DOWNTOWN REVITALIZATION AND
FINAL REPORT
TOWN OF SMITHS FALLS
WATERFRONT INTEGRATION MASTER PLAN
FEBRUARY 2013
TABLE OF CONTENTS
1.0 INTRODUCTION 1 1.1 Background and Purpose 3 1.2 Regional Setting 4 1.3 Study Area 5 1.4 Existing Challenges 6 2.0 VISION + FRAMEWORK 9 2.1 Draft Vision Statement 11 2.2 Guiding Principles 11 2.3 Structuring Elements 16 3.0 CONCEPTUAL MASTER PLAN 17 3.1 Overall Concept Plan 19 3.2 Concept Plan Components 20
Page No.
3.3 “Top of the Town” Civic Precinct 21 3.4 Beckwith Centered Downtown Revitalization Area 22 3.5 “Lower Town” Waterfront Redevelopment Area 28
3.6 Rideau Canal and Waterfront Greenway
4.0 DESIGN GUIDELINES 37
4.1 Design Themes 39
4.2 Streetscape Design 40
34
4.3 Built Form Guidelines 45 4.4 Sustainability Guidelines and Considerations 48
5.0 IMPLEMENTATION STRATEGY 51
5.1 The Community Improvement Plan
5.2 Key Recommendations 54
5.3 Potential Capital Funding Opportunities
5.4 Public Realm Development Costs
5.5 Phasing and Project Prioritization
53 55 56 56
MILL
Rideau Canal Museum Building (left), and Potential Development Site (right)
TABLE OF CONTENTS LIST OF FIGURES
Figure 1: Revitalization Process Diagram 3
Figure 2: Regional Context Map 4
Figure 3: Study Area Context Map 5
Figure 4: Preliminary Concept Plan
Figure 5: Concept Plan Components Diagram
Figure 6: “Top of the Town” Civic Precinct Detail Plan Options
Figure 7: Beckwith Centered Downtown Revitalization Area
Figure 8: Beckwith Street North Concept Plan
Figure 9: Civic Plaza Detail Area
Figure 10: Beckwith Street South Concept Plan
Figure 11: Beckwith Street Typical Block Detail
Figure 12: Proposed Concept Visualization of Beckwith Street
Figure 13: Beckwith Street Existing Cross Section
Figure 14: Front-In Angled Parking with Wide Pedestrian Boulevard
Figure 15: Parallel Parking with Wide Pedestrian Boulevard
Figure 16: “Lower Town” Waterfront Redevelopment Area
Figure 17: East Signature Development Site - Short Term Plan
Figure 18: East Signature Development Site - Medium Term Plan
Figure 19: East Signature Development Site - Long Term Plan
19 20 21 22 23 23 24 24 25 26 27 27 28 29 29 29
Figure 20: Proposed Concept Visualization - East Signature Waterfront Development 30 Figure 21: East Signature Development Site - Medium Term Plan 31 Figure 22: Proposed Concept Visualization - Waterfront View of West Signature Development Site 32 Figure 23: Proposed Concept Visualization - Street View of West Signature Development Site 33 Figure 24: Rideau Canal and Waterfront Greenway 34
Figure 25: Gateway Feature at Victoria Park
35
Figure 26: Proposed Concept Visualization of Gateway Feature at Victoria Park 36
Figure 27: Design Themes 39
Figure 28: Streetscape Zones
Figure 29: Option 1 - Angled Parking: Typical Cross Section and Plan
Figure 30: Option 2 - Parallel Parking: Typical Cross Section and Plan
Figure 31: Typical Facade Improvement Guidelines
40 44 44 45
Figure 32: Height and Massing Guidelines for Shoulder Areas 46 Figure 33: Height and Massing Guidelines for Beckwith Street and Main Street 46 Figure 34: Height and Massing Guidelines for Waterfront Development Sites 47 Figure 35: Development Zones Map 53
ii | Town of Smiths Falls | Downtown Revitalization and Waterfront Integration Master Plan
A
1.0 INTRODUCTION
“A sensational place to live, work, play and do business.” -Smiths Falls Community Profi le
DETACHED LOCK SMITHS FALLS COMBINED LOCK 29A HWY 29 OLD LOCKS 28, 29, 30
1.0 INTRODUCTION
1.1 Background and Purpose
Smiths Falls was historically a successful industrial town. In recent
years, much of the industry has left, but many historical buildings of
the Towns boom periods remain within the downtown area. Small
businesses remain and some new ones are beginning to locate there.
In recent years, Smiths Falls has also seen an increase of residents
and businesses looking to relocate from the City of Ottawa, who
are looking for a serene small town atmosphere within proximity
of a large city. The downtown is currently in the early stages of a
renaissance, a point at which its residents and leaders are eager to
ensure proper planning and preparation for the future.
1.1.1 Integrated Planning for Change
The Downtown Revitalization and Waterfront Integration Master Plan and the Community Improvement Plan for Smiths Falls have been developed as mutually reinforcing documents to ensure that the public and private realm are developed with a consistent vision in mind. These documents provide tools that are intended to guide the redevelopment of the downtown core and re-connection of the waterfront to ultimately make Smiths Falls a sensational place to live, work, shop, socialize and recreate.
Downtown Revitalization Goals/Priorities Achieved by Public Realm Actions Represented by Downtown Master Plan Private Actions Facilitated by implementation of Downtown CIP Figure 1: Revitalization Process Diagram
1.1.2 Public Realm Revitalization
The revitalization of Beckwith Street, the main street in Smiths Falls, will have a signifi cant impact from an economic development standpoint. In 2010 the economic development department undertook three critical master planning initiatives: Tourism Master Plan, Downtown Master Plan and a Waterfront Re-Development Master Plan. Other initiatives that have been undertaken include an Arts and Culture Visioning Exercise, Beckwith Street Reconstruction Study, Pedestrian Linkages Study (currently underway), as well as hosting a Youth Forum about the future of Smiths Falls. The fi nal outcomes of these initiatives will be integrated into the Downtown Revitalization and Waterfront Integration Master Plan, incorporating the needs and providing future direction for tourism, business development and overall quality of life in the community.
The purpose of the Downtown Revitalization and Waterfront Integration Master Plan is to develop a vision, policies, incentives, conceptual design and action planning to encourage growth in appropriate private and public sector development. The Plan is aimed to support principles of sustainability, pedestrian friendliness, heritage preservation, and the creation of vibrant outdoor public spaces.
1.1.3 Community Improvement Plan Provisions
The Town is also undertaking a Community Improvement Plan (CIP), concurrent with this Downtown Revitalization and Waterfront Integration Master Plan process; the CIP is being completed by Sierra Planning and Management. A Community Improvement Plan is focused on private ownership commercial, industrial and residential stock and is a tool under the Planning Act to help facilitate revitalization eff orts in defi ned target areas.
To carry out CIPs, municipalities can establish grant or loan programs to encourage private sector investment in development eff orts that seek to improve and revitalize an area. The CIP process will result in a separate yet complementary document.
Together, these plans will provide a coordinated strategy that includes recommendations for the public realm and privately owned property within the CIP area.
1.0 INTRODUCTION
1.1.4 Community Improvement Plan Provisions
A mandate for the Community Improvement Plan (CIP) is clearly articulated in Section 8.5 of the Town’s Offi cial Plan (1993) (currently under review). The Offi cial Plan identifi es the entire Town of Smiths Falls as a Community Improvement Policy Area for which Council may “undertake comprehensive and complementary improvement programs within the policy area as fi nancial resources permit” (Town of Smiths Falls Offi cial Plan, Section 8.5.4). More specifi cally, Section 8.5.5 identifi es the Downtown commercial core area as a high priority area for community improvement.
As it relates to community improvement in Downtown Smiths Falls, policy provisions as outlined in Section 8.5.2 of the Offi cial Plan support the following:
(8.5.2 (1)) Foster improvements in residential communities by:
-
Establishing and maintaining the physical infrastructure necessary and appropriate to the various residential communities. This may include the provision of sidewalks, street lighting, storm sewers, road widenings, etc.
-
Ensuring the maintenance of the existing housing stock and encouraging the rehabilitation, renovation, and repair of older dwellings; and where appropriate, supporting the conversion of older, large dwellings into multiple dwelling units to enable the creation of more rental housing.
(8.5.2 (2)) Foster improvements in commercial areas by:
-
Maintaining a vibrant, attractive downtown by providing the necessary physical conditions to create a pleasing shopping environment.
-
Providing and maintaining incentives to support the downtown core, to foster a healthy local economy for area businessmen.
-
Providing and maintaining downtown streets, sidewalks, lighting, benches, parking areas, to ensure that the downtown is accessible to both motorist and pedestrian.
The CIP which is currently being developed as a complementary exercise to this Master Plan focuses on the sustainability of the commercial building stock primarily, with an additional focus on opportunities to enable residential development in the core. The CIP will support appropriate development of multi-tenant housing based on the conversion of large dwellings but only where this comprises the development of legal apartment dwelling units. The CIP will support the development of new multi-unit ownership housing as well as rental housing on vacant, under used or redeveloped sites.
1.2 Regional Setting
The Town of Smiths Falls is strategically located at the Heart of the Rideau Canal, a UNESCO world heritage site, in the County of Lanark in Eastern Ontario. Smiths Falls is located within an hour’s drive of the City of Ottawa and the City of Kingston, approximately midway between Toronto and Montreal, and within an hour or two of several United States border crossings. The Town acts as a service centre for the surrounding rural areas. While the population of the Town is approximately 9,000 people, the Town serves a regional population of 25,000 people for activities such as employment, shopping, services, and recreational opportunities.
Rideau Canal SMITHS FALLS 100 kilometer radius approximate one hour drive
Figure 2: Regional Context Map
1.0 INTRODUCTION
1.3 Study Area
The study area for the Downtown Revitalization and Waterfront Integration Master Plan includes the downtown core area, as well as the infl uence areas - namely the gateway entrances into Smiths Falls.
The downtown core area is identifi ed in green on the adjacent map, and is defi ned by Elmsley Street to the northeast, the Rideau Canal to the south, and approximately one or two blocks east of Beckwith Street to the east. The downtown core area also includes a length of Lombard Street between Brockville Street to the west and Abbott Street to the east.
A key corridor within the study area is Beckwith Street, the main
commercial / retail street within the downtown. Beckwith Street
acts as the central business core within the community. The street
right-of-way is 30 metres (99 feet) wide, providing generous angle
parking; the street is seen as very unique across the region. Beckwith
is also the principle link between the Waterfront/Rideau Canal and
municipal waterfront park areas and the downtown business core.
The infl uence areas are identifi ed with purple on the adjacent map.
The proposed Downtown Smiths Falls Community Improvement
Project Area (CIPA) – that is the geographic area within which the
programs of fi nancial support outlined in the CIP will operate / be
applied – is co-terminous with the Master Plan study area boundary
with the addition of the properties on both sides of River Street.
Refer to the Community Improvement Plan document for exact
extent of the CIPA.
LEGEND Town Limit Influence Area Downtown Core Area
Union Street / Highway 15 Influence Area
Cornelia Street / Highway 43 Influence Area
Lombard Street / Highway 15 Influence Area
Queen Street / Highway 43 Influence Area
Brookville Street / Highway 26 Influence Area
Scale 1: 17,000 0 100 200 600
Figure 3: Study Area Context Map
1.0 INTRODUCTION
1.4 Existing Challenges
1.4.1 Design Challenges
The existing downtown and waterfront areas of Smiths Falls have a number of design challenges that must be overcome and will be addressed through this Master Plan document. Challenges related specifi cally to the waterfront include the following:
• Reconnect the waterfront with the Town, and the downtown core in particular;
• Create continuous open space and pedestrian linkages along the Canal;
• Potential redevelopment opportunities must be addressed;
• Public accessibility and views to the water and Canal to be preserved, created and/or redefi ned; and,
• Opportunities (and reasons) for tourists / boaters to stop in Smiths Falls.
Design challenges that are related to the downtown include:
• Defi ning the downtown core;
• Create spaces throughout the downtown that provide social areas and utilize placemaking techniques;
• Pedestrian connections along Beckwith Street by providing additional crossings to support the retail health of downtown; • Incorporate complete street principles;
• Maintain convenient parking locations, both on-street and off - street; and,
• Protect and enhance heritage buildings.
1.4.2 Market Conditions for Investment
Downtown Smiths Falls is a functioning commercial, residential, shopping and civic hub for the community, however historic disinvestment in parts of the building stock in the Downtown, coupled with the development of less stable commercial uses and in some instances long-term vacancy and dilapidation of buildings present signifi cant opportunities for future property development.
Residential Market Opportunities
The local residential housing market in Smiths Falls is geared to fi rst-time buyers as well as move-up buyers and move-down (empty nester) households. Despite much of the residential development in the region occurring on the outskirts of Smiths Falls in neighbouring municipalities such as Montague and Rideau Lakes (the latter having a market of local buyers and developments comprised of single housing family on one acre lots at prices around $300,000, with higher prices for lake front properties), the potential exists for the Town to tap into broader regional demand for new housing options.
In downtown Smiths Falls the housing market, as well as housing forms, will be diff erent from those observed elsewhere in the Town and surrounding areas. Accordingly, the scale of investment necessary is also higher, particularly if such development is focused on multi-unit residential development.
The locational assets of downtown Smiths Falls, particularly with the water, and the existence of retail at the south end of the Town as well as a range of services in the Downtown itself, provide solid opportunities for appropriate development to be planned for over the medium-term. In achieving this, there is a role to be played by the Town in assisting the development community in realizing residential development – whether it be through conversion of existing properties, new development, potential land assembly and
development of mixed-use buildings through the development of upper fl oors.
Commercial/Mixed-Use Opportunities
Evidence of existing vacant commercial units is principally a concern on the east-west streets either side of Beckwith Street North. This provides a clear indication of where Community Improvement Plan incentive programs should be allocated – to the level of individual buildings which can benefi t from building fabric improvements to entice and retain commercial tendencies.
Achieving viable uses on the upper fl oors which may include residential but also commercial offi ce space, consistent with the role of Downtown as more than a retail environment, should form the basis for individual property projects which can collectively restate and confi rm the long-term role of Downtown. Based on the existing profi le of Downtown, the opportunity exists to promote the interests of income-generating commercial buildings operating as mixed-use.
Commercial/Retail Opportunities
Retail in the Downtown is comprised of a range of durable goods (excluding food store type merchandise), some specialty retail stores (e.g. kitchen supply stores, and computer equipment service stores) and other retail services which provide important local neighbourhood and town-wide services. However, many of these retail establishments are not brand name, multi-location stores which operate as anchors and destinations for shoppers.
While relatively little can be done to determine the precise retail mix and ensure that brand name retailers and larger corporations take retail space, the potential exists to develop the building stock to provide both landlords and prospective tenants more attractive options for long-term investment.
1.0 INTRODUCTION
1.4.3 Regulatory Framework
A number of background documents were reviewed in order to gain an understanding of the regulations for Smiths Falls. Key points relevant to the development of the Master Plan are provided below.
Town of Smiths Falls Offi cial Plan (Draft), January 2010
The Draft Offi cial Plan for the Town of Smiths Falls was prepared by DELCAN Corporation in January 2010. The Plan is intended to guide the future development of the Town to its capacity population of approximately 12,000 to 13,000 persons; the population was 8,780 in 2006. Some of the key objectives of the Plan include:
• Maintain and strengthen the role of the downtown core as the primary commercial, civic and cultural centre of the Town and surrounding area.
• Encourage the preservation, restoration and adaptive reuse of the existing building stock throughout the Town.
• Protect and enhance cultural and natural heritage features.
• Recognize the Rideau Canal as the Town’s major tourism and recreation asset.
• Develop and maintain suffi cient parks and open space areas, and community facilities to meet the needs of all age and socioeconomic groups for active and passive recreation activities.
A number of policies specifi c to the Rideau Canal are identifi ed in the Plan. Those of particular importance to this study include that all (re)development must be consistent with the policies as set out in the Rideau Canal Management Plan, The World Heritage Site Management Plan, Smiths Falls Lower Reach Basin Parkland Study and the Middle Rideau River Watershed Study, in order to protect and enhance the cultural and natural features of the Canal. In addition, special consideration in site plan approval process for rear yards fronting the Canal shall be given to ensure consistency with the above Plans. This is to ensure that these areas are not dominated
by parking, storage, loading areas; if it is necessary to locate these facilities next to the Canal, these areas shall be appropriately buff ered, screened and landscaped to minimize visual impact.
The Land Use Designation for the Core Area, including downtown
and surrounding area, is intended “to foster a vibrant, mixed-use
downtown focused on an economically strong commercial core”.
Policies related to the Core Area as relevant to this study include:
•
Develop coordinated program to improve features of public lands and support improvement of private lands.
•
Create pedestrian linkages to the Canal and Town’s recreational walking system through development approval process.
•
Preserve historic landmarks, buildings and features.
•
Encourage continuous pedestrian-oriented shopping district; no further highway commercial or industrial uses are permitted in the Core Area.
•
Discourage parking lots fronting on Beckwith Street North.
•
Encourage residential uses within the Core Area (mixed-use buildings) to create a vibrant, mixed-use core.
•
Consider implementing a long range plan for provision of off - street municipal parking and encourage private sector to provide off -street parking to achieve a more effi cient parking supply.
Open Space designation are lands intended for conservation and recreation uses. Relevant policies related to Open Space include:
•
Cooperate with other public, quasi-public and private agencies in provision of open space and recreation systems.
•
Provide walkways, trails and bicycle paths as part of an overall linked open space system.
•
Adequate parking areas shall be established and access points for
parking shall be designed to minimize the danger to pedestrians.
Facilities such as ramps, walkways, and safe road crossings to
enable people to access open space are to be provided.
Town of Smiths Falls Zoning By-Law (Offi ce Consolidation 2010)
A majority of the Downtown Core Area is designated as General Commercial (C1) zone, meaning that there are numerous nonresidential uses permitted as well as residential uses, units on the upper storey of a non-residential building.
Rideau Canal World Heritage Site Management Plan (2005)
This plan identifi es how the world heritage values of the Canal will be protected for present and future generations. It provides a high-level management plan for the Rideau Canal by identifying management commitments and actions that will result in an integrated approach to administering the world heritage site. A number of policies and actions are identifi ed within the plan for the protection of the World Heritage Site; these include, but are not limited to, the following:
• Work with municipalities, landowners, the Province and other stakeholders to ensure that suitable land use policies for adjacent lands are in place to protect the Canal.
• Work with municipalities, empowered to control the development and use of shore lands, to protect the Canal through the maintenance of a buff er zone. Frontages of between 50 m to 75 m for waterfront lots, and a setback of 30 m from the shoreline for all new construction are required.
• Ensure that consideration is given to the conservation management of lands beyond the 30 m buff er, especially where development has the potential to degrade the heritage values of the property.
These policies and actions are adhered to and promoted in the development of the Downtown Revitalization and Waterfront Integration Master Plan.
canal wide square boats Bascule buildings utilize marketing Rehabilitate heritage Pedestrian Enhance Public waterfront development Town Mixed use street World Widen boaters gathering building designation potential Falls near Library focused edges Site washrooms sidewalks tourists patios profile appeal activities Heritage Heritage Highlight UNESCO Beautify economic Capitalize spaces Comfort vehicles Smiths Better
2.0 VISION + FRAMEWORK
Providing a variety of opportunities for people to access the water’s edge is important in creating an integrated downtown and waterfront.
PARKING
Canal Walkway, Fairport, New York
2.0 VISION + FRAMEWORK
2.1 Draft Vision Statement
A vision statement was prepared for the Smiths Falls Downtown and Waterfront area based on the key directions and outcomes of the community consultation and analysis:
“The Town of Smiths Falls Downtown and Waterfront core area is envisioned as the ‘Heart of the Rideau’ that will create a cohesive community identity on the Rideau Canal. It strives to protect and enhance the unique natural environment and extensive cultural heritage; provides a strong framework for social interaction, land and waterbased recreation and tourism; and encourages mutually supportive investment in the public realm and private development sites.”
2.2 Guiding Principles
Based on the previous consultation undertaken by the Town and the community session held in September 2012, a number of design principles were formulated based on the aspirations and values of the community. These principles serve as the foundation upon which the Master Plan will be developed for the Smiths Falls Downtown and Waterfront Area.
1
Distinct Character Areas
Acknowledge and reinforce the best attributes and qualities of the distinct character areas as a framework for planning and design. The Beckwith Street Downtown Promenade and associated shoulder areas presents opportunities for sensitive infi ll development, heritage character preservation, streetscape improvements and exciting public spaces. The Waterfront District is currently under-utilized and somewhat disconnected from the downtown. The opportunity exists for key pedestrian and cycling linkages, new public spaces as well as sensitive development along the water’s edge that incorporates accessible public spaces. The Cultural Node, located near the Beckwith and Elmsley intersection, off ers the opportunity to link key cultural features within Smiths Falls and develop a special area which highlights these features.
<u><strong><em>2</em></strong></u>
Protect and Enhance Community Heritage Features
Smiths Falls is recognized for its unique heritage; protection and enhancement of the key heritage resources within the downtown and waterfront area is important. Key resources to be protected and enhanced include heritage buildings, the Rideau Canal and associated infrastructure, waterfront and other parkland, and historic streetscapes.
Milden Avenue Glen Avenue Goldstone Street Church Street Russet Street William Street Milden Street Chambers Street Centre Street Shannonna Street Confederation Drive Lombard Street 3
Realize the Potential of Beckwith Street as the Downtown Promenade
Strive to provide a people-friendly environment with amenities narrow intersection crossings, social spaces, and support for vibrant retail. Capitalizing on the unique slope of the street and establishing exciting gateway features at the top and bottom of Beckwith Street will help to anchor the street within the Town. Providing safe and convenient parking, and creating a distinctive streetscape theme and design will reinforce the street as the downtown promenade, while adequately addressing the Provincial Connector Link designation requirements.
Emsley Street Maple Avenue Glen Avenue Gladstone Street Backwith Street Russell Street William Street 5
Connect Community Cultural Facilities
This principle highlights the "Top-of-the-Town" Cultural District, which includes the Town Hall, Carnegie Public Library and provides strong linkages to the Station Theatre to the east and the Rail Museum of Eastern Ontario to the west. Developing a Town Square between Library and Town Hall, at the heart of this Cultural District, will provide a public gathering space for events and festivals, as well as everyday socializing and casual gatherings. Establishing a self-guided walking tour that highlights key cultural facilities throughout Smiths Falls while providing interpretive elements along the route is also important.
4 Glenn Avenue Gibbstone Street Chaun Street Russell Street William Street Austin Street Corridor Drive Lombard Street
Reconnect with the UNESCO Waterfront Heritage Smiths Falls' strong heritage waterfront is an important feature to highlight and embrace. This guiding principle focusses to enlarge the public interface with the waterfront to ensure all people can easily access the water's edge. Developing the newly proposed pedestrian /cycle trails is a critical part of this, as is improving vehicular access and providing adequate yet discrete parking for residents, tourists and visitors alike Connecting the waterfront with key development sites is imperative to the integration of the waterfront with the downtown.
Glen Avenue Elmsley Street Gladstone Street Church Street Beckwith Street Miller Street Russell Street William Street Main Street Chambers Street ABBOTH Street Confederation Drive Lombard Street Brookville Street Jasper Avenue 6
Waterfront Development Sites
This principle focuses on highlighting the opportunities and potential for future waterfront development. Connecting these sites with the urban fabric of the downtown and the waterfront through pedestrian and cycling links as well as vehicular connections will develop a cohesive and permeable core area of Smiths Falls.
7
Enhance Gateway / Influence Areas
Enhancing the influence areas and developing them into gateway and entrance areas will provide a positive impression of the Town to visitors before they reach the downtown and waterfront area. For example, the Highway #15 approach from the south is essentially a strip of car dealerships and drive-through fast food restaurants. Enhancement to these areas with a comprehensive streetscape plan that will integrate public and private site and landscape works.
9
Develop a CIP to incentivize Private Sector Develop a CIP to incentivize private sector that is uniquely tailored to the planning priorities and needs of the Town of Smiths Falls to support municipal priorities for a healthy, vibrant, attractive Downtown where people live, work, play and shop.
William Street Main Street Chambers Street Centre Stre Abbott Street Strathcona Street Confederation Drive Lennard Dr East Brockville Street Jasper Avenue 8
Reconnect and Strengthen Access to Public Recreation Areas Along the Canal
Strengthen pedestrian connections across and around the Rideau Canal waterway, including the south side of the Canal and relocating seasonal camping sites to another suitable area. This will provide the opportunity to develop Victoria Park and surrounding public lands into premier waterfront areas for all people to enjoy.
10
Create New Population and Services through Progressive Development
Appropriate phasing and synchronization of public realm improvements and the Community Improvement Plan will facilitate the gradual and progressive revitalization of the Downtown and Waterfront Area as a vibrant hub of recreational, social and economic activity; attracting new investment in residential, retail and new services in the core -and a new range of residents, users and visitors to the Downtown.
Church Street Russell Street William Street Abbott Street Strathcona Street
11
Remove Barriers to Investment by Public Intervention Incentivize investment through utilization of the CIP in private residential, commercial and mixed-use properties, removing or reducing the financial costs associated with property rehabilitation and (re)development and other related barriers to investment (e.g. land assembly). Enhance access to development sites as well as the public access and interface with waterfront lands.
Glen Avenue Diallane Street Church Street Wilson Street William Street Aidle Street Snaffron Street Confederation Drive Centre Street Lombard Street 13
Improve the Retail Mix
Achieving an appropriate retail mix is a long-term proposition and aspiration of the Town to achieve higher order retail and specialty stores. This will come in time as Downtown operates as a destination and activity centre for residents. This represents the link between public realm improvements and the CIP which together encompass a plan for regeneration of Downtown via additional amenities, public spaces, walkways improved waterfront links, street furniture, signage, and property investment incentives/opportunities which together will offer market opportunities for new retail and services.
Green Avenue Gallant Street Church Street Spadish Street Acond Street Limbard Street
12
Achieve Higher Density in the Downtown Achieve higher density in the Downtown Core via new ownership housing in the Downtown (particularly the Waterfront area which represents the most appropriate location for high density forms of residential development) and along the shoulder areas to support the Downtown as a neighbourhood service centre and a place for recreation in addition to its civic, employment and tourism service centre roles.
14
Synchronize the CIP with Public Realm Improvements The vision for Downtown Waterfront Revitalization is essential to the success of the CIP in achieving long-term reinvestment in Downtown. Incentivizing the development of the Downtown building stock is only part of the work needed to achieve the revitalized role for Downtown as a service centre, tourism destination and activity hub. Synchronizing public realm improvements with private investment in Downtown property development is catalytic in achieving Downtown renewal. The CIP needs to work hand-in-hand with public realm improvements by focusing on private sector opportunities for development and reinvestment in Downtown. Monitoring of the plans -public realm and community improvement over time-is required to ensure that both public and private investment meets the overriding goal of creating improved aesthetics, tourism opportunities, and services to residents and visitors, enabling Downtown to viably operate as a place to live, a place to work, and a place to shop.
2.0 VISION + FRAMEWORK
Invest in Existing Building Stock Glen Avenue e
Glen Aven Gladstone St Church St Russell S About St 15 Confederation Drive
Invest in Existing Building Stock
The Downtown represents an older building stock; albeit one that has signifi cant presence, character and potential for long-term use. The Town needs to invest in the building stock to provide the greatest opportunity for sustainable uses and retention of these properties with viable income generating assets for their owners. This is a prima facie rationale for a Community Improvement Plan, goals of which are clearly in the public interest.
Glen Avenue Gladstone Street Church Street Russell Street William Street Blackwth Street Main Street Abbott Street 16 Conference Drive
Appropriate Infi ll Development
Appropriate Infi ll Development Glen Avenue e
Downtown does not exist in isolation but is part of a continuum of the urban fabric. The shoulder areas of the Downtown are arguably just as important as the Downtown itself. A focus on infi ll development, new build to replenish residential neighbourhoods and adaptive reuse of existing but under-used commercial and institutional buildings is important in this regard.
2.0 VISION + FRAMEWORK
2.3 Structuring Elements
The concept plan for Smiths Falls downtown and waterfront area is based on the fi ndings and values expressed during the community engagement process together with the previous consultation undertaken by the Town, and the technical analysis work completed by the consultants. It recognizes the strategic location of Smiths Falls relative to the Rideau Canal. As such, Smiths Falls is in the midst of a vast “Water/ Land Setting” and is well positioned to serve as a service centre and access point to this signifi cant environmental and recreational resource area. Access to the water is a key element of the plan and serves to link the actual settlement area with the canal system and water-based resources nearby.
The concept includes several key structuring elements:
• Create a source of community pride and identity;
• Develop cultural richness, tourism and attractions;
• Rediscover and reconnect with the canal and waterfront;
• Reclaim public open space;
• Foster greater connectivity and public access with additional street and trail connections;
• Streetscape enhancements to promote pedestrian activity using complete street principles;
• Reinforce the downtown core area with a strong civic precinct and social space, retail and services;
• Develop a framework for redevelopment; and,
• Provide an effi cient quantity and availability of parking.
The adjacent diagrams illustrate the key structuring elements that provide the basis of the concept plan. Open space and circulation are key elements that are imperative to developing a successful concept plan for Smiths Falls downtown and waterfront area.
CONCEPT
EXISTING
BASE
Conceptual Open Space Structure
CONCEPT
EXISTING
BASE
Conceptual Circulation Structure
Marian Towers
"TOP OF THE TOWN" CIVIC PRESIDENT
BECOMING CENTERED COMMUNITY CORPORATION AREA
"LOWER TOWN" INVESTMENT DEVELOPMENT AREA
UNDERGROUND WATER RESERVE] INDRAU CANAL + WATERFRONT GREAT WAY
3.0 CONCEPTUAL MASTER PLAN
The Town has an unique opportunity to increase the number of cycling and walking trips in the waterfront area by constructing facilities, such as a pedestrian bridge, that increase connectivity and shorten necessary travel distance to desirable destinations.
Pedestrian Bridge, Amsterdam, Netherlands
3.0 CONCEPTUAL MASTER PLAN
3.1 Overall Concept Plan
The concept plan for Smiths Falls is based on the fi ndings and values expressed during the community engagement process together with the analysis work completed by the Consulting Team. It recognizes the location of Smiths Falls relative to Highway 401 and the Rideau Canal, as well as its railroad heritage, still apparent today.
Smiths Falls is well positioned to serve as a service centre for those travelling between Highways 401 and 407 and along the Rideau Canal, a UNESCO World Heritage Site, as well as an access point to the Rideau Canal. Key structuring elements of the concept plan include an inter-connected downtown and waterfront area, enhanced gateway and infl uence area defi nition, Beckwith Street streetscape improvements, improved grid road system, pedestrian connections within downtown and along the waterfront, and mixeduse signature waterfront redevelopment sites.
Cultural Interest Point Marina Docks New Pedestrian Bridge Trail Interpretive Streetscape Theme (Rail Potential Development Area Environmentally Sensitive Area Arrival / Enhanced Green Corridors Revitalization Areas Existing Bridge
Station Theatre
New Gateway / Arrival Feature
Glen Avenue
Glencourt Street
Access / Drive-Thru Improvements @ Tim Hortons
Civic Square
Civic Centre
Eastern Ontario Railway Museum
Church Street
Russell Street
Shoulder Transitional Area
William Street
Shoulder Transitional Area
Arnithona Street
New Road Line
New Road
Marina Docks
Enhanced Public Park
Limestone
Enhanced Green Corridor
New Gateway / Arrival Feature
“TOP OF THE TOWN” CIVIC PRECINCT
BECKWITH CENTERED DOWNTOWN CORE REVITALIZATION AREA
“LOWER TOWN” WATERFRONT REDEVELOPMENT AREA
Extended Road Pattern and New Development Blocks
UNESCO (WORLD HERITAGE) RIDEAU CANAL + WATERFRONT GREENWAY
3.0 CONCEPTUAL MASTER PLAN
3.2 Concept Plan Components
The concept plan is broken down into four components:
• “Top of the Town” Civic Precinct
• Beckwith Centered Downtown Core Revitalization Area
• “Lower Town” Waterfront Redevelopment Area
• UNESCO World Heritage, Rideau Canal and Waterfront Greenway
The components represent unique precincts within a unifi ed downtown core, which includes the waterfront, an integral and vital part of the central area of Smiths Falls. Each of the four components and associated elements are described below, complete with detail plans and precedent imagery.
