1 Site Plan of Property: 2 Copies of Plot Plan and/or Copy of Existing Survey of Record:

- APPLICANT GUIDE TO PREPARING A PERMIT -

Note: This guide is meant to assist applicants, in preparing to file a more *complete application; to avoid process delay. Also for staff use as noted.

$\textcircled{1}$ Site Plan of Property: 2 Copies of Plot Plan and/or Copy of Existing Survey of Record:

  1. Lot line measurements and full extent of lot boundary/corners, with lot line setbacks to all buildings;
  2. Location and size of all buildings, structures, services (water/sewer), utilities (overhead/underground Hydro);
  3. Site Features: Entry Laneways, Parking spaces, culvert/ditch, fences or waterways (lake, river, stream);
  4. Adjacent Roads (County/Municipal or Private), corner lot, land easement or private right-of-way route;
  5. Any land cut or fill to meet Town grading standards for drainage swales; Identify land uses adjacent to lot. Other: More specific project guidelines are available for your information.

$\textcircled{2}$ Project Working Drawings: Prepare two (2) Copies for Residential & Three (3) for Commercial:

  1. All building plans to be drawn to scale, fully dimensioned with construction assembly detail;
  2. Foundation Plan structural design with any Main Floor Framing Layout shown above;
  3. All New Floor Plan(s) and full structural design with any upper framing layout shown above;
  4. Exterior Building Elevations; Grade level, wall finish material/any opening changes, deck/stairs, etc.;
  5. Cross Section full-height details of all new wall/floor/roof, with any fire separation detail; ► Important Form: ‘Schedule 1: Designer information’; For most residential projects, either Homeowner or a Building Code Designer-BCIN declares responsibility for all design work. For most Commercial work, a design data ‘Matrix’ to be filed by Designer/Architect/Engineer. Other:

► Service Note: Inquire about project type drawing guides that are available. Visit us, see online or inquire by email: building@smithsfalls.ca For all required drawings, fees and other documents; see Town Building By-Law/Schedules.

IMPORTANT: Completeness and Compliance to Applicable Laws: A ‘complete’ application is defined by the Ontario Building Code (OBC), which includes required drawings/supporting documents. A full permit plans review may only start once the application is *complete, determined by the Chief Building Official as per OBC 1.3.1.3 Div.C-Part 1.

$\textcircled{3}$ Application for Permit to Construct or Demolish: Fill out form and complete all fields.

  1. Project Value Estimate ($): Calculate a fair figure in the ‘Application Section A.’ for the total work value of all Construction Materials, Work/Labour (not free), Services & Equipment to fully complete the project.
  2. Area of Work (Sq.Ft.): Accurately provide the total work area/s in ‘Application Section A.’ for the gross building area in square feet or metres. See designer to verify total of all work area(s) on all floor levels.
  3. Purpose/Description/Use: Select purpose of a) New Construction, b) Addition to Existing building, c) Alteration/repair (renovation), d) Demolition (full or part) or e) Installation. Describe work and Declare use/s.
  4. Sign the Application: If application not signed by landowner (if other person signs application as an ‘agent’); Provide an ‘Agent form/letter signed by owner’ as written acknowledgement for agent to act on their behalf.
  5. Permit Fee: Deposit upfront or paid in full. Balance due prior to permit pickup. There is no credit card use.

May 6, 2022


Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act

For use by Principal Authority Town of Smiths Falls
Application number:Permit number (if different):
Date received:Roll number:
Application submitted to Town of Smiths Falls
A. Project information
Building number, street nameUnit number (if applicable)Lot/con. (Optional)
MunicipalityPostal codePlan number & lots/parts
Project value est. $ (To include cost of materials & labour)Area of work (ft2)
B. Purpose of application
☐ New construction ☐ Addition to an existing building ☐ Alteration/repair ☐ Demolition ☐ Conditional Permit ☐ Install/Erect/ Replace
Description of proposed work
Proposed use of buildingCurrent use of building
Age of BuildingCurrent use of building

Use
☐ Commercial ☐ Industrial ☐ Government/Institutional ☐ Municipal ☐ Single Residential ☐ Multi Unit Residential - If So, How Many Units ______
Type
☐ Single Family Home ☐ Duplex ☐ Apt/Row House ☐Conversion ☐Accessory Structure ☐ Addition ☐ Deck ☐ Garage/Carport
C. Applicant Applicant is: ☐ Owner or ☐ Authorized agent of owner (need signed agent form)
Last nameFirst nameCorporation or partnership
Street addressUnit number (If applicable)Lot/con.(Optional)
MunicipalityPostal codeProvinceE-mail
Telephone number ( )Fax ( )Cell number ( )
D. Owner (if different from applicant)
Last nameFirst nameCorporation or partnership
Street addressUnit number (If applicable)Lot/con.(Optional)
MunicipalityPostal codeProvinceE-mail
Telephone number ( )Fax ( )Cell number ( )
E. Builder (If builder is not the owner, this information is required) ☐ Owner is builder
Last nameFirst nameCorporation or partnership (if applicable)
Street addressUnit number (If applicable)Lot/con. (Optional)
MunicipalityPostal codeProvinceE-mail
Telephone number ( )Fax ( )Cell number ( )
F. Tarion Warranty Corporation (Ontario New Home Warranty Program) ☐ N/A – No new dwelling unit being constructed
i. Is proposed construction for a new home as defined in the Ontario New Home Warranties Plan Act? If no, go to section G.☐ Yes ☐ No
ii. Is registration required under the Ontario New Home Warranties Plan Act?☐ Yes ☐ No
iii. If yes to (ii) provide registration number(s): ________

