.09960116
RDL = Reportable Detection Limit QC Batch = Quality Control Batch
Bureau Veritas IDASLF70ASLF71ASLF72ASLF73ASLF74ASLF75
Sampling Date2025/06/25 13:002025/06/25 13:302025/06/25 14:002025/06/24 14:302025/06/24 13:002025/06/25 13:30
COC NumberN/AN/AN/AN/AN/AN/A
UNITSS8S9S10S11S12S13RDLQC Batch
Inorganics
Moisture%9.38.4121110161.09960116
RDL = Reportable Detection Limit QC Batch = Quality Control Batch

St Lawrence Testing Client Project #: C Site Location: S Sampler Initials: G

g & Inspection Co Ltd DMPOST SITE MITH FALLS M

PETROLEUM HYDROCARBONS (CCME)

Bureau Veritas IDASLF66ASLF70ASLF71ASLF72
Sampling Date2025/06/25 10:302025/06/25 13:002025/06/25 13:302025/06/25 14:00
COC NumberN/AN/AN/AN/A
UNITS$4$8$9$10RDLQC Batch
F2-F4 Hydrocarbons
F4G-sg (Grav. Heavy Hydrocarbons)ug/g820570051024001009962192
RDL = Reportable Detection Limit QC Batch = Quality Control Batch

TEST SUMMARY

Bureau Veritas ID: ASLF63

Sample ID: S1

Collected: 2025/06/24

Matrix: Soil

Shipped:

Received: 2025/06/28

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Methylnaphthalene SumCALC9959980N/A2025/07/03Automated Statchk
Hot Water Extractable BoronICP99623242025/07/032025/07/03Suban Kanapathipplai
Hexavalent Chromium in Soil by ICIC/SPEC99621822025/07/032025/07/03Harpuneet Kaur
Petroleum Hydro. CCME F1 & BTEX in SoilHSGC/MSFD9960382N/A2025/06/30Anca Ganea
Petroleum Hydrocarbons F2-F4 in SoilGC/FID99606112025/06/302025/07/01Mohammed Abdul Nafay Shoeb
Acid Extractable Metals by ICPMSICP/MS99619052025/07/022025/07/02Daniel Teclu
MoistureBAL9960116N/A2025/06/28Diksha Desawer
PAH Compounds in Soil by GC/MS (SIM)GC/MS99612992025/07/022025/07/03Mitesh Raj

Bureau Veritas ID: ASLF63 Dup

Collected: 2025/06/24

Sample ID: S1

Matrix: Soil

Shipped:

Received: 2025/06/28

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Petroleum Hydro. CCME F1 & BTEX in SoilHSGC/MSFD9960382N/A2025/06/30Anca Ganea

Bureau Veritas ID: ASLF64

Sample ID: S2

Collected: 2025/06/24

Shipped:

Matrix: Soil

Received: 2025/06/28

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Methylnaphthalene SumCALC9959980N/A2025/07/03Automated Statchk
Hot Water Extractable BoronICP99623242025/07/032025/07/03Suban Kanapathipplai
Hexavalent Chromium in Soil by ICIC/SPEC99621822025/07/032025/07/03Harpuneet Kaur
Petroleum Hydro. CCME F1 & BTEX in SoilHSGC/MSFD9960382N/A2025/06/30Anca Ganea
Petroleum Hydrocarbons F2-F4 in SoilGC/FID99606112025/06/302025/07/01Mohammed Abdul Nafay Shoeb
Acid Extractable Metals by ICPMSICP/MS99619052025/07/022025/07/02Daniel Teclu
MoistureBAL9960116N/A2025/06/28Diksha Desawer
PAH Compounds in Soil by GC/MS (SIM)GC/MS99612992025/07/022025/07/02Mitesh Raj

Bureau Veritas ID: ASLF64 Dup

Collected: 2025/06/24

Sample ID: S2

Matrix: Soil

Shipped:

Received: 2025/06/28

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Hexavalent Chromium in Soil by ICIC/SPEC99621822025/07/032025/07/03Harpuneet Kaur
PAH Compounds in Soil by GC/MS (SIM)GC/MS99612992025/07/022025/07/02Mitesh Raj

Bureau Veritas ID: ASLF65

Sample ID: S3

Collected: 2025/06/25

Matrix: Soil

Shipped:

Received: 2025/06/28

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Methylnaphthalene SumCALC9959980N/A2025/07/03Automated Statchk
Hot Water Extractable BoronICP99623242025/07/032025/07/03Suban Kanapathipplai
Hexavalent Chromium in Soil by ICIC/SPEC99621822025/07/032025/07/03Harpuneet Kaur

Bureau Veritas 100 - 36 Antares Dr. Nepean, ON, K2E 7W5 Phone: 613-274-0573 Website: www.bvna.com


TEST SUMMARY

Bureau Veritas ID: ASLF65

Sample ID: S3

Collected: 2025/06/25

Matrix: Soil

Shipped:

Received: 2025/06/28

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Petroleum Hydro. CCME F1 & BTEX in SoilHSGC/MSFD9960382N/A2025/06/30Anca Ganea
Petroleum Hydrocarbons F2-F4 in SoilGC/FID99606112025/06/302025/07/01Mohammed Abdul Nafay Shoeb
Acid Extractable Metals by ICPMSICP/MS99619052025/07/022025/07/02Daniel Teclu
MoistureBAL9960116N/A2025/06/28Diksha Desawer
PAH Compounds in Soil by GC/MS (SIM)GC/MS99612992025/07/022025/07/03Mitesh Raj

Bureau Veritas ID: ASLF66

Collected: 2025/06/25

Sample ID: S4

Shipped:

Matrix: Soil

Received: 2025/06/28

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Methylnaphthalene SumCALC9959980N/A2025/07/03Automated Statchk
Hot Water Extractable BoronICP99623242025/07/032025/07/03Suban Kanapathipplai
Hexavalent Chromium in Soil by ICIC/SPEC99621822025/07/032025/07/03Harpuneet Kaur
Petroleum Hydro. CCME F1 & BTEX in SoilHSGC/MSFD9960382N/A2025/06/30Anca Ganea
Petroleum Hydrocarbons F2-F4 in SoilGC/FID99606112025/06/302025/07/01Mohammed Abdul Nafay Shoeb
F4G (CCME Hydrocarbons Gravimetric)BAL99621922025/07/032025/07/03Rashmi Dubey
Acid Extractable Metals by ICPMSICP/MS99619052025/07/022025/07/02Daniel Teclu
MoistureBAL9960116N/A2025/06/28Diksha Desawer
PAH Compounds in Soil by GC/MS (SIM)GC/MS99612992025/07/022025/07/03Mitesh Raj

Bureau Veritas ID: ASLF67

Sample ID: S5

Collected: 2025/06/25

Shipped:

Matrix: Soil

Received: 2025/06/28

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Methylnaphthalene SumCALC9959980N/A2025/07/03Automated Statchk
Hot Water Extractable BoronICP99623242025/07/032025/07/03Suban Kanapathipplai
Hexavalent Chromium in Soil by ICIC/SPEC99621822025/07/032025/07/03Harpuneet Kaur
Petroleum Hydro. CCME F1 & BTEX in SoilHSGC/MSFD9960382N/A2025/06/30Anca Ganea
Petroleum Hydrocarbons F2-F4 in SoilGC/FID99606112025/06/302025/07/01Mohammed Abdul Nafay Shoeb
Acid Extractable Metals by ICPMSICP/MS99619052025/07/022025/07/02Daniel Teclu
MoistureBAL9960116N/A2025/06/28Diksha Desawer
PAH Compounds in Soil by GC/MS (SIM)GC/MS99612992025/07/022025/07/03Mitesh Raj

Bureau Veritas ID: ASLF68

Sample ID: S6

Collected: 2025/06/25

Matrix: Soil

Shipped:

Received: 2025/06/28

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Methylnaphthalene SumCALC9959980N/A2025/07/03Automated Statchk
Hot Water Extractable BoronICP99623242025/07/032025/07/03Suban Kanapathipplai
Hexavalent Chromium in Soil by ICIC/SPEC99621822025/07/032025/07/03Harpuneet Kaur
Petroleum Hydro. CCME F1 & BTEX in SoilHSGC/MSFD9960382N/A2025/06/30Anca Ganea
Petroleum Hydrocarbons F2-F4 in SoilGC/FID99606112025/06/302025/07/01Mohammed Abdul Nafay Shoeb

TEST SUMMARY

Bureau Veritas ID: ASLF68

Sample ID: S6

Collected: 2025/06/25

Matrix: Soil

Shipped:

Received: 2025/06/28

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Acid Extractable Metals by ICPMSICP/MS99619052025/07/022025/07/02Daniel Teclu
MoistureBAL9960116N/A2025/06/28Diksha Desawer
PAH Compounds in Soil by GC/MS (SIM)GC/MS99612992025/07/022025/07/03Mitesh Raj

Bureau Veritas ID: ASLF69

Sample ID: S7

Collected: 2025/06/25

Matrix: Soil

Shipped:

Received: 2025/06/28

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Methylnaphthalene SumCALC9959980N/A2025/07/03Automated Statchk
Hot Water Extractable BoronICP99623242025/07/032025/07/03Suban Kanapathipplai
Hexavalent Chromium in Soil by ICIC/SPEC99621822025/07/032025/07/03Harpuneet Kaur
Petroleum Hydro. CCME F1 & BTEX in SoilHSGC/MSFD9960382N/A2025/06/30Anca Ganea
Petroleum Hydrocarbons F2-F4 in SoilGC/FID99606112025/06/302025/07/01Mohammed Abdul Nafay Shoeb
Acid Extractable Metals by ICPMSICP/MS99619052025/07/022025/07/02Daniel Teclu
MoistureBAL9960116N/A2025/06/28Diksha Desawer
PAH Compounds in Soil by GC/MS (SIM)GC/MS99612992025/07/022025/07/03Mitesh Raj

Bureau Veritas ID: ASLF69 Dup

Sample ID: S7

Collected: 2025/06/25

Shipped:

Matrix: Soil

Received: 2025/06/28

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Hot Water Extractable BoronICP99623242025/07/032025/07/03Suban Kanapathipplai
Petroleum Hydrocarbons F2-F4 in SoilGC/FID99606112025/06/302025/07/01Mohammed Abdul Nafay Shoeb

Bureau Veritas ID: ASLF70

Collected: 2025/06/25

Sample ID: S8

Matrix: Soil

Shipped:

Received: 2025/06/28

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Methylnaphthalene SumCALC9959980N/A2025/07/03Automated Statchk
Hot Water Extractable BoronICP99623242025/07/032025/07/03Suban Kanapathipplai
Hexavalent Chromium in Soil by ICIC/SPEC99621822025/07/032025/07/03Harpuneet Kaur
Petroleum Hydro. CCME F1 & BTEX in SoilHSGC/MSFD9960382N/A2025/07/01Anca Ganea
Petroleum Hydrocarbons F2-F4 in SoilGC/FID99606112025/06/302025/07/01Mohammed Abdul Nafay Shoeb
F4G (CCME Hydrocarbons Gravimetric)BAL99621922025/07/032025/07/03Rashmi Dubey
Acid Extractable Metals by ICPMSICP/MS99619052025/07/022025/07/02Daniel Teclu
MoistureBAL9960116N/A2025/06/28Diksha Desawer
PAH Compounds in Soil by GC/MS (SIM)GC/MS99612992025/07/022025/07/03Mitesh Raj

TEST SUMMARY

Bureau Veritas ID: ASLF71

Sample ID: S9

Collected: 2025/06/25

Matrix: Soil

Shipped:

Received: 2025/06/28

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Methylnaphthalene SumCALC9959980N/A2025/07/03Automated Statchk
Hot Water Extractable BoronICP99623242025/07/032025/07/03Suban Kanapathipplai
Hexavalent Chromium in Soil by ICIC/SPEC99621822025/07/032025/07/03Harpuneet Kaur
Petroleum Hydro. CCME F1 & BTEX in SoilHSGC/MSFD9960382N/A2025/07/01Anca Ganea
Petroleum Hydrocarbons F2-F4 in SoilGC/FID99606112025/06/302025/07/01Mohammed Abdul Nafay Shoeb
F4G (CCME Hydrocarbons Gravimetric)BAL99621922025/07/032025/07/03Rashmi Dubey
Acid Extractable Metals by ICPMSICP/MS99619052025/07/022025/07/02Daniel Teclu
MoistureBAL9960116N/A2025/06/28Diksha Desawer
PAH Compounds in Soil by GC/MS (SIM)GC/MS99612992025/07/022025/07/03Mitesh Raj

Bureau Veritas ID: ASLF72

Collected: 2025/06/25

Sample ID: S10

Matrix: Soil

Shipped:

Received: 2025/06/28

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Methylnaphthalene SumCALC9959980N/A2025/07/03Automated Statchk
Hot Water Extractable BoronICP99623242025/07/032025/07/03Suban Kanapathipplai
Hexavalent Chromium in Soil by ICIC/SPEC99621822025/07/032025/07/03Harpuneet Kaur
Petroleum Hydro. CCME F1 & BTEX in SoilHSGC/MSFD9960382N/A2025/07/01Anca Ganea
Petroleum Hydrocarbons F2-F4 in SoilGC/FID99606112025/06/302025/07/01Mohammed Abdul Nafay Shoeb
F4G (CCME Hydrocarbons Gravimetric)BAL99621922025/07/032025/07/03Rashmi Dubey
Acid Extractable Metals by ICPMSICP/MS99619052025/07/022025/07/02Daniel Teclu
MoistureBAL9960116N/A2025/06/28Diksha Desawer
PAH Compounds in Soil by GC/MS (SIM)GC/MS99612992025/07/022025/07/03Mitesh Raj

Bureau Veritas ID: ASLF73

Collected: 2025/06/24

Sample ID: S11

Shipped:

Matrix: Soil

Received: 2025/06/28

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Methylnaphthalene SumCALC9959980N/A2025/07/03Automated Statchk
Hot Water Extractable BoronICP99623242025/07/032025/07/03Suban Kanapathipplai
Hexavalent Chromium in Soil by ICIC/SPEC99621822025/07/032025/07/03Harpuneet Kaur
Petroleum Hydro. CCME F1 & BTEX in SoilHSGC/MSFD9960382N/A2025/07/01Anca Ganea
Petroleum Hydrocarbons F2-F4 in SoilGC/FID99606112025/06/302025/07/01Mohammed Abdul Nafay Shoeb
Acid Extractable Metals by ICPMSICP/MS99619052025/07/022025/07/02Daniel Teclu
MoistureBAL9960116N/A2025/06/28Diksha Desawer
PAH Compounds in Soil by GC/MS (SIM)GC/MS99612992025/07/022025/07/03Mitesh Raj

Bureau Veritas ID: ASLF74

Sample ID: S12

Collected: 2025/06/24

Matrix: Soil

Shipped:

Received: 2025/06/28

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Methylnaphthalene SumCALC9959980N/A2025/07/03Automated Statchk

TEST SUMMARY

Bureau Veritas ID: ASLF74

Sample ID: S12

Collected: 2025/06/24

Matrix: Soil

Shipped:

Received: 2025/06/28

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Hot Water Extractable BoronICP99623242025/07/032025/07/03Suban Kanapathipplai
Hexavalent Chromium in Soil by ICIC/SPEC99621822025/07/032025/07/03Harpuneet Kaur
Petroleum Hydro. CCME F1 & BTEX in SoilHSGC/MSFD9960382N/A2025/07/01Anca Ganea
Petroleum Hydrocarbons F2-F4 in SoilGC/FID99606112025/06/302025/07/01Mohammed Abdul Nafay Shoeb
Acid Extractable Metals by ICPMSICP/MS99619052025/07/022025/07/02Daniel Teclu
MoistureBAL9960116N/A2025/06/28Diksha Desawer
PAH Compounds in Soil by GC/MS (SIM)GC/MS99612992025/07/022025/07/03Mitesh Raj

Bureau Veritas ID: ASLF75

Sample ID: S13

Collected: 2025/06/25

Matrix: Soil

Shipped:

Received: 2025/06/28

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Methylnaphthalene SumCALC9959980N/A2025/07/03Automated Statchk
Hot Water Extractable BoronICP99623242025/07/032025/07/03Suban Kanapathipplai
Hexavalent Chromium in Soil by ICIC/SPEC99621822025/07/032025/07/03Harpuneet Kaur
Petroleum Hydro. CCME F1 & BTEX in SoilHSGC/MSFD9960382N/A2025/07/01Anca Ganea
Petroleum Hydrocarbons F2-F4 in SoilGC/FID99606112025/06/302025/07/01Mohammed Abdul Nafay Shoeb
Acid Extractable Metals by ICPMSICP/MS99619052025/07/022025/07/02Daniel Teclu
MoistureBAL9960116N/A2025/06/28Diksha Desawer
PAH Compounds in Soil by GC/MS (SIM)GC/MS99612992025/07/022025/07/03Mitesh Raj

Bureau Veritas ID: ASLF75 Dup

Sample ID: S13

Collected: 2025/06/25

Matrix: Soil

Shipped:

Received: 2025/06/28

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Acid Extractable Metals by ICPMSICP/MS99619052025/07/022025/07/02Daniel Teclu

Site Location: SMITH FALLS

Sampler Initials: GM

GENERAL COMMENTS

Each temperature is the average of up to three cooler temperatures taken at receipt
Package 12.0°C
F1 Analysis: Soil weight exceeds the protocol specification of approximately 5g in the field preserved vial. Additional methanol was added to the vial to ensure extraction efficiency.
Sample ASLF70 [S8] : PAH Analysis: Due to the sample matrix, sample required dilution. Detection limits were adjusted accordingly.
Sample ASLF72 [S10] : PAH Analysis: Due to the sample matrix, sample required dilution. Detection limits were adjusted accordingly.
Results relate only to the items tested.