Community Theatre
New Gateway / Arrival Feature
Expanded Public Library
Civic Square
Civic Centre
Eastern Ontario Railway Museum
Access / Drive-Thru Improvements @ Tim Hortons
Church Street
Russell Street
Shoulder Transitional Area
William Street
Shoulder Transitional Area
Potential New Campsite Location
New Road Link
Strathcunn Street
New Road
Marina Docks
Enlanced Public Park
Lionard Street
Enhanced Green Corridor
New Gateway / Arrival Feature
Arrival Corridor
"TOP OF THE TOWN" CIVIC PRECINCT
BECKWITH CENTERED DOWNTOWN CORE REVITALIZATION AREA
"LOWER TOWN" WATERFRONT REDEVELOPMENT AREA
Extended Road Pattern and New Development Blocks
UNESCO (WORLD HERITAGE) RIDEAU CANAL + WATERFRONT GREENWAY
Figure 5: Concept Plan Components Diagram
3.0 CONCEPTUAL MASTER PLAN
3.3 “Top of the Town” Civic Precinct
The “Top of the Town” area will provide a strong civic precinct and
social space, acting as an anchor at the “top” of Beckwith Street.
Closing the section of Daniel Street between Beckwith Street and
Elmsley Street, in conjunction with the proposed addition to the
Library, will provide the opportunity to develop a public gathering
and event space within the downtown core. This space will help to
encourage pedestrian activity along Beckwith Street, and off er a
source of community pride and identity.
Key features of the Civic Precinct include gateway expression at the north end of Beckwith Street, intersection improvements with enhanced pedestrian crossings, a civic gathering plaza with water feature, streetscape improvements, and opportunities for green space and parkette development.
LEGEND
Gateway with Arrival Feature
Major Intersection Improvements w/ Pedestrian Crossing
Civic Plaza
Vertical Feature
Water Feature
Streetscape Improvements
Roadway Link
Parking Areas
Pedestrian Trail/Walkway Connections
Green Space Opportunities
Potential Expansion Area
Green Open Space
1
"TOP OF THE TOWN" CITY PRIORITY
BECKWITH CENTRE DOWNTOWN COME RESTYLATION AREA
TOWER TOWN RESTYLATION REDEVELOPMENT AREA
UNDERGROUND (WORLD MEMBER) NURRAY CORRAL + INTERCONTINENTAL GREENWAY
Key Plan
Precedent Imagery
MARKTSTADT
P P
Figure 6: “Top of the Town” Civic Precinct Detail Plan Options
P P Out P Out In
3.0 CONCEPTUAL MASTER PLAN
3.4 Beckwith Centered Downtown Revitalization Area
3.4.1 Concept Objectives
The Beckwith Centered Downtown Core Revitalization Area
will provide an enhanced downtown experience with a wide
selection of retail, commercial and service oriented businesses.
Convenient parking for employees, residents, and shoppers, will be
complemented by adequate directional and informational signage.
Pedestrian amenities, including street trees, street lighting and
furniture, will ensure comfort and safety in all seasons.
The shoulder transitional areas on the east and west limits of the downtown core. These areas provide a reasonable mix of mostly commercial services and residential uses, with on-street parking along many of the streets.
3.4.2 Key Features
The Master Plan calls for a number of improvements to the downtown core area, with many improvements focused along Beckwith Street. These improvements include signalized intersection improvements at Main, Chambers and Russell Street intersections with enhanced pedestrian crossings, street tree plantings, street furniture and amenities; enhanced pedestrian crosswalks at intersections throughout the downtown area; general streetscape improvements including widened boulevards, gathering and seating nodes, street furniture, lighting, and planting; interpretive streetscape theme linking the civic precinct with the Station Theatre and the Railway Museum; gateway signage expression at key entry points to the core area; and identifi cation of off -street and on-street parking amenities.
BEST CITY FOR MEDICAL CARE IN D.C.
PARKING
TOP OF THE WALL COLLEGE PRECINCT
BECKWITH CENTERED DOWNTOWN ZONE REVIVALIZATION AREA
TOWER TOWN METROPOLITAN REVEALMENT AREA
UNIVERSITY (WORLD) REAL ESTATE WARSAY CARIBBEAN WATERFRONT GREENWAY
Precedent Imagery
Key Plan
Gateway with Arrival Feature Civic Square Opportunity Green Open Space Signalized Intersection Improvements Main Signalized Intersection Improvement Intersection Improvements Streetscape Improvements Existing and Potential Parking Supply On-Street Parking New Road Link Trail Interpretive Streetscape Theme (Rail) Revitalization Areas Main Transportation Corridor
New Gateway / Arrival Feature Glen Avenue Gladstone Street Expanded Public Library Civic Square Access / Drive-Thru Improvements @ Tim Hortons Civic Centre Church Street Elmseley Street Russell Street Bedford Street Shoulder Transitional Area William Street Shoulder Transitional Area Main Street
Figure 7: Beckwith Centered Downtown Revitalization Area
3.0 CONCEPTUAL MASTER PLAN
Beckwith Street Key Plan
"TOP OF THE TOWN" CITY PRENET
RECKWITH CENTERED POPULATION CONE REVITALIZATION AREA
"TOWER ZONE" INDEPENDENT RESERVE/DEVELOPMENT AREA
UNIQUE ENCLOSURE HUMANES NODEAU GRAIL + WATERFRONT GENEWAY
Figure 8: Beckwith Street North Concept Plan
Key Plan
150m
Figure 9: Civic Plaza Detail Area
3.0 CONCEPTUAL MASTER PLAN
Beckwith Street Kep Plan
TOP OF THE TOWN" DINE PRECINCT
BACKWIDTH CENTERED DOMESTIC CREEK WATERILLION AREA
PUBLIC TOWN" WATERFRONT REDEVELOPMENT AREA
INTERIOR (WORLD MEMORIAL) WARRIOR CANAL + WATERFRONT OFFENSIVE
Figure 10: Beckwith Street South Concept Plan
Key Plan
Figure 11: Beckwith Street Typical Block Detail
3.0 CONCEPTUAL MASTER PLAN
21 Canada
Current Condition of Beckwith Street
TOP OF THE TOWN COME PREVAIL
BACKWATER CENTRE DOWNTOWN COME RESTORATION AREA
TOWER TOWN RESTORATION REDEVELOPMENT AREA
UNDERGROUND WATERBURNS KONAU GRAIL + WATERFRONT DENVERWAY
Key Plan
Café LAWYER SHOP 1 212-304-9777
Figure 12: Proposed Concept Visualization of Beckwith Street
3.0 CONCEPTUAL MASTER PLAN
3.4.3 Downtown Core Parking Strategy
When developing the parking strategy for the downtown core of Smiths Falls a number of key considerations must be looked at:
- Business Mix
• Critical mass / downtown
- Length of stay
• Short term parking - less than 1 hour
• Medium term parking - more than 1 hour
• Long term parking - all day
- Convenience vs. Cost
• Most convenient parking locations have the highest cost;
• Less convenient parking locations have a lower cost; and,
• Least convenient parking locations have the lowest or no cost.
As can be seen from the adjacent cross-section, Beckwith Street currently dedicates a majority of space to vehicles. Due to the wide right-of-way, the opportunity exists to investigate two alternatives for parking that would provide a wider boulevard in the pedestrian realm; these options are presented on the following page. Further investigation is required to determine the most appropriate parking confi guration for Beckwith Street in the long-term.
TOP OF THE TOWN DONALD PRINCIPLE
BACKWITH CENTERED DOMESTIC CITY REVITALIZATION AREA
TOWER TOWN WATERFRONT REVEALMENT AREA
UNIVERSITY WORLD MEMBERY ROSAY CANADA + WATERFRONT GREENWAY
3.8 5.0 4.1 4.2 4.1 5.0 3.8 BOULEVARD ROADWAY + PARKING BOULEVARD 30.0m R.O.W.
Figure 13: Beckwith Street Existing Cross Section
3.0 CONCEPTUAL MASTER PLAN
"TOP OF THE TOWN" DOWNTOWN CITY REVitalization Area
BACKWATER CENTER DOWNTOWN CITY REVitalization Area
CENTER TOWN WATERFRONT REDEVELOPMENT AREA
UNESCO WORLD HERITAGE RIVALI CIRCLE + WATERFRONT GREENWAY
Key Plan
Wider Boulevard front-in Angle Parking
BUILDING
RETAIL MIX USE
0.75 5.9 5.0 4.1 4.1 0.75 BOULEVARD ANGLE PARKING THROUGH LANE THROUGH LANE ANGLE PARKING BOULEVARD
30.0 ROW
← ↑
Figure 14: Front-In Angled Parking with Wide Pedestrian Boulevard
Parallel Parking with Wide Boulevard
7.2 BOULEVARD 2.8 PARALLEL PARKING 3.5 THROUGH LANE 3.5 MEDIAN/TURNING LANE 3.5 THROUGH LANE 2.6 PARALLEL PARKING 7.2 BOULEVARD
30.0 ROW
↓ ↗ ↑
Figure 15: Parallel Parking with Wide Pedestrian Boulevard
Parking Layout Evaluation Matrix
| Parking Layout | Pros | Cons |
|---|---|---|
| 1. Diagonal Front-In | • Easy to enter • Greater number of spaces per linear metre of street • Familiarity in town | • Harder to exit • Reduced width of sidewalk / people space |
| 2. Parallel | • Solid buffer between traffic roadway and boulevard • More generous pedestrian space • Familiar to most drivers | • Harder to enter • Fewer cars per linear metre of street (-25% ±) |
3.0 CONCEPTUAL MASTER PLAN
3.5 “Lower Town” Waterfront Redevelopment Area
3.5.1 Concept Objectives
The “Lower Town” waterfront redevelopment area will re-connect the downtown with the heritage waterfront in Smiths Falls. The plan for this area provides a framework for redevelopment of key sites that are critical to the success of an integrated downtown and waterfront. Reclaiming the public space along the water’s edge that have been lost or under-utilized will provide additional recreational space for residents and visitors alike, enabling a waterfront trail and gathering nodes along both the north and south edges of the canal.
3.5.2 Key Features
Key features of the “Lower Town” Waterfront Redevelopment Area include two signature redevelopment sites, reinforced street grid layouts, waterfront interpretive nodes and lookout points, Centennial Park reorganization, and enhanced pedestrian trail connections along waterfront and into downtown core.
