SCHEDULE ‘B’ – Financial Requirements

The Owner shall provide, on execution of this agreement, the following security toward the completion of the works described herein: In the amount of: _______ (representing 50% of the cost of on-site site works and 100% of the costs on the Corporation’s lands) relating to the following works:

Security required for work completed on Town Property (Please indicate N/A where not applicable)Unit Cost Breakdown UnitUnit Cost Breakdown QuantityUnit Cost Breakdown Unit/PriceUnit Cost Breakdown Estimated Cost
Watermain Connection and Appurtenances Indicate items included:Lump Sum
Sanitary Sewer and Appurtenances Indicate items included:Lump Sum
Stormwater Management Works Indicate items included:Lump Sum
Roadways
Earthworksm3
Line paintingm
Pavement MarkingsEach
Concrete Sidewalkm2
Concrete Curbm
Asphalt reinstatement (including granular sub base and base)m2
GradingLump Sum
Streetscape Furniture (Benches, bike racks, etc.) Indicate items included:Lump Sum
Landscaping (boulevard reinstatement)
Topsoilm3
Seeding/sodm3
PlantingsLump Sum
TreesEach
SUBTOTAL

$$ \mathsf{m}^{3} $$

$$ \mathsf{m}^{2} $$

$$ \mathsf{m}^{2} $$

$$ \mathsf{m}^{3} $$

$$ \mathsf{m}^{3} $$


Security required for work completed on Subject Property (Please indicate N/A where not applicable)Unit Cost Breakdown UnitUnit Cost Breakdown QuantityUnit Cost Breakdown Unit/PriceUnit Cost Breakdown Estimated Cost
Watermain Connection and AppurtenancesLump
Indicate items included:Sum
Sanitary Sewer and AppurtenancesLump
Indicate items included:Sum
Stormwater Management WorksLump
Indicate items includedSum
Roadways/Laneways/Driveways/Parking Lots
Earthworksm3
Asphaltm2
Sub Base granulartonne
Base granulartonne
Line paintingm
Pavement MarkingsEach
Sidewalks/Walkways (indicate type ie; concrete, interlock pavers, etc)m2
Curb (indicate type ie; concrete, precast, etc)
GradingLump
Outdoor LightingSum
Indicate items included:Sum
Fencingm
Streetscape Furniture (Benches, bike racks, etc.)
Indicate items included:
Landscaping
Topsoilm3
Seeding/sodm3
PlantingsLump
TreesEach
SUBTOTAL
Less 50% for works on Subject Property
GRAND TOTAL
(Works on Town Land + Works on Developer's Lands (at 50%))