Sampler Initials: GM

QUALITY ASSURANCE REPORT

QA/QC BatchInitQC TypeParameterDate AnalyzedValueRecoveryUNITSQC Limits
9960116DDRRPDMoisture2025/06/281.2%20
9960382AGAMatrix Spike [ASLF63-04]1,4-Difluorobenzene2025/06/3099%60 - 140
4-Bromofluorobenzene2025/06/30100%60 - 140
D10-o-Xylene2025/06/30101%60 - 140
D4-1,2-Dichloroethane2025/06/3095%60 - 140
Benzene2025/06/3079%50 - 140
Toluene2025/06/3080%50 - 140
Ethylbenzene2025/06/3092%50 - 140
o-Xylene2025/06/3092%50 - 140
p+m-Xylene2025/06/3089%50 - 140
F1 (C6-C10)2025/06/3093%60 - 140
9960382AGASpiked Blank1,4-Difluorobenzene2025/06/3094%60 - 140
4-Bromofluorobenzene2025/06/3098%60 - 140
D10-o-Xylene2025/06/30100%60 - 140
D4-1,2-Dichloroethane2025/06/3099%60 - 140
Benzene2025/06/3087%50 - 140
Toluene2025/06/3085%50 - 140
Ethylbenzene2025/06/3095%50 - 140
o-Xylene2025/06/3097%50 - 140
p+m-Xylene2025/06/3091%50 - 140
F1 (C6-C10)2025/06/3096%80 - 120
9960382AGAMethod Blank1,4-Difluorobenzene2025/06/30104%60 - 140
4-Bromofluorobenzene2025/06/3094%60 - 140
D10-o-Xylene2025/06/3099%60 - 140
D4-1,2-Dichloroethane2025/06/3099%60 - 140
Benzene2025/06/30ND, RDL=0.020ug/g
Toluene2025/06/30ND, RDL=0.020ug/g
Ethylbenzene2025/06/30ND, RDL=0.020ug/g
o-Xylene2025/06/30ND, RDL=0.020ug/g
p+m-Xylene2025/06/30ND, RDL=0.040ug/g
Total Xylenes2025/06/30ND, RDL=0.040ug/g
F1 (C6-C10)2025/06/30ND, RDL=10ug/g
F1 (C6-C10) - BTEX2025/06/30ND, RDL=10ug/g
9960382AGARPD [ASLF63-04]Benzene2025/06/30NC%50
Toluene2025/06/30NC%50
Ethylbenzene2025/06/30NC%50
o-Xylene2025/06/30NC%50
p+m-Xylene2025/06/30NC%50
Total Xylenes2025/06/30NC%50
F1 (C6-C10)2025/06/30NC%50
F1 (C6-C10) - BTEX2025/06/30NC%50
9960611MSZMatrix Spike [ASLF69-03]o-Terphenyl2025/07/0186%60 - 140
F2 (C10-C16 Hydrocarbons)2025/07/0192%60 - 140
F3 (C16-C34 Hydrocarbons)2025/07/0192%60 - 140
F4 (C34-C50 Hydrocarbons)2025/07/0186%60 - 140

QUALITY ASSURANCE REPORT(CONT'D)

QA/QC BatchInitQC TypeParameterDate AnalyzedValueRecoveryUNITSQC Limits
9960611MSZSpiked Blanko-Terphenyl2025/07/0184%60 - 140
9960611MSZSpiked BlankF2 (C10-C16 Hydrocarbons)2025/07/0187%80 - 120
9960611MSZSpiked BlankF3 (C16-C34 Hydrocarbons)2025/07/0187%80 - 120
9960611MSZSpiked BlankF4 (C34-C50 Hydrocarbons)2025/07/0180%80 - 120
9960611MSZMethod Blanko-Terphenyl2025/06/3087%60 - 140
9960611MSZMethod BlankF2 (C10-C16 Hydrocarbons)2025/06/30ND, RDL=7.0ug/g
9960611MSZMethod BlankF3 (C16-C34 Hydrocarbons)2025/06/30ND, RDL=50ug/g
9960611MSZMethod BlankF4 (C34-C50 Hydrocarbons)2025/06/30ND, RDL=50ug/g
9960611MSZRPD [ASLF69-03]F2 (C10-C16 Hydrocarbons)2025/07/01NC%30
9960611MSZRPD [ASLF69-03]F3 (C16-C34 Hydrocarbons)2025/07/01NC%30
9960611MSZRPD [ASLF69-03]F4 (C34-C50 Hydrocarbons)2025/07/01NC%30
9961299RAJMatrix Spike [ASLF64-03]D10-Anthracene2025/07/0291%50 - 130
9961299RAJMatrix Spike [ASLF64-03]D14-Terphenyl (FS)2025/07/0285%50 - 130
9961299RAJMatrix Spike [ASLF64-03]D8-Acenaphthylene2025/07/0284%50 - 130
9961299RAJMatrix Spike [ASLF64-03]Acenaphthene2025/07/0288%50 - 130
9961299RAJMatrix Spike [ASLF64-03]Acenaphthylene2025/07/0283%50 - 130
9961299RAJMatrix Spike [ASLF64-03]Anthracene2025/07/02103%50 - 130
9961299RAJMatrix Spike [ASLF64-03]Benzo(a)anthracene2025/07/0298%50 - 130
9961299RAJMatrix Spike [ASLF64-03]Benzo(a)pyrene2025/07/0295%50 - 130
9961299RAJMatrix Spike [ASLF64-03]Benzo(b,j)fluoranthene2025/07/0297%50 - 130
9961299RAJMatrix Spike [ASLF64-03]Benzo(g,h,i)perylene2025/07/0298%50 - 130
9961299RAJMatrix Spike [ASLF64-03]Benzo(k)fluoranthene2025/07/0295%50 - 130
9961299RAJMatrix Spike [ASLF64-03]Chrysene2025/07/0292%50 - 130
9961299RAJMatrix Spike [ASLF64-03]Dibenzo(a,h)anthracene2025/07/0298%50 - 130
9961299RAJMatrix Spike [ASLF64-03]Fluoranthene2025/07/0297%50 - 130
9961299RAJMatrix Spike [ASLF64-03]Fluorene2025/07/0290%50 - 130
9961299RAJMatrix Spike [ASLF64-03]Indeno(1,2,3-cd)pyrene2025/07/02100%50 - 130
9961299RAJMatrix Spike [ASLF64-03]1-Methylnaphthalene2025/07/0275%50 - 130
9961299RAJMatrix Spike [ASLF64-03]2-Methylnaphthalene2025/07/0279%50 - 130
9961299RAJMatrix Spike [ASLF64-03]Naphthalene2025/07/0270%50 - 130
9961299RAJMatrix Spike [ASLF64-03]Phenanthrene2025/07/0292%50 - 130
9961299RAJMatrix Spike [ASLF64-03]Pyrene2025/07/0298%50 - 130
9961299RAJSpiked BlankD10-Anthracene2025/07/0296%50 - 130
9961299RAJSpiked BlankD14-Terphenyl (FS)2025/07/0286%50 - 130
9961299RAJSpiked BlankD8-Acenaphthylene2025/07/0293%50 - 130
9961299RAJSpiked BlankAcenaphthene2025/07/0294%50 - 130
9961299RAJSpiked BlankAcenaphthylene2025/07/0292%50 - 130
9961299RAJSpiked BlankAnthracene2025/07/02104%50 - 130
9961299RAJSpiked BlankBenzo(a)anthracene2025/07/02102%50 - 130
9961299RAJSpiked BlankBenzo(a)pyrene2025/07/0296%50 - 130
9961299RAJSpiked BlankBenzo(b,j)fluoranthene2025/07/0299%50 - 130
9961299RAJSpiked BlankBenzo(g,h,i)perylene2025/07/02100%50 - 130
9961299RAJSpiked BlankBenzo(k)fluoranthene2025/07/0298%50 - 130
9961299RAJSpiked BlankChrysene2025/07/0295%50 - 130
9961299RAJSpiked BlankDibenzo(a,h)anthracene2025/07/02100%50 - 130
9961299RAJSpiked BlankFluoranthene2025/07/0297%50 - 130
9961299RAJSpiked BlankFluorene2025/07/0294%50 - 130
9961299RAJSpiked BlankIndeno(1,2,3-cd)pyrene2025/07/02104%50 - 130
9961299RAJSpiked Blank1-Methylnaphthalene2025/07/0290%50 - 130
9961299RAJSpiked Blank2-Methylnaphthalene2025/07/0296%50 - 130

QUALITY ASSURANCE REPORT(CONT'D)

QA/QC BatchInitQC TypeParameterDate AnalyzedValueRecoveryUNITSQC Limits
9961299RAJMethod BlankNaphthalene2025/07/0294%50 - 130
9961299RAJMethod BlankPhenanthrene2025/07/0293%50 - 130
9961299RAJMethod BlankPyrene2025/07/0299%50 - 130
9961299RAJMethod BlankD10-Anthracene2025/07/0296%50 - 130
9961299RAJMethod BlankD14-Terphenyl (FS)2025/07/0281%50 - 130
9961299RAJMethod BlankD8-Acenaphthylene2025/07/0292%50 - 130
9961299RAJMethod BlankAcenaphthene2025/07/02ND, RDL=0.0050ug/g
9961299RAJMethod BlankAcenaphthylene2025/07/02ND, RDL=0.0050ug/g
9961299RAJMethod BlankAnthracene2025/07/02ND, RDL=0.0050ug/g
9961299RAJMethod BlankBenzo(a)anthracene2025/07/02ND, RDL=0.0050ug/g
9961299RAJMethod BlankBenzo(a)pyrene2025/07/02ND, RDL=0.0050ug/g
9961299RAJMethod BlankBenzo(b/j)fluoranthene2025/07/02ND, RDL=0.0050ug/g
9961299RAJMethod BlankBenzo(g,h,i)perylene2025/07/02ND, RDL=0.0050ug/g
9961299RAJMethod BlankBenzo(k)fluoranthene2025/07/02ND, RDL=0.0050ug/g
9961299RAJMethod BlankChrysene2025/07/02ND, RDL=0.0050ug/g
9961299RAJMethod BlankDibenzo(a,h)anthracene2025/07/02ND, RDL=0.0050ug/g
9961299RAJMethod BlankFluoranthene2025/07/02ND, RDL=0.0050ug/g
9961299RAJMethod BlankFluorene2025/07/02ND, RDL=0.0050ug/g
9961299RAJMethod BlankIndeno(1,2,3-cd)pyrene2025/07/02ND, RDL=0.0050ug/g
9961299RAJMethod Blank1-Methylnaphthalene2025/07/02ND, RDL=0.0050ug/g
9961299RAJMethod Blank2-Methylnaphthalene2025/07/02ND, RDL=0.0050ug/g
9961299RAJMethod BlankNaphthalene2025/07/02ND, RDL=0.0050ug/g
9961299RAJMethod BlankPhenanthrene2025/07/02ND, RDL=0.0050ug/g
9961299RAJMethod BlankPyrene2025/07/02ND, RDL=0.0050ug/g
9961299RAJRPD [ASLF64-03]Acenaphthene2025/07/02NC%40
9961299RAJRPD [ASLF64-03]Acenaphthylene2025/07/02NC%40
9961299RAJRPD [ASLF64-03]Anthracene2025/07/02NC%40
9961299RAJRPD [ASLF64-03]Benzo(a)anthracene2025/07/02NC%40
9961299RAJRPD [ASLF64-03]Benzo(a)pyrene2025/07/02NC%40
9961299RAJRPD [ASLF64-03]Benzo(b/j)fluoranthene2025/07/02NC%40
9961299RAJRPD [ASLF64-03]Benzo(g,h,i)perylene2025/07/02NC%40
9961299RAJRPD [ASLF64-03]Benzo(k)fluoranthene2025/07/02NC%40
9961299RAJRPD [ASLF64-03]Chrysene2025/07/02NC%40
9961299RAJRPD [ASLF64-03]Dibenzo(a,h)anthracene2025/07/02NC%40
9961299RAJRPD [ASLF64-03]Fluoranthene2025/07/02NC%40
9961299RAJRPD [ASLF64-03]Fluorene2025/07/02NC%40

QUALITY ASSURANCE REPORT(CONT'D)