LEGEND
Major Intersection Improvements w/ Pedestrian Crossing Roadways Roadway Link Parking Areas Existing Bridge w/Opened Views Small Pedestrian Bridge Waterfront Interpretive Node/ Lookout Point Community/Greenway Node Pedestrian Trail/Walkway Connections Enhanced Marina/Dock Facilities Potential Development Area Green Open Space
- Continuous Greenway (@±30m width)
- New Pedestrian Feature Bridge
- Parks Canada Lock Interpretive Site
CINEMAS
Precedent Imagery
"TOP OF THE TOWN" DOWNTOWN CITY RENEWAL AREA
BACKWATCH CENTRAL DOWNTOWN CITY RENEWAL AREA
LONGER TOWN WATERFRONT RENEWAL AREA
UNDERGROUND HUMANISM BROWN CRAFT + WATERFRONT GREENWAY
Key Plan
1 2 3 1 1
Figure 16: “Lower Town” Waterfront Redevelopment Area
3.0 CONCEPTUAL MASTER PLAN
3.5.3 East Signature Development Site
The East Signature Development Site is located along Centre Street and fronts the Rideau Canal. A detailed scheme has been developed for a multi-use waterfront trail that can be implemented in the shortterm, once funding becomes available. This short-term project will open up the water’s edge for public access, and has the potential to become a catalyst for the redevelopment of this signature site.
The long-term concept plan for this site envisions a waterfront neighbourhood, re-establishing the public street right-of-ways in order to provide access to the appropriately sized development blocks. The concept respects the 30 metre setback required in the Rideau Canal Management Plan with a public greenway and trail along the Canal edge and ultimately a pedestrian bridge across the water, strengthening the pedestrian system and integrating the waterfront with the downtown core. Visual access is strengthened with a continued street grid pattern, providing views to the water from the Town and from the Canal into the Town.
The built form shall address both the street and the waterfront, reorienting existing local retail to address the redefi ned Centre Street, providing a comfortable pedestrian environment and opportunities for outdoor cafes and patios along the street and the waterfront.
Figure 17: East Signature Development Site - Short Term Plan
"TOP OF THE STREET" CIVIL PROJECT
BACKWITH CENTRAL DOWNTOWN CITY + REHABILITATION AREA
"TOWER TOWN" MERCHANTS REDEVELOPMENT AREA
UNDERGROUND (WORLD MEMORIES) MINAU CRAFT + WATERFRONT GREENWAY
Key Plan
PARK
Precedent Imagery
P P
Figure 18: East Signature Development Site - Medium Term Plan
P P 8
Figure 19: East Signature Development Site - Long Term Plan
3.0 CONCEPTUAL MASTER PLAN
SCHOOL BUS
P
Existing Conditions
Key Plan
Bicycle Lane
Preliminary Concept Sketch
Figure 20: Proposed Concept Visualization - East Signature Waterfront Development
3.0 CONCEPTUAL MASTER PLAN
3.5.4 West Signature Development Site
The West Signature Development Site is centred along Old Mill Road in the location of the former water treatment plant. The concept envisions an improved street grid network, including new street links extending Park Avenue to the proposed terminus of Confederation Drive and extending Strathcona Street to Old Mill Road.
Developing a mixed-use (commercial retail and residential) focal area to frame Centennial Park and provide increased visual access to the falls areas. The opportunity for street related retail and cafes fronting Centennial Park and the water exists and will provide an enhanced and comfortable pedestrian environment.
BEST WESTERN
Precedent Imagery
P P P
Figure 21: West Signature Development Site
TOP OF THE TOWN CIVIC PROJECT
RESEWITH CENTERED ADMINISTRATIVE AREA RESTORATION AREA
TOWER STORY WATERFRONT REDEVELOPMENT AREA
UNDERLID (WORLD) MEMBRANE KIRAU CRAI + WATERFRONT GREENWAY
Key Plan
3.0 CONCEPTUAL MASTER PLAN
Existing Conditions
residential building landing
Preliminary Concept Sketch
P P P P
Key Plan
BROOKLYN MARKETING
Figure 22: Proposed Concept Visualization - Waterfront View of West Signature Development Site
3.0 CONCEPTUAL MASTER PLAN
100
Existing Conditions
RESIDENTIAL BLOG (4-5-21)
P P P P
Preliminary Concept Sketch
Key Plan
PARKING
Figure 23: Proposed Concept Visualization - Street View of West Signature Development Site
3.0 CONCEPTUAL MASTER PLAN
3.6 Rideau Canal and Waterfront Greenway
3.6.1 Concept Objectives
The Rideau Canal and Waterfront Greenway concept focuses on developing continuous pedestrian connections along the water’s edge, linking key waterfront features with the street network and the downtown core in particular. Providing safe and comfortable space for various types of recreation along the Canal is the key objective for this concept plan.
3.6.2 Key Features
Key features of the Rideau Canal and Waterfront Greenway include redefi ning two key waterfront open spaces, Centennial Park and Victoria Park; providing complete pedestrian trail connections, adequate marina and docking facilities, interpretive nodes and Canal viewing locations, and adequate parking facilities.
3.6.3 Centennial Park
The concept plan for Centennial Park envisions the closure of a portion
of Confederation Drive (between Beckwith Street and the proposed
extension of Park Avenue) as well as a portion of Old Mill Road (between
Confederation Drive and the proposed extension of Strathcona Street). This
would maximize the public green open space fronting the water, and may
have the potential of hosting medium to large sized festivals and events.
The north-south roads that terminate at Centennial Park would provide
great access and views of the Canal and park, with lookout points and
interpretive nodes on the water’s edge.
3.6.4 Victoria Park
The concept plan for Victoria Park will also maximize the usable public open
space by relocating the mobile home park to another suitable location.
Victoria Park will transform into a passive recreation area, with naturalized
plantings and bio-swales along the portion of the park that fronts Lombard
Street. An expanded marina a will provide adequate services and a place to
stop and explore for those travelling along the Canal.
CANADA CITY FESTIVAL
"TOP OF THE TOWN" CIVIC PRESENT
BECKWITH CENTERED MOMENTUM TOWN REVitalization Area
"TOWER TOWN" INDEPENDENT REVitalization Area
UNDER SECOND MOMENTUMS ROCAU CERAL + WATERFRONT GREENWAY
PARK
Precedent Imagery
Key Plan
LEGEND
Gateway with Arrival Feature Major Intersection Improvements w/ Pedestrian Crossing Intersection Improvements Streetscape Improvements Median w/ Tree Planting Roadways Roadway Link Parking Areas Existing Bridge w/Opened Views Small Pedestrian Bridge Waterfront Interpretive Node/ Lookout Point Community/Greenway Node Pedestrian Trail/Walkway Connections Enhanced Marina/Dock Facilities Potential Development Area Green Open Space
Figure 24: Rideau Canal and Waterfront Greenway
3.0 CONCEPTUAL MASTER PLAN
3.6.5 Gateway Feature at Victoria Park
Implementing visually appealing gateway features at the key infl uence areas approaching / in Smiths Falls will provide for an attractive solution to a physical barrier that divides the Town. This will provide arrival points and a sense of place for visitors and residents alike. Features such as speciality intersection paving design, pedestrian crosswalks, identifi cation signage and associated landscaping will clearly defi ne the entrance to Smiths Falls.
The gateway feature at Victoria Park will be prominent when entering Smiths Falls from Highway 15 from the the south. Key features of the gateway include enhanced pedestrian paving, landscape plantings, signage walls, and special intersection design. These features convey the landscape design theme making residents and visitors aware of the unique character of the place.
Gateway with Arrival Feature
Major Intersection Improvements w/ Pedestrian Crossing
Streetscape Improvements
Roadway Link
Parking Areas
Pedestrian Trail/Walkway Connections
Green Space Opportunities
Waterfront Interpretive Node/ Lookout Point
Green Open Space
Vertical Feature
Signage Wall
Garden Area
"TOP OF THE TOWN" CORP REFLECT
BECWITH CENTRAL DOWNTOWN CORP REVOLUTION AREA
TOWER STREET INDEPENDENT DEVELOPMENT AREA
UNSOLD GROWTH MEMORIES ROKAU CRAAS + DEVELOPMENT GREENWAY
Key Plan
5 3 P P 4 2 $$ \textcircled{1} $$
Figure 25: Gateway Feature at Victoria Park
3.0 CONCEPTUAL MASTER PLAN
STOP
Existing Conditions
jaws to Boat on Canal. TONNOP SMITHS FALLS CAMEL GREEN PARK DOWNTOWN street trees.
1 2 3
Preliminary Concept Sketch
Key Plan
WELCOME TO SMITHS FALLS
Figure 26: Proposed Concept Visualization of Gateway Feature at Victoria Park
Bicycle Path
4.0 DESIGN GUIDELINES
Wide pedestrian boulevards will allow adequate space for street furniture, tree planting, patios, and sidewalk display areas.
Hurontario Street, Collingwood, Ontario
4.0 DESIGN GUIDELINES
4.1 Design Themes
Design themes that are rooted in the natural and cultural history of the place are the most genuine and valid. Many of these design themes can be found in the local landscape.
Smiths Falls has an extensive cultural history, a beautiful and apparent landscape of water and trees as well as the presence of a growing arts and culture sector.
These design themes will be incorporated into the design guidelines for the downtown and waterfront areas. This will reinforce and enhance the character and identity of the community.
Industrial Heritage • Manufacturing
River / Canal Centered • Parks and Open Space • Water and Trees
Rideau Canal Heritage • Lock
Transportation Heritage • Canal • Rail • Highway 15
Figure 27: Design Themes
4.0 DESIGN GUIDELINES
4.2 Streetscape Design
4.2.1 General Guidelines
Well-designed and attractive streetscapes will reinforce Smiths
Falls’ road system while enhancing the community’s quality of life.
These streetscapes can provide enhanced circulation, movement,
wayfi nding and orientation of both vehicular and non-vehicular
traffi c, provide public gathering places for the community to interact
and socialize, and will promote the image of Smiths Falls as a vibrant
and attractive community.
This section of the report will provide general guidelines for all streets within the downtown and waterfront areas of Smiths Falls, discuss various streetscape elements that are an essential part of the street character, and present guidelines for the primary northsouth road within the community, Beckwith Street - the provincial connecting link through Smiths Falls, as well as gateway treatments, located at a number of the identifi ed infl uence areas. The purpose of these streetscape guidelines are to create pedestrian-oriented, attractive and coordinated design that is complementary and compatible with the adjacent land uses and built form.
Sidewalks
Sidewalks of 3.0 metres minimum width are recommended
throughout the Beckwith Centered Downtown Revitalization Area.
Sidewalks may increase in width and vary in shape or texture at
certain pedestrian activity nodes within Smiths Falls. The use of
specialty paving will be provided at important intersections and / or
pedestrian crosswalks to delineate the pedestrian realm.
Street Trees
Street trees provide both a functional and aesthetic value to the character of the street. They play a unifying role in site development and create distinction among streets.
