SCHEDULE ‘B’ – Financial Requirements
The Owner shall provide, on execution of this agreement, the following security toward the completion of the works described herein: In the amount of: _______ (representing 50% of the cost of on-site site works and 100% of the costs on the Corporation’s lands) relating to the following works:
| Security required for work completed on Town Property (Please indicate N/A where not applicable) | Unit Cost Breakdown Unit | Unit Cost Breakdown Quantity | Unit Cost Breakdown Unit/Price | Unit Cost Breakdown Estimated Cost |
|---|---|---|---|---|
| Watermain Connection and Appurtenances Indicate items included: | Lump Sum | |||
| Sanitary Sewer and Appurtenances Indicate items included: | Lump Sum | |||
| Stormwater Management Works Indicate items included: | Lump Sum | |||
| Roadways | ||||
| Earthworks | m3 | |||
| Line painting | m | |||
| Pavement Markings | Each | |||
| Concrete Sidewalk | m2 | |||
| Concrete Curb | m | |||
| Asphalt reinstatement (including granular sub base and base) | m2 | |||
| Grading | Lump Sum | |||
| Streetscape Furniture (Benches, bike racks, etc.) Indicate items included: | Lump Sum | |||
| Landscaping (boulevard reinstatement) | ||||
| Topsoil | m3 | |||
| Seeding/sod | m3 | |||
| Plantings | Lump Sum | |||
| Trees | Each | |||
| SUBTOTAL |
$$ \mathsf{m}^{3} $$
$$ \mathsf{m}^{2} $$
$$ \mathsf{m}^{2} $$
$$ \mathsf{m}^{3} $$
$$ \mathsf{m}^{3} $$
| Security required for work completed on Subject Property (Please indicate N/A where not applicable) | Unit Cost Breakdown Unit | Unit Cost Breakdown Quantity | Unit Cost Breakdown Unit/Price | Unit Cost Breakdown Estimated Cost |
|---|---|---|---|---|
| Watermain Connection and Appurtenances | Lump | |||
| Indicate items included: | Sum | |||
| Sanitary Sewer and Appurtenances | Lump | |||
| Indicate items included: | Sum | |||
| Stormwater Management Works | Lump | |||
| Indicate items included | Sum | |||
| Roadways/Laneways/Driveways/Parking Lots | ||||
| Earthworks | m3 | |||
| Asphalt | m2 | |||
| Sub Base granular | tonne | |||
| Base granular | tonne | |||
| Line painting | m | |||
| Pavement Markings | Each | |||
| Sidewalks/Walkways (indicate type ie; concrete, interlock pavers, etc) | m2 | |||
| Curb (indicate type ie; concrete, precast, etc) | ||||
| Grading | Lump | |||
| Outdoor Lighting | Sum | |||
| Indicate items included: | Sum | |||
| Fencing | m | |||
| Streetscape Furniture (Benches, bike racks, etc.) | ||||
| Indicate items included: | ||||
| Landscaping | ||||
| Topsoil | m3 | |||
| Seeding/sod | m3 | |||
| Plantings | Lump | |||
| Trees | Each | |||
| SUBTOTAL | ||||
| Less 50% for works on Subject Property | ||||
| GRAND TOTAL | ||||
| (Works on Town Land + Works on Developer's Lands (at 50%)) |