QA/QC BatchInitQC TypeParameterDate AnalyzedValueRecoveryUNITSQC Limits
9961905DT1Matrix Spike [ASLF75-01]Indeno(1,2,3-cd)pyrene2025/07/02NC%40
9961905DT1Matrix Spike [ASLF75-01]1-Methylnaphthalene2025/07/02NC%40
9961905DT1Matrix Spike [ASLF75-01]2-Methylnaphthalene2025/07/02NC%40
9961905DT1Matrix Spike [ASLF75-01]Naphthalene2025/07/02NC%40
9961905DT1Matrix Spike [ASLF75-01]Phenanthrene2025/07/02NC%40
9961905DT1Matrix Spike [ASLF75-01]Pyrene2025/07/02NC%40
9961905DT1Matrix Spike [ASLF75-01]Acid Extractable Antimony (Sb)2025/07/02115%75 - 125
9961905DT1Matrix Spike [ASLF75-01]Acid Extractable Arsenic (As)2025/07/02104%75 - 125
9961905DT1Matrix Spike [ASLF75-01]Acid Extractable Barium (Ba)2025/07/02NC%75 - 125
9961905DT1Matrix Spike [ASLF75-01]Acid Extractable Beryllium (Be)2025/07/02101%75 - 125
9961905DT1Matrix Spike [ASLF75-01]Acid Extractable Boron (B)2025/07/0299%75 - 125
9961905DT1Matrix Spike [ASLF75-01]Acid Extractable Cadmium (Cd)2025/07/02101%75 - 125
9961905DT1Matrix Spike [ASLF75-01]Acid Extractable Chromium (Cr)2025/07/02101%75 - 125
9961905DT1Matrix Spike [ASLF75-01]Acid Extractable Cobalt (Co)2025/07/02101%75 - 125
9961905DT1Matrix Spike [ASLF75-01]Acid Extractable Copper (Cu)2025/07/0299%75 - 125
9961905DT1Matrix Spike [ASLF75-01]Acid Extractable Lead (Pb)2025/07/02105%75 - 125
9961905DT1Matrix Spike [ASLF75-01]Acid Extractable Molybdenum (Mo)2025/07/0296%75 - 125
9961905DT1Matrix Spike [ASLF75-01]Acid Extractable Nickel (Ni)2025/07/02101%75 - 125
9961905DT1Matrix Spike [ASLF75-01]Acid Extractable Selenium (Se)2025/07/02107%75 - 125
9961905DT1Matrix Spike [ASLF75-01]Acid Extractable Silver (Ag)2025/07/02101%75 - 125
9961905DT1Matrix Spike [ASLF75-01]Acid Extractable Thallium (Tl)2025/07/02108%75 - 125
9961905DT1Matrix Spike [ASLF75-01]Acid Extractable Uranium (U)2025/07/02111%75 - 125
9961905DT1Matrix Spike [ASLF75-01]Acid Extractable Vanadium (V)2025/07/02103%75 - 125
9961905DT1Matrix Spike [ASLF75-01]Acid Extractable Zinc (Zn)2025/07/02NC%75 - 125
9961905DT1Matrix Spike [ASLF75-01]Acid Extractable Mercury (Hg)2025/07/02101%75 - 125
9961905DT1Spiked BlankAcid Extractable Antimony (Sb)2025/07/02113%80 - 120
9961905DT1Spiked BlankAcid Extractable Arsenic (As)2025/07/02101%80 - 120
9961905DT1Spiked BlankAcid Extractable Barium (Ba)2025/07/02101%80 - 120
9961905DT1Spiked BlankAcid Extractable Beryllium (Be)2025/07/0296%80 - 120
9961905DT1Spiked BlankAcid Extractable Boron (B)2025/07/0289%80 - 120
9961905DT1Spiked BlankAcid Extractable Cadmium (Cd)2025/07/0297%80 - 120
9961905DT1Spiked BlankAcid Extractable Chromium (Cr)2025/07/0298%80 - 120
9961905DT1Spiked BlankAcid Extractable Cobalt (Co)2025/07/0298%80 - 120
9961905DT1Spiked BlankAcid Extractable Copper (Cu)2025/07/0297%80 - 120
9961905DT1Spiked BlankAcid Extractable Lead (Pb)2025/07/02103%80 - 120
9961905DT1Spiked BlankAcid Extractable Molybdenum (Mo)2025/07/0291%80 - 120
9961905DT1Spiked BlankAcid Extractable Nickel (Ni)2025/07/02102%80 - 120
9961905DT1Spiked BlankAcid Extractable Selenium (Se)2025/07/02103%80 - 120
9961905DT1Spiked BlankAcid Extractable Silver (Ag)2025/07/0296%80 - 120
9961905DT1Spiked BlankAcid Extractable Thallium (Tl)2025/07/02105%80 - 120
9961905DT1Spiked BlankAcid Extractable Uranium (U)2025/07/02106%80 - 120
9961905DT1Spiked BlankAcid Extractable Vanadium (V)2025/07/0299%80 - 120
9961905DT1Spiked BlankAcid Extractable Zinc (Zn)2025/07/02101%80 - 120
9961905DT1Spiked BlankAcid Extractable Mercury (Hg)2025/07/0297%80 - 120
9961905DT1Method BlankAcid Extractable Antimony (Sb)2025/07/02ND, RDL=0.20ug/g
9961905DT1Method BlankAcid Extractable Arsenic (As)2025/07/02ND, RDL=1.0ug/g
9961905DT1Method BlankAcid Extractable Barium (Ba)2025/07/02ND, RDL=0.50ug/g
9961905DT1Method BlankAcid Extractable Beryllium (Be)2025/07/02ND, RDL=0.20ug/g

QUALITY ASSURANCE REPORT(CONT'D)

QA/QC BatchInitQC TypeParameterDate AnalyzedValueRecoveryUNITSQC Limits
Acid Extractable Boron (B)2025/07/02ND, RDL=5.0ug/g
Acid Extractable Cadmium (Cd)2025/07/02ND, RDL=0.10ug/g
Acid Extractable Chromium (Cr)2025/07/02ND, RDL=1.0ug/g
Acid Extractable Cobalt (Co)2025/07/02ND, RDL=0.10ug/g
Acid Extractable Copper (Cu)2025/07/02ND, RDL=0.50ug/g
Acid Extractable Lead (Pb)2025/07/02ND, RDL=1.0ug/g
Acid Extractable Molybdenum (Mo)2025/07/02ND, RDL=0.50ug/g
Acid Extractable Nickel (Ni)2025/07/02ND, RDL=0.50ug/g
Acid Extractable Selenium (Se)2025/07/02ND, RDL=0.50ug/g
Acid Extractable Silver (Ag)2025/07/02ND, RDL=0.20ug/g
Acid Extractable Thallium (TI)2025/07/02ND, RDL=0.050ug/g
Acid Extractable Uranium (U)2025/07/02ND, RDL=0.050ug/g
Acid Extractable Vanadium (V)2025/07/02ND, RDL=5.0ug/g
Acid Extractable Zinc (Zn)2025/07/02ND, RDL=5.0ug/g
Acid Extractable Mercury (Hg)2025/07/02ND, RDL=0.050ug/g
9961905DT1RPD [ASLF75-01]Acid Extractable Antimony (Sb)2025/07/02NC%30
9961905DT1RPD [ASLF75-01]Acid Extractable Arsenic (As)2025/07/025.0%30
9961905DT1RPD [ASLF75-01]Acid Extractable Barium (Ba)2025/07/023.7%30
9961905DT1RPD [ASLF75-01]Acid Extractable Beryllium (Be)2025/07/024.5%30
9961905DT1RPD [ASLF75-01]Acid Extractable Boron (B)2025/07/024.3%30
9961905DT1RPD [ASLF75-01]Acid Extractable Cadmium (Cd)2025/07/02NC%30
9961905DT1RPD [ASLF75-01]Acid Extractable Chromium (Cr)2025/07/021.1%30
9961905DT1RPD [ASLF75-01]Acid Extractable Cobalt (Co)2025/07/021.5%30
9961905DT1RPD [ASLF75-01]Acid Extractable Copper (Cu)2025/07/020.24%30
9961905DT1RPD [ASLF75-01]Acid Extractable Lead (Pb)2025/07/022.9%30
9961905DT1RPD [ASLF75-01]Acid Extractable Molybdenum (Mo)2025/07/02NC%30
9961905DT1RPD [ASLF75-01]Acid Extractable Nickel (Ni)2025/07/023.2%30
9961905DT1RPD [ASLF75-01]Acid Extractable Selenium (Se)2025/07/02NC%30
9961905DT1RPD [ASLF75-01]Acid Extractable Silver (Ag)2025/07/02NC%30
9961905DT1RPD [ASLF75-01]Acid Extractable Thallium (TI)2025/07/028.8%30
9961905DT1RPD [ASLF75-01]Acid Extractable Uranium (U)2025/07/023.3%30
9961905DT1RPD [ASLF75-01]Acid Extractable Vanadium (V)2025/07/020.38%30
9961905DT1RPD [ASLF75-01]Acid Extractable Zinc (Zn)2025/07/020.36%30
9961905DT1RPD [ASLF75-01]Acid Extractable Mercury (Hg)2025/07/02NC%30
9962182HK1Matrix Spike [ASLF64-01]Chromium (VI)2025/07/0385%70 - 130
9962182HK1Spiked BlankChromium (VI)2025/07/0389%80 - 120
9962182HK1Method BlankChromium (VI)2025/07/03ND, RDL=0.18ug/g
9962182HK1RPD [ASLF64-01]Chromium (VI)2025/07/03NC%35

Client Project #: COMPOST SITE

Site Location: SMITH FALLS

Sampler Initials: GM

QUALITY ASSURANCE REPORT(CONT'D)

QA/QC
BatchInitQC TypeParameterDate AnalyzedValueRecoveryUNITSQC Limits
9962192RDUMatrix SpikeF4G-sg (Grav. Heavy Hydrocarbons)2025/07/0382%65 - 135
9962192RDUSpiked BlankF4G-sg (Grav. Heavy Hydrocarbons)2025/07/03101%65 - 135
9962192RDUMethod BlankF4G-sg (Grav. Heavy Hydrocarbons)2025/07/03ND, RDL=100ug/g
9962192RDURPDF4G-sg (Grav. Heavy Hydrocarbons)2025/07/037.7%50
9962324SUKMatrix Spike [ASLF69-01]Hot Water Ext. Boron (B)2025/07/03100%75 - 125
9962324SUKSpiked BlankHot Water Ext. Boron (B)2025/07/03104%75 - 125
9962324SUKMethod BlankHot Water Ext. Boron (B)2025/07/03ND, RDL=0.050ug/g
9962324SUKRPD [ASLF69-01]Hot Water Ext. Boron (B)2025/07/039.0%40
Duplicate: Paired analysis of a separate portion of the same sample. Used to evaluate the variance in the measurement. Matrix Spike: A sample to which a known amount of the analyte of interest has been added. Used to evaluate sample matrix interference.
Spiked Blank: A blank matrix sample to which a known amount of the analyte, usually from a second source, has been added. Used to evaluate method accuracy.
Method Blank: A blank matrix containing all reagents used in the analytical procedure. Used to identify laboratory contamination.
Surrogate: A pure or isotopically labeled compound whose behavior mirrors the analytes of interest. Used to evaluate extraction efficiency.
NC (Matrix Spike): The recovery in the matrix spike was not calculated. The relative difference between the concentration in the parent sample and the spike amount was too small to permit a reliable recovery calculation (matrix spike concentration was less than the native sample concentration)
NC (Duplicate RPD): The duplicate RPD was not calculated. The concentration in the sample and/or duplicate was too low to permit a reliable RPD calculation (absolute difference <= 2x RDL).

Bureau Veritas Job #: C577434 Report Date: 2025/07/03

St Lawrence Testing & Inspection Co Ltd Client Project #: COMPOST SITE Site Location: SMITH FALLS Sampler Initials: GM

VALIDATION SIGNATURE PAGE

The analytical data and all QC contained in this report were reviewed and validated by:

Cristina Carriere, Senior Scientific Specialist

Bureau Veritas has procedures in place to guard against improper use of the electronic signature and have the required "signatories", as per ISO/IEC 17025, signing the reports. For Service Group specific validation, please refer to the Validation Signatures page if included, otherwise available by request. For Department specific Analyst/Supervisor validation names, please refer to the Test Summary section if included, otherwise available by request. This report is authorized by Rodney Major, General Manager responsible for Ontario Environmental laboratory operations.


ATTACHMENT I

Laboratory Certificate of Analysis – Surface Water


Attention: Gib McIntee

St Lawrence Testing & Inspection Co Ltd

814 Second St PO Box 997 Cornwall, ON CANADA K

W

6H 5V1

Report Date: 2025/04/03 Report #: R8514203 Version: 1 - Final

CERTIFICATE OF ANALYSIS

BUREAU VERITAS JOB #: C533951

Received: 2025/03/28, 09:05

Sample Matrix: Water # Samples Received: 4

AnalysesDate QuantityDate ExtractedDate AnalyzedDate Laboratory MethodAnalytical Method
Methylnaphthalene Sum4N/A2025/04/02CAM SOP-00301EPA 8270D m
Chromium (VI) in Water4N/A2025/04/01CAM SOP-00436EPA 7199 m
Petroleum Hydro. CCME F1 & BTEX in Water4N/A2025/04/02CAM SOP-00315CCME PHC-CWS m
Petroleum Hydrocarbons F2-F4 in Water (1)42025/04/012025/04/01CAM SOP-00316CCME PHC-CWS m
Mercury42025/04/022025/04/02CAM SOP-00453EPA 7470A m
Dissolved Metals by ICPMS4N/A2025/03/31CAM SOP-00447EPA 6020B m
PAH Compounds in Water by GC/MS (SIM)42025/04/012025/04/01CAM SOP-00318EPA 8270E

Remarks:

Bureau Veritas is accredited to ISO/IEC 17025 for specific parameters on scopes of accreditation. Unless otherwise noted, procedures used by Bureau Veritas are based upon recognized Provincial, Federal or US method compendia such as CCME, EPA, APHA or the Quebec Ministry of Environment.

All work recorded herein has been done in accordance with procedures and practices ordinarily exercised by professionals in Bureau Veritas' profession using accepted testing methodologies, quality assurance and quality control procedures (except where otherwise agreed by the client and Bureau Veritas in writing). All data is in statistical control and has met quality control and method performance criteria unless otherwise noted. All method blanks are reported; unless indicated otherwise, associated sample data are not blank corrected. Where applicable, unless otherwise noted, Measurement Uncertainty has not been accounted for when stating conformity to the referenced standard.

Bureau Veritas liability is limited to the actual cost of the requested analyses, unless otherwise agreed in writing. There is no other warranty expressed or implied. Bureau Veritas has been retained to provide analysis of samples provided by the Client using the testing methodology referenced in this report. Interpretation and use of test results are the sole responsibility of the Client and are not within the scope of services provided by Bureau Veritas, unless otherwise agreed in writing. Bureau Veritas is not responsible for the accuracy or any data impacts, that result from the information provided by the customer or their agent.

Solid sample results, except biota, are based on dry weight unless otherwise indicated. Organic analyses are not recovery corrected except for isotope dilution methods.

Results relate to samples tested. When sampling is not conducted by Bureau Veritas, results relate to the supplied samples tested.

This Certificate shall not be reproduced except in full, without the written approval of the laboratory.

Reference Method suffix "m" indicates test methods incorporate validated modifications from specific reference methods to improve performance.

  • RPDs calculated using raw data. The rounding of final results may result in the apparent difference.

(1) All CCME PHC results met required criteria unless otherwise stated in the report. The CWS PHC methods employed by Bureau Veritas conform to all prescribed elements of the reference method and performance based elements have been validated. All modifications have been validated and proven equivalent following "Alberta Environment's


Your Project #: SMITHS FALLS COMPOST SITE Site Location: SMITHS FALLS Your C.O.C. #: N/A

Attention: Gib McIntee St Lawrence Testing & Inspection Co Ltd

814 Second St W PO Box 997 Cornwall, ON CANADA K6H 5V1

Report Date: 2025/04/03 Report #: R8514203 Version: 1 - Final

CERTIFICATE OF ANALYSIS

BUREAU VERITAS JOB #: C533951

Received: 2025/03/28, 09:05 Interpretation of the Reference Method for the Canada-Wide Standard for Petroleum Hydrocarbons in Soil Validation of Performance-Based Alternative Methods September 2003”. Documentation is available upon request. Modifications from Reference Method for the Canada-wide Standard for Petroleum Hydrocarbons in Soil-Tier 1 Method: F2/F3/F4 data reported using validated cold solvent extraction instead of Soxhlet extraction.

Encryption Key

Jolanta Goralczyk Project Manager 03 Apr 2025 17:53:04

Please direct all questions regarding this Certificate of Analysis to: Jolanta Goralczyk, Project Manager Email: Jolanta.Goralczyk@bureauveritas.com Phone# (905)817-5751

Bureau Veritas has procedures in place to guard against improper use of the electronic signature and have the required "signatories", as per ISO/IEC 17025, signing the reports. For Service Group specific validation, please refer to the Validation Signatures page if included, otherwise available by request. For Department specific Analyst/Supervisor validation names, please refer to the Test Summary section if included, otherwise available by request. This report is authorized by Rodney Major, General Manager responsible for Ontario Environmental laboratory operations.

Total Cover Pages : 2 Page 2 of 17

Bureau Veritas 6740 Campobello Road, Mississauga, Ontario, L5N 2L8 Tel: (905) 817-5700 Toll-Free: 800-563-6266 Fax: (905) 817-5777 www.bvna.com

Microbiology testing is conducted at 6660 Campobello Rd. Chemistry testing is conducted at 6740 Campobello Rd.


Sampler Initials: GM

O.REG 153 METALS PACKAGE (WATER)

Bureau Veritas IDAPIS12APIS12APIS13
Sampling Date2025/03/25 13:002025/03/25 13:002025/03/25 13:30
COC NumberN/AN/AN/A
UNITSS1RDLQC BatchS1 Lab-DupRDLQC BatchS2RDLQC Batch
Metals
Chromium (VI)ug/LND0.5099002060ND0.5099002060ND0.5099002060
Mercury (Hg)ug/LND0.1099002695ND0.1099002695
Dissolved Antimony (Sb)ug/LND0.509900835ND0.509900835ND0.509900835
Dissolved Arsenic (As)ug/LND1.09900835ND1.09900835ND1.09900835
Dissolved Barium (Ba)ug/L472.09900835482.09900835512.09900835
Dissolved Beryllium (Be)ug/LND0.409900835ND0.409900835ND0.409900835
Dissolved Boron (B)ug/LND109900835ND109900835ND109900835
Dissolved Cadmium (Cd)ug/LND0.0909900835ND0.0909900835ND0.0909900835
Dissolved Chromium (Cr)ug/LND5.09900835ND5.09900835ND5.09900835
Dissolved Cobalt (Co)ug/LND0.509900835ND0.509900835ND0.509900835
Dissolved Copper (Cu)ug/L1.00.9099008351.00.9099008351.10.909900835
Dissolved Lead (Pb)ug/LND0.509900835ND0.509900835ND0.509900835
Dissolved Molybdenum (Mo)ug/LND0.509900835ND0.509900835ND0.509900835
Dissolved Nickel (Ni)ug/LND1.09900835ND1.09900835ND1.09900835
Dissolved Selenium (Se)ug/LND2.09900835ND2.09900835ND2.09900835
Dissolved Silver (Ag)ug/LND0.0909900835ND0.0909900835ND0.0909900835
Dissolved Sodium (Na)ug/L810010099008358000100990083573001009900835
Dissolved Thallium (TI)ug/LND0.0509900835ND0.0509900835ND0.0509900835
Dissolved Uranium (U)ug/L0.140.1099008350.140.1099008350.170.109900835
Dissolved Vanadium (V)ug/LND0.509900835ND0.509900835ND0.509900835
Dissolved Zinc (Zn)ug/L8.85.09900835135.099008358.25.09900835
RDL = Reportable Detection LimitQC Batch = Quality Control BatchLab-Dup = Laboratory Initiated DuplicateND = Not Detected at a concentration equal or greater than the indicated Detection Limit.

O.REG 153 METALS PACKAGE (WATER)

Bureau Veritas IDAPIS14APIS15
Sampling Date2025/03/25 14:002025/03/25 14:30
COC NumberN/AN/A
UNITSS3S4RDLQC Batch
Metals
Chromium (VI)ug/LNDND0.509902060
Mercury (Hg)ug/LNDND0.109902695
Dissolved Antimony (Sb)ug/LNDND0.509900832
Dissolved Arsenic (As)ug/LNDND1.09900832
Dissolved Barium (Ba)ug/L55412.09900832
Dissolved Beryllium (Be)ug/LNDND0.409900832
Dissolved Boron (B)ug/LNDND109900832
Dissolved Cadmium (Cd)ug/LNDND0.0909900832
Dissolved Chromium (Cr)ug/LNDND5.09900832
Dissolved Cobalt (Co)ug/LNDND0.509900832
Dissolved Copper (Cu)ug/LNDND0.909900832
Dissolved Lead (Pb)ug/LNDND0.509900832
Dissolved Molybdenum (Mo)ug/LNDND0.509900832
Dissolved Nickel (Ni)ug/LNDND1.09900832
Dissolved Selenium (Se)ug/LNDND2.09900832
Dissolved Silver (Ag)ug/LNDND0.0909900832
Dissolved Sodium (Na)ug/L7500230001009900832
Dissolved Thallium (TI)ug/LNDND0.0509900832
Dissolved Uranium (U)ug/L0.160.160.109900832
Dissolved Vanadium (V)ug/LNDND0.509900832
Dissolved Zinc (Zn)ug/L6.35.55.09900832
RDL = Reportable Detection Limit QC Batch = Quality Control Batch ND = Not Detected at a concentration equal or greater than the indicated Detection Limit.

St Lawrence Testing & Inspection Co Ltd Client Project #: SMITHS FALLS COMPOST SITE Site Location: SMITHS FALLS Sampler Initials: GM

O.REG 153 PAHS (WATER)

Bureau Veritas IDAPIS12APIS13APIS14APIS15
Sampling Date2025/03/25 13:002025/03/25 13:302025/03/25 14:002025/03/25 14:30
COC NumberN/AN/AN/AN/A
UNITSS1QC BatchS2S3S4RDLQC Batch
Calculated Parameters
Methylnaphthalene, 2-(1-) Polyaromatic Hydrocarbonsug/LND9900077NDNDND0.0719900575
Acenaphtheneug/LND9901823NDNDND0.0509901823
Acenaphthyleneug/LND9901823NDNDND0.0509901823
Anthraceneug/LND9901823NDNDND0.0509901823
Benzo(a)anthraceneug/LND9901823NDNDND0.0509901823
Benzo(a)pyreneug/LND9901823NDNDND0.00909901823
Benzo(b/j)fluorantheneug/LND9901823NDNDND0.0509901823
Benzo(g,h,i)peryleneug/LND9901823NDNDND0.0509901823
Benzo(k)fluorantheneug/LND9901823NDNDND0.0509901823
Chryseneug/LND9901823NDNDND0.0509901823
Dibenzo(a,h)anthraceneug/LND9901823NDNDND0.0509901823
Fluorantheneug/LND9901823NDNDND0.0509901823
Fluoreneug/LND9901823NDNDND0.0509901823
Indeno(1,2,3-cd)pyreneug/LND9901823NDNDND0.0509901823
1-Methylnaphthaleneug/LND9901823NDNDND0.0509901823
2-Methylnaphthaleneug/LND9901823NDNDND0.0509901823
Naphthaleneug/LND9901823NDNDND0.0509901823
Phenanthreneug/LND9901823NDNDND0.0309901823
Pyreneug/LND9901823NDNDND0.0509901823
Surrogate Recovery (%)
D10-Anthracene%10699018231041011049901823
D14-Terphenyl (FS)%10599018231061041089901823
D8-Acenaphthylene%9599018239492939901823
RDL = Reportable Detection Limit QC Batch = Quality Control Batch ND = Not Detected at a concentration equal or greater than the indicated Detection Limit.

St Lawrence Testing & Inspection Co Ltd Client Project #: SMITHS FALLS COMPOST SITE Site Location: SMITHS FALLS Sampler Initials: GM

O.REG 153 PHCS, BTEX/F1-F4 (WATER)

Bureau Veritas IDAPIS12APIS13APIS14APIS15
Sampling Date2025/03/25 13:002025/03/25 13:302025/03/25 14:002025/03/25 14:30
COC NumberN/AN/AN/AN/A
UNITSS1S2S3S4RDLQC Batch
BTEX & F1 Hydrocarbons
Benzeneug/LNDNDNDND0.209902637
Tolueneug/LNDNDNDND0.209902637
Ethylbenzeneug/LNDNDNDND0.209902637
o-Xyleneug/LNDNDNDND0.209902637
p+m-Xyleneug/LNDNDNDND0.409902637
Total Xylenesug/LNDNDNDND0.409902637
F1 (C6-C10)ug/LNDNDNDND259902637
F1 (C6-C10) - BTEXug/LNDNDNDND259902637
F2-F4 Hydrocarbons
F2 (C10-C16 Hydrocarbons)ug/LNDNDNDND909901826
F3 (C16-C34 Hydrocarbons)ug/LNDNDNDND2009901826
F4 (C34-C50 Hydrocarbons)ug/LNDNDNDND2009901826
Reached Baseline at C50ug/LYesYesYesYes9901826
Surrogate Recovery (%)
1,4-Difluorobenzene%999598979902637
4-Bromofluorobenzene%1009797979902637
D10-o-Xylene%979595959902637
D4-1,2-Dichloroethane%979593939902637
o-Terphenyl%899189879901826
RDL = Reportable Detection Limit QC Batch = Quality Control Batch ND = Not Detected at a concentration equal or greater than the indicated Detection Limit.

TEST SUMMARY

Bureau Veritas ID: APIS12

Sample ID: S1

Collected: 2025/03/25

Matrix: Water

Shipped:

Received: 2025/03/28

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Methylnaphthalene SumCALC9900077N/A2025/04/02Automated Statchk
Chromium (VI) in WaterIC9902060N/A2025/04/01Rupinder Sihota
Petroleum Hydro. CCME F1 & BTEX in WaterHSGC/MSFD9902637N/A2025/04/02Ravinder Gaidhu
Petroleum Hydrocarbons F2-F4 in WaterGC/FID99018262025/04/012025/04/01Anna Stuglik-Rolland
MercuryCV/AA99026952025/04/022025/04/02Maitri PATIL
Dissolved Metals by ICPMSICP/MS9900835N/A2025/03/31Nan Raykha
PAH Compounds in Water by GC/MS (SIM)GC/MS99018232025/04/012025/04/01Margaret Kulczyk-Stanko

Bureau Veritas ID: APIS12 Dup

Collected: 2025/03/25

Sample ID: S1

Matrix: Water

Shipped:

Received: 2025/03/28

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Chromium (VI) in WaterIC9902060N/A2025/04/01Rupinder Sihota
Dissolved Metals by ICPMSICP/MS9900835N/A2025/03/31Nan Raykha

Bureau Veritas ID: APIS13

Sample ID: S2

Collected: 2025/03/25

Shipped:

Matrix: Water

Received: 2025/03/28

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Methylnaphthalene SumCALC9900575N/A2025/04/02Automated Statchk
Chromium (VI) in WaterIC9902060N/A2025/04/01Rupinder Sihota
Petroleum Hydro. CCME F1 & BTEX in WaterHSGC/MSFD9902637N/A2025/04/02Ravinder Gaidhu
Petroleum Hydrocarbons F2-F4 in WaterGC/FID99018262025/04/012025/04/01Anna Stuglik-Rolland
MercuryCV/AA99026952025/04/022025/04/02Maitri PATIL
Dissolved Metals by ICPMSICP/MS9900835N/A2025/03/31Nan Raykha
PAH Compounds in Water by GC/MS (SIM)GC/MS99018232025/04/012025/04/01Margaret Kulczyk-Stanko

Bureau Veritas ID: APIS14

Collected: 2025/03/25

Sample ID: S3

Matrix: Water

Shipped:

Received: 2025/03/28

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Methylnaphthalene SumCALC9900575N/A2025/04/02Automated Statchk
Chromium (VI) in WaterIC9902060N/A2025/04/01Rupinder Sihota
Petroleum Hydro. CCME F1 & BTEX in WaterHSGC/MSFD9902637N/A2025/04/02Ravinder Gaidhu
Petroleum Hydrocarbons F2-F4 in WaterGC/FID99018262025/04/012025/04/01Anna Stuglik-Rolland
MercuryCV/AA99026952025/04/022025/04/02Maitri PATIL
Dissolved Metals by ICPMSICP/MS9900832N/A2025/03/31Indira HarryPaul
PAH Compounds in Water by GC/MS (SIM)GC/MS99018232025/04/012025/04/01Margaret Kulczyk-Stanko

Bureau Veritas Job #: C533951 Report Date: 2025/04/03

St Lawrence Testing & Inspection Co Ltd Client Project #: SMITHS FALLS COMPOST SITE Site Location: SMITHS FALLS Sampler Initials: GM

TEST SUMMARY

Bureau Veritas ID: APIS15

Sample ID: S4

Matrix: Water

Collected: 2025/03/25

Shipped:

Received: 2025/03/28

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Methylnaphthalene SumCALC9900575N/A2025/04/02Automated Statchk
Chromium (VI) in WaterIC9902060N/A2025/04/01Rupinder Sihota
Petroleum Hydro. CCME F1 & BTEX in WaterHSGC/MSFD9902637N/A2025/04/02Ravinder Gaidhu
Petroleum Hydrocarbons F2-F4 in WaterGC/FID99018262025/04/012025/04/01Anna Stuglik-Rolland
MercuryCV/AA99026952025/04/022025/04/02Maitri PATIL
Dissolved Metals by ICPMSICP/MS9900832N/A2025/03/31Indira HarryPaul
PAH Compounds in Water by GC/MS (SIM)GC/MS99018232025/04/012025/04/01Margaret Kulczyk-Stanko

St Lawrence Testing & Inspection Co Ltd Client Project #: SMITHS FALLS COMPOST SITE Site Location: SMITHS FALLS Sampler Initials: GM

GENERAL COMMENTS

Each temperature is the average of up to three cooler temperatures taken at receipt
Package 13.3°C
Results relate only to the items tested.

Site Location: SMITHS FALLS

Sampler Initials: GM

QUALITY ASSURANCE REPORT

QA/QC BatchInitQC TypeParameterDate AnalyzedValueRecoveryUNITSQC Limits
9900832IHPMatrix SpikeDissolved Antimony (Sb)2025/03/31102%80 - 120
9900832IHPMatrix SpikeDissolved Arsenic (As)2025/03/3199%80 - 120
9900832IHPMatrix SpikeDissolved Barium (Ba)2025/03/31101%80 - 120
9900832IHPMatrix SpikeDissolved Beryllium (Be)2025/03/3198%80 - 120
9900832IHPMatrix SpikeDissolved Boron (B)2025/03/3191%80 - 120
9900832IHPMatrix SpikeDissolved Cadmium (Cd)2025/03/3199%80 - 120
9900832IHPMatrix SpikeDissolved Chromium (Cr)2025/03/3197%80 - 120
9900832IHPMatrix SpikeDissolved Cobalt (Co)2025/03/3193%80 - 120
9900832IHPMatrix SpikeDissolved Copper (Cu)2025/03/3197%80 - 120
9900832IHPMatrix SpikeDissolved Lead (Pb)2025/03/3196%80 - 120
9900832IHPMatrix SpikeDissolved Molybdenum (Mo)2025/03/31100%80 - 120
9900832IHPMatrix SpikeDissolved Nickel (Ni)2025/03/3194%80 - 120
9900832IHPMatrix SpikeDissolved Selenium (Se)2025/03/3199%80 - 120
9900832IHPMatrix SpikeDissolved Silver (Ag)2025/03/3193%80 - 120
9900832IHPMatrix SpikeDissolved Sodium (Na)2025/03/3193%80 - 120
9900832IHPMatrix SpikeDissolved Thallium (Tl)2025/03/3199%80 - 120
9900832IHPMatrix SpikeDissolved Uranium (U)2025/03/31103%80 - 120
9900832IHPMatrix SpikeDissolved Vanadium (V)2025/03/3197%80 - 120
9900832IHPMatrix SpikeDissolved Zinc (Zn)2025/03/3197%80 - 120
9900832IHPSpiked BlankDissolved Antimony (Sb)2025/03/3196%80 - 120
9900832IHPSpiked BlankDissolved Arsenic (As)2025/03/3197%80 - 120
9900832IHPSpiked BlankDissolved Barium (Ba)2025/03/3197%80 - 120
9900832IHPSpiked BlankDissolved Beryllium (Be)2025/03/3194%80 - 120
9900832IHPSpiked BlankDissolved Boron (B)2025/03/3189%80 - 120
9900832IHPSpiked BlankDissolved Cadmium (Cd)2025/03/3195%80 - 120
9900832IHPSpiked BlankDissolved Chromium (Cr)2025/03/3195%80 - 120
9900832IHPSpiked BlankDissolved Cobalt (Co)2025/03/3191%80 - 120
9900832IHPSpiked BlankDissolved Copper (Cu)2025/03/3194%80 - 120
9900832IHPSpiked BlankDissolved Lead (Pb)2025/03/3194%80 - 120
9900832IHPSpiked BlankDissolved Molybdenum (Mo)2025/03/3196%80 - 120
9900832IHPSpiked BlankDissolved Nickel (Ni)2025/03/3192%80 - 120
9900832IHPSpiked BlankDissolved Selenium (Se)2025/03/3195%80 - 120
9900832IHPSpiked BlankDissolved Silver (Ag)2025/03/3191%80 - 120
9900832IHPSpiked BlankDissolved Sodium (Na)2025/03/3194%80 - 120
9900832IHPSpiked BlankDissolved Thallium (Tl)2025/03/3199%80 - 120
9900832IHPSpiked BlankDissolved Uranium (U)2025/03/3198%80 - 120
9900832IHPSpiked BlankDissolved Vanadium (V)2025/03/3195%80 - 120
9900832IHPSpiked BlankDissolved Zinc (Zn)2025/03/3195%80 - 120
9900832IHPMethod BlankDissolved Antimony (Sb)2025/03/31ND, RDL=0.50ug/L
9900832IHPMethod BlankDissolved Arsenic (As)2025/03/31ND, RDL=1.0ug/L
9900832IHPMethod BlankDissolved Barium (Ba)2025/03/31ND, RDL=2.0ug/L
9900832IHPMethod BlankDissolved Beryllium (Be)2025/03/31ND, RDL=0.40ug/L
9900832IHPMethod BlankDissolved Boron (B)2025/03/31ND, RDL=10ug/L
9900832IHPMethod BlankDissolved Cadmium (Cd)2025/03/31ND, RDL=0.090ug/L

QUALITY ASSURANCE REPORT(CONT'D)

QA/QC BatchInitQC TypeParameterDate AnalyzedValueRecoveryUNITSQC Limits
Dissolved Chromium (Cr)2025/03/31ND, RDL=5.0ug/L
Dissolved Cobalt (Co)2025/03/31ND, RDL=0.50ug/L
Dissolved Copper (Cu)2025/03/31ND, RDL=0.90ug/L
Dissolved Lead (Pb)2025/03/31ND, RDL=0.50ug/L
Dissolved Molybdenum (Mo)2025/03/31ND, RDL=0.50ug/L
Dissolved Nickel (Ni)2025/03/31ND, RDL=1.0ug/L
Dissolved Selenium (Se)2025/03/31ND, RDL=2.0ug/L
Dissolved Silver (Ag)2025/03/31ND, RDL=0.090ug/L
Dissolved Sodium (Na)2025/03/31ND, RDL=100ug/L
Dissolved Thallium (TI)2025/03/31ND, RDL=0.050ug/L
Dissolved Uranium (U)2025/03/31ND, RDL=0.10ug/L
Dissolved Vanadium (V)2025/03/31ND, RDL=0.50ug/L
Dissolved Zinc (Zn)2025/03/31ND, RDL=5.0ug/L
9900832IHPRPDDissolved Lead (Pb)2025/03/31NC%20
9900835N_RMatrix Spike [APIS12-03]Dissolved Antimony (Sb)2025/03/31101%80 - 120
Dissolved Arsenic (As)2025/03/3199%80 - 120
Dissolved Barium (Ba)2025/03/3197%80 - 120
Dissolved Beryllium (Be)2025/03/3193%80 - 120
Dissolved Boron (B)2025/03/3189%80 - 120
Dissolved Cadmium (Cd)2025/03/31100%80 - 120
Dissolved Chromium (Cr)2025/03/3195%80 - 120
Dissolved Cobalt (Co)2025/03/3196%80 - 120
Dissolved Copper (Cu)2025/03/3199%80 - 120
Dissolved Lead (Pb)2025/03/3195%80 - 120
Dissolved Molybdenum (Mo)2025/03/3198%80 - 120
Dissolved Nickel (Ni)2025/03/3195%80 - 120
Dissolved Selenium (Se)2025/03/31100%80 - 120
Dissolved Silver (Ag)2025/03/3189%80 - 120
Dissolved Sodium (Na)2025/03/3194%80 - 120
Dissolved Thallium (TI)2025/03/3198%80 - 120
Dissolved Uranium (U)2025/03/3199%80 - 120
Dissolved Vanadium (V)2025/03/3195%80 - 120
Dissolved Zinc (Zn)2025/03/3198%80 - 120
9900835N_RSpiked BlankDissolved Antimony (Sb)2025/03/3198%80 - 120
Dissolved Arsenic (As)2025/03/3198%80 - 120
Dissolved Barium (Ba)2025/03/3196%80 - 120
Dissolved Beryllium (Be)2025/03/3192%80 - 120
Dissolved Boron (B)2025/03/3189%80 - 120
Dissolved Cadmium (Cd)2025/03/3199%80 - 120

Bureau Veritas 6740 Campobello Road, Mississauga, Ontario, LSN 2L8 Tel:(905) 817-5700 Toll-Free: 800-563-6266 Fax:(905) 817-5777 www.bvna.com


QUALITY ASSURANCE REPORT(CONT'D)

QA/QC BatchInitQC TypeParameterDate AnalyzedValueRecoveryUNITSQC Limits
Dissolved Chromium (Cr)2025/03/3196%80 - 120
Dissolved Cobalt (Co)2025/03/3198%80 - 120
Dissolved Copper (Cu)2025/03/3198%80 - 120
Dissolved Lead (Pb)2025/03/3196%80 - 120
Dissolved Molybdenum (Mo)2025/03/3197%80 - 120
Dissolved Nickel (Ni)2025/03/3197%80 - 120
Dissolved Selenium (Se)2025/03/3198%80 - 120
Dissolved Silver (Ag)2025/03/3192%80 - 120
Dissolved Sodium (Na)2025/03/3199%80 - 120
Dissolved Thallium (Tl)2025/03/3198%80 - 120
Dissolved Uranium (U)2025/03/3199%80 - 120
Dissolved Vanadium (V)2025/03/3196%80 - 120
Dissolved Zinc (Zn)2025/03/3198%80 - 120
9900835N_RMethod BlankDissolved Antimony (Sb)2025/03/31ND, RDL=0.50ug/L
Dissolved Arsenic (As)2025/03/31ND, RDL=1.0ug/L
Dissolved Barium (Ba)2025/03/31ND, RDL=2.0ug/L
Dissolved Beryllium (Be)2025/03/31ND, RDL=0.40ug/L
Dissolved Boron (B)2025/03/31ND, RDL=10ug/L
Dissolved Cadmium (Cd)2025/03/31ND, RDL=0.090ug/L
Dissolved Chromium (Cr)2025/03/31ND, RDL=5.0ug/L
Dissolved Cobalt (Co)2025/03/31ND, RDL=0.50ug/L
Dissolved Copper (Cu)2025/03/31ND, RDL=0.90ug/L
Dissolved Lead (Pb)2025/03/31ND, RDL=0.50ug/L
Dissolved Molybdenum (Mo)2025/03/31ND, RDL=0.50ug/L
Dissolved Nickel (Ni)2025/03/31ND, RDL=1.0ug/L
Dissolved Selenium (Se)2025/03/31ND, RDL=2.0ug/L
Dissolved Silver (Ag)2025/03/31ND, RDL=0.090ug/L
Dissolved Sodium (Na)2025/03/31ND, RDL=100ug/L
Dissolved Thallium (Tl)2025/03/31ND, RDL=0.050ug/L
Dissolved Uranium (U)2025/03/31ND, RDL=0.10ug/L
Dissolved Vanadium (V)2025/03/31ND, RDL=0.50ug/L
Dissolved Zinc (Zn)2025/03/31ND, RDL=5.0ug/L
9900835N_RRPD [APIS12-03]Dissolved Antimony (Sb)2025/03/31NC%20

Sampler Initials: GM

QUALITY ASSURANCE REPORT(CONT'D)

QA/QC
BatchinitQC TypeParameterDate AnalyzedValueRecoveryUNITSQC Limits
Dissolved Arsenic (As)2025/03/31NC%20
Dissolved Barium (Ba)2025/03/312.1%20
Dissolved Beryllium (Be)2025/03/31NC%20
Dissolved Boron (B)2025/03/31NC%20
Dissolved Cadmium (Cd)2025/03/31NC%20
Dissolved Chromium (Cr)2025/03/31NC%20
Dissolved Cobalt (Co)2025/03/31NC%20
Dissolved Copper (Cu)2025/03/310.86%20
Dissolved Lead (Pb)2025/03/31NC%20
Dissolved Molybdenum (Mo)2025/03/31NC%20
Dissolved Nickel (Ni)2025/03/31NC%20
Dissolved Selenium (Se)2025/03/31NC%20
Dissolved Silver (Ag)2025/03/31NC%20
Dissolved Sodium (Na)2025/03/310.76%20
Dissolved Thallium (Tl)2025/03/31NC%20
Dissolved Uranium (U)2025/03/312.1%20
Dissolved Vanadium (V)2025/03/31NC%20
Dissolved Zinc (Zn)2025/03/31NC%20
9901823MKSMatrix SpikeD10-Anthracene2025/04/01101%50 - 130
9901823MKSMatrix SpikeD14-Terphenyl (FS)2025/04/01102%50 - 130
9901823MKSMatrix SpikeDB-Acenaphthylene2025/04/0194%50 - 130
9901823MKSMatrix SpikeAcenaphthene2025/04/0194%50 - 130
9901823MKSMatrix SpikeAcenaphthylene2025/04/0192%50 - 130
9901823MKSMatrix SpikeAnthracene2025/04/01106%50 - 130
9901823MKSMatrix SpikeBenzo(a)anthracene2025/04/01103%50 - 130
9901823MKSMatrix SpikeBenzo(a)pyrene2025/04/0197%50 - 130
9901823MKSMatrix SpikeBenzo(b,f)fluoranthene2025/04/01100%50 - 130
9901823MKSMatrix SpikeBenzo(g,h,i)perylene2025/04/0198%50 - 130
9901823MKSMatrix SpikeBenzo(k)fluoranthene2025/04/01102%50 - 130
9901823MKSMatrix SpikeChrysene2025/04/0199%50 - 130
9901823MKSMatrix SpikeDibenzo(a,h)anthracene2025/04/0189%50 - 130
9901823MKSMatrix SpikeFluoranthene2025/04/01112%50 - 130
9901823MKSMatrix SpikeFluorene2025/04/01100%50 - 130
9901823MKSMatrix SpikeIndeno(1,2,3-cd)pyrene2025/04/01105%50 - 130
9901823MKSMatrix Spike1-Methylnaphthalene2025/04/0192%50 - 130
9901823MKSMatrix Spike2-Methylnaphthalene2025/04/0190%50 - 130
9901823MKSMatrix SpikeNaphthalene2025/04/0191%50 - 130
9901823MKSMatrix SpikePhenanthrene2025/04/01101%50 - 130
9901823MKSMatrix SpikePyrene2025/04/01112%50 - 130
9901823MKSSpiked BlankD10-Anthracene2025/04/01104%50 - 130
9901823MKSSpiked BlankD14-Terphenyl (FS)2025/04/01106%50 - 130
9901823MKSSpiked BlankDB-Acenaphthylene2025/04/0195%50 - 130
9901823MKSSpiked BlankAcenaphthene2025/04/0192%50 - 130
9901823MKSSpiked BlankAcenaphthylene2025/04/0190%50 - 130
9901823MKSSpiked BlankAnthracene2025/04/01103%50 - 130
9901823MKSSpiked BlankBenzo(a)anthracene2025/04/01101%50 - 130
9901823MKSSpiked BlankBenzo(a)pyrene2025/04/0196%50 - 130
9901823MKSSpiked BlankBenzo(b,f)fluoranthene2025/04/0199%50 - 130
9901823MKSSpiked BlankBenzo(g,h,i)perylene2025/04/0198%50 - 130
9901823MKSSpiked BlankBenzo(k)fluoranthene2025/04/01102%50 - 130
9901823MKSSpiked BlankChrysene2025/04/0199%50 - 130

Sampler Initials: GM

QUALITY ASSURANCE REPORT(CONT'D)

QA/QC BatchInitQC TypeParameterDate AnalyzedValueRecoveryUNITSQC Limits
9901823MKSMethod BlankDibenzo(a,h)anthracene2025/04/0190%50 - 130
9901823MKSMethod BlankFluoranthene2025/04/01107%50 - 130
9901823MKSMethod BlankFluorene2025/04/0196%50 - 130
9901823MKSMethod BlankIndeno(1,2,3-cd)pyrene2025/04/01107%50 - 130
9901823MKSMethod Blank1-Methylnaphthalene2025/04/0188%50 - 130
9901823MKSMethod Blank2-Methylnaphthalene2025/04/0186%50 - 130
9901823MKSMethod BlankNaphthalene2025/04/0187%50 - 130
9901823MKSMethod BlankPhenanthrene2025/04/0198%50 - 130
9901823MKSMethod BlankPyrene2025/04/01108%50 - 130
9901823MKSMethod BlankD10-Anthracene2025/04/01102%50 - 130
9901823MKSMethod BlankD14-Terphenyl (FS)2025/04/01106%50 - 130
9901823MKSMethod BlankDB-Acenaphthylene2025/04/0193%50 - 130
9901823MKSMethod BlankAcenaphthene2025/04/01ND, RDL=0.050ug/L
9901823MKSMethod BlankAcenaphthylene2025/04/01ND, RDL=0.050ug/L
9901823MKSMethod BlankAnthracene2025/04/01ND, RDL=0.050ug/L
9901823MKSMethod BlankBenzo(a)anthracene2025/04/01ND, RDL=0.050ug/L
9901823MKSMethod BlankBenzo(a)pyrene2025/04/01ND, RDL=0.050ug/L
9901823MKSMethod BlankBenzo(b/j)fluoranthene2025/04/01ND, RDL=0.050ug/L
9901823MKSMethod BlankBenzo(g,h,i)perylene2025/04/01ND, RDL=0.050ug/L
9901823MKSMethod BlankBenzo(k)fluoranthene2025/04/01ND, RDL=0.050ug/L
9901823MKSMethod BlankChrysene2025/04/01ND, RDL=0.050ug/L
9901823MKSMethod BlankDibenzo(a,h)anthracene2025/04/01ND, RDL=0.050ug/L
9901823MKSMethod BlankFluoranthene2025/04/01ND, RDL=0.050ug/L
9901823MKSMethod BlankFluorene2025/04/01ND, RDL=0.050ug/L
9901823MKSMethod BlankIndeno(1,2,3-cd)pyrene2025/04/01ND, RDL=0.050ug/L
9901823MKSMethod Blank1-Methylnaphthalene2025/04/01ND, RDL=0.050ug/L
9901823MKSMethod Blank2-Methylnaphthalene2025/04/01ND, RDL=0.050ug/L
9901823MKSMethod BlankNaphthalene2025/04/01ND, RDL=0.050ug/L
9901823MKSMethod BlankPhenanthrene2025/04/01ND, RDL=0.050ug/L
9901823MKSMethod BlankPyrene2025/04/01ND, RDL=0.050ug/L
9901823MKSRPDAcenaphthene2025/04/01NC%30
9901823MKSRPDAcenaphthylene2025/04/01NC%30
9901823MKSRPDAnthracene2025/04/01NC%30
9901823MKSRPDBenzo(a)anthracene2025/04/01NC%30

Sampler Initials: GM

QUALITY ASSURANCE REPORT(CONT'D)

QA/QC BatchInitQC TypeParameterDate AnalyzedValueRecoveryUNITSQC Limits
Benzo(a)pyrene2025/04/01NC%30
Benzo(b/j)fluoranthene2025/04/01NC%30
Benzo(g,h,i)perylene2025/04/01NC%30
Benzo(k)fluoranthene2025/04/01NC%30
Chrysene2025/04/01NC%30
Dibenzo(a,h)anthracene2025/04/01NC%30
Fluoranthene2025/04/01NC%30
Fluorene2025/04/01NC%30
Indeno(1,2,3-cd)pyrene2025/04/01NC%30
1-Methylnaphthalene2025/04/01NC%30
2-Methylnaphthalene2025/04/01NC%30
Naphthalene2025/04/01NC%30
Phenanthrene2025/04/01NC%30
Pyrene2025/04/01NC%30
9901826AS2Matrix Spikeo-Terphenyl2025/04/0187%60 - 140
9901826AS2Matrix SpikeF2 (C10-C16 Hydrocarbons)2025/04/0188%60 - 140
9901826AS2Matrix SpikeF3 (C16-C34 Hydrocarbons)2025/04/0191%60 - 140
9901826AS2Matrix SpikeF4 (C34-C50 Hydrocarbons)2025/04/0183%60 - 140
9901826AS2Spiked Blanko-Terphenyl2025/04/0190%60 - 140
9901826AS2Spiked BlankF2 (C10-C16 Hydrocarbons)2025/04/0191%60 - 140
9901826AS2Spiked BlankF3 (C16-C34 Hydrocarbons)2025/04/0195%60 - 140
9901826AS2Spiked BlankF4 (C34-C50 Hydrocarbons)2025/04/0183%60 - 140
9901826AS2Method Blanko-Terphenyl2025/04/0187%60 - 140
9901826AS2Method BlankF2 (C10-C16 Hydrocarbons)2025/04/01ND, RDL=90ug/L
9901826AS2Method BlankF3 (C16-C34 Hydrocarbons)2025/04/01ND, RDL=200ug/L
9901826AS2Method BlankF4 (C34-C50 Hydrocarbons)2025/04/01ND, RDL=200ug/L
9901826AS2RPDF2 (C10-C16 Hydrocarbons)2025/04/01NC%30
9901826AS2RPDF3 (C16-C34 Hydrocarbons)2025/04/01NC%30
9901826AS2RPDF4 (C34-C50 Hydrocarbons)2025/04/01NC%30
9902060RSUMatrix Spike [APIS12-04]Chromium (VI)2025/04/0199%80 - 120
9902060RSUSpiked BlankChromium (VI)2025/04/0199%80 - 120
9902060RSUMethod BlankChromium (VI)2025/04/01ND, RDL=0.50ug/L
9902060RSURPD [APIS12-04]Chromium (VI)2025/04/01NC%20
9902637RGAMatrix Spike1,4-Difluorobenzene2025/04/0297%70 - 130
9902637RGAMatrix Spike4-Bromofluorobenzene2025/04/02102%70 - 130
9902637RGAMatrix SpikeD10-o-Xylene2025/04/0298%70 - 130
9902637RGAMatrix SpikeD4-1,2-Dichloroethane2025/04/0294%70 - 130
9902637RGAMatrix SpikeBenzene2025/04/0287%50 - 140
9902637RGAMatrix SpikeToluene2025/04/0287%50 - 140
9902637RGAMatrix SpikeEthylbenzene2025/04/02102%50 - 140
9902637RGAMatrix Spikeo-Xylene2025/04/02100%50 - 140
9902637RGAMatrix Spikep+m-Xylene2025/04/0295%50 - 140
9902637RGAMatrix SpikeF1 (C6-C10)2025/04/0298%60 - 140
9902637RGASpiked Blank1,4-Difluorobenzene2025/04/0295%70 - 130
9902637RGASpiked Blank4-Bromofluorobenzene2025/04/0297%70 - 130
9902637RGASpiked BlankD10-o-Xylene2025/04/0295%70 - 130
9902637RGASpiked BlankD4-1,2-Dichloroethane2025/04/0291%70 - 130

Sampler Initials: GM

QUALITY ASSURANCE REPORT(CONT'D)

QA/QC
BatchInitQC TypeParameterDate AnalyzedValueRecoveryUNITSQC Limits
Benzene2025/04/0283%50 - 140
Toluene2025/04/0284%50 - 140
Ethylbenzene2025/04/02104%50 - 140
o-Xylene2025/04/0296%50 - 140
p+m-Xylene2025/04/0296%50 - 140
F1 (C6-C10)2025/04/0297%60 - 140
9902637RGAMethod Blank1,4-Difluorobenzene2025/04/0296%70 - 130
4-Bromofluorobenzene2025/04/0295%70 - 130
D10-o-Xylene2025/04/0294%70 - 130
D4-1,2-Dichloroethane2025/04/0295%70 - 130
Benzene2025/04/02ND, RDL=0.20ug/L
Toluene2025/04/02ND, RDL=0.20ug/L
Ethylbenzene2025/04/02ND, RDL=0.20ug/L
o-Xylene2025/04/02ND, RDL=0.20ug/L
p+m-Xylene2025/04/02ND, RDL=0.40ug/L
Total Xylenes2025/04/02ND, RDL=0.40ug/L
F1 (C6-C10)2025/04/02ND, RDL=25ug/L
F1 (C6-C10) - BTEX2025/04/02ND, RDL=25ug/L
9902637RGARPDBenzene2025/04/02NC%30
Toluene2025/04/02NC%30
Ethylbenzene2025/04/02NC%30
o-Xylene2025/04/02NC%30
p+m-Xylene2025/04/02NC%30
Total Xylenes2025/04/02NC%30
F1 (C6-C10)2025/04/02NC%30
F1 (C6-C10) - BTEX2025/04/02NC%30
9902695MPJMatrix SpikeMercury (Hg)2025/04/0294%75 - 125
9902695MPJSpiked BlankMercury (Hg)2025/04/0298%80 - 120
9902695MPJMethod BlankMercury (Hg)2025/04/02ND, RDL=0.10ug/L
9902695MPJRPDMercury (Hg)2025/04/02NC%20
Duplicate: Paired analysis of a separate portion of the same sample. Used to evaluate the variance in the measurement.
Matrix Spike: A sample to which a known amount of the analyte of interest has been added. Used to evaluate sample matrix interference.
Spiked Blank: A blank matrix sample to which a known amount of the analyte, usually from a second source, has been added. Used to evaluate method accuracy.
Method Blank: A blank matrix containing all reagents used in the analytical procedure. Used to identify laboratory contamination.
Surrogate: A pure or isotopically labeled compound whose behavior mirrors the analytes of interest. Used to evaluate extraction efficiency.
NC (Duplicate RPD): The duplicate RPD was not calculated. The concentration in the sample and/or duplicate was too low to permit a reliable RPD calculation (absolute difference <= 2x RDL).

Bureau Veritas Job #: C533951 Report Date: 2025/04/03

St Lawrence Testing & Inspection Co Ltd Client Project #: SMITHS FALLS COMPOST SITE Site Location: SMITHS FALLS Sampler Initials: GM

VALIDATION SIGNATURE PAGE

The analytical data and all QC contained in this report were reviewed and validated by:

Louise Harding, Scientific Specialist

Bureau Veritas has procedures in place to guard against improper use of the electronic signature and have the required "signatories", as per ISO/IEC 17025, signing the reports. For Service Group specific validation, please refer to the Validation Signatures page if included, otherwise available by request. For Department specific Analyst/Supervisor validation names, please refer to the Test Summary section if included, otherwise available by request. This report is authorized by Rodney Major, General Manager responsible for Ontario Environmental laboratory operations.

Microbiology testing is conducted at 6660 Campobello Rd. Chemistry testing is conducted at 6740 Campobello Rd.


ATTACHMENT J

Laboratory Certificate of Analysis – Groundwater


Your Project #: COMI Site Location: SMIT Your C.O.C. #: N/A

POST SITE THS FALLS

Attention: Gib McIntee

St Lawrence Testing & Inspection Co Ltd

814 Second St PO Box 997 Cornwall, ON CANADA

W K6H 5V1

Report R

Date: 2025/07/03 Report #: R8569237 Version: 1 - Final

CERTIFICATE OF ANALYSIS

BUREAU VERITAS JOB #: C577436

Received: 2025/06/27,11:30

Sample Matrix: Water # Samples Received: 6

AnalysesDate QuantityDate ExtractedDate AnalyzedDate Laboratory MethodAnalytical Method
Methylnaphthalene Sum (1)6N/A2025/07/02CAM SOP-00301EPA 8270D m
Chromium (VI) in Water (1)6N/A2025/06/30CAM SOP-00436EPA 7199 m
Petroleum Hydro. CCME F1 & BTEX in Water (1)4N/A2025/07/02CAM SOP-00315CCME PHC-CWS m
Petroleum Hydro. CCME F1 & BTEX in Water (1)2N/A2025/07/03CAM SOP-00315CCME PHC-CWS m
Petroleum Hydrocarbons F2-F4 in Water (1, 2)62025/06/292025/06/30CAM SOP-00316CCME PHC-CWS m
Mercury (1)62025/06/302025/06/30CAM SOP-00453EPA 7470A m
Dissolved Metals by ICPMS (1)6N/A2025/06/30CAM SOP-00447EPA 6020B m
PAH Compounds in Water by GC/MS (SIM) (1)62025/06/292025/06/30CAM SOP-00318EPA 8270E

Remarks:

Bureau Veritas is accredited to ISO/IEC 17025 for specific parameters on scopes of accreditation. Unless otherwise noted, procedures used by Bureau Veritas are based upon recognized Provincial, Federal or US method compendia such as CCME, EPA, APHA or the Quebec Ministry of Environment.

All work recorded herein has been done in accordance with procedures and practices ordinarily exercised by professionals in Bureau Veritas' profession using accepted testing methodologies, quality assurance and quality control procedures (except where otherwise agreed by the client and Bureau Veritas in writing). All data is in statistical control and has met quality control and method performance criteria unless otherwise noted. All method blanks are reported; unless indicated otherwise, associated sample data are not blank corrected. Where applicable, unless otherwise noted, Measurement Uncertainty has not been accounted for when stating conformity to the referenced standard.

Bureau Veritas liability is limited to the actual cost of the requested analyses, unless otherwise agreed in writing. There is no other warranty expressed or implied. Bureau Veritas has been retained to provide analysis of samples provided by the Client using the testing methodology referenced in this report. Interpretation and use of test results are the sole responsibility of the Client and are not within the scope of services provided by Bureau Veritas, unless otherwise agreed in writing. Bureau Veritas is not responsible for the accuracy or any data impacts, that result from the information provided by the customer or their agent.

Solid sample results, except biota, are based on dry weight unless otherw dilution methods.

indicated. Organic analyses are not recovery corrected except for isotope

Results relate to samples tested. When sampling is not conducted by Bureau Veritas, results relate to the supplied samples tested.

This Certificate shall not be reproduced except in full, without the written approval of the laboratory.

Reference Method suffix "m" indicates test methods incorporate validated modifications from specific reference methods to improve performance.

  • RPDs calculated using raw data. The rounding of final results may result in the apparent difference.

(1) This test was performed by Bureau Veritas Mississauga, 6740 Campobello Rd , Mississauga, ON, L5N 2L8

(2) All CCME PHC results met required criteria unless otherwise stated in the report. The CWS PHC methods employed by Bureau Veritas conform to all prescribed elements of the


Your Project #: COMPOST SITE Site Location: SMITHS FALLS Your C.O.C. #: N/A

Attention: Gib McIntee St Lawrence Testing & Inspection Co Ltd 814 Second St W PO Box 997 Cornwall, ON CANADA K6H 5V1

Report Date: 2025/07/03 Report #: R8569237 Version: 1 - Final

CERTIFICATE OF ANALYSIS

BUREAU VERITAS JOB #: C577436

Received: 2025/06/27, 11:30

reference method and performance based elements have been validated. All modifications have been validated and proven equivalent following “Alberta Environment’s Interpretation of the Reference Method for the Canada-Wide Standard for Petroleum Hydrocarbons in Soil Validation of Performance-Based Alternative Methods September 2003”. Documentation is available upon request. Modifications from Reference Method for the Canada-wide Standard for Petroleum Hydrocarbons in Soil-Tier 1 Method: F2/F3/F4 data reported using validated cold solvent extraction instead of Soxhlet extraction.

Encryption Key

Jolanta Goralczyk Project Manager 03 Jul 2025 17:26:58

Please direct all questions regarding this Certificate of Analysis to: Jolanta Goralczyk, Project Manager Email: Jolanta.Goralczyk@bureauveritas.com Phone#(905)817-5751

Bureau Veritas has procedures in place to guard against improper use of the electronic signature and have the required "signatories", as per ISO/IEC 17025, signing the reports. For Service Group specific validation, please refer to the Validation Signatures page if included, otherwise available by request. For Department specific Analyst/Supervisor validation names, please refer to the Test Summary section if included, otherwise available by request. This report is authorized by Rodney Major, General Manager responsible for Ontario Environmental laboratory operations.


O.REG 153 METALS PACKAGE (WATER)

Bureau Veritas IDASLF87ASLF87ASLF88ASLF89
Sampling Date2025/06/26 10:302025/06/26 10:302025/06/26 11:002025/06/26 10:15
COC NumberN/AN/AN/AN/A
UNITSMW 1RDLQC BatchMW 1 Lab-DupRDLQC BatchMW 2MW 3RDLQC Batch
Metals
Chromium (VI)ug/LND0.509960659ND0.509960659NDND0.509960659
Mercury (Hg)ug/LND0.109960669NDND0.109960669
Dissolved Antimony (Sb)ug/LND0.509960077NDND0.509960077
Dissolved Arsenic (As)ug/LND1.099600771.9ND1.09960077
Dissolved Barium (Ba)ug/L1502.099600773501902.09960077
Dissolved Beryllium (Be)ug/LND0.409960077NDND0.409960077
Dissolved Boron (B)ug/L211099600775651109960077
Dissolved Cadmium (Cd)ug/LND0.0909960077NDND0.0909960077
Dissolved Chromium (Cr)ug/LND5.09960077NDND5.09960077
Dissolved Cobalt (Co)ug/L2.40.5099600772.2ND0.509960077
Dissolved Copper (Cu)ug/LND0.9099600773.40.970.909960077
Dissolved Lead (Pb)ug/LND0.509960077NDND0.509960077
Dissolved Molybdenum (Mo)ug/L2.60.509960077134.90.509960077
Dissolved Nickel (Ni)ug/L2.41.099600773.22.11.09960077
Dissolved Selenium (Se)ug/LND2.09960077NDND2.09960077
Dissolved Silver (Ag)ug/LND0.0909960077NDND0.0909960077
Dissolved Sodium (Na)ug/L170001009960077300000380001009960077
Dissolved Thallium (TI)ug/LND0.0509960077NDND0.0509960077
Dissolved Uranium (U)ug/L0.700.1099600772.61.30.109960077
Dissolved Vanadium (V)ug/LND0.5099600774.2ND0.509960077
Dissolved Zinc (Zn)ug/LND5.09960077NDND5.09960077
RDL = Reportable Detection Limit QC Batch = Quality Control Batch Lab-Dup = Laboratory Initiated Duplicate ND = Not Detected at a concentration equal or greater than the indicated Detection Limit.

O.REG 153 METALS PACKAGE (WATER)

Bureau Veritas IDASLF90ASLF91ASLF92
Sampling Date2025/06/26 10:002025/06/26 09:402025/06/26 10:45
COC NumberN/AN/AN/A
UNITSMW 4MW 6MW 7RDLQC Batch
Metals
Chromium (VI)ug/LND1.9ND0.509960659
Mercury (Hg)ug/LNDNDND0.109960669
Dissolved Antimony (Sb)ug/LNDNDND0.509960077
Dissolved Arsenic (As)ug/LNDNDND1.09960077
Dissolved Barium (Ba)ug/L1201203402.09960077
Dissolved Beryllium (Be)ug/LNDNDND0.409960077
Dissolved Boron (B)ug/L592540109960077
Dissolved Cadmium (Cd)ug/LNDNDND0.0909960077
Dissolved Chromium (Cr)ug/LNDNDND5.09960077
Dissolved Cobalt (Co)ug/L0.86NDND0.509960077
Dissolved Copper (Cu)ug/L5.07.23.30.909960077
Dissolved Lead (Pb)ug/LNDNDND0.509960077
Dissolved Molybdenum (Mo)ug/L4.33.02.00.509960077
Dissolved Nickel (Ni)ug/L2.41.2ND1.09960077
Dissolved Selenium (Se)ug/LNDNDND2.09960077
Dissolved Silver (Ag)ug/LNDNDND0.0909960077
Dissolved Sodium (Na)ug/L17000021000078001009960077
Dissolved Thallium (TI)ug/LNDNDND0.0509960077
Dissolved Uranium (U)ug/L101.02.80.109960077
Dissolved Vanadium (V)ug/LND1.30.590.509960077
Dissolved Zinc (Zn)ug/LND7.26.15.09960077
RDL = Reportable Detection Limit QC Batch = Quality Control Batch ND = Not Detected at a concentration equal or greater than the indicated Detection Limit.

Site Location: SMITHS FALLS

O.REG 153 PAHS (WATER)

Bureau Veritas IDASLF87ASLF88ASLF89ASLF90ASLF91ASLF92
Sampling Date2025/06/26 10:302025/06/26 11:002025/06/26 10:152025/06/26 10:002025/06/26 09:402025/06/26 10:45
COC NumberN/AN/AN/AN/AN/AN/A
UNITSMW 1MW 2MW 3MW 4MW 6MW 7RDLQC Batch
Calculated Parameters
Methylnaphthalene, 2-(1-)ug/LNDNDNDNDNDND0.0719959971
Polyaromatic Hydrocarbons
Acenaphtheneug/LNDND0.098NDNDND0.0509960196
Acenaphthyleneug/LNDNDNDNDNDND0.0509960196
Anthraceneug/LNDNDNDNDNDND0.0509960196
Benzo(a)anthraceneug/LNDNDNDNDNDND0.0509960196
Benzo(a)pyreneug/LNDNDNDNDNDND0.00909960196
Benzo(b,j)fluorantheneug/LNDNDNDNDNDND0.0509960196
Benzo(g,h,i)peryleneug/LNDNDNDNDNDND0.0509960196
Benzo(k)fluorantheneug/LNDNDNDNDNDND0.0509960196
Chryseneug/LNDNDNDNDNDND0.0509960196
Dibenzo(a,h)anthraceneug/LNDNDNDNDNDND0.0509960196
Fluorantheneug/L0.052ND0.098NDNDND0.0509960196
Fluoreneug/LNDND0.078NDNDND0.0509960196
Indeno(1,2,3-cd)pyreneug/LNDNDNDNDNDND0.0509960196
1-Methylnaphthaleneug/LNDNDNDNDNDND0.0509960196
2-Methylnaphthaleneug/LNDNDNDNDNDND0.0509960196
Naphthaleneug/LNDND0.12NDNDND0.0509960196
Phenanthreneug/L0.18ND0.330.0310.0830.0640.0309960196
Pyreneug/L0.073ND0.080NDNDND0.0509960196
Surrogate Recovery (%)
D10-Anthracene%10198949999869960196
D14-Terphenyl (FS)%9692889395799960196
D8-Acenaphthylene%9589888991789960196
RDL = Reportable Detection Limit QC Batch = Quality Control Batch ND = Not Detected at a concentration equal or greater than the indicated Detection Limit.