Guidelines:
•
Cluster street trees at street corner with tree grates, and midblock locations planted in pairs at 6-8m on centre in raised planters (seat height), as appropriate. Variations may occur in response to adjacent land uses such as open space, town spaces, focal points, etc. The objective is a grouped canopy at key nodes along the street;
•
Preference should be given to hardy native species or other salttolerant, high-branching, deciduous varieties;
•
Use species that are relatively low maintenance and noninvasive;
•
Trees should be planted in groupings, i.e. at special places and intersections, rather than as single specimen.
GARDENERS
Clustered trees at corners and mid-block pedestrian crossings.
Roadway Lighting, Furniture and Planing Zone Pedestrian Clearway Public / Private Interface Zone (varies) 2.5 - 3m 3m 0 - 3m (varies) RETA
Figure 28: Streetscape Zones
4.0 DESIGN GUIDELINES
4.2.2 Streetscape Elements
The streetscape consists of the zone from a building face to the curb and shall be designed with equal consideration for the elements within the right-of-way and the built form or uses in the adjacent property.
Coordinating streetscape elements is important in conveying the identity of the community, reinforcing its character and ensuring the safety, accessibility and comfort of pedestrians, cyclists and motorists. Design of streetscape elements should complement one another and be consistent with the design vision for Smiths Falls. Streetscape elements include:
• Street Lighting
• Site Furniture
Street Lighting
Lighting provides safety for both vehicles and pedestrians and serves both a functional as well as an aesthetic purpose. The street lighting design shall be consistent with the overall architectural character of Smiths Falls, providing adequate lighting on the roadway as well as on the sidewalks and trails for pedestrians.
Guidelines:
• Street lighting should be placed in line with street trees where appropriate;
• Specialty lighting fi xtures may be used along Beckwith Street and along the waterfront to highlight these areas; and,
• Light standard types and styles should be coordinated with other street furniture.
Note: The two light fi xtures shown are consistent with those recommended in the Pedestrian Linkage Study.
2
D
D
Recommended Light Fixtures for Waterfront and Trails
Precedent Imagery
4.0 DESIGN GUIDELINES
Site Furniture
Street furnishings will be used to unify and enhance landscape elements within the pedestrian realm. These elements will be consistent in design and not only be functional but also coordinate and reinforce the streetscape character. The inclusion and placement of visually attractive site furniture not only enhances the public realm but also improves the use of public space.
Guidelines:
• Colours, materials, forms and styles of site furniture should be complementary and consistent with the overall theme of the community;
• Placement and arrangement of site furniture should encourage safe use, reinforce and coordinate with the streetscape design;
• Site furniture shall be located at corners, key mid-block nodes, and other appropriate locations along the street.
Criteria:
• Along with other elements of streetscape treatment, furnishings will establish an identity for Smiths Falls;
• Subtle design variations to street furnishings are acceptable for specifi c spaces such as Beckwith Street and along the waterfront;
• The range of furnishings should be minimized to avoid visual clutter and be tied together by a common theme and colour palette;
• Furnishings should be low maintenance, vandal-resistant and easily replaceable.
1. Benches
Note: The street furniture shown is consistent with that recommended in the Pedestrian Linkage Study.
• Durable;
• Benches should be approximately 6 feet in length to accommodate 2 to 3 people comfortably;
• Should have back and arm rests for optimal comfort.
2. Waste Receptacles / Recycling Bins
• Durable waste containers;
• Consistent design style with other site furniture;
• Should be equipped with plastic liners, rain proof tops and be easily accessible for emptying.
3. Bicycle Racks
• Embedment mounting;
• Should be located near points of interest and attractions, as well as at strategic locations along Beckwith Street.
4. Planters
• Consistent design style with benches and waste receptacles;
• Customize plant materials to provide seasonal interest;
• Should be located on sidewalk in commercial areas.
Recommended Street Furniture for Downtown Core
Recommended Site Furniture for Waterfront and Trails
Recommended Site Furniture for Waterfront and Trails
4.0 DESIGN GUIDELINES
4.2.3 Beckwith Street
Purpose:
Beckwith Street is the central north-south spine and the primary commercial street within Smiths Falls. This road will be characterized by a single lane of traffi c in each direction and front-in angled parking on both sides of the street with a central median with left turn lanes at intersections. Streetscape design should support this vision.
OPTION 1 - Angled Parking
Features:
• 30 m right-of-way;
• 2 vehicular through lanes of 4.1 m width;
• 2 front-in angled parking areas of 5.0 m width;
• 1 turning lane / mid-block median of 3.5 m width;
• 4.15 m boulevard on both sides of street;
• Street trees located at corners, intersections and appropriate mid-block locations.
OPTION 2 - Parallel Parking
Features:
• 30 m right-of-way;
• 2 vehicular through lanes of 3.5 m width;
• 2 parallel parking lanes of 2.6 m width;
• 1 turning lane / mid-block median of 3.5 m width;
• 7.2 m boulevard on both sides of street;
• Street trees located along length of street where appropriate.
Character:
• Commercial interface;
•
Comfortable for people - shade, wind protection and shelter;
•
Sustainable growth environment for trees - large high quality stock, ease of maintenance, suffi cient tree rooting area;
•
Active pedestrian environment.
Guidelines:
•
Generous sidewalks should be located on both sides of the street and may include commercial display areas;
•
Decorative paving should be introduced to delineate the pedestrian realm, particularly at intersections and crosswalks;
•
Street trees should be consistent in species along entire length of street;
•
Decorative pedestrian-scale street lighting will be incorporated along the entire length of Beckwith Street and coordinated with the street trees to ensure proper placement and spacing;
•
Pedestrian level lighting will be integrated with street lighting poles;
•
Design, materials, colours and styles shall be consistent with the adjacent architecture; and,
•
Consistent building signage.
In addition, it is recommended to investigate a coordinated street and pedestrian lighting system strategy. Due to the width of Beckwith Street, this will provide adequate lighting in a visually appealing and uncluttered manner.
4.0 DESIGN GUIDELINES
Wider Boulevard front-in Angle Parking
Trees at corner 1 or front/park only
Trees at corner 2 or front/park only
RETAIL/MIX USE
0.75 5.9 5.0 4.1 4.1 5.0 0.75 5.9 BOULEVARD ANGLE PARKING THROUGH LANE THROUGH LANE ANGLE PARKING BOULEVARD
30.0 ROW
Figure 29: Option 1 - Angled Parking: Typical Cross Section and Plan
Parallel Parking with Wide Boulevard
BUILDING
RETAIL/MIX USE
7.2 BOULEVARD 2.6 PARALLEL PARKING 3.5 THROUGH LANE 3.5 MEDIAN/TURNING LANE 3.5 THROUGH LANE 2.6 PARALLEL PARKING 7.2 BOULEVARD
30.0 ROW
Figure 30: Option 2 - Parallel Parking: Typical Cross Section and Plan
4.0 DESIGN GUIDELINES
4.3 Built Form Guidelines
4.3.1 Existing and Heritage Buildings
The following guidelines for existing and heritage buildings are intended to provide a strong framework for the further creation of a sense of place, identity and attractive character for the Town of Smiths Falls that refl ects the heritage themes of the Town. These guidelines will describe the recommended built form for the downtown core area within Smiths Falls, along Beckwith Street and the shoulder areas, to reinforce the commercial core as the main service centre for the Town.
General Guidelines:
• Encourage strong architectural tradition upon the original character that the core area was built;
• Encourage consistent design in facades and visual relatedness, to accomplish an integrated and cohesive Beckwith Street;
• Encourage consistency in design and signage while recognizing the importance of creativity and diversity;
• Natural materials in signs with external lighting are preferred, and signs that enhance the architectural characteristics of the building are encouraged;
• Promote the removal of materials such as vinyl or aluminum siding and the restoration of original brick, block or wood facades. Where restoration is not possible, the use of siding of natural materials is encouraged to ensure the form and scale of the original façade is maintained.
BANK OF NEW YORK
Inspirational Building - Frost and Wood Offi ce, 1939 (Photo Credit: Heritage House Museum)
BALLET STORE
Precedent Imagery - Restored Heritage Building
Windows Do not block windows with signs or other materials.
Lighting Use subtle gooseneck lights to illuminate signs and building features.
Sign Keep sign wording simple and clear. Use consistent lettering and limit the number of colors used to two or three.
Transom Sash Avoid filling this space with an air conditioner, which can drip and harm the appearance of your store's entrance.
Cornice Central architectural element that tops the facade. Do not cover with signage.
Awning Use sturdy fabric or canvas awnings. Avoid vinyl waterfall awnings, which deteriorate quickly.
Street Number Make street number easy to read and locate over entrance to help customers find you.
Display Window Make an excellent window display the centerpiece of your storefront. Avoid blocking display with signs.
Figure 31: Typical Facade Improvement Guidelines
4.0 DESIGN GUIDELINES
4.3.2 New Development
Any new development that occurs in Smiths Falls, especially within the Downtown core or waterfront area shall be compatible with existing built form, respect the local scale and character and promote a comfortable pedestrian environment.
These guidelines utilize the commonly applied 45º visual angular plane. The angular plane is taken from the mid-point of the rightof-way (30 metres on Beckwith Street). The application of these guidelines allow for buildings that provide good sunlight access throughout the day by minimizing shadowing and maximizing sky views.
General Guidelines:
•
Maintain minimum sidewalk widths;
•
Contribute to a pedestrian scale, by balancing width of street with height of new buildings;
•
Minimum 2 storey street wall shall be established;
•
Respect existing and historic built form, on Beckwith Street and on commercial streets in the shoulder areas, by establishing a step-back above a 2 storey podium at the street to help preserve a town atmosphere. 3 storey buildings will not require a 2nd storey step-back at the street wall;
• New infi ll buildings shall respect and be harmonious with the existing massing and height of the streetscape;
• Along the length of Beckwith Street a minimum of two to a maximum of fi ve storeys is recommended.
Precedent Imagery for Downtown Sites
front property line
16.5
13.5
4
3.0
10.5
3
3.0
16.5
2
3.0
1
4.5
Setback or Overhang
10.0
Half of the R.O.W.
30.0
9.0
Setback 2-way Lane
Figure 32: Height and Massing Guidelines for Shoulder Areas
front property line
16.5
5 3.0
13.5
4 3.0
10.5
3 3.0 16.5
2 3.0
1 4.5
Setback or Overhang
15.0
Half of the R.O.W.
30.0
9.0
Setback 2-way Lane
rear property line
Existing 2-Story House
Figure 33: Height and Massing Guidelines for Beckwith Street and Main Street
4.0 DESIGN GUIDELINES
Precedent Imagery for Waterfront Development Sites
front property line rear property line 16.5 13.5 10.5 5 4 3 2 1 Setback or Overhang 30.0 20.0 R.O.W. 30.0 9.0 Setback 2 vew lage
Figure 34: Height and Massing Guidelines for Waterfront Development Sites
4.0 DESIGN GUIDELINES
4.4 Sustainability Guidelines and Considerations
The sustainable design guidelines for the Smiths Falls Downtown Revitalization and Waterfront Integration Master Plan encompasses the natural and physical environment, the social environment and the economic environment. Green infrastructure off ers a number of benefi ts including mitigation of urban heat island eff ects, reduction of energy demands, reduction of stormwater fl ows, protection from fl ooding, sequestration of carbon, fi ltration of air and water pollutants as well as a range of aesthetic improvements, social, community and economic benefi ts.
