Final 2023 Capital Budget Summary
| Final 2023 Capital Budget Summary | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Dept | Project | Total Budget | Category | AMP or Strat Plan Priority (Y/N) | Carry-over (or other) Reserve | Capital Reserve | DC's | FGT | Misc. Revenue | Loans | Finance/ Approved Grants |
| WTP/Dist. | New Water Tower | 2,335,000 | Facility | Y | 501,750 | 1,833,250 | |||||
| Trunk Upgrade (New Tower) | 1,820,000 | Distribution | Y | 273,000 | 1,547,000 | ||||||
| Water Tower Detailed Design | 249,000 | 147,380 | 101,620 | ||||||||
| Catherine St. | 726,674 | Water Mains | Y | 309,350 | 417,324 | ||||||
| Water Meter Replacement | 50,000 | Equipment | Y | 50,000 | |||||||
| Zebra Mussell Intake | 127,129 | Equipment | Y | 127,129 | |||||||
| Filter GAC Replacement | 450,000 | Equipment | Y | 450,000 | |||||||
| Equipment/Analyzer Replacement | 16,395 | Equipment | Y | 16,395 | |||||||
| HLP 184 Refurbishment | 21,220 | Equipment | Y | 21,220 | |||||||
| AquaDAF 1 & 2 | 20,000 | Equipment | Y | 20,000 | |||||||
| Valve Maintenance Trailer | 120,000 | Equipment | N | 120,000 | |||||||
| LLP-103 | 9,549 | Equipment | Y | 9,549 | |||||||
| EV Charging Stations (2 only) | 15,000 | Equipment | N | 15,000 | |||||||
| Exterior Door Replacement | 69,256 | Building | N | 69,256 | |||||||
| TOTAL WTP/DISTRIBUTION CAPITAL BUDGET: | 6,029,223 | 274,509 | 1,080,770 | 273,000 | 0 | 0 | 2,466,074 | 1,934,870 | |||
| WPCP | Catherine St. | 708,840 | Combined Sewers | Y | 440,908 | 267,932 | |||||
| Sanitary Sewer Lining - road works | 52,000 | Sanitary | N | 52,000 | |||||||
| Collection System Lining | 200,000 | Sanitary | N | 200,000 | |||||||
| Old Mill Manhole | 100,000 | Linear | N | 100,000 | |||||||
| Equipment Analyzer Failure | 16,395 | Equipment | Y | 16,395 | |||||||
| Bar Screen Project (2022/2023) Headworks | 1,084,000 | Equipment | Y | 535,000 | 549,000 | ||||||
| M104; Sewage Lift Pump #4 | 30,000 | Equipment | Y | 30,000 | |||||||
| Actuator for V 209 | 13,116 | Equipment | Y | 13,116 | |||||||
| South Aeration Tank | 54,650 | Equipment | Y | 54,650 | |||||||
| North Aeration Tank | 54,650 | Equipment | Y | 54,650 | |||||||
| North Secondary Tank Collectors | 27,325 | Equipment | Y | 27,325 | |||||||
| Primary/Secondary Tank Gates | 500,000 | Equipment | Y | 34,632 | 465,368 |
Final 2023 Capital Budget Summary
| Dept | Project | Total Budget | Category | AMP or Strat Plan Priority (Y/N) | Carry-over (or other) Reserve | Capital Reserve | DC's | FGT | Misc. Revenue | Loans | Finance/ Approved Grants |
|---|---|---|---|---|---|---|---|---|---|---|---|
| TOTAL WPCP CAPITAL BUDGET: | 2,840,976 | 569,632 | 2,003,412 | 0 | 267,932 | 0 | |||||
| TAX- SUPPORTED | |||||||||||
| POLICE | Annual Vehicle Replacement | 65,000 | Vehicles | Y | 65,000 | ||||||
| NG 911 System | 100,000 | Equipment | Y | 75,000 | 25,000 | ||||||
| AIRPORT | Crack Sealing | 8,000 | Y | 8,000 | |||||||
| FIRE | SCBA Equipment | 25,000 | Equipment | Y | 25,000 | ||||||
| New Radio System | 500,000 | Equipment | Y | 500,000 | |||||||
| NG 911 Upgrade | 50,000 | Equipment | Y | 50,000 | |||||||
| CAD | 10,000 | Equipment | N | 10,000 | |||||||
| Haz Mat Equipment | 9,964 | Equipment | N | 4,964 | 5,000 | ||||||
| Water Rescue Equipment | 30,000 | Equipment | N | 21,000 | 9,000 | ||||||
| Hoses/Nozzles | 45,000 | Equipment | N | 20,000 | 25,000 | ||||||
| PARKS | Expand the urban forest | 20,000 | Misc. | Y | 20,000 | ||||||
| Le Boat Docks | 130,000 | Equipment | N | 130,000 | |||||||
| Mower zero turn | 25,000 | Equipment | N | 25,000 | |||||||
| Playground Updates | 150,000 | Equipment | N | 150,000 | |||||||
| Playground Equipment | 249,551 | Equipment | Y | 249,551 | |||||||
