Final 2023 Capital Budget Summary

Final 2023 Capital Budget Summary
DeptProjectTotal BudgetCategoryAMP or Strat Plan Priority (Y/N)Carry-over (or other) ReserveCapital ReserveDC'sFGTMisc. RevenueLoansFinance/ Approved Grants
WTP/Dist.New Water Tower2,335,000FacilityY501,7501,833,250
Trunk Upgrade (New Tower)1,820,000DistributionY273,0001,547,000
Water Tower Detailed Design249,000147,380101,620
Catherine St.726,674Water MainsY309,350417,324
Water Meter Replacement50,000EquipmentY50,000
Zebra Mussell Intake127,129EquipmentY127,129
Filter GAC Replacement450,000EquipmentY450,000
Equipment/Analyzer Replacement16,395EquipmentY16,395
HLP 184 Refurbishment21,220EquipmentY21,220
AquaDAF 1 & 220,000EquipmentY20,000
Valve Maintenance Trailer120,000EquipmentN120,000
LLP-1039,549EquipmentY9,549
EV Charging Stations (2 only)15,000EquipmentN15,000
Exterior Door Replacement69,256BuildingN69,256
TOTAL WTP/DISTRIBUTION CAPITAL BUDGET:6,029,223274,5091,080,770273,000002,466,0741,934,870
WPCPCatherine St.708,840Combined SewersY440,908267,932
Sanitary Sewer Lining - road works52,000SanitaryN52,000
Collection System Lining200,000SanitaryN200,000
Old Mill Manhole100,000LinearN100,000
Equipment Analyzer Failure16,395EquipmentY16,395
Bar Screen Project (2022/2023) Headworks1,084,000EquipmentY535,000549,000
M104; Sewage Lift Pump #430,000EquipmentY30,000
Actuator for V 20913,116EquipmentY13,116
South Aeration Tank54,650EquipmentY54,650
North Aeration Tank54,650EquipmentY54,650
North Secondary Tank Collectors27,325EquipmentY27,325
Primary/Secondary Tank Gates500,000EquipmentY34,632465,368

Final 2023 Capital Budget Summary

DeptProjectTotal BudgetCategoryAMP or Strat Plan Priority (Y/N)Carry-over (or other) ReserveCapital ReserveDC'sFGTMisc. RevenueLoansFinance/ Approved Grants
TOTAL WPCP CAPITAL BUDGET:2,840,976569,6322,003,4120267,9320
TAX- SUPPORTED
POLICEAnnual Vehicle Replacement65,000VehiclesY65,000
NG 911 System100,000EquipmentY75,00025,000
AIRPORTCrack Sealing8,000Y8,000
FIRESCBA Equipment25,000EquipmentY25,000
New Radio System500,000EquipmentY500,000
NG 911 Upgrade50,000EquipmentY50,000
CAD10,000EquipmentN10,000
Haz Mat Equipment9,964EquipmentN4,9645,000
Water Rescue Equipment30,000EquipmentN21,0009,000
Hoses/Nozzles45,000EquipmentN20,00025,000
PARKSExpand the urban forest20,000Misc.Y20,000
Le Boat Docks130,000EquipmentN130,000
Mower zero turn25,000EquipmentN25,000
Playground Updates150,000EquipmentN150,000
Playground Equipment249,551EquipmentY249,551
Geotech & Design; Lower Reach Parking Lot40,000Misc.N40,000
104 Mower50,000EquipmentN50,000
Christmas light displays15,000EquipmentN15,000

Final 2023 Capital Budget Summary

DeptProjectTotal BudgetCategoryAMP or Strat Plan Priority (Y/N)Carry-over (or other) ReserveCapital ReserveDC'sFGTMisc. RevenueLoansFinance/ Approved Grants
FACILITIES
Garage Door - Lions Club Building15,000BuildingsN15,000
Cooling Tower Resealing11,000BuildingsN11,000
Engineering Evaluation - CC Roof20,00020,000
FOB Access (Community Centre)21,826Y21,826
Air Conditioning Units - Senior Centre30,000BuildingsN30,000
Heating/AC units (town hall; old school house)30,000BuildingsN30,000
Camera's (Arena, Murphy Park, Vic Park, WTP)30,000BuildingsN30,000
Interlock - Station Theatre60,000BuildingsN60,000
Lighting, seniors centre7,000BuildingsN7,000
Heat Exchanger CC15,000BuildingsN15,000
Reconfiguration of Reception Area (Town Hall)10,000BuildingsN10,000
Air Care Dr. Roof59,674Buildings59,674
PUBLIC WORKSCatherine St. (Roads)1,739,234Y581,1321,158,102
Snowplow Single Axle360,000VehicleY360,000
Sidewalk Plow & Attach.200,000EquipmentN200,000
Confederation Bridge1,367,000BridgesY69,2321,297,768
Catherine St. (Storm Sewers)976,797Storm SewersY798,714178,083
Transportation Master Plan175,000StudyY24,156150,844
Asphalt concrete paving and milling program812,376RoadsY812,376

Final 2023 Capital Budget Summary

DeptProjectTotal BudgetCategoryAMP or Strat Plan Priority (Y/N)Carry-over (or other) ReserveCapital ReserveDC'sFGTMisc. RevenueLoansFinance/ Approved Grants
Railway Crossing sidewalk at William/Sussex57,200SidewalkN57,200
PXO Hershey Dr.60,000SidewalkN9,00051,000
PXO Jasper Ave @Vincent20,000SidewalkN20,000
Waste Management Study30,000StudyN30,000
Fleet AVL, Upgrade Pilot30,000EquipmentN30,000
Traffic Controller Equipment (x2)60,000EquipmentN60,000
Old Sly Sidewalk197,000SidewalkN9,327187,673
CityWide AM Update48,000StudyN48,000
Wood t. 3 cable guide rail; Queen St.6,000Misc.N6,000
LIBRARYLibrary Renovations (Children's Room)1,287,000BuildingsY297,677438,41710,000540,906
EC DEVCentre St. Revitalization Plan50,000StudyN50,000
CORPORATE SERVICESLands Needs Study16,427StudyY16,427
Secondary Plan & OP Review90,000StudyY90,000
Data Retention System (Multi-year project)50,000EquipmentY50,000
Strategic Planning10,000StudyN10,000
Heritage Conservation District Project120,000StudyN120,000
TOTAL TAX-SUPPORTED CAPITAL BUDGET:9,594,0491,643,6024,154,45610,000581,132570,9061,297,7681,336,185
Total18,464,2482,487,7437,238,638283,000581,132570,9064,031,7743,271,055