Encouraging development that is environmentally sustainable is an important element to achieve the overall vision. There are a number of performance measures and considerations that can be utilized by the Town of Smiths Falls to ensure that any future development adheres to the overall objective of sustainability.
The measures listed below have been adapted from the criteria established by the American Society of Landscape Architects Sustainable Sites Initiative (2009) and are intended to supplement the Canada Green Building Council’s LEED Rating System. These measures are as follows:
Site Selection Considerations
• Protect fl oodplain functions and preserve wetlands;
• Ensure the preservation of threatened or endangered species and their habitats by avoiding development of these areas;
• Select brownfi elds or greyfi elds for redevelopment to reduce pressure on undeveloped land;
• Encourage site development within existing community to reduce pollution and development impacts, support local economy and improve human health;
• Select sites that encourage non-motorized transportation;
Pre-Design Assessment and Planning Considerations
• Conduct a pre-design site assessment and explore opportunities for site sustainability;
• Use a multidisciplinary team to collaborate on the design, construction and maintenance of the site in an integrated process;
• Engage users and other stakeholders in site design process;
• Reduce the use of potable water for landscape irrigation after plant establishment;
• Encourage alternative irrigation methods and water conservation strategies;
• Preserve and enhance riparian, wetland, and shoreline buff ers to improve fl ood control and water quality;
• Rehabilitate the ecosystem functions and values of lost streams, wetlands, and shorelines;
Site Design Criteria
• Manage stormwater on-site by restoring the water balance of the site;
• Protect and enhance on-site water resources and receiving water quality;
• Design rainwater / stormwater features to provide a landscape amenity;
• Manage water features to conserve water and other resources;
• Control and manage known invasive plants found on site to limit damage to local ecosystem services;
• Use appropriate, non-invasive plants to improve landscape performance and reduce resource use;
• Develop and communicate a soil management plan prior to construction to limit disturbance and assist soil restoration eff orts;
•
Minimize soil disturbance in design and construction;
•
Identify and preserve all vegetation designated as special status by local, provincial or federal entities;
•
Maintain or establish regionally appropriate vegetation biomass to support the ecosystem service benefi ts provided by vegetation on site;
•
Plant appropriate vegetation that is native to the eco-region of the site and preserve and restore existing plant communities native to the eco-region to contribute to regional diversity;
•
Place vegetation strategically around buildings to reduce energy consumption and costs associated with indoor climate control;
•
Use vegetation and refl ective materials to reduce heat islands and minimize eff ects on microclimate and on human and wildlife habitat;
•
Eliminate the use of wood from threatened tree species to minimize negative eff ects on other ecosystems;
•
Utilize existing materials as resources for new site development to reduce costs for new purchased materials;
• Use materials with recycled content to reduce the use of virgin materials and avoid sending useful materials to the landfi ll;
• Ensure certifi ed lumber is used to encourage exemplary forest management that is environmentally and socially responsible;
•
Use regional materials to reduce energy use and support local resources and promote a regional identity;
•
Select products in site development that contain reduced amounts of volatile organic compounds (VOCs) to reduce harmful health eff ects associated with air pollution;
•
Support sustainable practices in plant production and materials manufacturing by purchasing plants and materials from providers who reduce resource consumption and waste;
4.0 DESIGN GUIDELINES
Human Health and Well-Being Criteria
• Promote equitable site development by ensuring that project provides economic or social benefi ts to local community during construction and end use;
• Interpret on-site features and processes to promote the understanding of sustainability in ways that positively infl uence user bahaviour on site and beyond;
• Protect and maintain cultural and historical locations, attributes and artifacts to enhance a site’s sense of place and meaning;
• Provide for optimum site accessibility, safety and wayfi nding of outdoor spaces;
• Provide on-site opportunities that encourage outdoor physical activity to improve human health;
• Provide visual and physical connections to the outdoors to optimize the mental health benefi ts of site users;
• Provide outdoor gathering spaces of various sizes and orientations to accommodate groups to build community and improve social ties;
• Reduce light pollution by minimizing light trespass on site to reduce sky-glow, increase nighttime visibility and minimize negative eff ects on nocturnal environments and human health;
Construction Criteria
• Prevent the discharge of construction site pollutants and materials to protect receiving waters, air quality and public safety;
• Restore soils disturbed during construction in all areas that will be re-vegetated and areas of previously disturbed topsoils and subsoils to rebuild site’s ability to support healthy plants, biological communities, water storage and infi ltration;
• Divert construction and demolition materials generated by site development from disposal;
• Reuse or recycle vegetation, rocks, and soil generated during
construction to achieve a net zero waste site;
• Use construction equipment that minimizes the generation of greenhouse gas emissions and localized air pollutants;
Monitoring and Innovation Criteria
• Monitor and document sustainable design practices to evaluate their performance over time and improve the body of knowledge on long-term site sustainability;
• Encourage and reward innovative sustainable practices for exceptional performance and / or innovative performance in sustainable sites;
Operations and Maintenance Criteria
• Prepare a site maintenance plan outlining long-term strategies and short-term actions to achieve sustainable maintenance goals;
• Provide for storage and collection of recyclables in outdoor areas to reduce waste generation;
• Select energy-effi cient outdoor fi xtures and equipment to reduce energy consumption and costs;
• Use electricity from renewable sources to reduce greenhouse gas emissions associated with site operations and minimize air pollution, habitat destruction, and pollution from fossil fuelbased energy production;
• Minimize generation of greenhouse gases and exposure to localized air pollutants during landscape maintenance activities; and,
• Promote the use of vehicles that have reduced emissions and / or high fuel effi ciency to reduce pollution and land development impacts from automobile use.
PARKING LOT
A
Integrate stormwater features into landscape design
SUSTAINABLE STORMWATER MANAGEMENT
Sustainable stormwater management is a key component of the National Water Policy, which aims to ensure that water resources are used efficiently and sustainably. It involves the use of various techniques and technologies to manage stormwater runoff effectively.
Some of the most common techniques include:
- Rainfall Mitigation: This involves using vegetation or other natural features to absorb rainwater and reduce runoff.
- Landscape Management: This includes the design and maintenance of green spaces, parks, and urban areas to help absorb rainwater and prevent flooding.
- Water Treatment: This involves treating stormwater before it is released into the environment to remove pollutants and contaminants.
- Recycling: This involves recycling materials such as plastic, paper, and metal to reduce waste and promote sustainability.
The goal of sustainable stormwater management is to protect water resources from pollution and damage while ensuring that they remain available for future use.
Interpretive sustainability signage
Utilize regional materials
TAPING PRIEST POTTERY WATERFORD 2017-2020
5.0 IMPLEMENTATION STRATEGY
Creating public gathering spaces within the downtown will provide a unique sense of place for residents and visitors alike.
THE FOUNTAIN
City Hall Square, Burlington, Ontario
5.0 IMPLEMENTATION STRATEGY
5.1 The Community Improvement Plan
The Community Improvement Plan (CIP) is intended to promote long-term economic sustainability and quality of life in downtown Smiths Falls and represents part of the broader context of economic development and land use planning supported by the Town.
The Community Improvement Plan supports the aforementioned guiding principles of this Master Plan project – specifi cally higher density residential development, multi-use commercial/offi ce/ residential development within the commercial core as well as improvements of key development zones in Town. Major sites exist for potential development of multi-unit residential and commercial on the south end of the Downtown, both east and west of Beckwith Street South, on the fringes of the Downtown and in the existing residential shoulder areas of the Downtown. Recognition that development opportunities exist beyond the core commercial area will be resolved through the Community Improvement Project Area (CIPA) defi nition which, as defi ned in Section 1.3, encompasses target areas along key gateways and shoulder areas outside on the commercial core.
LEGEND Parks Canada Public Land Town Owned Public Land Federal Government (Canada Post) Private Land CIPA Boundary Development Zones
Town lands are opportunities for appropriate infill development over long-term. There may be other lands with potential for redevelopment – these will become apparent over time.
LIMBARD STREET INFILL and INTENSIFICATION.
MAIN STREET BECONWITH STREET
Major redevelopment opportunity over the long-term.
LOMBARD STREET
Figure 35: Development Zones Map
5.0 IMPLEMENTATION STRATEGY
5.2 Key Recommendations
-
Coordinate public sector revitalization eff orts with private sector initiatives where ever possible to ensure mutually supportive programs and optimization of funding.
-
Undertake a complete streetscape redevelopment program on Beckwith Street in concert with underground municipal services upgrades, roadway paving and on-street parking strategy.
-
Undertake streetscape redevelopment within the shoulder areas progressively as underground municipal services upgrades and roadway paving proceed.
-
Pursue development of the Civic Square in the area presently occupied by Daniel Street, between the Library and Town Hall buildings as part of a long term commitment to reinforcing Civic identity.
-
Leverage opportunities created through private development to support initiatives within the public realm such as streetscape and park enhancements.
-
Continue to pursue implementation of the multi-use pedestrian trail system throughout the downtown and waterfront areas to open up access to public spaces along the Rideau Canal and related open spaces.
-
Open up views and visual connections with the Rideau Canal and waterfront areas where ever possible.
Continue the grid system of local streets toward and along the waterfront areas both east and west of Beckwith Street to provide enhanced visual connections and public access to the waterfront.
While these are long term projects, develop more detailed (secondary) plans for the waterfront redevelopment areas that will identify opportunities and constraints, physical framework and servicing considerations as well as roles and responsibilities of the public sector and private sector to guide future development interest.
- Implementation of a 5-year Community Improvement Plan (CIP) to encourage private property development in the Downtown and Waterfront area via the following fi nancial incentive programs:
• Rehabilitation and Redevelopment Grant Program (Tax Increment Grant);
• Building Restoration and Improvement Grant Program;
• Façade Improvement and Signage Grant Program;
• Planning and Development Fees Grant Program; and
• Environmental Site Assessment (ESA) Grant Program.
-
Pursue planning to enable the long-term development of new ownership housing – likely medium to higher density housing in response to market opportunities such as catering to older, active retirees, and fi rst-time buyers.
-
Fund the Community Improvement Plan commencing in late 2013 or in the 2014 fi scal year to a level that will enable eff ective take-up of the grant programs by those properties owners that can present demonstrable plans to invest in their properties.
-
Institute the necessary monitoring and administrative structure at the Town to enable the successful administration and implementation of the CIP (via the creation of an Evaluation Committee to review and approve program applications under the coordination of a dedicated staff -person assigned to manage the implementation of the CIP, as well as undertaking annual program monitoring and marketing of the CIP to business owners/property owners).