| Geotech & Design; Lower Reach Parking Lot | 40,000 | Misc. | N | 40,000 | |||||||
| 104 Mower | 50,000 | Equipment | N | 50,000 | |||||||
| Christmas light displays | 15,000 | Equipment | N | 15,000 | |||||||
Final 2023 Capital Budget Summary
| Dept | Project | Total Budget | Category | AMP or Strat Plan Priority (Y/N) | Carry-over (or other) Reserve | Capital Reserve | DC's | FGT | Misc. Revenue | Loans | Finance/ Approved Grants |
|---|---|---|---|---|---|---|---|---|---|---|---|
| FACILITIES | |||||||||||
| Garage Door - Lions Club Building | 15,000 | Buildings | N | 15,000 | |||||||
| Cooling Tower Resealing | 11,000 | Buildings | N | 11,000 | |||||||
| Engineering Evaluation - CC Roof | 20,000 | 20,000 | |||||||||
| FOB Access (Community Centre) | 21,826 | Y | 21,826 | ||||||||
| Air Conditioning Units - Senior Centre | 30,000 | Buildings | N | 30,000 | |||||||
| Heating/AC units (town hall; old school house) | 30,000 | Buildings | N | 30,000 | |||||||
| Camera's (Arena, Murphy Park, Vic Park, WTP) | 30,000 | Buildings | N | 30,000 | |||||||
| Interlock - Station Theatre | 60,000 | Buildings | N | 60,000 | |||||||
| Lighting, seniors centre | 7,000 | Buildings | N | 7,000 | |||||||
| Heat Exchanger CC | 15,000 | Buildings | N | 15,000 | |||||||
| Reconfiguration of Reception Area (Town Hall) | 10,000 | Buildings | N | 10,000 | |||||||
| Air Care Dr. Roof | 59,674 | Buildings | 59,674 | ||||||||
| PUBLIC WORKS | Catherine St. (Roads) | 1,739,234 | Y | 581,132 | 1,158,102 | ||||||
| Snowplow Single Axle | 360,000 | Vehicle | Y | 360,000 | |||||||
| Sidewalk Plow & Attach. | 200,000 | Equipment | N | 200,000 | |||||||
| Confederation Bridge | 1,367,000 | Bridges | Y | 69,232 | 1,297,768 | ||||||
| Catherine St. (Storm Sewers) | 976,797 | Storm Sewers | Y | 798,714 | 178,083 | ||||||
| Transportation Master Plan | 175,000 | Study | Y | 24,156 | 150,844 | ||||||
| Asphalt concrete paving and milling program | 812,376 | Roads | Y | 812,376 |
Final 2023 Capital Budget Summary
| Dept | Project | Total Budget | Category | AMP or Strat Plan Priority (Y/N) | Carry-over (or other) Reserve | Capital Reserve | DC's | FGT | Misc. Revenue | Loans | Finance/ Approved Grants |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Railway Crossing sidewalk at William/Sussex | 57,200 | Sidewalk | N | 57,200 | |||||||
| PXO Hershey Dr. | 60,000 | Sidewalk | N | 9,000 | 51,000 | ||||||
| PXO Jasper Ave @Vincent | 20,000 | Sidewalk | N | 20,000 | |||||||
| Waste Management Study | 30,000 | Study | N | 30,000 | |||||||
| Fleet AVL, Upgrade Pilot | 30,000 | Equipment | N | 30,000 | |||||||
| Traffic Controller Equipment (x2) | 60,000 | Equipment | N | 60,000 | |||||||
| Old Sly Sidewalk | 197,000 | Sidewalk | N | 9,327 | 187,673 | ||||||
| CityWide AM Update | 48,000 | Study | N | 48,000 | |||||||
| Wood t. 3 cable guide rail; Queen St. | 6,000 | Misc. | N | 6,000 | |||||||
| LIBRARY | Library Renovations (Children's Room) | 1,287,000 | Buildings | Y | 297,677 | 438,417 | 10,000 | 540,906 | |||
| EC DEV | Centre St. Revitalization Plan | 50,000 | Study | N | 50,000 | ||||||
| CORPORATE SERVICES | Lands Needs Study | 16,427 | Study | Y | 16,427 | ||||||
| Secondary Plan & OP Review | 90,000 | Study | Y | 90,000 | |||||||
| Data Retention System (Multi-year project) | 50,000 | Equipment | Y | 50,000 | |||||||
| Strategic Planning | 10,000 | Study | N | 10,000 | |||||||
| Heritage Conservation District Project | 120,000 | Study | N | 120,000 | |||||||
| TOTAL TAX-SUPPORTED CAPITAL BUDGET: | 9,594,049 | 1,643,602 | 4,154,456 | 10,000 | 581,132 | 570,906 | 1,297,768 | 1,336,185 | |||
| Total | 18,464,248 | 2,487,743 | 7,238,638 | 283,000 | 581,132 | 570,906 | 4,031,774 | 3,271,055 |