Requirements for CIP Incentive Program
Program 5: Affordable Housing Additional Residential Unit (ARU) Rebate
Program Summary
This program supports homeowners who renovate their home to include a new legal ARU<sup>1</sup>,in accordance with the Town’s Zoning By-law. Additional funding may be available for projects where construction costs to accommodate the ARU exceed $30,000 or where improvements are made to reduce the home’s carbon footprint.
Available Funding
Rebate 1: Eligible applicants can qualify for a rebate of up to $15,000 to reduce the cost of required professional studies or drawings for the ARU, limited to:
a) structural and/or servicing assessment by a Professional Engineer to confirm adequacy to accommodate an ARU; b) HVAC study by a qualified professional to determine appropriate heating, ventilation, and/or cooling requirements to accommodate an ARU; and/or, c) architectural drawings, prepared by a licensed architect or design professional with a Building Code Identification Number (BCIN) for a Building Permit application. Rebate 2: Eligible applicants who receive Rebate 1 can qualify for an additional rebate of $5,000 where it can be proven that construction costs for the ARU exceed $30,000.
Rebate 3: Eligible applicants who receive Rebate 1 and Rebate 2 can qualify for and additional rebate of up to 50% of eligible improvements, to a maximum of $5,000, where the applicant can prove that improvements were made to reduce the home’s carbon footprint.
Additional Considerations
The ARU does not need to meet the description of affordable for the purpose of the CIP and does not need to be rented during the time of application to be eligible. However, the unit must be available for rent as a legitimate housing unit and must not be marketed as short-stay accommodation (i.e., must not be listed on a website such as Airbnb, Tripping.com, VRBO, etc.), or the rebate will have to be repaid to the Town.
¹Means a self-contained Dwelling Unit with kitchen and bathroom facilities that are intended for the exclusive Use of the unit only, which is secondary to a mina Dwelling Unit, and which is contained within a permitted Single-Detached Dwelling, Semi-Detached Dwelling, or Rowhouse (i.e.) Townhouse) Dwelling, or which is contained in a Building or Structure that is ancillary to a permitted Single-Detached dwelling, Semi-Detached Dwelling, or Townhouse (I,e, Townhouse) Dwelling, and which is accessed through a private entrance outside the main Dwelling Unit or through a common hallways or stairway within the main Dwelling Unit.
Requirements for CIP Incentive Program
Criteria to Meet
Homeowners may be eligible for funding under Rebate 1, Rebate 2 and Rebate 3 under this program if the following criteria are met by the application and/or throughout the duration of the project:

