Budget
Projects2025
FireCAD Upgrade60,000
FireFire Hose and FIT testing machines8,230
FireTanker Replacement200,000
FireTree saw, vent saw18,000
FireDrone purchase9,500
FireReplacement of SCBA Filling Machine40,000
FireTotal335,730
PoliceAnnual Vehicle Replacement70,000
PoliceAutomated License Plate Readers64,500
PoliceNG 911 System25,000
PoliceBallistic Helmets20,000
PoliceCAD Mapping65,000
PoliceTotal244,500
ParksAccessibility Signage (non-verbal communication assist)15,000
ParksRockers - Alexander Park6,000
ParksSplash Pad Repair and Upgrades - Lower Reach Park40,000
ParksAluminum Bleachers - Various Parks and Playgrounds30,000
ParksWalkway upgrades - Various Parks and Playgrounds10,000
ParksPark Groomer - All Water-side parks; Hillcrest12,000
ParksGoose Hazing - All Water-side parks50,000
ParksOutdoor Infrastructure25,000
ParksUrban Forest Expansion15,000
ParksPicnic Shelters x 2 - Alexander Park15,000
ParksNew performance stage- Lower Reach - Lower Reach Park10,000
ParksLower Reach Parking Lot - Lower Reach Park750,000
ParksTotal978,000
FacilitiesFurnace at Kinsmen - Kinsmen Building7,500
FacilitiesIce Resurfacer - MCM/Youth Arena190,000
FacilitiesTables and chairs - Community Centre Hall/Youth Arena Hall12,000
FacilitiesTown Hall Complex Roof, Returned Eaves and Cupola Replacement225,000
FacilitiesFurnace Replacement - Town Hall Complex Basement12,000
FacilitiesVisitor Services Upgrades - Victoria Park20,000
FacilitiesWater Infrastructure - new well at Cemetery20,000
FacilitiesChiller - Youth Arena (dependant on Feasibility Study)150,000
FacilitiesReplacement Air Handling Unit - Memorial Community Centre45,000
FacilitiesCemetery Software13,000
FacilitiesWall Mounted Garage Door Openers (x 2) and 2 Doors - Fire Hall22,000
FacilitiesBuilding Condition Assessments (all assets) - Assessments for priority facilities60,000
FacilitiesMCM Barrel Roof Repair - Memorial Community Centre Complex25,000
FacilitiesHHM Painting- Exterior - HHM40,000
FacilitiesHHM Painting- Interior - HHM30,000
FacilitiesAccessible Buttons- Door Upgrades - Thurber Street MCC50,000
FacilitiesCommunity Centre Doors - Community Centre30,000
FacilitiesTotal951,500
LibraryPainting20,000
LibraryKitchen Installation10,000
Library30,000
WaterWater Tower5,145,000
WaterTrunk Main for Water Tower - Phase 15,000,000
WaterWater Meter Replacement825,000
WaterParks Canada Water Service60,000
WaterWatts Backflow Prevention Test Kit10,000
WaterWater Hydraulic Modelling50,000
WaterTotal Chlorine Analyzer12,000
WaterDissolved Air Flotation (DAF) maintenance15,000
WaterReplacement of last two sections of High Lift piping70,000
WaterHigh Lift Pump VFD upgrade40,000
WaterNew SCBA (x2) (Budget reflective of 2)36,000
Funding
ReserveDCsFGTOCIFDebtGrant
(60,000)
(8,230)
(200,000)
(18,000)
(9,500)
(40,000)
(118,000)(209,500)---(8,230)
(70,000)
(64,500)
(25,000)
(20,000)
(65,000)
(244,500)-----
(15,000)
(6,000)
(40,000)
(30,000)
(10,000)
(12,000)
(50,000)
(25,000)
(15,000)
(15,000)
(10,000)
(750,000)
(978,000)-----
(7,500)
(190,000)
(12,000)
(225,000)
(12,000)
(20,000)
(20,000)
(150,000)
(45,000)
(13,000)
(22,000)
(60,000)
(25,000)
(40,000)
(30,000)
(50,000)
(30,000)
(951,500)-----
(20,000)
(10,000)
(30,000)-----
(771,750)(3,585,500)(787,750)
(750,000)(4,250,000)
(825,000)
(60,000)
(10,000)
(50,000)
(12,000)
(15,000)
(70,000)
(40,000)
(36,000)
Projects2025
WastewaterGranulated Activated Carbon (GAC) filter top-up20,000
WastewaterDiesel Fuel System - Flagged Deficiencies45,000
WastewaterTree Removal and Perimeter Fencing20,000
WastewaterProcess Control Narrative and Operational Plan15,000
WastewaterTotal11,363,000
WastewaterM105; Sewage Lift Pump #520,000
WastewaterSulzer Blower (upgrade 1 blower)60,000
WastewaterSewer Hydraulic Capacity Study175,000
WastewaterManhole Replacement at River/Elm St. Intersection50,000
WastewaterSewer Camera25,000
WastewaterPump replacement - OPP Pumping Station15,000
WastewaterPollution Prevention Control Plan10,000
WastewaterDiesel Emergency Backup Fuel System50,000
Wastewatersecondary clarifiers at WCPC60,000
WastewaterHigh Pressure Effluent Pump Rebuild15,000
WastewaterSewer Lining200,000
WastewaterProcess Control Narrative and Operational Plan40,000
Wastewater720,000
Public WorksConfederation Bridge1,025,000
Public WorksACMP Program1,060,000
Public WorksRTK Unit (includes hardware and base station)30,000
Public WorksTraffic Controllers (2) - Cornelia/Elmsley w. radar pre-emption & Old Slys/Queen100,000
Public WorksPXO on Olds Slys at Curling Club/Lower Reach25,000
Public WorksPXO on Abbott Street @ Water Treatment Plant25,000
Public WorksPXO on Queen @ Lorne25,000
Public WorksPlate Packer25,000
Public WorksSidewalk Plow with attachments260,000
Public WorksBackhoe240,000
Public WorksAir Compressor for PW Garage11,000
Public WorksTotal2,826,000
ConstructionPhase #2 George St Water814,919
ConstructionPhase #2 George St Wastewater651,743
ConstructionPhase #2 George St. Roads1,482,609
ConstructionTotal2,949,272
CorpNetwork Refresh140,000
CorpMaintenance Manager Software (Parks and Rec, Corporate)35,000
CorpTotal175,000
TotalsFire335,730
TotalsPolice244,500
TotalsParks978,000
TotalsFacilities951,500
TotalsLibrary30,000
TotalsWater11,363,000
TotalsWastewater720,000
TotalsPublic Works2,826,000
TotalsConstruction2,949,272
TotalsCorporate Services175,000
TotalsTotal20,573,002

Funding

ReserveDCsFGTOCIFDebtGrant
(20,000)
(45,000)
(20,000)
(15,000)
(1,218,000)(1,521,750)--(7,835,500)(787,750)
(20,000)
(60,000)
(175,000)
(50,000)
(25,000)
(15,000)
(10,000)
(50,000)
(60,000)
(15,000)
(200,000)
(40,000)
(720,000)-----
(530,000)(495,000)
(1,060,000)
(30,000)
(100,000)
(25,000)
(25,000)
(25,000)
(25,000)
(260,000)
(240,000)
(11,000)
(2,331,000)----(495,000)
(814,919)
(651,743)
(517,216)(965,393)
(1,466,662)-(517,216)(965,393)--
(140,000)
(35,000)
(175,000)-----
(118,000)(209,500)---(8,230)
(244,500)-----
(978,000)-----
(951,500)-----
(30,000)-----
(1,218,000)(1,521,750)--(7,835,500)(787,750)
(720,000)-----
(2,331,000)----(495,000)
(1,466,662)-(517,216)(965,394)--
(175,000)-----
(8,232,662)(1,731,250)(517,216)(965,394)(7,835,500)(1,290,980)