-
Enhance private property improvement opportunities via coordination of fi nancial incentive programs of the Smiths Falls CIP with the Valley Heartland Community Futures Development Corporation Facade Improvement Loan Program.
5.0 IMPLEMENTATION STRATEGY
5.3 Potential Capital Funding Opportunities
5.3.1 Public Realm Improvements
There is a range of Provincial/Federal infrastructure funding programs available from time to time that every municipality in either a defi ned area or the Province as a whole may take advantage of. The Town of Smiths Falls should, as part of the implementation mandate for this project, assess the eligibility of the planned improvements for funding under a range of existing programs which may arise.
The Building Canada Fund is one program under the Building Canada Plan (2007-2014) for which $8.8 billion has been allocated over the 7 year period to fund a range of public infrastructure projects including the development of local roads and bridges. The Building Canada Fund program has two components: 1) the Major Infrastructure Component (MIC) and 2) Communities Component. The MIC supports projects of national/regional importance. The Communities Component (currently closed for applications) funds infrastructure projects in smaller communities like the Town of Smiths Falls (with less than 100,000 in population). Projects are cost shared, with the maximum federal share being limited to one-third for municipal projects (matching contributions are expected from the Province and municipality).
In terms of government-backed fi nancing options, the Infrastructure Ontario Loan Program established in 2006, has funded in excess of $350 million to municipal corporations as of mid-year 2011. This includes transportation infrastructure projects.
The Gas Tax Fund, initiated by the Paul Martin Government in 2004, has in recent years provided funding for a range of infrastructure projects across Canada. As of 2009, the federal gas tax transfers to the Provinces and Territories in support of municipal infrastructure projects increased to $2 billion annually. According to the latest
information available from the Government, the Gas Tax Fund (GTF) is to remain at that level up to 2014. By that time, current plans are for the GTF to become a permanent measure of funding for Ontario’s municipalities.
The GTF is predicated on capital investments and environmentally sustainable municipal infrastructure that improves water and air quality and reduces greenhouse gas emissions. To that end, eligible investments include a range of infrastructure such as water, waste water and solid waste facilities, public transit, community energy systems, and local roads and bridges. In Ontario, the Association of Municipalities of Ontario (AMO) is party to a bi-lateral agreement with the Federal Government delivers the program to other Ontario municipalities.
Every municipality in Canada receives a portion of the GTF. The GTF allocations determine the Provincial/Territorial level based on a per capita formula. For both the 2012-2013 and 2013-2014 fi scal years, a total of $746,765,000 is allocated to Ontario in each of those years. Since the launch of the fund in 2005, Ontario municipalities have invested more than $2.1 billion of funding into more than 3,800 infrastructure projects worth over $6.7 billion.
The Association of Municipalities of Ontario has an online database of 22 infrastructure projects – some completed and ongoing – in the Town of Smiths Falls since 2007. Of these projects, federal gas tax funding has largely been allocated to asphalt resurfacing, drainage/ sewer projects.
5.3.2 The Community Improvement Plan
The Town of Smith Falls should also explore Provincial and Federal opportunities to help fund the community revitalization goals of the CIP as well as the CIP reserve. In addition to the range of infrastructure funding programs previously described, the Rural Economic Development (RED) Fund (administered by the Ontario Ministry of Agriculture, Food and Rural Aff airs) serves to assist with the costs associated with a range of community revitalization projects in rural Ontario.
Currently the RED Fund is fully subscribed. If and when additional funding is allocated to the program, the Town of Smiths Falls should explore this opportunity for funding of the CIP. Under the RED Fund, eligible community revitalization projects are cost-shared with the Province (up to 50% in most cases) and eligible project costs relate to the development and distribution of marketing and promotional materials and minor capital costs including renovations necessary for the project.
5.0 IMPLEMENTATION STRATEGY
5.4 Public Realm Development Costs
Through an initial assessment of the concept plans developed for the Downtown Revitalization and Waterfront Integration Master Plan, the Consulting Team has developed order of magnitude development cost estimates for three key projects, the Civic Plaza, Beckwith Street and the Waterfront Trail.
| Project | Anticipated Cost |
|---|---|
| Civic Plaza | $1-1.5 M |
| Beckwith Street | $5-6 M |
| Waterfront Trail | $275,000 - 300,000 |
| TOTAL | $6.275 - 7.8 M |
Note: the above costs do not include design fees, contingency or H.S.T.
5.5 Phasing and Project Prioritization
5.5.1 Private Sector Phasing
The CIP will pursue area goals for the development of the Downtown core, shoulder areas as well as signature redevelopment sites simultaneously through the development of individual fi nancial incentive programs which will be tailored to address the specifi c needs of each of these target areas. For example, the Façade Improvement and Signage Grant Program will be critical in addressing development needs in the Downtown core; likewise the Rehabilitation and Redevelopment Tax Increment Grant Program will be tailored to support residential and major along shoulder areas in the Downtown.
Recognizing that major property development investment is long-term in nature, incremental improvements to the existing core over time is most likely. The phasing/implementation of the CIP may facilitate the gradual revitalization of the Downtown by way of providing an immediate focus on programs such as Façade Improvement and Building Improvement Grants which have the potential to create instant visual impact in the core and generate a critical mass of interest from other property owners.
5.5.2 Public Sector Phasing
Downtown
1. Top-of-the-Town Cultural District
This special precinct is located at the upper and most northerly end of Beckwith Street. It contains two key civic facilities - the Town Hall and Library. The sites occupied by these important facilities are separated by Daniel Street. The potential expansion of the library and future improvements to Town Hall provides the opportunity for development of a Civic Square between the two buildings with frontage on Beckwith and Elmsley. This would necessitate the closing of Daniel Street. Planning and design of these buildings and their immediate sites should include the development of the Civic Square when site plans and costing are prepared.
Enhancements are also recommended at the adjacent intersection of Beckwith and Elmsley and should take place as part of the Beckwith Streetscape project outlined below.
2. Beckwith Streetscape
Beckwith Street is the main commercial / retail street in Smiths Falls.
As part of Highway 15, it is also a “Connecting Link” road within the
Provincial system of highways. Contact has been made with MTO
staff during the course of the preparation of this study to coordinate
the work on Beckwith relative to the Connecting Link requirements.
At the same time, participants in the public meetings and workshops
held in Smiths Falls indicated the need for an enhanced streetscape
along Beckwith that would support a strong, vibrant retail and
pedestrian-friendly environment together with on-street parking.
A preliminary concept design has been developed for Beckwith
that illustrates the general intent of the streetscape design and
is used as a basis for a preliminary estimate of the likely cost of
streetscape works. We also understand that there may also be a
need to replace and / or upgrade certain underground municipal
services along Beckwith Street. Given the interdependency of these
projects, it is recommended that all of the underground works and
the streetscape works be undertaken on a coordinated basis. That is,
the underground works should be undertaken fi rst, followed by the
streetscape enhancements including curb realignments, pedestrian
crossings, roadway pavement, pedestrian and roadway lighting,
street trees, street furnishings (benches, planters, etc). Investigations
into the funding for these projects should also be addressed to
explore ways to “piggy-back” sources of funding whenever possible.
This may involve a combination of sources of funding, such as those
provided for utility upgrades, road improvements, streetscape
enhancements, etc. At the time of this report publication, funding
in support of the Connecting Link roadway had been recently
discontinued.
5.0 IMPLEMENTATION STRATEGY
3. Shoulder Areas
The shoulder areas are important components of the Downtown Revitalization Plan. As such, they support Beckwith Street with additional retail and commercial / offi ce spaces. The streets themselves provide much needed on-street parking and access to off street parking where possible. Long term streetscape improvements should be undertaken when funding is available.
Waterfront
<em>1a.</em> East Side Redevelopment Area (Short Term Objective)
The east side redevelopment area is located east of Beckwith Street and south of Chambers Street to the Rideau Canal. The short-term objective for this area is to work closely with the property owners to establish an initial waterfront trail (as described in Section XXX of this report). This trail will meet the required Conservation Authority and Parks Canada guidelines and requirements for development adjacent to the canal, providing access to the waterfront for pedestrians and cyclists.
<em>1b.</em> East Side Redevelopment Area (Long Term Objective)
The long-term objective for this six block area will require a confi rmation and re-establishment of public realm street fabric to properly service these existing and future development sites. In addition, the establishment of the required 30 m setback along the Rideau Canal and a new, single-loaded public roadway (18-20m ROW) beyond will further defi ne the developable land areas and sites. The 30 m wide setback will provide an important green buff er and public pedestrian access to the waterfront. The design for the initial multi-use trail along this section of the Rideau Canal is already in place. Development of this framework and eventual development of these sites for mixed use, residential and retail / commercial purposes is seen as a long term project that would require a joint public-private approach.
2. West Side Redevelopment Area (Short Term Objective)
The west side redevelopment area is located west of Beckwith Street and the canal spillway along Old Mill Road. The area includes the site of the former pumping station, lands adjacent to Confederation Park and part of the existing parking lot. The area around this site is proposed to include roadway framework modifi cations related to Confederation Park enhancements. The actual development site straddles Old Mill Road and includes frontage on the spillway. This site is the subject of a developer proposal call process.
3. Confederation Park Enhancements (Short Term Objective )
The proposed enhancements to Confederation Park are predicated on the closure of the Confederation Bridge to vehicular traffi c and the extension of Park Avenue eastward to connect with Old Mill Road. This re-confi guration of streets will provide greater public interface with the park and achieve a more contiguous, fl exible and useable park space while eliminating Confederation Drive that presently cuts the park space into small disconnected pieces. The enhanced park has the potential to become a vibrant, multi-use park or “Town Green on the Canal”. Re-development, street re-alignments and enhancements to Confederation Park should be coordinated with the development of the West Side Redevelopment Area noted above. Implementation of these improvements should consider the cost savings from the improvements to Confederation Bridge that could now be re-allocated to the park redevelopment together with funds from community service organizations and partnerships.
4. Victoria Park Enhancements / Gateway Feature (Short Term <em>Objective)</em>
The key move in Victoria Park is the re-location of the existing
camp ground to another site in close proximity to the canal and
downtown if possible. Two potential alternative locations include
the properties owned by Parks Canada located on Lombard Street
and William Street West. These and other potential locations for the
camp ground should be investigated for feasibility to accommodate
this function. This will free-up additional waterfront lands within the
Town core / Canal area for broader use by local residents and tourists
as well. This strategy, together with improved pedestrian access
across Lombard Street, a Town Gateway on the northeast corner of
the Abbott Street and Lombard Street intersection and additional
park development, walkways, fl exible green space and amenities.
5.5.3 Project Prioritzation
Through the public engagement process, consultation with Town staff , and recognizing funding requirements, the following projects have been prioritized for implementation.
-
East Redevelopment Signature Site Waterfront Trail
-
Community Improvement Plan (CIP)
-
Cultural Plaza
-
West Redevelopment Signature Site
-
Confederation Park
-
Victoria Park
-
Beckwith Street