G. Required Schedules
i) Attach Schedule 1 for each individual who reviews and takes responsibility for design activities. ☐ Attached ii) Attach Schedule 2 where application is to construct on-site, install or repair a sewage system. ☐ Attached ☐N/A iii) Attach Schedule 3 being the required plot plan. iv) Attach Schedule 4 where application is to demolish. ☐ Attached ☐ N/A
H. Completeness and compliance with applicable law
i) This application meets all the requirements of clauses 1.3.1.3 (5) (a) to (d) of Division C of the Building Code (the application is made in the correct form and by the owner or authorized agent, all applicable fields have been completed on the application and required schedules, and all required schedules are submitted). Payment has been made of all fees that are required, under the applicable by-law, resolution or regulation made under clause 7(1)(c) of the Building Code Act, 1992, to be paid when the application is made.☐ Yes☐ No
i) This application meets all the requirements of clauses 1.3.1.3 (5) (a) to (d) of Division C of the Building Code (the application is made in the correct form and by the owner or authorized agent, all applicable fields have been completed on the application and required schedules, and all required schedules are submitted). Payment has been made of all fees that are required, under the applicable by-law, resolution or regulation made under clause 7(1)(c) of the Building Code Act, 1992, to be paid when the application is made.☐ Yes☐ No
ii) This application is accompanied by the plans and specifications prescribed by the applicable by-law, resolution or regulation made under clause 7(1)(b) of the Building Code Act, 1992.☐ Yes☐ No
iii) This application is accompanied by the information and documents prescribed by the applicable by-law, resolution or regulation made under clause 7(1)(b) of the Building Code Act, 1992 which enable the chief building official to determine whether the proposed building, construction or demolition will contravene any applicable law.☐ Yes☐ No
iv) The proposed building, construction or demolition will not contravene any applicable law.☐ Yes☐ No
I. Declaration of applicant
I ________ declare that: (print name) 1. The information contained in these application, attached schedules, attached plans and specifications, and other attached documentation is true to the best of my knowledge. 2. If the owner is a corporation or partnership, I have the authority to bind the corporation or partnership. Date ________ Signature of applicant

Personal information contained in this form and schedules is collected under the authority of subsection 8(1.1) of the Building Code Act, 1992, and will be used in the administration and enforcement of the Building Code Act, 1992. Questions about the collection of personal information may be addressed to: a) the Chief Building Official of the municipality or upper-tier municipality to which this application is being made, or, b) the inspector having the powers and duties of a chief building official in relation to sewage systems or plumbing for an upper-tier municipality, board of health or conservation authority to whom this application is made, or, c) Director, Building and Development Branch, Ministry of Municipal Affairs and Housing 777 Bay St., 2nd Floor. Toronto, M5G 2E5 (416) 585-6666.


Schedule 1: Designer Information

Use one form for each individual who reviews and takes responsibility for design activities with respect to the project.
A. Project Information
Building number, street nameUnit no.Lot/con.
MunicipalityPostal codePlan number and lots/parts
B. Individual who reviews and takes responsibility for design activities
NameFirm
Street addressUnit no.Lot/con.
MunicipalityPostal codeProvinceE-mail
Telephone number ( )Fax number ( )Cell number ( )
C. Design activities undertaken by individual identified in Section B. [Building Code Table 3.5.2.1. of Division C]
☐ House ☐ HVAC – House ☐ Building Structural ☐ Small Buildings ☐ Building Services ☐ Plumbing – House ☐ Large Buildings ☐ Detection, Lighting and Power ☐ Plumbing – All Buildings ☐ Complex Buildings ☐ Fire Protection ☐ On-site Sewage Systems
Description of designer's work or ☐ letter attached.
D. Declaration of Designer
I ________________ declare that (choose one as appropriate): (print name) ☐ I review and take responsibility for the design work on behalf of a firm registered under subsection 3.2.4.of Division C, of the Building Code. I am qualified, and the firm is registered, in the appropriate classes/categories. Individual BCIN: ____________________ Firm BCIN: ____________________ ☐ I review and take responsibility for the design and am qualified in the appropriate category as an “other designer” under subsection 3.2.5.of Division C, of the Building Code. Individual BCIN: ____________________ Basis for exemption from registration: ____________________ ☐ The design work is exempt from the registration and qualification requirements of the Building Code. Basis for exemption from registration and qualification: ☐ Owner Design ☐ Other – Detail Required: ____________________ I certify that: 1. The information contained in this schedule is true to the best of my knowledge. 2. I have submitted this application with the knowledge and consent of the firm.
  1. I have submitted this application with the knowledge and consent of the firm.