O.REG 153 PHCS, BTEX/F1-F4 (WATER)

Bureau Veritas IDASLF87ASLF88ASLF89ASLF90ASLF91ASLF92
Sampling Date2025/06/26 10:302025/06/26 11:002025/06/26 10:152025/06/26 10:002025/06/26 09:402025/06/26 10:45
COC NumberN/AN/AN/AN/AN/AN/A
UNITSMW 1MW 2MW 3MW 4MW 6MW 7RDLQC Batch
BTEX & F1 Hydrocarbons
Benzeneug/LND0.400.28NDNDND0.209961684
Tolueneug/LND0.330.46ND26ND0.209961684
Ethylbenzeneug/LNDNDNDNDNDND0.209961684
o-Xyleneug/LNDNDNDNDNDND0.209961684
p+m-Xyleneug/LNDNDNDNDNDND0.409961684
Total Xylenesug/LNDNDNDNDNDND0.409961684
F1 (C6-C10)ug/LNDNDNDND34ND259961684
F1 (C6-C10) - BTEXug/LNDNDNDNDNDND259961684
F2-F4 Hydrocarbons
F2 (C10-C16 Hydrocarbons)ug/LNDNDNDNDNDND909960197
F3 (C16-C34 Hydrocarbons)ug/LNDNDNDNDNDND2009960197
F4 (C34-C50 Hydrocarbons)ug/LNDNDNDNDNDND2009960197
Reached Baseline at C50ug/LYesYesYesYesYesYes9960197
Surrogate Recovery (%)
1,4-Difluorobenzene%99991009997999961684
4-Bromofluorobenzene%9690958792929961684
D10-o-Xylene%9797919393929961684
D4-1,2-Dichloroethane%1041021041051061069961684
o-Terphenyl%98989898971009960197
RDL = Reportable Detection Limit QC Batch = Quality Control Batch ND = Not Detected at a concentration equal or greater than the indicated Detection Limit.

TEST SUMMARY

Bureau Veritas ID: ASLF87

Sample ID: MW1

Collected: 2025/06/26

Matrix: Water

Shipped:

Received: 2025/06/27

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Methylnaphthalene SumCALC9959971N/A2025/07/02Automated Statchk
Chromium (VI) in WaterIC9960659N/A2025/06/30Rupinder Sihota
Petroleum Hydro. CCME F1 & BTEX in WaterHSGC/MSFD9961684N/A2025/07/03Ravinder Gaidhu
Petroleum Hydrocarbons F2-F4 in WaterGC/FID99601972025/06/292025/06/30Jeevaraj Jeevaratnam
MercuryCV/AA99606692025/06/302025/06/30Maitri PATIL
Dissolved Metals by ICPMSICP/MS9960077N/A2025/06/30Prempal Bhatti
PAH Compounds in Water by GC/MS (SIM)GC/MS99601962025/06/292025/06/30Biljana Lazovic

Bureau Veritas ID: ASLF87 Dup

Collected: 2025/06/26

Sample ID: MW1

Matrix: Water

Shipped:

Received: 2025/06/27

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Chromium (VI) in WaterIC9960659N/A2025/06/30Rupinder Sihota

Bureau Veritas ID: ASLF88

Sample ID: MW 2

Collected: 2025/06/26

Matrix: Water

Shipped:

Received: 2025/06/27

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Methylnaphthalene SumCALC9959971N/A2025/07/02Automated Statchk
Chromium (VI) in WaterIC9960659N/A2025/06/30Rupinder Sihota
Petroleum Hydro. CCME F1 & BTEX in WaterHSGC/MSFD9961684N/A2025/07/03Ravinder Gaidhu
Petroleum Hydrocarbons F2-F4 in WaterGC/FID99601972025/06/292025/06/30Jeevaraj Jeevaratnam
MercuryCV/AA99606692025/06/302025/06/30Maitri PATIL
Dissolved Metals by ICPMSICP/MS9960077N/A2025/06/30Prempal Bhatti
PAH Compounds in Water by GC/MS (SIM)GC/MS99601962025/06/292025/06/30Biljana Lazovic

Bureau Veritas ID: ASLF89

Sample ID: MW3

Collected: 2025/06/26

Matrix: Water

Shipped:

Received: 2025/06/27

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Methylnaphthalene SumCALC9959971N/A2025/07/02Automated Statchk
Chromium (VI) in WaterIC9960659N/A2025/06/30Rupinder Sihota
Petroleum Hydro. CCME F1 & BTEX in WaterHSGC/MSFD9961684N/A2025/07/02Ravinder Gaidhu
Petroleum Hydrocarbons F2-F4 in WaterGC/FID99601972025/06/292025/06/30Jeevaraj Jeevaratnam
MercuryCV/AA99606692025/06/302025/06/30Maitri PATIL
Dissolved Metals by ICPMSICP/MS9960077N/A2025/06/30Prempal Bhatti
PAH Compounds in Water by GC/MS (SIM)GC/MS99601962025/06/292025/06/30Biljana Lazovic

TEST SUMMARY

Bureau Veritas ID: ASLF90

Sample ID: MW 4

Collected: 2025/06/26

Matrix: Water

Shipped:

Received: 2025/06/27

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Methylnaphthalene SumCALC9959971N/A2025/07/02Automated Statchk
Chromium (VI) in WaterIC9960659N/A2025/06/30Rupinder Sihota
Petroleum Hydro. CCME F1 & BTEX in WaterHSGC/MSFD9961684N/A2025/07/02Ravinder Gaidhu
Petroleum Hydrocarbons F2-F4 in WaterGC/FID99601972025/06/292025/06/30Jeevaraj Jeevaratnam
MercuryCV/AA99606692025/06/302025/06/30Maitri PATIL
Dissolved Metals by ICPMSICP/MS9960077N/A2025/06/30Prempal Bhatti
PAH Compounds in Water by GC/MS (SIM)GC/MS99601962025/06/292025/06/30Biljana Lazovic

Bureau Veritas ID: ASLF91

Collected: 2025/06/26

Sample ID: MW 6

Matrix: Water

Shipped:

Received: 2025/06/27

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Methylnaphthalene SumCALC9959971N/A2025/07/02Automated Statchk
Chromium (VI) in WaterIC9960659N/A2025/06/30Rupinder Sihota
Petroleum Hydro. CCME F1 & BTEX in WaterHSGC/MSFD9961684N/A2025/07/02Ravinder Gaidhu
Petroleum Hydrocarbons F2-F4 in WaterGC/FID99601972025/06/292025/06/30Jeevaraj Jeevaratnam
MercuryCV/AA99606692025/06/302025/06/30Maitri PATIL
Dissolved Metals by ICPMSICP/MS9960077N/A2025/06/30Prempal Bhatti
PAH Compounds in Water by GC/MS (SIM)GC/MS99601962025/06/292025/06/30Biljana Lazovic

Bureau Veritas ID: ASLF92

Collected: 2025/06/26

Sample ID: MW 7

Matrix: Water

Shipped:

Received: 2025/06/27

Test DescriptionInstrumentationBatchExtractedDate AnalyzedAnalyst
Methylnaphthalene SumCALC9959971N/A2025/07/02Automated Statchk
Chromium (VI) in WaterIC9960659N/A2025/06/30Rupinder Sihota
Petroleum Hydro. CCME F1 & BTEX in WaterHSGC/MSFD9961684N/A2025/07/02Ravinder Gaidhu
Petroleum Hydrocarbons F2-F4 in WaterGC/FID99601972025/06/292025/06/30Jeevaraj Jeevaratnam
MercuryCV/AA99606692025/06/302025/06/30Maitri PATIL
Dissolved Metals by ICPMSICP/MS9960077N/A2025/06/30Prempal Bhatti
PAH Compounds in Water by GC/MS (SIM)GC/MS99601962025/06/292025/06/30Biljana Lazovic

GENERAL COMMENTS

Each temperature is the average of up to three cooler temperatures taken at receipt
Package 18.7°C
Results relate only to the items tested.

Site Location: SMITHS FALLS

QUALITY ASSURANCE REPORT

QA/QC BatchInitQC TypeParameterDate AnalyzedValueRecoveryUNITSQC Limits
9960077PBAMatrix SpikeDissolved Antimony (Sb)2025/06/30104%80 - 120
9960077PBAMatrix SpikeDissolved Arsenic (As)2025/06/30102%80 - 120
9960077PBAMatrix SpikeDissolved Barium (Ba)2025/06/30103%80 - 120
9960077PBAMatrix SpikeDissolved Beryllium (Be)2025/06/30103%80 - 120
9960077PBAMatrix SpikeDissolved Boron (B)2025/06/30102%80 - 120
9960077PBAMatrix SpikeDissolved Cadmium (Cd)2025/06/30102%80 - 120
9960077PBAMatrix SpikeDissolved Chromium (Cr)2025/06/30104%80 - 120
9960077PBAMatrix SpikeDissolved Cobalt (Co)2025/06/30100%80 - 120
9960077PBAMatrix SpikeDissolved Copper (Cu)2025/06/30104%80 - 120
9960077PBAMatrix SpikeDissolved Lead (Pb)2025/06/3097%80 - 120
9960077PBAMatrix SpikeDissolved Molybdenum (Mo)2025/06/30103%80 - 120
9960077PBAMatrix SpikeDissolved Nickel (Ni)2025/06/3099%80 - 120
9960077PBAMatrix SpikeDissolved Selenium (Se)2025/06/30102%80 - 120
9960077PBAMatrix SpikeDissolved Silver (Ag)2025/06/3099%80 - 120
9960077PBAMatrix SpikeDissolved Sodium (Na)2025/06/30NC%80 - 120
9960077PBAMatrix SpikeDissolved Thallium (Tl)2025/06/3099%80 - 120
9960077PBAMatrix SpikeDissolved Uranium (U)2025/06/3098%80 - 120
9960077PBAMatrix SpikeDissolved Vanadium (V)2025/06/30104%80 - 120
9960077PBAMatrix SpikeDissolved Zinc (Zn)2025/06/3099%80 - 120
9960077PBASpiked BlankDissolved Antimony (Sb)2025/06/30102%80 - 120
9960077PBASpiked BlankDissolved Arsenic (As)2025/06/30101%80 - 120
9960077PBASpiked BlankDissolved Barium (Ba)2025/06/30101%80 - 120
9960077PBASpiked BlankDissolved Beryllium (Be)2025/06/30101%80 - 120
9960077PBASpiked BlankDissolved Boron (B)2025/06/3099%80 - 120
9960077PBASpiked BlankDissolved Cadmium (Cd)2025/06/30100%80 - 120
9960077PBASpiked BlankDissolved Chromium (Cr)2025/06/30101%80 - 120
9960077PBASpiked BlankDissolved Cobalt (Co)2025/06/3099%80 - 120
9960077PBASpiked BlankDissolved Copper (Cu)2025/06/30102%80 - 120
9960077PBASpiked BlankDissolved Lead (Pb)2025/06/3098%80 - 120
9960077PBASpiked BlankDissolved Molybdenum (Mo)2025/06/30101%80 - 120
9960077PBASpiked BlankDissolved Nickel (Ni)2025/06/3099%80 - 120
9960077PBASpiked BlankDissolved Selenium (Se)2025/06/30100%80 - 120
9960077PBASpiked BlankDissolved Silver (Ag)2025/06/3097%80 - 120
9960077PBASpiked BlankDissolved Sodium (Na)2025/06/3097%80 - 120
9960077PBASpiked BlankDissolved Thallium (Tl)2025/06/3099%80 - 120
9960077PBASpiked BlankDissolved Uranium (U)2025/06/3097%80 - 120
9960077PBASpiked BlankDissolved Vanadium (V)2025/06/30101%80 - 120
9960077PBASpiked BlankDissolved Zinc (Zn)2025/06/3098%80 - 120
9960077PBAMethod BlankDissolved Antimony (Sb)2025/06/30ND, RDL=0.50 ND, RDL=1.0ND, RDL=2.0ug/L80 - 120
9960077PBAMethod BlankDissolved Arsenic (As)2025/06/30ND, RDL=1.0ug/L80 - 120
9960077PBAMethod BlankDissolved Barium (Ba)2025/06/30ND, RDL=2.0ug/L80 - 120
9960077PBAMethod BlankDissolved Beryllium (Be)2025/06/30ND, RDL=0.40ug/L80 - 120
9960077PBAMethod BlankDissolved Boron (B)2025/06/30ND, RDL=10ug/L80 - 120
9960077PBAMethod BlankDissolved Cadmium (Cd)2025/06/30ND, RDL=0.090ug/L80 - 120
9960077PBAMethod BlankDissolved Chromium (Cr)2025/06/30ND, RDL=5.0ug/L80 - 120
9960077PBAMethod BlankDissolved Cobalt (Co)2025/06/30ND, RDL=0.50ug/L80 - 120

QUALITY ASSURANCE REPORT(CONT'D)

QA/QC BatchInitQC TypeParameterDate AnalyzedValueRecoveryUNITSQC Limits
Dissolved Copper (Cu)2025/06/30ND, RDL=0.90ug/L
Dissolved Lead (Pb)2025/06/30ND, RDL=0.50ug/L
Dissolved Molybdenum (Mo)2025/06/30ND, RDL=0.50ug/L
Dissolved Nickel (Ni)2025/06/30ND, RDL=1.0ug/L
Dissolved Selenium (Se)2025/06/30ND, RDL=2.0ug/L
Dissolved Silver (Ag)2025/06/30ND, RDL=0.090ug/L
Dissolved Sodium (Na)2025/06/30ND, RDL=100ug/L
Dissolved Thallium (Tl)2025/06/30ND, RDL=0.050ug/L
Dissolved Uranium (U)2025/06/30ND, RDL=0.10ug/L
Dissolved Vanadium (V)2025/06/30ND, RDL=0.50ug/L
Dissolved Zinc (Zn)2025/06/30ND, RDL=5.0ug/L
9960077PBARPDDissolved Antimony (Sb)2025/06/30NC%20
9960077PBARPDDissolved Arsenic (As)2025/06/301.4%20
9960077PBARPDDissolved Barium (Ba)2025/06/301.7%20
9960077PBARPDDissolved Beryllium (Be)2025/06/30NC%20
9960077PBARPDDissolved Boron (B)2025/06/301.9%20
9960077PBARPDDissolved Cadmium (Cd)2025/06/30NC%20
9960077PBARPDDissolved Chromium (Cr)2025/06/30NC%20
9960077PBARPDDissolved Cobalt (Co)2025/06/30NC%20
9960077PBARPDDissolved Copper (Cu)2025/06/30NC%20
9960077PBARPDDissolved Lead (Pb)2025/06/300.94%20
9960077PBARPDDissolved Molybdenum (Mo)2025/06/30NC%20
9960077PBARPDDissolved Nickel (Ni)2025/06/30NC%20
9960077PBARPDDissolved Selenium (Se)2025/06/30NC%20
9960077PBARPDDissolved Silver (Ag)2025/06/300.31%20
9960077PBARPDDissolved Sodium (Na)2025/06/30NC%20
9960077PBARPDDissolved Thallium (Tl)2025/06/308.0%20
9960077PBARPDDissolved Uranium (U)2025/06/303.1%20
9960077PBARPDDissolved Vanadium (V)2025/06/30NC%20
9960196BLZMatrix SpikeDissolved Zinc (Zn)2025/06/309850 - 130
9960196BLZMatrix SpikeD10-Anthracene2025/06/309850 - 130
9960196BLZMatrix SpikeD14-Terphenyl (FS)2025/06/309450 - 130
9960196BLZMatrix SpikeD8-Acenaphthylene2025/06/308950 - 130
9960196BLZMatrix SpikeAcenaphthene2025/06/3010050 - 130
9960196BLZMatrix SpikeAcenaphthylene2025/06/3010050 - 130
9960196BLZMatrix SpikeAnthracene2025/06/3010250 - 130
9960196BLZMatrix SpikeBenzo(a)anthracene2025/06/3010050 - 130
9960196BLZMatrix SpikeBenzo(a)pyrene2025/06/309750 - 130
9960196BLZMatrix SpikeBenzo(b/j)fluoranthene2025/06/309750 - 130
9960196BLZMatrix SpikeBenzo(g,h,i)perylene2025/06/309850 - 130
9960196BLZMatrix SpikeBenzo(k)fluoranthene2025/06/309450 - 130
9960196BLZMatrix SpikeChrysene2025/06/309750 - 130
9960196BLZMatrix SpikeDibenzo(a,h)anthracene2025/06/3010150 - 130