NOTE:

  1. For the purposes of this form, "individual" means the "person" referred to in Clause 3.2.4.7(1) d).of Division C, Article 3.2.5.1. of Division C, and all other persons who are exempt from qualification under Subsections 3.2.4. and 3.2.5. of Division C.

  2. Schedule 1 is not required to be completed by a holder of a license, temporary license, or a certificate of practice, issued by the Ontario Association of Architects. Schedule 1 is also not required to be completed by a holder of a license to practise, a limited license to practise, or a certificate of authorization, issued by the Association of Professional Engineers of Ontario.

Application for a Permit to Construct or Demolish - Effective June 17,2022


C COPY OF PLOT PLAN

(Scale)

STREET OR CONCESSION

STREET OR CONCESSION

D DECLARATION

I, _____ certify the truth of all the statements or representations contained therein.

I understand that the issuance of a permit shall not be deemed a waiver of any of the provisions of any by-laws or requirements of the Building Code Act, 1992, or regulations made thereunder, notwithstanding anything included in or omitted from the plans or other material filed in support of or in connection with an application.

I acknowledge that in the event a permit is issued, any departure from specific conditions, plans, specifications or building locations proposed in the application is prohibited and such could result in the permit being revoked.

I further acknowledge that in the event the permit is revoked for any cause or irregularity or non-conformity with by-laws or requirements of the Building Code Act, 1992, or regulations made thereunder, there shall be no right of claim whatsoever against the municipal corporation or any official thereof and any such claim is hereby expressly waived.

Date Signature of Applicant


Interior Side Yard Setback

Accessory Structure Dimensions of Structure (including Height)

Distance to Main Structure

Rear Yard Setback

Hydro Easements

Lot Depth

Interior Side Yard Setback

Main Structure Dimensions of Structure (including height)

Front Yard Setback

Driveway

Lot Frontage

PLOT PLAN SAMPLE

Front Street

Please note that additional site specific information in addition to that shown on the sample may be required for the assessment of the applications compliance with applicable law.


Schedule 4: Disconnection of Services & Compliance Requirement for Demolition

A. Project Information
Building number, street nameUnit number (If applicable)Lot/con. (Optional)
MunicipalityPostal codePlan number & lots/parts
Proposed Date of Demolition
Completion Date of Demolition
B. The Following Services Require Disconnection or Shut Off Prior to Issuance of a Demolition Permit and Clearance From the Corresponding Utility Agencies Is Required. This Completed Form Must Be Forwarded to The Chief Building Official Prior To Obtaining a Demolition Permit.
Bell Canada Telephone: (613) 345-2377 Fax: (613) 345-2581
Date Service to be Disconnected: ________________ Authorized Representative/Signature: ________________
Hydro One Telephone: 1-888-345-2377 Fax: (613) 267-9917
Date Service to be Disconnected: ________________ Authorized Representative/Signature: ________________
Cogeco Telephone: (613) 432-6580 Fax: (613) 432-4810
Date Service to be Disconnected: ________________ Authorized Representative/Signature: ________________
Water/Sewer Telephone: (613) 283-4124 Fax: (613) 283-0558
Date Service to be Disconnected: ________________ Authorized Representative/Signature: ________________
Enbridge Telephone: 1-800-267-3616 Fax: (613) 742-4503
Date Service to be Disconnected: ________________ Authorized Representative/Signature: ________________
C. Requirements:
1. If the building is serviced by a septic tank, the tank shall be pumped out & capped until approved for future use or the septic tank shall be pumped out, broken and filled with sand or gravel, or the entire tank shall be removed or backfilled.
2. If the building is serviced by a well, the well is to be properly abandoned by a licensed well driller in accordance with Regulation 903 of The Ontario Water Resources Act.
3. Sites containing any possible contaminants are to be decommissioned and approved by the Ministry of the Environment.
4. A material assessment inspection must be conducted and a Notice of Project forwarded to the Ministry of Labour according to Ontario Regulation 278/05.
5. A copy of the material assessment inspection report must be provided to the building department.
D. Declaration of Applicant:
I ________________ declare that: (print name) I acknowledge that all of the above agencies that are applicable to this structure have been contacted and the services disconnected. I further acknowledge that I have read Requirements 1 to 5 and have complied with all that are applicable. __________________ Date ________________ Signature of applicant