QUALITY ASSURANCE REPORT(CONT'D)

QA/QC BatchInitQC TypeParameterDate AnalyzedValueRecoveryUNITSQC Limits
9960196BLZSpiked BlankFluoranthene2025/06/30101%50 - 130
9960196BLZSpiked BlankFluorene2025/06/30100%50 - 130
9960196BLZSpiked BlankIndeno(1,2,3-cd)pyrene2025/06/30100%50 - 130
9960196BLZSpiked Blank1-Methylnaphthalene2025/06/30103%50 - 130
9960196BLZSpiked Blank2-Methylnaphthalene2025/06/30106%50 - 130
9960196BLZSpiked BlankNaphthalene2025/06/30124%50 - 130
9960196BLZSpiked BlankPhenanthrene2025/06/3098%50 - 130
9960196BLZSpiked BlankPyrene2025/06/30100%50 - 130
9960196BLZSpiked BlankD10-Anthracene2025/06/3099%50 - 130
9960196BLZSpiked BlankD14-Terphenyl (FS)2025/06/30100%50 - 130
9960196BLZSpiked BlankD8-Acenaphthylene2025/06/3091%50 - 130
9960196BLZSpiked BlankAcenaphthene2025/06/3098%50 - 130
9960196BLZSpiked BlankAcenaphthylene2025/06/3099%50 - 130
9960196BLZSpiked BlankAnthracene2025/06/30100%50 - 130
9960196BLZSpiked BlankBenzo(a)anthracene2025/06/3098%50 - 130
9960196BLZSpiked BlankBenzo(a)pyrene2025/06/3096%50 - 130
9960196BLZSpiked BlankBenzo(b,j)fluoranthene2025/06/3096%50 - 130
9960196BLZSpiked BlankBenzo(g,h,i)perylene2025/06/3091%50 - 130
9960196BLZSpiked BlankBenzo(k)fluoranthene2025/06/3096%50 - 130
9960196BLZSpiked BlankChrysene2025/06/3096%50 - 130
9960196BLZSpiked BlankDibenzo(a,h)anthracene2025/06/3096%50 - 130
9960196BLZSpiked BlankFluoranthene2025/06/30101%50 - 130
9960196BLZSpiked BlankFluorene2025/06/3098%50 - 130
9960196BLZSpiked BlankIndeno(1,2,3-cd)pyrene2025/06/3094%50 - 130
9960196BLZSpiked Blank1-Methylnaphthalene2025/06/30102%50 - 130
9960196BLZSpiked Blank2-Methylnaphthalene2025/06/30103%50 - 130
9960196BLZSpiked BlankNaphthalene2025/06/30120%50 - 130
9960196BLZSpiked BlankPhenanthrene2025/06/3096%50 - 130
9960196BLZSpiked BlankPyrene2025/06/30100%50 - 130
9960196BLZMethod BlankD10-Anthracene2025/06/30101%50 - 130
9960196BLZMethod BlankD14-Terphenyl (FS)2025/06/3098%50 - 130
9960196BLZMethod BlankD8-Acenaphthylene2025/06/3092%50 - 130
9960196BLZMethod BlankAcenaphthene2025/06/30ND, RDL=0.050ug/L
9960196BLZMethod BlankAcenaphthylene2025/06/30ND, RDL=0.050ug/L
9960196BLZMethod BlankAnthracene2025/06/30ND, RDL=0.050ug/L
9960196BLZMethod BlankBenzo(a)anthracene2025/06/30ND, RDL=0.050ug/L
9960196BLZMethod BlankBenzo(a)pyrene2025/06/30ND, RDL=0.050ug/L
9960196BLZMethod BlankBenzo(b,j)fluoranthene2025/06/30ND, RDL=0.050ug/L
9960196BLZMethod BlankBenzo(g,h,i)perylene2025/06/30ND, RDL=0.050ug/L
9960196BLZMethod BlankBenzo(k)fluoranthene2025/06/30ND, RDL=0.050ug/L
9960196BLZMethod BlankChrysene2025/06/30ND, RDL=0.050ug/L
9960196BLZMethod BlankDibenzo(a,h)anthracene2025/06/30ND, RDL=0.050ug/L
9960196BLZMethod BlankFluoranthene2025/06/30ND, RDL=0.050ug/L

QUALITY ASSURANCE REPORT(CONT'D)

QA/QC BatchInitQC TypeParameterDate AnalyzedValueRecoveryUNITSQC Limits
Fluorene2025/06/30ND, RDL=0.050ug/L
Indeno(1,2,3-cd)pyrene2025/06/30ND, RDL=0.050ug/L
1-Methylnaphthalene2025/06/30ND, RDL=0.050ug/L
2-Methylnaphthalene2025/06/30ND, RDL=0.050ug/L
Naphthalene2025/06/30ND, RDL=0.050ug/L
Phenanthrene2025/06/30ND, RDL=0.030ug/L
Pyrene2025/06/30ND, RDL=0.050ug/L
9960196BLZRPDAcenaphthene2025/06/30NC%30
9960196BLZRPDAcenaphthylene2025/06/30NC%30
9960196BLZRPDAnthracene2025/06/30NC%30
9960196BLZRPDBenzo(a)anthracene2025/06/30NC%30
9960196BLZRPDBenzo(a)pyrene2025/06/30NC%30
9960196BLZRPDBenzo(b,j)fluoranthene2025/06/30NC%30
9960196BLZRPDBenzo(g,h,i)perylene2025/06/30NC%30
9960196BLZRPDBenzo(k)fluoranthene2025/06/30NC%30
9960196BLZRPDChrysene2025/06/30NC%30
9960196BLZRPDDibenzo(a,h)anthracene2025/06/30NC%30
9960196BLZRPDFluoranthene2025/06/30NC%30
9960196BLZRPDFluorene2025/06/30NC%30
9960196BLZRPDIndeno(1,2,3-cd)pyrene2025/06/30NC%30
9960196BLZRPD1-Methylnaphthalene2025/06/30NC%30
9960196BLZRPD2-Methylnaphthalene2025/06/30NC%30
9960196BLZRPDNaphthalene2025/06/30NC%30
9960196BLZRPDPhenanthrene2025/06/30NC%30
9960196BLZRPDPyrene2025/06/30NC%30
9960197JJEMatrix Spikeo-Terphenyl2025/06/30100%60 - 140
9960197JJEMatrix SpikeF2 (C10-C16 Hydrocarbons)2025/06/3094%60 - 140
9960197JJEMatrix SpikeF3 (C16-C34 Hydrocarbons)2025/06/3097%60 - 140
9960197JJEMatrix SpikeF4 (C34-C50 Hydrocarbons)2025/06/3083%60 - 140
9960197JJESpiked Blanko-Terphenyl2025/06/3098%60 - 140
9960197JJESpiked BlankF2 (C10-C16 Hydrocarbons)2025/06/3094%60 - 140
9960197JJESpiked BlankF3 (C16-C34 Hydrocarbons)2025/06/3099%60 - 140
9960197JJESpiked BlankF4 (C34-C50 Hydrocarbons)2025/06/3087%60 - 140
9960197JJEMethod Blanko-Terphenyl2025/06/3096%60 - 140
9960197JJEMethod BlankF2 (C10-C16 Hydrocarbons)2025/06/30ND, RDL=90ug/L
9960197JJEMethod BlankF3 (C16-C34 Hydrocarbons)2025/06/30ND, RDL=200ug/L
9960197JJEMethod BlankF4 (C34-C50 Hydrocarbons)2025/06/30ND, RDL=200ug/L
9960197JJERPDF2 (C10-C16 Hydrocarbons)2025/06/30NC%30
9960197JJERPDF3 (C16-C34 Hydrocarbons)2025/06/30NC%30
9960197JJERPDF4 (C34-C50 Hydrocarbons)2025/06/30NC%30
9960659RSUMatrix Spike [ASLF87-01]Chromium (VI)2025/06/30101%80 - 120
9960659RSUSpiked BlankChromium (VI)2025/06/30103%80 - 120
9960659RSUMethod BlankChromium (VI)2025/06/30ND, RDL=0.50ug/L

QUALITY ASSURANCE REPORT(CONT'D)

QA/QC BatchInitQC TypeParameterDate AnalyzedValueRecoveryUNITSQC Limits
9960659RSURPD [ASLF87-01]Chromium (VI)2025/06/30NC%20
9960669MPJMatrix SpikeMercury (Hg)2025/06/3089%75 - 125
9960669MPJSpiked BlankMercury (Hg)2025/06/3091%80 - 120
9960669MPJMethod BlankMercury (Hg)2025/06/30ND, RDL=0.10ug/L
9960669MPJRPDMercury (Hg)2025/06/30NC%20
9961684RGAMatrix Spike1,4-Difluorobenzene2025/07/0297%70 - 130
4-Bromofluorobenzene2025/07/02103%70 - 130
D10-o-Xylene2025/07/0288%70 - 130
D4-1,2-Dichloroethane2025/07/0299%70 - 130
Benzene2025/07/0287%50 - 140
Toluene2025/07/0286%50 - 140
Ethylbenzene2025/07/0294%50 - 140
o-Xylene2025/07/0292%50 - 140
p+m-Xylene2025/07/0293%50 - 140
F1 (C6-C10)2025/07/02100%60 - 140
9961684RGASpiked Blank1,4-Difluorobenzene2025/07/0296%70 - 130
4-Bromofluorobenzene2025/07/02103%70 - 130
D10-o-Xylene2025/07/0287%70 - 130
D4-1,2-Dichloroethane2025/07/0298%70 - 130
Benzene2025/07/0288%50 - 140
Toluene2025/07/0288%50 - 140
Ethylbenzene2025/07/0296%50 - 140
o-Xylene2025/07/0294%50 - 140
p+m-Xylene2025/07/0296%50 - 140
F1 (C6-C10)2025/07/02100%60 - 140
9961684RGAMethod Blank1,4-Difluorobenzene2025/07/02100%70 - 130
4-Bromofluorobenzene2025/07/0298%70 - 130
D10-o-Xylene2025/07/0292%70 - 130
D4-1,2-Dichloroethane2025/07/02102%70 - 130
Benzene2025/07/02ND, RDL=0.20ug/L
Toluene2025/07/02ND, RDL=0.20ug/L
Ethylbenzene2025/07/02ND, RDL=0.20ug/L
o-Xylene2025/07/02ND, RDL=0.20ug/L
p+m-Xylene2025/07/02ND, RDL=0.40ug/L
Total Xylenes2025/07/02ND, RDL=0.40ug/L
F1 (C6-C10)2025/07/02ND, RDL=25ug/L
F1 (C6-C10) - BTEX2025/07/02ND, RDL=25ug/L
9961684RGARPDBenzene2025/07/02NC%30
Toluene2025/07/02NC%30
Ethylbenzene2025/07/02NC%30
o-Xylene2025/07/02NC%30
p+m-Xylene2025/07/02NC%30
Total Xylenes2025/07/02NC%30
F1 (C6-C10)2025/07/02NC%30

QUALITY ASSURANCE REPORT(CONT'D)

QA/QC
BatchInitQC TypeParameterDate AnalyzedValueRecoveryUNITSQC Limits
F1 (C6-C10) - BTEX2025/07/02NC%30
Duplicate: Paired analysis of a separate portion of the same sample. Used to evaluate the variance in the measurement.
Matrix Spike: A sample to which a known amount of the analyte of interest has been added. Used to evaluate sample matrix interference.
Spiked Blank: A blank matrix sample to which a known amount of the analyte, usually from a second source, has been added. Used to evaluate method accuracy.
Method Blank: A blank matrix containing all reagents used in the analytical procedure. Used to identify laboratory contamination.
Surrogate: A pure or isotopically labeled compound whose behavior mirrors the analytes of interest. Used to evaluate extraction efficiency.
NC (Matrix Spike): The recovery in the matrix spike was not calculated. The relative difference between the concentration in the parent sample and the spike amount was too small to permit a reliable recovery calculation (matrix spike concentration was less than the native sample concentration)
NC (Duplicate RPD): The duplicate RPD was not calculated. The concentration in the sample and/or duplicate was too low to permit a reliable RPD calculation (absolute difference <= 2x RDL).

Bureau Veritas Job #: C577436 Report Date: 2025/07/03

St Lawrence Testing & Inspection Co Ltd Client Project #: COMPOST SITE Site Location: SMITHS FALLS

VALIDATION SIGNATURE PAGE

The analytical data and all QC contained in this report were reviewed and validated by:

Cristina Carriere, Senior Scientific Specialist

Bureau Veritas has procedures in place to guard against improper use of the electronic signature and have the required "signatories", as per ISO/IEC 17025, signing the reports. For Service Group specific validation, please refer to the Validation Signatures page if included, otherwise available by request. For Department specific Analyst/Supervisor validation names, please refer to the Test Summary section if included, otherwise available by request. This report is authorized by Rodney Major, General Manager responsible for Ontario Environmental laboratory operations.


RLC-HydroG

ATTACHMENT K

Spill Response Plan


Spill Response Plan

Town of Smiths Falls Compost Site

The Town of Smiths Falls addresses spill response within the broader framework of its Municipal Emergency Management Program, which focuses on hazard identification, planning, training, exercises, and public education to ensure community preparedness and resilience against various emergencies, including potential spills. Spill response is integrated into the municipality's comprehensive emergency management efforts and its commitment to protecting the environment and drinking water.

1. Purpose

This plan outlines procedures for responding to accidental spills at the Smiths Falls Compost Site, where potential sources of contamination include petroleum hydrocarbons (PHCs) and BTEX compounds associated with vehicular traffic and mobile machinery (e.g., loader and contractor screening equipment). All vehicles and machinery are stored, refueled, and serviced offsite.

2. Scope

This plan applies to all site personnel and contractors operating at the compost facility.

3. Potential Spill Sources

  1. Poten�al Spill Sources
  • Leaks or minor spills from mobile equipment during operation (e.g., hydraulic fluid, diesel, motor oil).

• Accidental rupture of fuel or oil lines on vehicles in use.

4. Spill Prevention Measures

  1. Spill Preven�on Measures

• All equipment is stored, refueled, and serviced offsite.

  • Routine visual inspections of equipment before operation.

  • Operators trained in spill recognition and response.

  • Spill response kits maintained onsite near operational areas.

5. Spill Response Procedure

In the event of a spill:

• Step 1: Ensure safety.

Stop work and secure the area. Avoid contact with spilled material.

• Step 2: Contain the spill.

Use absorbent socks, pads, or booms to prevent spread, especially near stormwater conveyances or permeable ground.

  • Step 3: Notify supervisor and Town representative.

Step 3: No�fy supervisor and Town representa�ve.

Report all spills immediately, regardless of size.

o Phone: 613.283.4124

Email: info@smithsfalls.ca

• Step 4: Clean up the spill.

Use absorbents and dispose of contaminated material in accordance with provincial guidelines.

• Step 5: Record and report.

Complete an incident report including date, time, material spilled, estimated volume, cause, response actions, and disposal method.

  • Step 6: Notify authorities if required.

Step 6: No�fy authori�es if required.

If the spill exceeds reportable quantities under Ontario Regulation 675/98 (Spills), contact the Spills Action Centre (1- 800-268-6060).

6. Equipment and Materials

• Onsite spill response kit to include:

o Absorbent pads and booms

o Disposal bags

o Nitrile gloves and safety goggles

o Dustpan and broom

Instructions and contact list

7. Training and Review

• All site personnel and contractors shall be trained in this plan annually.

• This plan shall be reviewed and updated annually or a er any spill incident.